WisDOT contract 20260915030 bid tabulation
Chippewa Falls - Thorp; 160th Street Bridge B-09-0032 (STH 029, Chippewa County Chippewa Falls - Thorp). Let by Wisconsin DOT on September 15, 2026, Chippewa. 3 bids received; low bid $1,594,055 by Zenith Tech., Inc. - Waukesha.
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 82
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zenith Tech., Inc. - Waukesha | $1,594,055 | Low |
| 2 | Sheet Piling Services LLC | $1,664,457 | +4.0% |
| 3 | Lunda Construction Company | $1,712,879 | +7.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zenith Tech., Inc. - Waukesha | 2. Sheet Piling Services LLC | 3. Lunda Construction Company |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 7 | $1,995.00 | $1,995.00 | $1,655.00 |
| 2 | Grubbing (201.0205) | STA | 7 | $495.00 | $495.00 | $915.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 2 | $785.00 | $785.00 | $200.00 |
| 4 | Abatement of asbestos containing material (structure) 01. B-9-32 (203.0211.S) | EACH | 1 | $10,000 | $25,000 | $10,000 |
| 5 | Removing structure (structure) 01. B-9-32 (203.0220) | EACH | 1 | $280,000 | $306,000 | $300,000 |
| 6 | Removing asphaltic surface (204.0110) | SY | 2,290 | $4.50 | $4.50 | $10.50 |
| 7 | Removing guardrail (204.0165) | LF | 400 | $3.15 | $3.15 | $3.00 |
| 8 | Removing fence (204.0170) | LF | 156 | $3.90 | $3.90 | $7.00 |
| 9 | Removing concrete slope paving (204.0175) | SY | 335 | $15.65 | $15.65 | $46.00 |
| 10 | Removing delineators and markers (204.0180) | EACH | 3 | $39.00 | $39.00 | $50.00 |
| 11 | Removing surface drains (204.0190) | EACH | 2 | $785.00 | $785.00 | $255.00 |
| 12 | Excavation common (205.0100) | CY | 473 | $13.00 | $13.00 | $18.00 |
| 13 | Excavation for structures bridges (structure) 01. B-9-32 (206.1001) | EACH | 1 | $8,000.00 | $125,000 | $10,000 |
| 14 | Borrow (208.0100) | CY | 2,073 | $23.65 | $23.65 | $19.25 |
| 15 | Backfill structure type A (210.1500) | TON | 164 | $17.85 | $17.85 | $26.50 |
| 16 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 44 | $130.00 | $130.00 | $270.00 |
| 17 | Finishing roadway (project) 01. 1050-01-83 (213.0100) | EACH | 1 | $500.00 | $0.01 | $1,000.00 |
| 18 | Base aggregate dense 3/4-inch (305.0110) | TON | 335 | $25.28 | $25.28 | $49.20 |
| 19 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,020 | $22.60 | $22.60 | $20.15 |
| 20 | Tack coat (455.0605) | GAL | 180 | $12.00 | $12.00 | $12.00 |
| 21 | Asphaltic surface (465.0105) | TON | 710 | $133.07 | $133.07 | $133.07 |
| 22 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 4,200 | $2.24 | $1.00 | $1.00 |
| 23 | Concrete masonry bridges (502.0100) | CY | 307 | $1,200.00 | $950.00 | $1,000.00 |
| 24 | Protective surface treatment (502.3200) | SY | 678 | $4.00 | $5.00 | $5.00 |
| 25 | Pigmented surface sealer (502.3210) | SY | 206 | $10.00 | $5.00 | $8.00 |
| 26 | Adhesive anchors no. 4 bar (502.4204) | EACH | 20 | $28.00 | $18.00 | $20.00 |
| 27 | Adhesive anchors no. 5 bar (502.4205) | EACH | 276 | $32.00 | $20.00 | $25.00 |
| 28 | Bar steel reinforcement HS coated structures (505.0600) | LB | 67,980 | $1.69 | $1.60 | $1.55 |
| 29 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 8 | $1,250.00 | $2,500.00 | $1,250.00 |
| 30 | Steel diaphragms (structure) 01. B- 9-32 (506.4000) | EACH | 16 | $1,500.00 | $3,100.00 | $1,500.00 |
| 31 | Removing bearings (structure) 01. B-9-32 (506.7050.S) | EACH | 8 | $2,200.00 | $500.00 | $1,250.00 |
| 32 | Concrete surface repair (509.1500) | SF | 55 | $225.00 | $165.00 | $150.00 |
| 33 | Rubberized membrane waterproofing (516.0500) | SY | 20 | $50.00 | $25.00 | $25.00 |
| 34 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 108 | $64.38 | $64.38 | $64.38 |
| 35 | Concrete surface drains (602.3010) | CY | 2 | $1,521.48 | $1,521.48 | $1,521.48 |
| 36 | Slope paving crushed aggregate (604.0500) | SY | 335 | $62.25 | $62.25 | $43.00 |
| 37 | Riprap medium (606.0200) | CY | 28 | $125.00 | $125.00 | $106.00 |
| 38 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $400.00 | $500.00 | $200.00 |
| 39 | MGS guardrail 3 (614.2300) | LF | 125 | $26.25 | $26.25 | $29.00 |
| 40 | MGS thrie beam transition (614.2500) | LF | 157.60 | $103.00 | $103.00 | $88.00 |
| 41 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,750.00 | $3,750.00 | $3,233.00 |
| 42 | Fence woven wire (height) 01. 4- foot (616.0100) | LF | 156 | $29.00 | $29.00 | $15.00 |
| 43 | Maintenance and repair of haul roads (project) 01. 1050-01-83 (618.0100) | EACH | 1 | $500.00 | $0.01 | $0.01 |
| 44 | Mobilization (619.1000) | EACH | 1 | $244,000 | $204,849 | $403,366 |
| 45 | Water (624.0100) | MGAL | 20 | $1.00 | $1.00 | $45.00 |
| 46 | Topsoil (625.0100) | SY | 3,770 | $3.10 | $3.10 | $3.20 |
| 47 | Erosion bales (628.1104) | EACH | 50 | $20.00 | $20.00 | $15.00 |
| 48 | Silt fence (628.1504) | LF | 1,600 | $2.25 | $2.25 | $2.50 |
| 49 | Silt fence maintenance (628.1520) | LF | 1,600 | $0.01 | $0.01 | $0.03 |
| 50 | Mobilizations erosion control (628.1905) | EACH | 4 | $750.00 | $750.00 | $123.00 |
| 51 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $10.00 | $10.00 | $153.00 |
| 52 | Erosion mat class I type B (628.2004) | SY | 3,770 | $1.20 | $1.20 | $1.03 |
| 53 | Temporary ditch checks (628.7504) | LF | 125 | $7.85 | $7.85 | $7.00 |
| 54 | Fertilizer type B (629.0210) | CWT | 3 | $85.00 | $85.00 | $100.00 |
| 55 | Seeding mixture no. 20 (630.0120) | LB | 85 | $13.15 | $13.15 | $9.00 |
| 56 | Seeding mixture no. 30 (630.0130) | LB | 90 | $13.15 | $13.15 | $9.00 |
| 57 | Seed water (630.0500) | MGAL | 85 | $1.00 | $1.00 | $5.00 |
| 58 | Delineator posts steel (633.0100) | EACH | 3 | $100.00 | $100.00 | $75.00 |
| 59 | Delineator reflectors (633.0500) | EACH | 3 | $25.00 | $25.00 | $25.00 |
| 60 | Moving signs type II (638.2102) | EACH | 6 | $130.00 | $130.00 | $200.00 |
| 61 | Field office type B (642.5001) | EACH | 1 | $6,500.00 | $1,500.00 | $4,000.00 |
| 62 | Traffic control drums (643.0300) | DAY | 4,850 | $0.18 | $0.18 | $0.18 |
| 63 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 80 | $35.00 | $35.00 | $35.00 |
| 64 | Traffic control barricades type III (643.0420) | DAY | 1,760 | $0.45 | $0.45 | $0.45 |
| 65 | Traffic control warning lights type A (643.0705) | DAY | 2,560 | $0.11 | $0.11 | $0.11 |
| 66 | Traffic control warning lights type C (643.0715) | DAY | 2,200 | $0.11 | $0.11 | $0.11 |
| 67 | Traffic control connected arrow boards (643.0810) | DAY | 80 | $13.50 | $13.50 | $13.50 |
| 68 | Traffic control signs (643.0900) | DAY | 2,840 | $0.28 | $0.28 | $0.28 |
| 69 | Traffic control signs fixed message (643.1000) | SF | 10 | $14.00 | $14.00 | $14.00 |
| 70 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 80 | $9.00 | $9.00 | $9.00 |
| 71 | Traffic control (643.5000) | EACH | 1 | $65,450 | $65,450 | $65,450 |
| 72 | Geotextile type HR (645.0120) | SY | 90 | $5.00 | $5.00 | $5.00 |
| 73 | Marking line epoxy 4-inch (646.1020) | LF | 2,280 | $4.40 | $2.20 | $4.40 |
| 74 | Construction staking subgrade (650.4500) | LF | 580 | $0.01 | $0.01 | $0.01 |
| 75 | Construction staking base (650.5000) | LF | 580 | $0.01 | $0.01 | $0.60 |
| 76 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 108 | $2.00 | $2.00 | $5.00 |
| 77 | Construction staking structure layout (structure) 01. B-9-32 (650.6501) | EACH | 1 | $1,812.40 | $1,812.40 | $3,000.00 |
| 78 | Construction staking supplemental control (project) 01. 1050-01-83 (650.9911) | EACH | 1 | $500.00 | $500.00 | $600.00 |
| 79 | Construction staking slope stakes (650.9920) | LF | 580 | $1.00 | $1.00 | $0.75 |
| 80 | Sawing asphalt (690.0150) | LF | 204 | $2.22 | $2.22 | $4.85 |
| 81 | Incentive strength concrete structures (715.0502) | DOL | 1,500 | $1.00 | $1.00 | $1.00 |
| 82 | Special 01. fiber wrap reinforcing structural (SPV.0165) | SF | 513 | $98.00 | $168.00 | $125.95 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.