WisDOT contract 20250114024 bid tabulation

T Burlington, Mt Tom Rd; Hoosier Creek Bridge P51-0911 (LOC STR, Racine County T Burlington, Mt Tom Rd). Let by Wisconsin DOT on January 14, 2025, Racine. 5 bids received; low bid $747,913 by Pheifer Brothers Construction Co., Inc..

Owner
Wisconsin DOT
Letting
14 JAN 2025
Pay items
67
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Pheifer Brothers Construction Co., Inc.$747,913Low
2Concrete Structures, Inc.$760,116+2.0%
3Lunda Construction Company$798,405+7.0%
4Zenith Tech., Inc. - Waukesha$922,959+23%
5Granite Construction Company$959,771+28%
WisDOT contract 20250114024: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Pheifer Brothers Construction Co., Inc.2. Concrete Structures, Inc.3. Lunda Construction Company4. Zenith Tech., Inc. - Waukesha5. Granite Construction Company
1Grubbing (201.0205)STA2$50.00$50.00$50.00$50.00$50.00
2Removing structure over waterway minimal debris (structure) 01. P-51- 0911 (203.0260)EACH1$178,700$75,000$75,000$44,427$200,000
3Removing guardrail (204.0165)LF117$5.00$5.00$5.00$10.00$5.00
4Excavation common (205.0100)CY660$15.00$15.00$15.00$15.00$15.00
5Excavation for structures bridges (structure) 01. B-51-164 (206.1001)EACH1$56,600$8,000.00$6,000.00$23,274$35,000
6Borrow (208.0100)CY100$22.00$22.00$22.00$22.00$22.00
7Backfill structure type A (210.1500)TON250$18.50$18.50$18.50$18.50$22.50
8Finishing roadway (project) 01. 3834-05-71 (213.0100)EACH1$500.00$500.00$500.00$2,107.51$1,500.00
9Base aggregate dense 3/4-inch (305.0110)TON200$21.00$21.00$21.00$21.00$27.25
10Base aggregate dense 1 1/4-inch (305.0120)TON1,625$19.25$19.25$19.25$19.25$19.25
11Concrete pavement approach slab (415.0410)SY155$158.00$254.29$288.00$254.29$158.00
12Tack coat (455.0605)GAL95$3.00$3.00$3.00$2.50$3.00
13Incentive density HMA pavement (460.2000)DOL280$1.00$1.00$1.00$1.00$1.00
14HMA pavement 3 LT 58-28 S (460.5223)TON232$85.85$85.85$85.85$100.00$85.85
15HMA pavement 4 LT 58-28 S (460.5224)TON155$85.85$85.85$85.85$112.00$85.85
16Concrete masonry bridges (502.0100)CY166$600.00$800.00$850.00$1,531.01$1,125.00
17Protective surface treatment (502.3200)SY221$4.60$7.00$6.00$4.33$12.00
18Prestressed girder type I 28-inch (503.0128)LF348$230.00$290.00$325.00$254.58$250.00
19Bar steel reinforcement HS structures (505.0400)LB5,380$1.30$1.20$1.35$1.42$1.33
20Bar steel reinforcement HS coated structures (505.0600)LB13,742$1.40$1.30$1.40$1.60$1.44
21Bearing pads elastomeric non- laminated (506.2605)EACH12$73.00$150.00$175.00$129.37$75.00
22Steel diaphragms (structure) 01. B- 51-164 (506.4000)EACH5$950.00$900.00$3,000.00$723.63$1,000.00
23Railing tubular type M (513.4061)LF173$280.00$272.00$425.00$284.06$375.00
24Rubberized membrane waterproofing (516.0500)SY20$59.00$37.00$35.00$62.16$150.00
25Piling steel HP 10-inch X 42 LB (550.1100)LF1,015$17.00$50.00$39.00$55.98$60.00
26Riprap heavy (606.0300)CY139$87.41$75.00$75.00$75.00$115.00
27Pipe underdrain wrapped 6-inch (612.0406)LF129$9.00$9.00$9.00$9.00$9.00
28MGS guardrail 3 (614.2300)LF51$29.10$29.10$29.10$35.00$29.10
29MGS thrie beam transition (614.2500)LF158$97.10$97.10$97.10$98.00$97.10
30MGS guardrail terminal eat (614.2610)EACH4$4,300.00$4,300.00$4,300.00$4,200.00$4,300.00
31Mobilization (619.1000)EACH1$29,684$95,620$78,751$133,750$45,000
32Water (624.0100)MGAL100$0.01$0.01$0.01$0.01$0.01
33Topsoil (625.0100)SY1,465$7.00$7.00$7.30$7.00$7.00
34Mulching (627.0200)SY1,465$0.50$0.50$0.50$0.30$0.50
35Silt fence (628.1504)LF1,385$2.10$2.10$2.10$2.50$2.10
36Silt fence maintenance (628.1520)LF1,385$0.10$0.10$0.10$0.25$0.10
37Mobilizations erosion control (628.1905)EACH1$100.00$100.00$100.00$250.00$100.00
38Mobilizations emergency erosion control (628.1910)EACH1$50.00$50.00$50.00$300.00$50.00
39Erosion mat class II type C (628.2027)SY49$10.00$10.00$10.00$5.00$10.00
40Turbidity barriers (628.6005)SY49$40.00$40.00$40.00$100.00$40.00
41Fertilizer type B (629.0210)CWT2$80.00$80.00$80.00$100.00$80.00
42Seeding mixture no. 20 (630.0120)LB40$10.00$10.00$10.00$20.00$10.00
43Seeding temporary (630.0200)LB21$3.00$3.00$3.00$5.00$3.00
44Seed water (630.0500)MGAL63$30.00$30.00$30.00$75.00$30.00
45Posts wood 4X6-inch X 12-FT (634.0612)EACH4$110.00$110.00$110.00$75.00$110.00
46Signs type II reflective F (637.2230)SF12$35.00$35.00$35.00$35.00$35.00
47Removing signs type II (638.2602)EACH4$1.00$1.00$1.00$50.00$1.00
48Removing small sign supports (638.3000)EACH4$1.00$1.00$1.00$50.00$1.00
49Field office type B (642.5001)EACH1$3,700.00$1,500.00$3,000.00$6,000.00$25,000
50Traffic control barricades type III (643.0420)DAY1,267$0.75$0.75$0.63$0.75$0.75
51Traffic control warning lights type A (643.0705)DAY1,690$0.28$0.28$0.10$0.28$0.28
52Traffic control signs (643.0900)DAY986$1.50$1.50$0.45$1.50$1.50
53Traffic control (643.5000)EACH1$800.00$800.00$4,800.00$800.00$5,000.00
54Geotextile type DF schedule A (645.0111)SY123$7.00$7.00$7.00$7.00$7.00
55Geotextile type HR (645.0120)SY208$6.35$5.00$7.00$7.00$12.66
56Construction staking subgrade (650.4500)LF479$0.01$0.01$0.01$0.01$0.01
57Construction staking base (650.5000)LF479$1.00$1.00$1.00$1.60$1.00
58Construction staking structure layout (structure) 01. B-51-164 (650.6501)EACH1$2,800.00$2,800.00$2,800.00$3,000.00$2,800.00
59Construction staking supplemental control (project) 01. 3834-05-71 (650.9911)EACH1$500.00$500.00$500.00$600.00$500.00
60Construction staking slope stakes (650.9920)LF957$0.90$0.90$0.90$0.75$0.90
61Sawing asphalt (690.0150)LF49$2.95$16.22$2.95$2.95$1.50
62Incentive strength concrete structures (715.0502)DOL996$1.00$1.00$1.00$1.00$1.00
63Maintaining bird deterrent system (station) 01. 4+18 (999.2005.S)EACH1$0.01$500.00$0.01$0.01$3,580.25
64On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS250$5.00$5.00$5.00$5.00$5.00
65On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00$5.00
66Special 01. flashing stainless steel (SPV.0090)LF61$68.00$100.00$85.00$57.83$75.00
67Special 01. select crushed material for travel corridor (SPV.0195)TON9$83.00$50.00$120.00$100.00$125.00
WisDOT contract 20250114024: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy