WisDOT contract 20261013023 bid tabulation
Baldwin - Menomonie; Hall Estate Rd/160th St B-17-0216 (IH 094, Dunn County Baldwin - Menomonie). Let by Wisconsin DOT on October 13, 2026, Dunn. 4 bids received; low bid $2,234,844 by Sheet Piling Services LLC.
- Owner
- Wisconsin DOT
- Letting
- 13 OCT 2026
- Pay items
- 114
- Data through
- 10 NOV 2026
3 of the 4 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sheet Piling Services LLC | $2,234,844 | Low |
| 2 | Lunda Construction Company | $2,271,712 | +2.0% |
| 4 | Zenith Tech., Inc. - Waukesha | $2,620,617 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sheet Piling Services LLC | 2. Lunda Construction Company | 3. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 10 | $286.00 | $286.00 | $286.00 |
| 2 | Grubbing (201.0205) | STA | 10 | $145.00 | $145.00 | $145.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 3 | $360.00 | $360.00 | $360.00 |
| 4 | Removing structure (structure) 01. B-17-0020 (203.0220) | EACH | 1 | $200,000 | $200,000 | $175,000 |
| 5 | Removing asphaltic surface (204.0110) | SY | 360 | $3.60 | $3.60 | $3.60 |
| 6 | Removing concrete barrier (204.0157) | LF | 130 | $17.90 | $17.90 | $17.90 |
| 7 | Removing guardrail (204.0165) | LF | 180 | $6.00 | $6.00 | $6.00 |
| 8 | Removing fence (204.0170) | LF | 360 | $2.40 | $2.40 | $2.40 |
| 9 | Removing delineators and markers (204.0180) | EACH | 7 | $23.85 | $23.85 | $23.85 |
| 10 | Excavation common (205.0100) | CY | 14,780 | $11.80 | $11.80 | $11.80 |
| 11 | Excavation for structures bridges (structure) 01. B-17-0216 (206.1001) | EACH | 1 | $60,530 | $60,530 | $40,000 |
| 12 | Borrow (208.0100) | CY | 139 | $0.01 | $0.01 | $0.01 |
| 13 | Backfill structure type A (210.1500) | TON | 456 | $14.20 | $14.20 | $14.20 |
| 14 | Finishing roadway (project) 01. 1021-01-79 (213.0100) | EACH | 1 | $0.01 | $1,000.00 | $1,500.00 |
| 15 | Base aggregate dense 3/4-inch (305.0110) | TON | 595 | $31.50 | $31.50 | $31.50 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,655 | $27.35 | $27.35 | $27.35 |
| 17 | Shaping shoulders (305.0500) | STA | 8 | $10.00 | $10.00 | $10.00 |
| 18 | Pulverize and relay (325.0100) | SY | 800 | $0.01 | $0.01 | $3.32 |
| 19 | Tack coat (455.0605) | GAL | 110 | $7.86 | $7.86 | $7.86 |
| 20 | Incentive density HMA pavement (460.2000) | DOL | 310 | $1.00 | $1.00 | $1.00 |
| 21 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 484 | $164.71 | $164.71 | $164.71 |
| 22 | Asphaltic surface patching (465.0110) | TON | 50 | $164.71 | $164.71 | $164.71 |
| 23 | Asphaltic curb (465.0310) | LF | 100 | $10.93 | $10.93 | $10.93 |
| 24 | Asphaltic flumes (465.0315) | SY | 100 | $54.67 | $54.67 | $54.67 |
| 25 | Concrete masonry bridges (502.0100) | CY | 445 | $875.00 | $800.00 | $1,350.00 |
| 26 | Protective surface treatment (502.3200) | SY | 637 | $4.00 | $5.00 | $5.00 |
| 27 | Pigmented surface sealer (502.3210) | SY | 271 | $5.00 | $8.00 | $14.00 |
| 28 | Prestressed girder type I 45W-inch (503.0146) | LF | 1,184 | $375.00 | $325.00 | $300.00 |
| 29 | Bar steel reinforcement HS structures (505.0400) | LB | 7,960 | $1.35 | $1.30 | $1.37 |
| 30 | Bar steel reinforcement HS coated structures (505.0600) | LB | 78,970 | $1.45 | $1.35 | $1.56 |
| 31 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 20 | $160.00 | $150.00 | $175.00 |
| 32 | Steel diaphragms (structure) 01. B- 17-0216 (506.4000) | EACH | 16 | $1,700.00 | $750.00 | $1,100.00 |
| 33 | Temporary shoring (structure) 01. B-17-216 (511.1200) | SF | 740 | $20.00 | $20.00 | $45.00 |
| 34 | Rubberized membrane waterproofing (516.0500) | SY | 16 | $25.00 | $25.00 | $70.00 |
| 35 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 2 | $358.50 | $358.50 | $358.50 |
| 36 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 2 | $613.00 | $613.00 | $613.00 |
| 37 | Culvert pipe class III-A non-metal 12-inch (520.3412) | LF | 35 | $29.85 | $29.85 | $29.85 |
| 38 | Culvert pipe class III-A non-metal 24-inch (520.3424) | LF | 44 | $55.30 | $55.30 | $55.30 |
| 39 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 256 | $201.00 | $201.00 | $201.00 |
| 40 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 4 | $2,409.00 | $2,409.00 | $2,409.00 |
| 41 | Pile points (550.0500) | EACH | 36 | $175.00 | $150.00 | $150.00 |
| 42 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 1,125 | $62.00 | $55.00 | $90.00 |
| 43 | Concrete barrier temporary precast delivered (603.8000) | LF | 2,600 | $10.85 | $10.85 | $11.14 |
| 44 | Concrete barrier temporary precast installed (603.8125) | LF | 2,600 | $4.64 | $4.64 | $4.64 |
| 45 | Slope paving crushed aggregate (604.0500) | SY | 262 | $48.85 | $48.85 | $48.85 |
| 46 | Riprap medium (606.0200) | CY | 30 | $104.40 | $104.40 | $104.40 |
| 47 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 130 | $6.75 | $6.75 | $6.75 |
| 48 | Barrier system grading shaping finishing (614.0010) | EACH | 1 | $2,395.00 | $2,395.00 | $2,395.00 |
| 49 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $500.00 | $250.00 | $500.00 |
| 50 | Steel thrie beam bullnose terminal (614.0220) | EACH | 2 | $17,446 | $17,446 | $17,446 |
| 51 | Steel thrie beam (614.0230) | LF | 125 | $50.00 | $50.00 | $50.00 |
| 52 | Crash cushions temporary (614.0905) | EACH | 4 | $4,750.00 | $4,750.00 | $3,950.00 |
| 53 | Salvaged rail (614.0920) | LF | 408 | $4.00 | $4.00 | $4.00 |
| 54 | Salvaged guardrail end treatments (614.0925) | EACH | 3 | $601.00 | $601.00 | $601.00 |
| 55 | MGS guardrail 3 (614.2300) | LF | 100 | $24.50 | $24.50 | $24.50 |
| 56 | MGS thrie beam transition (614.2500) | LF | 160 | $106.75 | $106.75 | $106.75 |
| 57 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,610.00 | $3,610.00 | $3,610.00 |
| 58 | MGS guardrail terminal type 2 (614.2620) | EACH | 1 | $3,200.00 | $3,200.00 | $3,200.00 |
| 59 | Fence woven wire (height) 01. 4- FT (616.0100) | LF | 320 | $19.05 | $19.05 | $19.05 |
| 60 | Maintenance and repair of haul roads (project) 01. 1021-01-79 (618.0100) | EACH | 1 | $0.01 | $0.01 | $1,500.00 |
| 61 | Mobilization (619.1000) | EACH | 1 | $97,065 | $254,738 | $330,000 |
| 62 | Water (624.0100) | MGAL | 100 | $1.00 | $1.00 | $1.00 |
| 63 | Salvaged topsoil (625.0500) | SY | 8,250 | $1.20 | $1.20 | $1.20 |
| 64 | Mulching (627.0200) | SY | 1,530 | $0.55 | $0.55 | $0.55 |
| 65 | Silt fence (628.1504) | LF | 1,000 | $1.80 | $1.80 | $1.80 |
| 66 | Silt fence maintenance (628.1520) | LF | 1,000 | $0.01 | $0.01 | $0.01 |
| 67 | Mobilizations erosion control (628.1905) | EACH | 5 | $120.00 | $120.00 | $120.00 |
| 68 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $60.00 | $60.00 | $60.00 |
| 69 | Erosion mat class I type B (628.2004) | SY | 6,720 | $1.05 | $1.05 | $1.05 |
| 70 | Temporary ditch checks (628.7504) | LF | 144 | $6.95 | $6.95 | $6.95 |
| 71 | Culvert pipe checks (628.7555) | EACH | 13 | $23.20 | $23.20 | $23.20 |
| 72 | Fertilizer type B (629.0210) | CWT | 5.20 | $104.00 | $104.00 | $104.00 |
| 73 | Seeding mixture no. 20 (630.0120) | LB | 230 | $8.85 | $8.85 | $8.85 |
| 74 | Seeding temporary (630.0200) | LB | 230 | $3.70 | $3.70 | $3.70 |
| 75 | Delineator posts steel (633.0100) | EACH | 4 | $55.00 | $55.00 | $55.00 |
| 76 | Delineator reflectors (633.0500) | EACH | 4 | $39.00 | $39.00 | $39.00 |
| 77 | Markers culvert end (633.5200) | EACH | 6 | $66.00 | $66.00 | $66.00 |
| 78 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $85.00 | $85.00 | $85.00 |
| 79 | Signs type II reflective F (637.2230) | SF | 12 | $29.00 | $29.00 | $29.00 |
| 80 | Removing signs type II (638.2602) | EACH | 2 | $36.00 | $36.00 | $36.00 |
| 81 | Removing small sign supports (638.3000) | EACH | 2 | $36.00 | $36.00 | $36.00 |
| 82 | Field office type B (642.5001) | EACH | 1 | $2,500.00 | $6,000.00 | $10,000 |
| 83 | Traffic control drums (643.0300) | DAY | 4,394 | $0.25 | $0.25 | $0.25 |
| 84 | Traffic control barricades type III (643.0420) | DAY | 2,628 | $1.00 | $1.00 | $1.00 |
| 85 | Traffic control warning lights type A (643.0705) | DAY | 5,904 | $0.15 | $0.15 | $0.15 |
| 86 | Traffic control warning lights type C (643.0715) | DAY | 2,062 | $0.15 | $0.15 | $0.15 |
| 87 | Traffic control connected arrow boards (643.0810) | DAY | 200 | $11.00 | $11.00 | $11.00 |
| 88 | Traffic control signs (643.0900) | DAY | 11,798 | $0.20 | $0.20 | $0.20 |
| 89 | Traffic control covering signs type II (643.0920) | EACH | 2 | $110.00 | $110.00 | $110.00 |
| 90 | Traffic control signs PCMS (643.1050) | DAY | 480 | $10.00 | $10.00 | $10.00 |
| 91 | Traffic control signs PCMS with TMC communications (643.1051) | DAY | 480 | $12.50 | $12.50 | $12.50 |
| 92 | Basic traffic queue warning system (643.1205.S) | DAY | 320 | $90.00 | $90.00 | $90.00 |
| 93 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 320 | $4.85 | $4.85 | $4.85 |
| 94 | Traffic control interim lane closure (643.4100) | EACH | 48 | $1,155.00 | $1,155.00 | $1,155.00 |
| 95 | Traffic control (643.5000) | EACH | 1 | $33,250 | $33,250 | $33,250 |
| 96 | Geotextile type DF schedule A (645.0111) | SY | 52 | $4.65 | $4.65 | $4.65 |
| 97 | Geotextile type HR (645.0120) | SY | 60 | $6.00 | $6.00 | $16.82 |
| 98 | Construction staking subgrade (650.4500) | LF | 1,705 | $0.01 | $0.01 | $0.01 |
| 99 | Construction staking base (650.5000) | LF | 1,705 | $0.70 | $0.70 | $0.70 |
| 100 | Construction staking pipe culverts (650.6000) | EACH | 4 | $300.00 | $300.00 | $300.00 |
| 101 | Construction staking structure layout (structure) 01. B-17-0216 (650.6501) | EACH | 1 | $3,000.00 | $3,000.00 | $3,000.00 |
| 102 | Construction staking supplemental control (project) 01. 1021-01-79 (650.9911) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 103 | Construction staking slope stakes (650.9920) | LF | 1,705 | $0.80 | $0.80 | $0.80 |
| 104 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 180 | $15.00 | $12.00 | $15.00 |
| 105 | Install conduit into existing item (652.0700.S) | EACH | 2 | $250.00 | $200.00 | $250.00 |
| 106 | Adjusting pull boxes (653.0900) | EACH | 1 | $250.00 | $300.00 | $250.00 |
| 107 | Remove cable (674.0300) | LF | 130 | $3.00 | $3.00 | $3.00 |
| 108 | Reinstall cable (674.0400) | LF | 120 | $4.00 | $3.00 | $4.00 |
| 109 | Sawing asphalt (690.0150) | LF | 100 | $5.00 | $5.00 | $5.00 |
| 110 | Incentive strength concrete structures (715.0502) | DOL | 2,670 | $1.00 | $1.00 | $1.00 |
| 111 | Installing and maintaining bird deterrent system (station) 01. 10+00 (999.2000.S) | EACH | 1 | $0.01 | $0.01 | $12,000 |
| 112 | Special 01. remove and reinstall existing guardrail (SPV.0090) | LF | 295 | $15.00 | $15.00 | $15.00 |
| 113 | Special 02. salvage and reinstall high tension cable barrier (SPV.0090) | LF | 693 | $23.50 | $23.50 | $23.50 |
| 114 | Special 01. remove existing field entrance (SPV.0180) | SY | 60 | $14.75 | $14.75 | $14.75 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.