WisDOT contract 20250114024 bid tabulation
T Burlington, Mt Tom Rd; Hoosier Creek Bridge P51-0911 (LOC STR, Racine County T Burlington, Mt Tom Rd). Let by Wisconsin DOT on January 14, 2025, Racine. 5 bids received; low bid $747,913 by Pheifer Brothers Construction Co., Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 67
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Pheifer Brothers Construction Co., Inc. | $747,913 | Low |
| 2 | Concrete Structures, Inc. | $760,116 | +2.0% |
| 3 | Lunda Construction Company | $798,405 | +7.0% |
| 4 | Zenith Tech., Inc. - Waukesha | $922,959 | +23% |
| 5 | Granite Construction Company | $959,771 | +28% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Pheifer Brothers Construction Co., Inc. | 2. Concrete Structures, Inc. | 3. Lunda Construction Company | 4. Zenith Tech., Inc. - Waukesha | 5. Granite Construction Company |
|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 2 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 2 | Removing structure over waterway minimal debris (structure) 01. P-51- 0911 (203.0260) | EACH | 1 | $178,700 | $75,000 | $75,000 | $44,427 | $200,000 |
| 3 | Removing guardrail (204.0165) | LF | 117 | $5.00 | $5.00 | $5.00 | $10.00 | $5.00 |
| 4 | Excavation common (205.0100) | CY | 660 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 5 | Excavation for structures bridges (structure) 01. B-51-164 (206.1001) | EACH | 1 | $56,600 | $8,000.00 | $6,000.00 | $23,274 | $35,000 |
| 6 | Borrow (208.0100) | CY | 100 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 |
| 7 | Backfill structure type A (210.1500) | TON | 250 | $18.50 | $18.50 | $18.50 | $18.50 | $22.50 |
| 8 | Finishing roadway (project) 01. 3834-05-71 (213.0100) | EACH | 1 | $500.00 | $500.00 | $500.00 | $2,107.51 | $1,500.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 200 | $21.00 | $21.00 | $21.00 | $21.00 | $27.25 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,625 | $19.25 | $19.25 | $19.25 | $19.25 | $19.25 |
| 11 | Concrete pavement approach slab (415.0410) | SY | 155 | $158.00 | $254.29 | $288.00 | $254.29 | $158.00 |
| 12 | Tack coat (455.0605) | GAL | 95 | $3.00 | $3.00 | $3.00 | $2.50 | $3.00 |
| 13 | Incentive density HMA pavement (460.2000) | DOL | 280 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 232 | $85.85 | $85.85 | $85.85 | $100.00 | $85.85 |
| 15 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 155 | $85.85 | $85.85 | $85.85 | $112.00 | $85.85 |
| 16 | Concrete masonry bridges (502.0100) | CY | 166 | $600.00 | $800.00 | $850.00 | $1,531.01 | $1,125.00 |
| 17 | Protective surface treatment (502.3200) | SY | 221 | $4.60 | $7.00 | $6.00 | $4.33 | $12.00 |
| 18 | Prestressed girder type I 28-inch (503.0128) | LF | 348 | $230.00 | $290.00 | $325.00 | $254.58 | $250.00 |
| 19 | Bar steel reinforcement HS structures (505.0400) | LB | 5,380 | $1.30 | $1.20 | $1.35 | $1.42 | $1.33 |
| 20 | Bar steel reinforcement HS coated structures (505.0600) | LB | 13,742 | $1.40 | $1.30 | $1.40 | $1.60 | $1.44 |
| 21 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 12 | $73.00 | $150.00 | $175.00 | $129.37 | $75.00 |
| 22 | Steel diaphragms (structure) 01. B- 51-164 (506.4000) | EACH | 5 | $950.00 | $900.00 | $3,000.00 | $723.63 | $1,000.00 |
| 23 | Railing tubular type M (513.4061) | LF | 173 | $280.00 | $272.00 | $425.00 | $284.06 | $375.00 |
| 24 | Rubberized membrane waterproofing (516.0500) | SY | 20 | $59.00 | $37.00 | $35.00 | $62.16 | $150.00 |
| 25 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 1,015 | $17.00 | $50.00 | $39.00 | $55.98 | $60.00 |
| 26 | Riprap heavy (606.0300) | CY | 139 | $87.41 | $75.00 | $75.00 | $75.00 | $115.00 |
| 27 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 129 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 28 | MGS guardrail 3 (614.2300) | LF | 51 | $29.10 | $29.10 | $29.10 | $35.00 | $29.10 |
| 29 | MGS thrie beam transition (614.2500) | LF | 158 | $97.10 | $97.10 | $97.10 | $98.00 | $97.10 |
| 30 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $4,300.00 | $4,300.00 | $4,300.00 | $4,200.00 | $4,300.00 |
| 31 | Mobilization (619.1000) | EACH | 1 | $29,684 | $95,620 | $78,751 | $133,750 | $45,000 |
| 32 | Water (624.0100) | MGAL | 100 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 33 | Topsoil (625.0100) | SY | 1,465 | $7.00 | $7.00 | $7.30 | $7.00 | $7.00 |
| 34 | Mulching (627.0200) | SY | 1,465 | $0.50 | $0.50 | $0.50 | $0.30 | $0.50 |
| 35 | Silt fence (628.1504) | LF | 1,385 | $2.10 | $2.10 | $2.10 | $2.50 | $2.10 |
| 36 | Silt fence maintenance (628.1520) | LF | 1,385 | $0.10 | $0.10 | $0.10 | $0.25 | $0.10 |
| 37 | Mobilizations erosion control (628.1905) | EACH | 1 | $100.00 | $100.00 | $100.00 | $250.00 | $100.00 |
| 38 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $50.00 | $50.00 | $50.00 | $300.00 | $50.00 |
| 39 | Erosion mat class II type C (628.2027) | SY | 49 | $10.00 | $10.00 | $10.00 | $5.00 | $10.00 |
| 40 | Turbidity barriers (628.6005) | SY | 49 | $40.00 | $40.00 | $40.00 | $100.00 | $40.00 |
| 41 | Fertilizer type B (629.0210) | CWT | 2 | $80.00 | $80.00 | $80.00 | $100.00 | $80.00 |
| 42 | Seeding mixture no. 20 (630.0120) | LB | 40 | $10.00 | $10.00 | $10.00 | $20.00 | $10.00 |
| 43 | Seeding temporary (630.0200) | LB | 21 | $3.00 | $3.00 | $3.00 | $5.00 | $3.00 |
| 44 | Seed water (630.0500) | MGAL | 63 | $30.00 | $30.00 | $30.00 | $75.00 | $30.00 |
| 45 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $110.00 | $110.00 | $110.00 | $75.00 | $110.00 |
| 46 | Signs type II reflective F (637.2230) | SF | 12 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 47 | Removing signs type II (638.2602) | EACH | 4 | $1.00 | $1.00 | $1.00 | $50.00 | $1.00 |
| 48 | Removing small sign supports (638.3000) | EACH | 4 | $1.00 | $1.00 | $1.00 | $50.00 | $1.00 |
| 49 | Field office type B (642.5001) | EACH | 1 | $3,700.00 | $1,500.00 | $3,000.00 | $6,000.00 | $25,000 |
| 50 | Traffic control barricades type III (643.0420) | DAY | 1,267 | $0.75 | $0.75 | $0.63 | $0.75 | $0.75 |
| 51 | Traffic control warning lights type A (643.0705) | DAY | 1,690 | $0.28 | $0.28 | $0.10 | $0.28 | $0.28 |
| 52 | Traffic control signs (643.0900) | DAY | 986 | $1.50 | $1.50 | $0.45 | $1.50 | $1.50 |
| 53 | Traffic control (643.5000) | EACH | 1 | $800.00 | $800.00 | $4,800.00 | $800.00 | $5,000.00 |
| 54 | Geotextile type DF schedule A (645.0111) | SY | 123 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 55 | Geotextile type HR (645.0120) | SY | 208 | $6.35 | $5.00 | $7.00 | $7.00 | $12.66 |
| 56 | Construction staking subgrade (650.4500) | LF | 479 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 57 | Construction staking base (650.5000) | LF | 479 | $1.00 | $1.00 | $1.00 | $1.60 | $1.00 |
| 58 | Construction staking structure layout (structure) 01. B-51-164 (650.6501) | EACH | 1 | $2,800.00 | $2,800.00 | $2,800.00 | $3,000.00 | $2,800.00 |
| 59 | Construction staking supplemental control (project) 01. 3834-05-71 (650.9911) | EACH | 1 | $500.00 | $500.00 | $500.00 | $600.00 | $500.00 |
| 60 | Construction staking slope stakes (650.9920) | LF | 957 | $0.90 | $0.90 | $0.90 | $0.75 | $0.90 |
| 61 | Sawing asphalt (690.0150) | LF | 49 | $2.95 | $16.22 | $2.95 | $2.95 | $1.50 |
| 62 | Incentive strength concrete structures (715.0502) | DOL | 996 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 63 | Maintaining bird deterrent system (station) 01. 4+18 (999.2005.S) | EACH | 1 | $0.01 | $500.00 | $0.01 | $0.01 | $3,580.25 |
| 64 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 250 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 65 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 66 | Special 01. flashing stainless steel (SPV.0090) | LF | 61 | $68.00 | $100.00 | $85.00 | $57.83 | $75.00 |
| 67 | Special 01. select crushed material for travel corridor (SPV.0195) | TON | 9 | $83.00 | $50.00 | $120.00 | $100.00 | $125.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.