Granite Construction Company: WisDOT bid record
Granite Construction Company submitted 25 bids on Wisconsin DOT contracts in the data, from 11 JAN 2022 to 11 MAR 2025, and was the low bidder on 1 of them (4%). When it was not low, its total sat a median +25% above the low bid.
- Owner
- Wisconsin DOT
- Low bid volume
- $802,298
- Latest bid
- 11 MAR 2025
- Data through
- 10 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 11 | 1 | 9% |
| 2023 | 11 | 0 | 0% |
| 2024 | 1 | 0 | 0% |
| 2025 | 2 | 0 | 0% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Milwaukee | 7 | 0 | 0% |
| Dane | 5 | 0 | 0% |
| Waukesha | 4 | 1 | 25% |
| Fond Du Lac | 3 | 0 | 0% |
| Racine | 2 | 0 | 0% |
| Dodge | 1 | 0 | 0% |
| Jefferson | 1 | 0 | 0% |
| Columbia | 1 | 0 | 0% |
| Southeast Region Wide | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Incentive strength concrete structures | 715.0502 | DOL | 23 | 23 (100%) | $1.00 | $1.00 |
| Traffic control warning lights type A | 643.0705 | DAY | 25 | 21 (84%) | $0.10 | $0.12 |
| Silt fence | 628.1504 | LF | 23 | 20 (87%) | $2.50 | $2.35 |
| Traffic control signs | 643.0900 | DAY | 25 | 17 (68%) | $0.50 | $0.40 |
| Silt fence maintenance | 628.1520 | LF | 23 | 17 (74%) | $0.10 | $0.02 |
| Tack coat | 455.0605 | GAL | 21 | 17 (81%) | $3.00 | $3.85 |
| Construction staking subgrade | 650.4500 | LF | 20 | 17 (85%) | $0.01 | $0.01 |
| Traffic control | 643.5000 | EACH | 25 | 16 (64%) | $6,500.00 | $7,500.00 |
| On-the-job training graduate at $5.00/HR | ASP.1T0G | HRS | 16 | 16 (100%) | $5.00 | $5.00 |
| On-the-job training apprentice at $5.00/HR | ASP.1T0A | HRS | 16 | 16 (100%) | $5.00 | $5.00 |
| Traffic control barricades type III | 643.0420 | DAY | 25 | 15 (60%) | $0.80 | $0.60 |
| Mobilizations erosion control | 628.1905 | EACH | 22 | 15 (68%) | $250.00 | $233.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Zenith Tech., Inc. - Waukesha | 21 | 19 of 21 |
| Lunda Construction Company | 19 | 15 of 19 |
| Sheet Piling Services LLC | 12 | 12 of 12 |
| Pheifer Brothers Construction Co., Inc. | 8 | 6 of 8 |
| Concrete Structures, Inc. | 7 | 7 of 7 |
| R.G. Huston Company, Inc. | 5 | 5 of 5 |
| Zignego Company, Inc. | 3 | 2 of 3 |
| Kraemer North America, LLC | 3 | 2 of 3 |
| Vinton Construction Company | 2 | 2 of 2 |
| Radtke Contractors Inc. | 2 | 2 of 2 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 11 MAR 2025 | 20250311048 | Milwaukee | C Milwaukee, Water St; Milwaukee River Bridge B40-548 (LOC STR, Milwaukee County C Milwaukee, Water St) | 4 of 4 | $2,999,682 | +12% |
| 14 JAN 2025 | 20250114024 | Racine | T Burlington, Mt Tom Rd; Hoosier Creek Bridge P51-0911 (LOC STR, Racine County T Burlington, Mt Tom Rd) | 5 of 5 | $959,771 | +28% |
| 13 FEB 2024 | 20240213014 | Milwaukee | C Milwaukee N 76th St; Bridge Over Upc Rr B40-380/1 (STH 181, Milwaukee County C Milwaukee N 76th St) | 4 of 4 | $4,860,406 | +36% |
| 12 DEC 2023 | 20231212015 | Southeast Region Wide | Various Noise Wall Locations; Locations On Stn Per Annual Plan (OFF SYS, Milwaukee County Various Noise Wall Locations) | 2 of 3 | $985,209 | +3.0% |
| 14 NOV 2023 | 20231114020 | Waukesha | V Summit Delafield Road; Bridge Over Battle Creek B-67-0670 (LOC STR, Waukesha County V Summit Delafield Road) | 8 of 8 | $841,908 | +65% |
| 08 AUG 2023 | 20230808006 | Milwaukee | 1360-13-70 | 3 of 3 | $11,143,005 | +24% |
| 09 MAY 2023 | 20230509030 | Waukesha | Various Bridge Locations; Sth 59 & Ush 18 (VAR HWY, Waukesha County Various Bridge Locations) | 6 of 6 | $7,553,501 | +23% |
| 14 MAR 2023 | 20230314001 | Dane | Madison - Portage; River Road Bridge B-13-89 (IH 039, Dane County Madison - Portage) | 2 of 4 | $317,476 | +2.0% |
| 14 MAR 2023 | 20230314009 | Dane | Village Of Windsor, Windsor Road; Yahara River Bridge, B-13-0890 (LOC STR, Dane County Village of Windsor, Windsor Road) | 7 of 7 | $799,341 | +27% |
| 14 MAR 2023 | 20230314016 | Milwaukee | C Milwaukee S 70th Street; Bridge Over Cp Rr/Hast P-40-856 (LOC STR, Milwaukee County S 70th Street) | 5 of 5 | $2,895,842 | +6.0% |
| 14 MAR 2023 | 20230314018 | Milwaukee | C Milwaukee, Appleton Avenue; Bridge Over Menomonee River (STH 175, Milwaukee County City Milwaukee, Appleton Avenue) | 4 of 5 | $2,416,376 | +18% |
| 14 FEB 2023 | 20230214012 | Columbia | Town Of Columbus, Old Sth 73 Rd; Crawfish River Bridge, B-11-0175 (LOC STR, Columbia County Town of Columbus, Old STH 73 Rd) | 5 of 5 | $1,634,839 | +30% |
| 14 FEB 2023 | 20230214028 | Fond Du Lac | Rosendale-Oshkosh; Sth 23 - Cth Ff (STH 026, Fond Du Lac County Rosendale-Oshkosh) | 6 of 6 | $1,444,045 | +36% |
| 10 JAN 2023 | 20230110018 | Fond Du Lac | Fond Du Lac - Oshkosh; Town Line Road Overpass (IH 041, Fond du Lac County Fond Du Lac - Oshkosh) | 6 of 6 | $1,179,440 | +29% |
| 13 DEC 2022 | 20221213011 | Dane | Ush 14 - Sth 138; Badfish Creek Bridge, B-13-0887 (CTH A, Dane County USH 14 - STH 138) | 7 of 7 | $1,032,289 | +25% |
| 13 SEP 2022 | 20220913014 | Fond Du Lac | Kewaskum-Eden; Milwaukee River Bridge (USH 045, Fond du Lac County Kewaskum - Eden) | 6 of 7 | $1,839,737 | +48% |
| 10 MAY 2022 | 20220510015 | Waukesha | Duplainville Road; Bridge Over Spring Creek B-67-0009 (LOC STR, Waukesha County Duplainville Road) | 1 of 2 | $802,298 | Low, 9.0% under the second |
| 12 APR 2022 | 20220412003 | Jefferson | C Ft Atkinson, Robert Street; Rock River Bridge B-28-0009 (USH 012, Jefferson County C FT Atkinson, Robert Street) | 2 of 2 | $3,481,000 | +25% |
| 12 APR 2022 | 20220412037 | Milwaukee | C Milwaukee, Fond Du Lac Ave; 107th St Bridge (STH 145, Milwaukee County C Milwaukee, Fond du Lac Ave) | 3 of 3 | $4,550,490 | +4.0% |
| 08 MAR 2022 | 20220308019 | Racine | 58th Road; Bridge Over W Br Root River Canal (LOC STR, Racine County 58th Road) | 3 of 4 | $561,436 | +19% |
| 08 FEB 2022 | 20220208016 | Waukesha | Lilly Road; Bridge Over Menomonee River (LOC STR, Waukesha County Lilly Road) | 4 of 4 | $1,206,322 | +5.0% |
| 08 FEB 2022 | 20220208018 | Milwaukee | W Calumet Road; Bridge Over Little Menomonee River (LOC STR, Milwaukee County W Calumet Rd) | 2 of 3 | $1,411,931 | +4.0% |
| 11 JAN 2022 | 20220111003 | Dodge | Watertown - Waukesha; Up Rr Structure B-14-0041,-0042 (STH 016, Dodge County Watertown - Waukesha) | 3 of 5 | $1,143,464 | +4.0% |
| 11 JAN 2022 | 20220111008 | Dane | Town Of Albion, Aarback Road; Koshkonong Creek Bridge, B-13-0693 (LOC STR, Dane County Town of Albion, Aarback Road) | 5 of 5 | $684,993 | +41% |
| 11 JAN 2022 | 20220111009 | Dane | 3625-00-72 | 4 of 4 | $1,139,517 | +39% |
How this record was read
WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
- Every bid counted here matched its published total to within one dollar; WisDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.