WisDOT contract 20250610007 bid tabulation
STH 16 S Frontage Rd-Wisconsin Ave; Plank Rd to Brown St, B-67-579 (OFF SYS, Waukesha County STH 16 S Frontage Rd - Wisconsin Ave). Let by Wisconsin DOT on June 10, 2025, Waukesha. 4 bids received; low bid $1,509,749 by Concrete Structures, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 JUN 2025
- Pay items
- 89
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Concrete Structures, Inc. | $1,509,749 | Low |
| 2 | Zignego Company, Inc. | $1,926,025 | +28% |
| 3 | Zenith Tech., Inc. - Waukesha | $1,931,521 | +28% |
| 4 | Lunda Construction Company | $1,945,531 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Concrete Structures, Inc. | 2. Zignego Company, Inc. | 3. Zenith Tech., Inc. - Waukesha | 4. Lunda Construction Company |
|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 2 | $100.00 | $1,266.00 | $1,266.00 | $1,266.00 |
| 2 | Removing structure over waterway debris capture (structure) 01. B-67- 579 (203.0270) | EACH | 1 | $150,000 | $200,000 | $150,000 | $200,000 |
| 3 | Removing concrete pavement (204.0100) | SY | 952 | $15.00 | $15.00 | $3.00 | $3.00 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 37 | $25.00 | $25.00 | $25.00 | $25.00 |
| 5 | Removing asphaltic surface milling (204.0125) | TON | 2,397 | $9.75 | $9.75 | $9.75 | $9.75 |
| 6 | Removing curb & gutter (204.0150) | LF | 447 | $8.00 | $8.00 | $6.00 | $6.00 |
| 7 | Removing guardrail (204.0165) | LF | 607 | $4.00 | $4.00 | $4.00 | $4.00 |
| 8 | Excavation common (205.0100) | CY | 627 | $26.00 | $17.00 | $32.58 | $32.58 |
| 9 | Excavation for structures bridges (structure) 01. B-67-390 (206.1001) | EACH | 1 | $30,000 | $40,000 | $23,000 | $25,000 |
| 10 | Cofferdams (structure) 01. B-67-390 (206.5001) | EACH | 1 | $97,500 | $135,000 | $325,000 | $135,000 |
| 11 | Borrow (208.0100) | CY | 15 | $40.00 | $1.00 | $0.01 | $0.01 |
| 12 | Backfill structure type A (210.1500) | TON | 400 | $22.00 | $40.00 | $39.25 | $38.00 |
| 13 | Finishing roadway (project) 01. 3310-07-71 (213.0100) | EACH | 1 | $500.00 | $1,000.00 | $1,500.00 | $1,500.00 |
| 14 | Base aggregate dense 3/4-inch (305.0110) | TON | 257 | $32.00 | $40.00 | $49.75 | $49.75 |
| 15 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,168 | $26.00 | $27.50 | $22.50 | $22.50 |
| 16 | Concrete pavement approach slab (415.0410) | SY | 124 | $243.50 | $300.00 | $264.00 | $243.50 |
| 17 | Tack coat (455.0605) | GAL | 1,190 | $5.10 | $5.10 | $5.10 | $5.10 |
| 18 | Incentive density HMA pavement (460.2000) | DOL | 2,881 | $1.00 | $1.00 | $1.00 | $1.00 |
| 19 | HMA pavement 5 MT 58-28 V (460.6625) | TON | 2,881 | $82.90 | $82.90 | $82.90 | $82.90 |
| 20 | Asphaltic surface driveways and field entrances (465.0120) | TON | 8 | $90.00 | $90.00 | $90.00 | $90.00 |
| 21 | Concrete masonry bridges (502.0100) | CY | 224 | $950.00 | $1,550.00 | $1,350.00 | $1,550.00 |
| 22 | Protective surface treatment (502.3200) | SY | 325 | $7.00 | $7.00 | $4.00 | $7.00 |
| 23 | Pigmented surface sealer (502.3210) | SY | 121 | $10.00 | $9.00 | $14.00 | $9.00 |
| 24 | Prestressed girder type I 36W-inch (503.0137) | LF | 552 | $260.00 | $225.00 | $250.00 | $225.00 |
| 25 | Bar steel reinforcement HS structures (505.0400) | LB | 4,170 | $1.20 | $1.20 | $1.75 | $1.20 |
| 26 | Bar steel reinforcement HS coated structures (505.0600) | LB | 26,770 | $1.30 | $1.30 | $1.80 | $1.30 |
| 27 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 12 | $250.00 | $150.00 | $140.00 | $150.00 |
| 28 | Steel diaphragms (structure) 01. B- 67-390 (506.4000) | EACH | 10 | $1,300.00 | $1,400.00 | $1,050.00 | $1,400.00 |
| 29 | Rubberized membrane waterproofing (516.0500) | SY | 18 | $37.00 | $35.00 | $70.00 | $35.00 |
| 30 | Pile points (550.0500) | EACH | 24 | $200.00 | $110.00 | $110.25 | $110.00 |
| 31 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 2,400 | $55.00 | $45.00 | $60.00 | $45.00 |
| 32 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 367 | $34.65 | $60.00 | $35.00 | $34.65 |
| 33 | Riprap medium (606.0200) | CY | 98 | $100.00 | $80.00 | $104.00 | $105.00 |
| 34 | Riprap heavy (606.0300) | CY | 456 | $85.00 | $80.00 | $97.50 | $95.00 |
| 35 | Inlet covers type H (611.0624) | EACH | 2 | $850.00 | $1,000.00 | $750.00 | $750.00 |
| 36 | Adjusting inlet covers (611.8115) | EACH | 2 | $750.00 | $1,000.00 | $650.00 | $650.00 |
| 37 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 200 | $8.00 | $30.00 | $8.00 | $8.00 |
| 38 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $400.00 | $300.00 | $300.00 | $300.00 |
| 39 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 85 | $55.00 | $55.00 | $55.00 | $55.00 |
| 40 | MGS guardrail 3 (614.2300) | LF | 12.50 | $35.00 | $35.00 | $35.00 | $35.00 |
| 41 | MGS thrie beam transition (614.2500) | LF | 156 | $88.00 | $88.00 | $88.00 | $88.00 |
| 42 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 43 | Mobilization (619.1000) | EACH | 1 | $85,850 | $281,650 | $175,000 | $353,314 |
| 44 | Water (624.0100) | MGAL | 14.70 | $0.01 | $50.00 | $40.00 | $40.00 |
| 45 | Topsoil (625.0100) | SY | 1,040 | $8.00 | $8.00 | $6.00 | $6.00 |
| 46 | Mulching (627.0200) | SY | 1,040 | $1.00 | $1.00 | $1.00 | $1.00 |
| 47 | Silt fence (628.1504) | LF | 1,035 | $2.50 | $2.50 | $2.50 | $2.50 |
| 48 | Silt fence maintenance (628.1520) | LF | 1,035 | $0.01 | $0.01 | $0.01 | $0.01 |
| 49 | Mobilizations erosion control (628.1905) | EACH | 3 | $100.00 | $100.00 | $100.00 | $100.00 |
| 50 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $100.00 | $100.00 | $100.00 | $100.00 |
| 51 | Inlet protection type A (628.7005) | EACH | 1 | $150.00 | $150.00 | $150.00 | $150.00 |
| 52 | Inlet protection type B (628.7010) | EACH | 4 | $60.00 | $60.00 | $60.00 | $60.00 |
| 53 | Inlet protection type C (628.7015) | EACH | 13 | $65.00 | $65.00 | $65.00 | $65.00 |
| 54 | Inlet protection type D (628.7020) | EACH | 10 | $120.00 | $120.00 | $120.00 | $120.00 |
| 55 | Fertilizer type B (629.0210) | CWT | 0.60 | $250.00 | $250.00 | $250.00 | $250.00 |
| 56 | Seeding mixture no. 30 (630.0130) | LB | 40 | $19.00 | $19.00 | $19.00 | $19.00 |
| 57 | Seed water (630.0500) | MGAL | 37 | $10.00 | $10.00 | $10.00 | $10.00 |
| 58 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 11 | $100.00 | $100.00 | $100.00 | $100.00 |
| 59 | Signs type II reflective H (637.2210) | SF | 35.36 | $25.00 | $25.00 | $25.00 | $25.00 |
| 60 | Signs type II reflective F (637.2230) | SF | 37 | $27.00 | $27.00 | $27.00 | $27.00 |
| 61 | Removing signs type II (638.2602) | EACH | 8 | $35.00 | $35.00 | $35.00 | $35.00 |
| 62 | Removing small sign supports (638.3000) | EACH | 8 | $35.00 | $35.00 | $35.00 | $35.00 |
| 63 | Field office type B (642.5001) | EACH | 1 | $1,500.00 | $10,000 | $15,000 | $5,500.00 |
| 64 | Traffic control barricades type III (643.0420) | DAY | 2,055 | $0.75 | $0.75 | $0.75 | $0.75 |
| 65 | Traffic control warning lights type A (643.0705) | DAY | 4,110 | $0.20 | $0.20 | $0.20 | $0.20 |
| 66 | Traffic control signs (643.0900) | DAY | 8,768 | $0.22 | $0.22 | $0.22 | $0.22 |
| 67 | Traffic control signs PCMS (643.1050) | DAY | 14 | $45.00 | $45.00 | $45.00 | $45.00 |
| 68 | Traffic control (643.5000) | EACH | 1 | $8,215.00 | $8,215.00 | $8,215.00 | $8,215.00 |
| 69 | Geotextile type DF schedule A (645.0111) | SY | 82 | $10.00 | $10.00 | $5.00 | $5.00 |
| 70 | Geotextile type HR (645.0120) | SY | 690 | $6.00 | $4.00 | $4.00 | $6.00 |
| 71 | Marking line epoxy 4-inch (646.1020) | LF | 1,518 | $2.45 | $1.00 | $1.00 | $1.00 |
| 72 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 13,234 | $1.63 | $1.44 | $1.44 | $1.44 |
| 73 | Marking line epoxy 8-inch (646.3020) | LF | 553 | $4.85 | $1.50 | $1.50 | $1.50 |
| 74 | Marking arrow epoxy (646.5020) | EACH | 2 | $230.00 | $350.00 | $350.00 | $350.00 |
| 75 | Marking stop line epoxy 18-inch (646.6120) | LF | 92 | $13.25 | $15.00 | $15.00 | $15.00 |
| 76 | Cold weather marking epoxy 6-inch (646.6466) | LF | 532 | $10.00 | $1.00 | $1.00 | $1.00 |
| 77 | Construction staking base (650.5000) | LF | 359 | $5.50 | $5.50 | $5.50 | $5.50 |
| 78 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 361 | $2.75 | $2.75 | $2.75 | $2.75 |
| 79 | Construction staking structure layout (structure) 01. B-67-390 (650.6501) | EACH | 1 | $2,850.00 | $2,850.00 | $2,850.00 | $2,850.00 |
| 80 | Construction staking supplemental control (project) 01. 3310-07-71 (650.9911) | EACH | 1 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 81 | Sawing asphalt (690.0150) | LF | 587 | $1.25 | $1.39 | $1.25 | $1.44 |
| 82 | Sawing concrete (690.0250) | LF | 28 | $2.25 | $2.25 | $2.25 | $3.91 |
| 83 | Incentive strength concrete structures (715.0502) | DOL | 1,344 | $1.00 | $1.00 | $1.00 | $1.00 |
| 84 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 85 | Incentive iri ride (740.0440) | DOL | 4,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 86 | Maintaining bird deterrent system (station) 01. 37+81 (999.2005.S) | EACH | 1 | $1.00 | $0.01 | $1.00 | $0.01 |
| 87 | Special 01. fisheries consultant (SPV.0060) | EACH | 1 | $10,000 | $13,840 | $7,500.00 | $10,000 |
| 88 | Special 01. select crushed material for travel corridor (SPV.0195) | TON | 9 | $100.00 | $300.00 | $100.00 | $123.00 |
| 89 | Special 02. streambed restoration material (SPV.0195) | TON | 34 | $85.00 | $300.00 | $73.11 | $87.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of June 10, 2025. Compiled by Mirage Metrics.