WisDOT contract 20261013023 bid tabulation

Baldwin - Menomonie; Hall Estate Rd/160th St B-17-0216 (IH 094, Dunn County Baldwin - Menomonie). Let by Wisconsin DOT on October 13, 2026, Dunn. 4 bids received; low bid $2,234,844 by Sheet Piling Services LLC.

Owner
Wisconsin DOT
Letting
13 OCT 2026
Pay items
114
Data through
10 NOV 2026

3 of the 4 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Sheet Piling Services LLC$2,234,844Low
2Lunda Construction Company$2,271,712+2.0%
4Zenith Tech., Inc. - Waukesha$2,620,617+17%
WisDOT contract 20261013023: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sheet Piling Services LLC2. Lunda Construction Company3. Zenith Tech., Inc. - Waukesha
1Clearing (201.0105)STA10$286.00$286.00$286.00
2Grubbing (201.0205)STA10$145.00$145.00$145.00
3Removing small pipe culverts (203.0100)EACH3$360.00$360.00$360.00
4Removing structure (structure) 01. B-17-0020 (203.0220)EACH1$200,000$200,000$175,000
5Removing asphaltic surface (204.0110)SY360$3.60$3.60$3.60
6Removing concrete barrier (204.0157)LF130$17.90$17.90$17.90
7Removing guardrail (204.0165)LF180$6.00$6.00$6.00
8Removing fence (204.0170)LF360$2.40$2.40$2.40
9Removing delineators and markers (204.0180)EACH7$23.85$23.85$23.85
10Excavation common (205.0100)CY14,780$11.80$11.80$11.80
11Excavation for structures bridges (structure) 01. B-17-0216 (206.1001)EACH1$60,530$60,530$40,000
12Borrow (208.0100)CY139$0.01$0.01$0.01
13Backfill structure type A (210.1500)TON456$14.20$14.20$14.20
14Finishing roadway (project) 01. 1021-01-79 (213.0100)EACH1$0.01$1,000.00$1,500.00
15Base aggregate dense 3/4-inch (305.0110)TON595$31.50$31.50$31.50
16Base aggregate dense 1 1/4-inch (305.0120)TON1,655$27.35$27.35$27.35
17Shaping shoulders (305.0500)STA8$10.00$10.00$10.00
18Pulverize and relay (325.0100)SY800$0.01$0.01$3.32
19Tack coat (455.0605)GAL110$7.86$7.86$7.86
20Incentive density HMA pavement (460.2000)DOL310$1.00$1.00$1.00
21HMA pavement 4 MT 58-34 S (460.6244)TON484$164.71$164.71$164.71
22Asphaltic surface patching (465.0110)TON50$164.71$164.71$164.71
23Asphaltic curb (465.0310)LF100$10.93$10.93$10.93
24Asphaltic flumes (465.0315)SY100$54.67$54.67$54.67
25Concrete masonry bridges (502.0100)CY445$875.00$800.00$1,350.00
26Protective surface treatment (502.3200)SY637$4.00$5.00$5.00
27Pigmented surface sealer (502.3210)SY271$5.00$8.00$14.00
28Prestressed girder type I 45W-inch (503.0146)LF1,184$375.00$325.00$300.00
29Bar steel reinforcement HS structures (505.0400)LB7,960$1.35$1.30$1.37
30Bar steel reinforcement HS coated structures (505.0600)LB78,970$1.45$1.35$1.56
31Bearing pads elastomeric non- laminated (506.2605)EACH20$160.00$150.00$175.00
32Steel diaphragms (structure) 01. B- 17-0216 (506.4000)EACH16$1,700.00$750.00$1,100.00
33Temporary shoring (structure) 01. B-17-216 (511.1200)SF740$20.00$20.00$45.00
34Rubberized membrane waterproofing (516.0500)SY16$25.00$25.00$70.00
35Apron endwalls for culvert pipe 12- inch (520.1012)EACH2$358.50$358.50$358.50
36Apron endwalls for culvert pipe 24- inch (520.1024)EACH2$613.00$613.00$613.00
37Culvert pipe class III-A non-metal 12-inch (520.3412)LF35$29.85$29.85$29.85
38Culvert pipe class III-A non-metal 24-inch (520.3424)LF44$55.30$55.30$55.30
39Culvert pipe reinforced concrete class III 30-inch (522.0130)LF256$201.00$201.00$201.00
40Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH4$2,409.00$2,409.00$2,409.00
41Pile points (550.0500)EACH36$175.00$150.00$150.00
42Piling steel HP 10-inch X 42 LB (550.1100)LF1,125$62.00$55.00$90.00
43Concrete barrier temporary precast delivered (603.8000)LF2,600$10.85$10.85$11.14
44Concrete barrier temporary precast installed (603.8125)LF2,600$4.64$4.64$4.64
45Slope paving crushed aggregate (604.0500)SY262$48.85$48.85$48.85
46Riprap medium (606.0200)CY30$104.40$104.40$104.40
47Pipe underdrain wrapped 6-inch (612.0406)LF130$6.75$6.75$6.75
48Barrier system grading shaping finishing (614.0010)EACH1$2,395.00$2,395.00$2,395.00
49Anchor assemblies for steel plate beam guard (614.0150)EACH4$500.00$250.00$500.00
50Steel thrie beam bullnose terminal (614.0220)EACH2$17,446$17,446$17,446
51Steel thrie beam (614.0230)LF125$50.00$50.00$50.00
52Crash cushions temporary (614.0905)EACH4$4,750.00$4,750.00$3,950.00
53Salvaged rail (614.0920)LF408$4.00$4.00$4.00
54Salvaged guardrail end treatments (614.0925)EACH3$601.00$601.00$601.00
55MGS guardrail 3 (614.2300)LF100$24.50$24.50$24.50
56MGS thrie beam transition (614.2500)LF160$106.75$106.75$106.75
57MGS guardrail terminal eat (614.2610)EACH4$3,610.00$3,610.00$3,610.00
58MGS guardrail terminal type 2 (614.2620)EACH1$3,200.00$3,200.00$3,200.00
59Fence woven wire (height) 01. 4- FT (616.0100)LF320$19.05$19.05$19.05
60Maintenance and repair of haul roads (project) 01. 1021-01-79 (618.0100)EACH1$0.01$0.01$1,500.00
61Mobilization (619.1000)EACH1$97,065$254,738$330,000
62Water (624.0100)MGAL100$1.00$1.00$1.00
63Salvaged topsoil (625.0500)SY8,250$1.20$1.20$1.20
64Mulching (627.0200)SY1,530$0.55$0.55$0.55
65Silt fence (628.1504)LF1,000$1.80$1.80$1.80
66Silt fence maintenance (628.1520)LF1,000$0.01$0.01$0.01
67Mobilizations erosion control (628.1905)EACH5$120.00$120.00$120.00
68Mobilizations emergency erosion control (628.1910)EACH5$60.00$60.00$60.00
69Erosion mat class I type B (628.2004)SY6,720$1.05$1.05$1.05
70Temporary ditch checks (628.7504)LF144$6.95$6.95$6.95
71Culvert pipe checks (628.7555)EACH13$23.20$23.20$23.20
72Fertilizer type B (629.0210)CWT5.20$104.00$104.00$104.00
73Seeding mixture no. 20 (630.0120)LB230$8.85$8.85$8.85
74Seeding temporary (630.0200)LB230$3.70$3.70$3.70
75Delineator posts steel (633.0100)EACH4$55.00$55.00$55.00
76Delineator reflectors (633.0500)EACH4$39.00$39.00$39.00
77Markers culvert end (633.5200)EACH6$66.00$66.00$66.00
78Posts wood 4X6-inch X 12-FT (634.0612)EACH4$85.00$85.00$85.00
79Signs type II reflective F (637.2230)SF12$29.00$29.00$29.00
80Removing signs type II (638.2602)EACH2$36.00$36.00$36.00
81Removing small sign supports (638.3000)EACH2$36.00$36.00$36.00
82Field office type B (642.5001)EACH1$2,500.00$6,000.00$10,000
83Traffic control drums (643.0300)DAY4,394$0.25$0.25$0.25
84Traffic control barricades type III (643.0420)DAY2,628$1.00$1.00$1.00
85Traffic control warning lights type A (643.0705)DAY5,904$0.15$0.15$0.15
86Traffic control warning lights type C (643.0715)DAY2,062$0.15$0.15$0.15
87Traffic control connected arrow boards (643.0810)DAY200$11.00$11.00$11.00
88Traffic control signs (643.0900)DAY11,798$0.20$0.20$0.20
89Traffic control covering signs type II (643.0920)EACH2$110.00$110.00$110.00
90Traffic control signs PCMS (643.1050)DAY480$10.00$10.00$10.00
91Traffic control signs PCMS with TMC communications (643.1051)DAY480$12.50$12.50$12.50
92Basic traffic queue warning system (643.1205.S)DAY320$90.00$90.00$90.00
93Traffic control connected work zone start and end location markers (643.1220)DAY320$4.85$4.85$4.85
94Traffic control interim lane closure (643.4100)EACH48$1,155.00$1,155.00$1,155.00
95Traffic control (643.5000)EACH1$33,250$33,250$33,250
96Geotextile type DF schedule A (645.0111)SY52$4.65$4.65$4.65
97Geotextile type HR (645.0120)SY60$6.00$6.00$16.82
98Construction staking subgrade (650.4500)LF1,705$0.01$0.01$0.01
99Construction staking base (650.5000)LF1,705$0.70$0.70$0.70
100Construction staking pipe culverts (650.6000)EACH4$300.00$300.00$300.00
101Construction staking structure layout (structure) 01. B-17-0216 (650.6501)EACH1$3,000.00$3,000.00$3,000.00
102Construction staking supplemental control (project) 01. 1021-01-79 (650.9911)EACH1$1,000.00$1,000.00$1,000.00
103Construction staking slope stakes (650.9920)LF1,705$0.80$0.80$0.80
104Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF180$15.00$12.00$15.00
105Install conduit into existing item (652.0700.S)EACH2$250.00$200.00$250.00
106Adjusting pull boxes (653.0900)EACH1$250.00$300.00$250.00
107Remove cable (674.0300)LF130$3.00$3.00$3.00
108Reinstall cable (674.0400)LF120$4.00$3.00$4.00
109Sawing asphalt (690.0150)LF100$5.00$5.00$5.00
110Incentive strength concrete structures (715.0502)DOL2,670$1.00$1.00$1.00
111Installing and maintaining bird deterrent system (station) 01. 10+00 (999.2000.S)EACH1$0.01$0.01$12,000
112Special 01. remove and reinstall existing guardrail (SPV.0090)LF295$15.00$15.00$15.00
113Special 02. salvage and reinstall high tension cable barrier (SPV.0090)LF693$23.50$23.50$23.50
114Special 01. remove existing field entrance (SPV.0180)SY60$14.75$14.75$14.75
WisDOT contract 20261013023: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way