WisDOT contract 20260915032 bid tabulation
Drummond - USH 2; 20 Mile Creek Bridge B-04-0129 (USH 063, Bayfield County Drummond - USH 2). Let by Wisconsin DOT on September 15, 2026, Bayfield. 3 bids received; low bid $3,188,743 by Sheet Piling Services LLC.
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 112
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sheet Piling Services LLC | $3,188,743 | Low |
| 2 | Northern Interstate Construction, Inc. | $3,260,717 | +2.0% |
| 3 | Lunda Construction Company | $3,351,267 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sheet Piling Services LLC | 2. Northern Interstate Construction, Inc. | 3. Lunda Construction Company |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 18 | $1,601.77 | $1,601.77 | $1,601.77 |
| 2 | Grubbing (201.0205) | STA | 18 | $1,010.60 | $1,010.60 | $1,010.60 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 1 | $1,521.43 | $1,521.43 | $1,521.43 |
| 4 | Removing structure (structure) 01. C-4-1 (203.0220) | EACH | 1 | $14,826 | $25,826 | $14,826 |
| 5 | Removing structure (structure) 02. 10 X 10 concrete box culvert (203.0220) | EACH | 1 | $53,902 | $74,901 | $53,902 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 76 | $6.07 | $2.60 | $8.44 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 1,980 | $18.15 | $2.60 | $8.44 |
| 8 | Removing guardrail (204.0165) | LF | 1,022 | $2.75 | $2.75 | $2.75 |
| 9 | Excavation common (205.0100) | CY | 4,522 | $26.01 | $26.01 | $26.01 |
| 10 | Excavation for structures bridges (structure) 01. B-4-129 (206.1001) | EACH | 1 | $265,260 | $285,215 | $265,260 |
| 11 | Backfill structure type A (210.1500) | TON | 860 | $36.00 | $36.00 | $36.00 |
| 12 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 6 | $200.00 | $100.00 | $200.00 |
| 13 | Finishing roadway (project) 01. 1560-00-78 (213.0100) | EACH | 1 | $0.01 | $1,000.00 | $1,000.00 |
| 14 | Base aggregate dense 3/4-inch (305.0110) | TON | 850 | $31.44 | $31.44 | $31.44 |
| 15 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,320 | $32.35 | $30.35 | $32.35 |
| 16 | Concrete pavement 9-inch (415.0090) | SY | 34 | $157.09 | $157.09 | $157.09 |
| 17 | Concrete pavement approach slab (415.0410) | SY | 118 | $329.06 | $329.06 | $329.06 |
| 18 | Tack coat (455.0605) | GAL | 380 | $3.62 | $3.62 | $3.62 |
| 19 | Incentive density HMA pavement (460.2000) | DOL | 570 | $1.00 | $1.00 | $1.00 |
| 20 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 880 | $131.21 | $131.21 | $131.21 |
| 21 | Asphaltic rumble strips, shoulder (465.0520) | LF | 1,784 | $2.00 | $1.50 | $1.50 |
| 22 | Asphaltic rumble strips, centerline (465.0560) | LF | 892 | $2.00 | $1.50 | $1.50 |
| 23 | Concrete masonry bridges (502.0100) | CY | 651 | $965.00 | $800.00 | $800.00 |
| 24 | Protective surface treatment (502.3200) | SY | 799 | $5.00 | $5.00 | $5.00 |
| 25 | Pigmented surface sealer (502.3210) | SY | 321 | $5.00 | $8.00 | $8.00 |
| 26 | Prestressed girder type I 72W-inch (503.0172) | LF | 959 | $415.00 | $325.00 | $325.00 |
| 27 | Bar steel reinforcement HS structures (505.0400) | LB | 8,800 | $1.55 | $1.70 | $1.70 |
| 28 | Bar steel reinforcement HS coated structures (505.0600) | LB | 87,360 | $1.65 | $1.75 | $1.75 |
| 29 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 1,800 | $5.00 | $4.25 | $4.25 |
| 30 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 14 | $200.00 | $200.00 | $200.00 |
| 31 | Steel diaphragms (structure) 01. B- 4-129 (506.4000) | EACH | 12 | $2,500.00 | $1,500.00 | $1,500.00 |
| 32 | Polymer overlay (509.5100.S) | SY | 187 | $93.09 | $93.09 | $72.10 |
| 33 | Railing steel type C2 (513.7011) | LF | 177 | $225.00 | $225.00 | $225.00 |
| 34 | Floor drains type GC (514.0445) | EACH | 1 | $5,000.00 | $3,500.00 | $3,500.00 |
| 35 | Floor drains type WF (514.0450) | EACH | 2 | $7,500.00 | $5,000.00 | $5,000.00 |
| 36 | Downspout 8-inch (514.2608) | LF | 15 | $500.00 | $125.00 | $125.00 |
| 37 | Downspout 6-inch (514.2625) | LF | 7 | $500.00 | $100.00 | $100.00 |
| 38 | Rubberized membrane waterproofing (516.0500) | SY | 40 | $30.00 | $25.00 | $25.00 |
| 39 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 2 | $969.99 | $979.90 | $969.99 |
| 40 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 4 | $1,069.82 | $1,080.74 | $1,069.82 |
| 41 | Culvert pipe class IV 24-inch (520.4124) | LF | 133 | $183.00 | $184.87 | $183.00 |
| 42 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $2,366.45 | $2,390.62 | $2,366.45 |
| 43 | Culvert pipe corrugated polyethylene 18-inch (530.0118) | LF | 54 | $163.08 | $164.74 | $163.08 |
| 44 | Pile points (550.0500) | EACH | 28 | $200.00 | $200.00 | $200.00 |
| 45 | Piling steel HP 12-inch X 53 LB (550.1120) | LF | 1,540 | $70.00 | $65.00 | $65.00 |
| 46 | Concrete curb & gutter 4-inch sloped 30-inch type TBTT (601.0586) | LF | 30 | $110.04 | $110.04 | $110.04 |
| 47 | Concrete barrier type S42B (603.1342) | LF | 28 | $662.97 | $662.98 | $662.97 |
| 48 | Concrete barrier transition type V42 to S42 (603.3655) | EACH | 2 | $5,541.10 | $5,541.15 | $5,541.10 |
| 49 | Riprap heavy (606.0300) | CY | 3,170 | $98.01 | $99.01 | $98.01 |
| 50 | Storm sewer pipe class III-B 12- inch (608.3612) | LF | 98 | $99.48 | $100.50 | $99.48 |
| 51 | Inlet covers type BW (611.0610) | EACH | 2 | $1,211.62 | $1,223.99 | $1,211.62 |
| 52 | Inlet covers type V (611.0654) | EACH | 2 | $1,119.46 | $1,130.89 | $1,119.46 |
| 53 | Inlets 2X2.5-FT (611.3225) | EACH | 4 | $3,527.34 | $3,563.37 | $3,527.34 |
| 54 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 224 | $29.22 | $29.52 | $29.22 |
| 55 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 2 | $500.00 | $200.00 | $200.00 |
| 56 | MGS guardrail 3 (614.2300) | LF | 300 | $26.00 | $26.00 | $26.00 |
| 57 | MGS thrie beam transition (614.2500) | LF | 157.60 | $89.00 | $89.00 | $89.00 |
| 58 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,233.00 | $3,233.03 | $3,233.00 |
| 59 | Maintenance and repair of haul roads (project) 01. 1560-00-78 (618.0100) | EACH | 1 | $0.01 | $1,000.00 | $0.01 |
| 60 | Mobilization (619.1000) | EACH | 1 | $168,132 | $434,413 | $568,136 |
| 61 | Water (624.0100) | MGAL | 30 | $250.00 | $120.00 | $250.00 |
| 62 | Topsoil (625.0100) | SY | 9,000 | $4.67 | $4.71 | $4.67 |
| 63 | Mulching (627.0200) | SY | 1,300 | $0.42 | $0.42 | $0.42 |
| 64 | Erosion bales (628.1104) | EACH | 50 | $15.00 | $15.00 | $15.00 |
| 65 | Silt fence (628.1504) | LF | 5,250 | $1.75 | $1.75 | $1.75 |
| 66 | Silt fence maintenance (628.1520) | LF | 5,250 | $0.03 | $0.03 | $0.03 |
| 67 | Mobilizations erosion control (628.1905) | EACH | 6 | $293.00 | $293.00 | $293.00 |
| 68 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $373.00 | $373.00 | $373.00 |
| 69 | Erosion mat urban class I type B (628.2008) | SY | 4,000 | $1.75 | $1.75 | $1.75 |
| 70 | Erosion mat class II type C (628.2027) | SY | 3,700 | $3.73 | $3.73 | $3.73 |
| 71 | Inlet protection type C (628.7015) | EACH | 4 | $75.00 | $75.00 | $75.00 |
| 72 | Temporary ditch checks (628.7504) | LF | 350 | $7.00 | $7.00 | $7.00 |
| 73 | Culvert pipe checks (628.7555) | EACH | 15 | $25.00 | $25.00 | $25.00 |
| 74 | Rock bags (628.7570) | EACH | 158 | $5.00 | $5.00 | $5.00 |
| 75 | Fertilizer type B (629.0210) | CWT | 6 | $100.00 | $100.00 | $100.00 |
| 76 | Seeding mixture no. 20 (630.0120) | LB | 400 | $7.00 | $7.00 | $7.00 |
| 77 | Seeding temporary (630.0200) | LB | 250 | $5.00 | $5.00 | $5.00 |
| 78 | Seed water (630.0500) | MGAL | 210 | $5.00 | $5.00 | $5.00 |
| 79 | Markers culvert end (633.5200) | EACH | 4 | $75.00 | $75.00 | $75.00 |
| 80 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 4 | $150.00 | $150.00 | $150.00 |
| 81 | Moving signs type II (638.2102) | EACH | 3 | $250.00 | $250.00 | $250.00 |
| 82 | Removing small sign supports (638.3000) | EACH | 4 | $50.00 | $50.00 | $50.00 |
| 83 | Field office type B (642.5001) | EACH | 1 | $1,500.00 | $10,102 | $4,500.00 |
| 84 | Traffic control drums (643.0300) | DAY | 2,000 | $0.40 | $0.40 | $0.40 |
| 85 | Traffic control barricades type III (643.0420) | DAY | 3,600 | $1.00 | $1.01 | $1.00 |
| 86 | Traffic control warning lights type A (643.0705) | DAY | 6,100 | $0.10 | $0.10 | $0.10 |
| 87 | Traffic control signs (643.0900) | DAY | 41,000 | $0.28 | $0.28 | $0.28 |
| 88 | Traffic control covering signs type II (643.0920) | EACH | 20 | $25.00 | $100.00 | $25.00 |
| 89 | Traffic control signs fixed message (643.1000) | SF | 36 | $10.20 | $14.00 | $10.20 |
| 90 | Traffic control (643.5000) | EACH | 1 | $2,000.00 | $2,000.01 | $2,000.00 |
| 91 | Geotextile type DF schedule A (645.0111) | SY | 176 | $4.21 | $4.26 | $4.21 |
| 92 | Geotextile type HR (645.0120) | SY | 4,730 | $3.66 | $3.70 | $3.66 |
| 93 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 4,620 | $3.00 | $2.50 | $3.50 |
| 94 | Construction staking storm sewer (650.4000) | EACH | 8 | $425.00 | $250.00 | $425.00 |
| 95 | Construction staking subgrade (650.4500) | LF | 1,531 | $0.01 | $1.00 | $0.01 |
| 96 | Construction staking base (650.5000) | LF | 1,531 | $3.33 | $3.00 | $3.33 |
| 97 | Construction staking pipe culverts (650.6000) | EACH | 2 | $1,750.00 | $250.00 | $1,750.00 |
| 98 | Construction staking structure layout (structure) 01. B-4-129 (650.6501) | EACH | 1 | $8,500.00 | $7,500.07 | $8,500.00 |
| 99 | Construction staking supplemental control (project) 01. 1560-00-78 (650.9911) | EACH | 1 | $10.00 | $1,500.02 | $10.00 |
| 100 | Construction staking slope stakes (650.9920) | LF | 2,073 | $1.75 | $3.00 | $1.75 |
| 101 | Sawing asphalt (690.0150) | LF | 68 | $2.20 | $2.20 | $2.20 |
| 102 | Incentive strength concrete structures (715.0502) | DOL | 3,906 | $1.00 | $1.00 | $1.00 |
| 103 | Incentive strength concrete barrier (715.0603) | DOL | 15 | $1.00 | $1.00 | $1.00 |
| 104 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 105 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 900 | $4.00 | $4.00 | $4.00 |
| 106 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 800 | $5.00 | $5.00 | $5.00 |
| 107 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 |
| 108 | Special 01. temporary water diversion station 954+68 (SPV.0060) | EACH | 1 | $45,716 | $54,161 | $45,716 |
| 109 | Special 01. fence timber 4.5-FT (SPV.0090) | LF | 65 | $125.00 | $125.00 | $125.00 |
| 110 | Special 01. footer rock (SPV.0195) | TON | 20 | $371.41 | $375.20 | $371.41 |
| 111 | Special 02. riffle rock (SPV.0195) | TON | 270 | $94.92 | $85.79 | $94.92 |
| 112 | Special 03. infill riprap B-4-129 (SPV.0195) | TON | 186 | $71.53 | $41.96 | $71.53 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.