Chippewa Falls - Thorp; 160th Street Bridge B-09-0032 (STH 029, Chippewa County Chippewa Falls - Thorp). Let by Wisconsin DOT on September 15, 2026, Chippewa. 3 bids received; low bid $1,594,055 by Zenith Tech., Inc. - Waukesha.

Owner
Wisconsin DOT
Letting
15 SEP 2026
Pay items
82
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Zenith Tech., Inc. - Waukesha$1,594,055Low
2Sheet Piling Services LLC$1,664,457+4.0%
3Lunda Construction Company$1,712,879+7.0%
WisDOT contract 20260915030: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Zenith Tech., Inc. - Waukesha2. Sheet Piling Services LLC3. Lunda Construction Company
1Clearing (201.0105)STA7$1,995.00$1,995.00$1,655.00
2Grubbing (201.0205)STA7$495.00$495.00$915.00
3Removing small pipe culverts (203.0100)EACH2$785.00$785.00$200.00
4Abatement of asbestos containing material (structure) 01. B-9-32 (203.0211.S)EACH1$10,000$25,000$10,000
5Removing structure (structure) 01. B-9-32 (203.0220)EACH1$280,000$306,000$300,000
6Removing asphaltic surface (204.0110)SY2,290$4.50$4.50$10.50
7Removing guardrail (204.0165)LF400$3.15$3.15$3.00
8Removing fence (204.0170)LF156$3.90$3.90$7.00
9Removing concrete slope paving (204.0175)SY335$15.65$15.65$46.00
10Removing delineators and markers (204.0180)EACH3$39.00$39.00$50.00
11Removing surface drains (204.0190)EACH2$785.00$785.00$255.00
12Excavation common (205.0100)CY473$13.00$13.00$18.00
13Excavation for structures bridges (structure) 01. B-9-32 (206.1001)EACH1$8,000.00$125,000$10,000
14Borrow (208.0100)CY2,073$23.65$23.65$19.25
15Backfill structure type A (210.1500)TON164$17.85$17.85$26.50
16Prepare foundation for asphaltic shoulders (211.0400)STA44$130.00$130.00$270.00
17Finishing roadway (project) 01. 1050-01-83 (213.0100)EACH1$500.00$0.01$1,000.00
18Base aggregate dense 3/4-inch (305.0110)TON335$25.28$25.28$49.20
19Base aggregate dense 1 1/4-inch (305.0120)TON1,020$22.60$22.60$20.15
20Tack coat (455.0605)GAL180$12.00$12.00$12.00
21Asphaltic surface (465.0105)TON710$133.07$133.07$133.07
22Asphaltic rumble strips, shoulder divided roadway (465.0510)LF4,200$2.24$1.00$1.00
23Concrete masonry bridges (502.0100)CY307$1,200.00$950.00$1,000.00
24Protective surface treatment (502.3200)SY678$4.00$5.00$5.00
25Pigmented surface sealer (502.3210)SY206$10.00$5.00$8.00
26Adhesive anchors no. 4 bar (502.4204)EACH20$28.00$18.00$20.00
27Adhesive anchors no. 5 bar (502.4205)EACH276$32.00$20.00$25.00
28Bar steel reinforcement HS coated structures (505.0600)LB67,980$1.69$1.60$1.55
29Bearing pads elastomeric non- laminated (506.2605)EACH8$1,250.00$2,500.00$1,250.00
30Steel diaphragms (structure) 01. B- 9-32 (506.4000)EACH16$1,500.00$3,100.00$1,500.00
31Removing bearings (structure) 01. B-9-32 (506.7050.S)EACH8$2,200.00$500.00$1,250.00
32Concrete surface repair (509.1500)SF55$225.00$165.00$150.00
33Rubberized membrane waterproofing (516.0500)SY20$50.00$25.00$25.00
34Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF108$64.38$64.38$64.38
35Concrete surface drains (602.3010)CY2$1,521.48$1,521.48$1,521.48
36Slope paving crushed aggregate (604.0500)SY335$62.25$62.25$43.00
37Riprap medium (606.0200)CY28$125.00$125.00$106.00
38Anchor assemblies for steel plate beam guard (614.0150)EACH4$400.00$500.00$200.00
39MGS guardrail 3 (614.2300)LF125$26.25$26.25$29.00
40MGS thrie beam transition (614.2500)LF157.60$103.00$103.00$88.00
41MGS guardrail terminal eat (614.2610)EACH4$3,750.00$3,750.00$3,233.00
42Fence woven wire (height) 01. 4- foot (616.0100)LF156$29.00$29.00$15.00
43Maintenance and repair of haul roads (project) 01. 1050-01-83 (618.0100)EACH1$500.00$0.01$0.01
44Mobilization (619.1000)EACH1$244,000$204,849$403,366
45Water (624.0100)MGAL20$1.00$1.00$45.00
46Topsoil (625.0100)SY3,770$3.10$3.10$3.20
47Erosion bales (628.1104)EACH50$20.00$20.00$15.00
48Silt fence (628.1504)LF1,600$2.25$2.25$2.50
49Silt fence maintenance (628.1520)LF1,600$0.01$0.01$0.03
50Mobilizations erosion control (628.1905)EACH4$750.00$750.00$123.00
51Mobilizations emergency erosion control (628.1910)EACH2$10.00$10.00$153.00
52Erosion mat class I type B (628.2004)SY3,770$1.20$1.20$1.03
53Temporary ditch checks (628.7504)LF125$7.85$7.85$7.00
54Fertilizer type B (629.0210)CWT3$85.00$85.00$100.00
55Seeding mixture no. 20 (630.0120)LB85$13.15$13.15$9.00
56Seeding mixture no. 30 (630.0130)LB90$13.15$13.15$9.00
57Seed water (630.0500)MGAL85$1.00$1.00$5.00
58Delineator posts steel (633.0100)EACH3$100.00$100.00$75.00
59Delineator reflectors (633.0500)EACH3$25.00$25.00$25.00
60Moving signs type II (638.2102)EACH6$130.00$130.00$200.00
61Field office type B (642.5001)EACH1$6,500.00$1,500.00$4,000.00
62Traffic control drums (643.0300)DAY4,850$0.18$0.18$0.18
63Digital speed reduction system (DSRS) (643.0370.S)DAY80$35.00$35.00$35.00
64Traffic control barricades type III (643.0420)DAY1,760$0.45$0.45$0.45
65Traffic control warning lights type A (643.0705)DAY2,560$0.11$0.11$0.11
66Traffic control warning lights type C (643.0715)DAY2,200$0.11$0.11$0.11
67Traffic control connected arrow boards (643.0810)DAY80$13.50$13.50$13.50
68Traffic control signs (643.0900)DAY2,840$0.28$0.28$0.28
69Traffic control signs fixed message (643.1000)SF10$14.00$14.00$14.00
70Traffic control connected work zone start and end location markers (643.1220)DAY80$9.00$9.00$9.00
71Traffic control (643.5000)EACH1$65,450$65,450$65,450
72Geotextile type HR (645.0120)SY90$5.00$5.00$5.00
73Marking line epoxy 4-inch (646.1020)LF2,280$4.40$2.20$4.40
74Construction staking subgrade (650.4500)LF580$0.01$0.01$0.01
75Construction staking base (650.5000)LF580$0.01$0.01$0.60
76Construction staking curb gutter and curb & gutter (650.5500)LF108$2.00$2.00$5.00
77Construction staking structure layout (structure) 01. B-9-32 (650.6501)EACH1$1,812.40$1,812.40$3,000.00
78Construction staking supplemental control (project) 01. 1050-01-83 (650.9911)EACH1$500.00$500.00$600.00
79Construction staking slope stakes (650.9920)LF580$1.00$1.00$0.75
80Sawing asphalt (690.0150)LF204$2.22$2.22$4.85
81Incentive strength concrete structures (715.0502)DOL1,500$1.00$1.00$1.00
82Special 01. fiber wrap reinforcing structural (SPV.0165)SF513$98.00$168.00$125.95
WisDOT contract 20260915030: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy