WisDOT contract 20261013022 bid tabulation
1020-05-63. Let by Wisconsin DOT on October 13, 2026, Dunn. 2 bids received; low bid $10,646,418 by Lunda Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 13 OCT 2026
- Pay items
- 244
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lunda Construction Company | $10,646,418 | Low |
| 2 | Zenith Tech., Inc. - Waukesha | $11,785,841 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lunda Construction Company | 2. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 3 | $1,625.00 | $1,625.00 |
| 2 | Grubbing (201.0205) | STA | 1 | $813.00 | $813.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 1 | $2,225.00 | $2,225.00 |
| 4 | Removing structure (structure) 01. B-17-29 (203.0220) | EACH | 1 | $50,000 | $150,000 |
| 5 | Removing structure (structure) 01. B-17-51 (203.0220) | EACH | 1 | $41,175 | $250,000 |
| 6 | Removing concrete pavement (204.0100) | SY | 1,241 | $39.70 | $39.70 |
| 7 | Removing asphaltic surface (204.0110) | SY | 58,219 | $6.72 | $6.75 |
| 8 | Removing asphaltic surface butt joints (204.0115) | SY | 31 | $20.00 | $20.00 |
| 9 | Removing curb & gutter (204.0150) | LF | 1,185 | $16.25 | $16.25 |
| 10 | Removing concrete sidewalk (204.0155) | SY | 467 | $20.30 | $20.30 |
| 11 | Removing concrete barrier (204.0157) | LF | 192 | $20.30 | $20.30 |
| 12 | Removing guardrail (204.0165) | LF | 7,822 | $2.35 | $2.35 |
| 13 | Removing fence (204.0170) | LF | 200 | $3.10 | $3.10 |
| 14 | Removing surface drains (204.0190) | EACH | 7 | $1,115.00 | $1,115.00 |
| 15 | Removing concrete bases (204.0195) | EACH | 20 | $200.00 | $200.00 |
| 16 | Removing manholes (204.0210) | EACH | 1 | $1,115.00 | $1,115.00 |
| 17 | Removing (item description) 01. street light assembly (204.9060.S) | EACH | 42 | $220.00 | $220.00 |
| 18 | Removing (item description) 02. wireless traffic sensor access point (204.9060.S) | EACH | 2 | $800.00 | $800.00 |
| 19 | Removing (item description) 03. wireless traffic sensor repeater (204.9060.S) | EACH | 2 | $800.00 | $800.00 |
| 20 | Removing (item description) 01. electrical conductors from existing conduit (204.9090.S) | LF | 6,810 | $0.50 | $0.50 |
| 21 | Excavation common (205.0100) | CY | 466 | $22.25 | $22.25 |
| 22 | Excavation for structures bridges (structure) 01. B-17-29 (206.1001) | EACH | 1 | $35,000 | $50,000 |
| 23 | Excavation for structures culverts (structure) 01. B-17-51 (206.2001) | EACH | 1 | $78,350 | $250,000 |
| 24 | Borrow (208.0100) | CY | 160 | $36.50 | $36.50 |
| 25 | Backfill structure type A (210.1500) | TON | 537 | $26.30 | $26.30 |
| 26 | Backfill structure type B (210.2500) | TON | 1,440 | $18.80 | $18.80 |
| 27 | Prepare foundation for asphaltic paving (project) 01. 1020-05-63 (211.0101) | EACH | 1 | $32,860 | $32,860 |
| 28 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 68 | $164.77 | $164.77 |
| 29 | Finishing roadway (project) 01. 1020-05-63 (213.0100) | EACH | 1 | $1,000.00 | $500.00 |
| 30 | Finishing roadway (project) 01. 1021-01-78 (213.0100) | EACH | 1 | $1,000.00 | $500.00 |
| 31 | Base aggregate dense 3/4-inch (305.0110) | TON | 4,161 | $33.94 | $33.94 |
| 32 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 191 | $45.90 | $45.90 |
| 33 | Shaping shoulders (305.0500) | STA | 340 | $72.08 | $72.08 |
| 34 | Breaker run (311.0110) | TON | 347 | $38.65 | $38.65 |
| 35 | Concrete pavement 8-inch (415.0080) | SY | 681 | $87.01 | $87.01 |
| 36 | Concrete pavement approach slab (415.0410) | SY | 241 | $324.13 | $324.13 |
| 37 | Concrete pavement approach slab hes (415.1410) | SY | 212 | $327.01 | $327.01 |
| 38 | Drilled tie bars (416.0610) | EACH | 1,622 | $11.03 | $11.03 |
| 39 | Drilled dowel bars (416.0620) | EACH | 5,095 | $15.05 | $18.05 |
| 40 | Concrete pavement repair (416.1710) | SY | 495 | $112.33 | $115.00 |
| 41 | Concrete pavement replacement (416.1720) | SY | 1,711 | $117.93 | $115.00 |
| 42 | Continuous diamond grinding concrete pavement (420.1000) | SY | 11,976 | $6.44 | $6.44 |
| 43 | Tack coat (455.0605) | GAL | 4,322 | $4.06 | $4.06 |
| 44 | Incentive density HMA pavement (460.2000) | DOL | 6,460 | $1.00 | $1.00 |
| 45 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 12,504 | $119.70 | $119.70 |
| 46 | Asphaltic surface temporary (465.0125) | TON | 118 | $206.37 | $206.37 |
| 47 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 31,562 | $0.20 | $0.27 |
| 48 | Concrete masonry bridges (502.0100) | CY | 140 | $1,200.00 | $1,500.00 |
| 49 | Expansion device (502.3101) | LF | 170 | $325.00 | $450.00 |
| 50 | Protective surface treatment (502.3200) | SY | 827 | $5.00 | $4.00 |
| 51 | Pigmented surface sealer reseal (502.3205) | SY | 220 | $8.00 | $29.00 |
| 52 | Pigmented surface sealer (502.3210) | SY | 15 | $8.00 | $17.00 |
| 53 | Protective surface treatment reseal (502.3215) | SY | 269 | $5.00 | $10.00 |
| 54 | Adhesive anchors no. 5 bar (502.4205) | EACH | 138 | $20.00 | $32.00 |
| 55 | Concrete masonry culverts (504.0100) | CY | 214 | $800.00 | $1,650.00 |
| 56 | Bar steel reinforcement HS structures (505.0400) | LB | 31,970 | $2.10 | $2.25 |
| 57 | Bar steel reinforcement HS coated structures (505.0600) | LB | 21,810 | $2.20 | $2.55 |
| 58 | Bar couplers no. 4 (505.0904) | EACH | 25 | $25.00 | $50.00 |
| 59 | Bar couplers no. 7 (505.0907) | EACH | 87 | $45.00 | $57.00 |
| 60 | Bar couplers no. 9 (505.0909) | EACH | 101 | $65.00 | $100.00 |
| 61 | Bearing assemblies fixed (structure) 01. B-17-40 (506.5000) | EACH | 24 | $2,900.00 | $4,000.00 |
| 62 | Bearing assemblies expansion (structure) 01. B-17-40 (506.6000) | EACH | 24 | $4,000.00 | $5,000.00 |
| 63 | Removing bearings (structure) 01. B-17-40 (506.7050.S) | EACH | 48 | $2,500.00 | $4,000.00 |
| 64 | Preparation decks type 1 (509.0301) | SY | 52 | $175.00 | $300.00 |
| 65 | Preparation decks type 2 (509.0302) | SY | 22 | $200.00 | $450.00 |
| 66 | Sawing pavement deck preparation areas (509.0310.S) | LF | 220 | $5.00 | $10.00 |
| 67 | Cleaning decks to reapply concrete masonry overlay (509.0505.S) | SY | 695 | $10.00 | $20.00 |
| 68 | Joint repair (509.1000) | SY | 85 | $1,500.00 | $2,500.00 |
| 69 | Concrete surface repair (509.1500) | SF | 702 | $150.00 | $225.00 |
| 70 | Full-depth deck repair (509.2000) | SY | 3 | $500.00 | $1,000.00 |
| 71 | Concrete masonry deck repair (509.2100.S) | CY | 3 | $500.00 | $1,500.00 |
| 72 | Concrete masonry overlay decks (509.2500) | CY | 70 | $1,500.00 | $1,800.00 |
| 73 | Removing concrete masonry deck overlay (structure) 01. B-17-40 (509.9005.S) | SY | 695 | $36.28 | $40.00 |
| 74 | Temporary shoring (structure) 01. B-17-29 (511.1200) | SF | 520 | $50.00 | $75.00 |
| 75 | Temporary shoring (structure) 01. B-17-51 (511.1200) | SF | 5,676 | $35.00 | $0.01 |
| 76 | Rubberized membrane waterproofing (516.0500) | SY | 98 | $25.00 | $65.00 |
| 77 | Concrete staining (structure) 01. B- 17-29 (517.1010.S) | SF | 97 | $30.00 | $30.00 |
| 78 | Architectural surface treatment (structure) 01. B-17-29 (517.1050.S) | SF | 111 | $30.00 | $100.00 |
| 79 | Concrete collars for pipe (520.8000) | EACH | 1 | $1,455.00 | $1,455.00 |
| 80 | Cleaning culvert pipes (520.8700) | EACH | 1 | $1,470.00 | $1,470.00 |
| 81 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 94 | $332.00 | $332.00 |
| 82 | Culvert pipe reinforced concrete class III 36-inch (522.0136) | LF | 200 | $486.00 | $486.00 |
| 83 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $2,360.00 | $2,360.00 |
| 84 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 2 | $3,665.00 | $3,665.00 |
| 85 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 1,591 | $53.92 | $53.92 |
| 86 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 281 | $53.92 | $53.92 |
| 87 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 364 | $99.00 | $99.00 |
| 88 | Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590) | LF | 76 | $99.00 | $99.00 |
| 89 | Concrete curb pedestrian (601.0600) | LF | 48 | $37.00 | $37.00 |
| 90 | Concrete sidewalk 4-inch (602.0405) | SF | 2,553 | $8.77 | $8.77 |
| 91 | Concrete sidewalk 6-inch (602.0415) | SF | 2,035 | $19.53 | $19.53 |
| 92 | Curb ramp detectable warning field yellow (602.0505) | SF | 107 | $62.51 | $62.51 |
| 93 | Concrete surface drains (602.3010) | CY | 25 | $1,516.99 | $1,516.99 |
| 94 | Concrete rumble strips, shoulder divided roadway (602.3210) | LF | 26,889 | $0.85 | $0.85 |
| 95 | Concrete rumble strips, transverse (602.3280) | SY | 144 | $62.00 | $65.00 |
| 96 | Concrete barrier type S42 (603.1142) | LF | 149 | $247.78 | $247.78 |
| 97 | Concrete barrier temporary precast delivered (603.8000) | LF | 3,645 | $11.09 | $15.00 |
| 98 | Concrete barrier temporary precast installed (603.8125) | LF | 3,645 | $4.64 | $8.00 |
| 99 | Slope paving crushed aggregate (604.0500) | SY | 175 | $66.50 | $66.50 |
| 100 | Reseal crushed aggregate slope paving (604.9015.S) | SY | 570 | $15.00 | $15.00 |
| 101 | Riprap medium (606.0200) | CY | 3 | $195.00 | $195.00 |
| 102 | Riprap heavy (606.0300) | CY | 26 | $118.00 | $118.00 |
| 103 | Inlet covers type BW (611.0610) | EACH | 1 | $1,870.00 | $1,870.00 |
| 104 | Inlet covers type C (611.0612) | EACH | 1 | $1,427.00 | $1,427.00 |
| 105 | Inlet covers type H (611.0624) | EACH | 1 | $1,645.00 | $1,645.00 |
| 106 | Manholes 5-FT diameter (611.2005) | EACH | 1 | $6,005.00 | $6,005.00 |
| 107 | Adjusting manhole covers (611.8110) | EACH | 1 | $725.00 | $725.00 |
| 108 | Cover plates temporary (611.8120.S) | EACH | 1 | $50.00 | $50.00 |
| 109 | Barrier system grading shaping finishing (614.0010) | EACH | 23 | $3,525.00 | $3,525.00 |
| 110 | Steel thrie beam bullnose terminal (614.0220) | EACH | 6 | $17,925 | $17,925 |
| 111 | Steel thrie beam (614.0230) | LF | 450 | $51.35 | $51.35 |
| 112 | Crash cushions temporary (614.0905) | EACH | 3 | $4,750.00 | $4,750.00 |
| 113 | MGS guardrail 3 (614.2300) | LF | 4,950 | $26.70 | $26.70 |
| 114 | MGS guardrail 3 K (614.2330) | LF | 512.50 | $41.80 | $41.80 |
| 115 | MGS thrie beam transition (614.2500) | LF | 671.50 | $112.00 | $112.00 |
| 116 | MGS guardrail terminal eat (614.2610) | EACH | 18 | $3,745.00 | $3,745.00 |
| 117 | MGS guardrail terminal type 2 (614.2620) | EACH | 5 | $3,345.00 | $3,345.00 |
| 118 | Wisconsin historical marker (615.1000) | EACH | 2 | $3,500.00 | $3,500.00 |
| 119 | Fence woven wire (height) 01. 4- FT (616.0100) | LF | 200 | $29.30 | $29.30 |
| 120 | Maintenance and repair of haul roads (project) 01. 1020-05-63 (618.0100) | EACH | 1 | $0.01 | $1,000.00 |
| 121 | Maintenance and repair of haul roads (project) 01. 1021-01-78 (618.0100) | EACH | 1 | $0.01 | $1,000.00 |
| 122 | Mobilization (619.1000) | EACH | 1 | $1,958,078 | $2,015,000 |
| 123 | Water (624.0100) | MGAL | 40 | $59.10 | $59.10 |
| 124 | Topsoil (625.0100) | SY | 21 | $26.40 | $26.40 |
| 125 | Salvaged topsoil (625.0500) | SY | 1,439 | $2.00 | $2.00 |
| 126 | Mulching (627.0200) | SY | 21 | $3.85 | $3.85 |
| 127 | Erosion bales (628.1104) | EACH | 10 | $41.85 | $41.85 |
| 128 | Silt fence (628.1504) | LF | 3,263 | $1.85 | $1.85 |
| 129 | Silt fence maintenance (628.1520) | LF | 3,263 | $0.01 | $0.01 |
| 130 | Mobilizations erosion control (628.1905) | EACH | 10 | $350.00 | $350.00 |
| 131 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $175.00 | $175.00 |
| 132 | Erosion mat urban class I type B (628.2008) | SY | 1,474 | $1.90 | $1.90 |
| 133 | Inlet protection type A (628.7005) | EACH | 6 | $170.00 | $170.00 |
| 134 | Inlet protection type C (628.7015) | EACH | 4 | $53.00 | $53.00 |
| 135 | Temporary ditch checks (628.7504) | LF | 168 | $7.35 | $7.35 |
| 136 | Culvert pipe checks (628.7555) | EACH | 6 | $40.00 | $40.00 |
| 137 | Fertilizer type B (629.0210) | CWT | 1 | $195.00 | $195.00 |
| 138 | Seeding mixture no. 20 (630.0120) | LB | 57 | $11.60 | $11.60 |
| 139 | Seeding mixture no. 40 (630.0140) | LB | 9 | $43.50 | $43.50 |
| 140 | Seeding temporary (630.0200) | LB | 57 | $5.00 | $5.00 |
| 141 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 22 | $93.30 | $93.30 |
| 142 | Sign supports replacing base connection bolts (635.0300) | EACH | 16 | $395.00 | $395.00 |
| 143 | Signs type I reflective SH (637.1220) | SF | 1,446 | $38.80 | $38.80 |
| 144 | Signs type II reflective H (637.2210) | SF | 111 | $24.90 | $24.90 |
| 145 | Signs type II reflective F (637.2230) | SF | 35.50 | $27.40 | $27.40 |
| 146 | Moving signs type II (638.2102) | EACH | 11 | $150.00 | $150.00 |
| 147 | Removing signs type I (638.2601) | EACH | 16 | $367.00 | $367.00 |
| 148 | Removing signs type II (638.2602) | EACH | 17 | $24.50 | $24.50 |
| 149 | Removing small sign supports (638.3000) | EACH | 16 | $23.00 | $23.00 |
| 150 | Field office type B (642.5001) | EACH | 1 | $7,500.00 | $15,000 |
| 151 | Traffic control drums (643.0300) | DAY | 68,747 | $0.15 | $0.22 |
| 152 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 116 | $63.00 | $171.25 |
| 153 | Traffic control barricades type III (643.0420) | DAY | 1,407 | $0.45 | $0.60 |
| 154 | Traffic control flexible tubular marker posts (643.0500) | EACH | 16 | $38.00 | $22.00 |
| 155 | Traffic control flexible tubular marker bases (643.0600) | EACH | 16 | $14.75 | $5.00 |
| 156 | Traffic control warning lights type A (643.0705) | DAY | 2,696 | $0.10 | $0.12 |
| 157 | Traffic control warning lights type C (643.0715) | DAY | 9,424 | $0.10 | $0.12 |
| 158 | Traffic control connected arrow boards (643.0810) | DAY | 236 | $11.00 | $25.00 |
| 159 | Traffic control signs (643.0900) | DAY | 5,577 | $0.50 | $0.43 |
| 160 | Traffic control covering signs type I (643.0910) | EACH | 4 | $300.00 | $220.00 |
| 161 | Traffic control covering signs type II (643.0920) | EACH | 35 | $105.00 | $40.00 |
| 162 | Traffic control signs PCMS (643.1050) | DAY | 392 | $12.50 | $50.00 |
| 163 | Portable automated real-time traffic queue warning system (643.1200.S) | DAY | 12 | $265.00 | $609.37 |
| 164 | Basic traffic queue warning system (643.1205.S) | DAY | 104 | $80.00 | $126.50 |
| 165 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 226 | $8.20 | $17.50 |
| 166 | Temporary marking line removable tape 6-inch (643.3180) | LF | 13,860 | $2.22 | $1.95 |
| 167 | Traffic control (643.5000) | EACH | 1 | $78,500 | $72,000 |
| 168 | Temporary pedestrian surface matting (644.1440) | SF | 465 | $2.75 | $7.00 |
| 169 | Temporary pedestrian curb ramp (644.1601) | DAY | 50 | $30.00 | $10.00 |
| 170 | Temporary pedestrian detectable warning field (644.1605) | SF | 100 | $5.00 | $20.00 |
| 171 | Temporary pedestrian barricade (644.1810) | LF | 575 | $7.00 | $6.00 |
| 172 | Geotextile type C (645.0105) | SY | 261 | $6.00 | $6.00 |
| 173 | Geotextile type HR (645.0120) | SY | 44 | $7.85 | $7.85 |
| 174 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 8,370 | $0.93 | $1.54 |
| 175 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 83,122 | $1.37 | $1.34 |
| 176 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 9,430 | $7.65 | $7.91 |
| 177 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 8,040 | $2.81 | $2.22 |
| 178 | Marking arrow epoxy (646.5020) | EACH | 4 | $218.26 | $229.00 |
| 179 | Marking word epoxy (646.5120) | EACH | 2 | $291.48 | $250.00 |
| 180 | Marking stop line epoxy 18-inch (646.6120) | LF | 90 | $14.98 | $12.00 |
| 181 | Marking diagonal epoxy 12-inch (646.7120) | LF | 135 | $14.54 | $9.50 |
| 182 | Marking chevron epoxy 24-inch (646.7220) | LF | 1,190 | $29.08 | $13.70 |
| 183 | Marking curb epoxy (646.8120) | LF | 125 | $8.49 | $8.00 |
| 184 | Marking parking stall epoxy (646.8320) | LF | 618 | $18.46 | $6.50 |
| 185 | Marking removal line 4-inch (646.9000) | LF | 420 | $1.15 | $0.85 |
| 186 | Marking removal line 6-inch (646.9002) | LF | 3,295 | $1.25 | $1.27 |
| 187 | Construction staking storm sewer (650.4000) | EACH | 1 | $350.00 | $250.00 |
| 188 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 282 | $2.00 | $3.00 |
| 189 | Construction staking pipe culverts (650.6000) | EACH | 1 | $350.00 | $250.00 |
| 190 | Construction staking structure layout (structure) 01. B-17-51 (650.6501) | EACH | 1 | $3,000.00 | $2,000.00 |
| 191 | Construction staking concrete pavement (650.7000) | LF | 486 | $4.00 | $4.75 |
| 192 | Construction staking concrete barrier (650.7500) | LF | 149 | $5.00 | $5.00 |
| 193 | Construction staking resurfacing reference (650.8000) | LF | 38,626 | $0.12 | $0.10 |
| 194 | Construction staking curb ramps (650.9000) | EACH | 9 | $300.00 | $350.00 |
| 195 | Construction staking sidewalk (project) 01. 1020-05-63 (650.9500) | EACH | 1 | $1,000.00 | $1,000.00 |
| 196 | Construction staking supplemental control (project) 01. 1020-05-63 (650.9911) | EACH | 1 | $2,000.00 | $2,000.00 |
| 197 | Construction staking supplemental control (project) 01. 1021-01-78 (650.9911) | EACH | 1 | $2,000.00 | $2,000.00 |
| 198 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 5,180 | $8.50 | $8.50 |
| 199 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 50 | $10.00 | $10.00 |
| 200 | Conduit special 2-inch (652.0605) | LF | 650 | $23.00 | $23.00 |
| 201 | Install conduit into existing item (652.0700.S) | EACH | 3 | $95.00 | $95.00 |
| 202 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 7 | $2,100.00 | $2,100.00 |
| 203 | Adjusting pull boxes (653.0900) | EACH | 1 | $160.00 | $160.00 |
| 204 | Concrete bases type 5 (654.0105) | EACH | 29 | $1,245.00 | $1,245.00 |
| 205 | Electrical wire lighting 12 AWG (655.0610) | LF | 8,284 | $0.85 | $0.85 |
| 206 | Electrical wire lighting 8 AWG (655.0620) | LF | 29,154 | $1.50 | $1.50 |
| 207 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 51 | $850.00 | $850.00 |
| 208 | Poles type 5-aluminum (657.0322) | EACH | 51 | $2,180.00 | $2,180.00 |
| 209 | Luminaire arms single member 4 1/2-inch clamp 6-FT (657.0610) | EACH | 33 | $340.00 | $340.00 |
| 210 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 18 | $870.00 | $870.00 |
| 211 | Luminaires utility LED B (659.1120) | EACH | 33 | $500.00 | $500.00 |
| 212 | Luminaires utility LED C (659.1125) | EACH | 18 | $530.00 | $530.00 |
| 213 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 42 | $8.00 | $8.00 |
| 214 | Field system integrator (670.0101) | EACH | 1 | $5,485.00 | $5,485.00 |
| 215 | Install camera assembly (677.0200) | EACH | 5 | $2,445.00 | $2,445.00 |
| 216 | Removing CCTV camera (677.9200.S) | EACH | 5 | $1,200.00 | $1,200.00 |
| 217 | Sawing asphalt (690.0150) | LF | 8,048 | $1.95 | $1.95 |
| 218 | Sawing concrete (690.0250) | LF | 13,219 | $2.55 | $2.55 |
| 219 | Incentive strength concrete structures (715.0502) | DOL | 1,285 | $1.00 | $1.00 |
| 220 | Incentive strength concrete barrier (715.0603) | DOL | 75 | $1.00 | $1.00 |
| 221 | Incentive compressive strength concrete pavement (715.0720) | DOL | 1,840 | $1.00 | $1.00 |
| 222 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 5,852 | $2.25 | $2.25 |
| 223 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,500 | $5.00 | $5.00 |
| 224 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,000 | $5.00 | $5.00 |
| 225 | Special 01. repair embankment (SPV.0060) | EACH | 3 | $3,000.00 | $3,000.00 |
| 226 | Special 02. reset and retie end section (SPV.0060) | EACH | 1 | $2,500.00 | $2,500.00 |
| 227 | Special 03. remove stone sign supports (SPV.0060) | EACH | 2 | $616.00 | $616.00 |
| 228 | Special 04. remove playground landscaping (SPV.0060) | EACH | 2 | $2,265.00 | $2,265.00 |
| 229 | Special 05. modify existing lighting controls (SPV.0060) | EACH | 2 | $800.00 | $800.00 |
| 230 | Special 06. temporary street lighting system (rest area #61) (SPV.0060) | EACH | 1 | $23,000 | $23,000 |
| 231 | Special 07. temporary street lighting system (rest area #62) (SPV.0060) | EACH | 1 | $23,000 | $23,000 |
| 232 | Special 08. install wireless traffic sensor (SPV.0060) | EACH | 12 | $2,300.00 | $2,300.00 |
| 233 | Special 09. install wireless traffic sensor access point (SPV.0060) | EACH | 2 | $5,000.00 | $5,000.00 |
| 234 | Special 10. install wireless traffic sensor repeater (SPV.0060) | EACH | 2 | $5,700.00 | $5,700.00 |
| 235 | Special 11. fence repairs B-17-29 (SPV.0060) | EACH | 1 | $5,000.00 | $15,000 |
| 236 | Special 12. bearing maintenance B- 17-29 (SPV.0060) | EACH | 26 | $2,750.00 | $3,500.00 |
| 237 | Special 13. temporary water diversion, structure B-17-51 (SPV.0060) | EACH | 1 | $15,000 | $50,000 |
| 238 | Special 14. cleaning box culvert (SPV.0060) | EACH | 1 | $22,900 | $50,000 |
| 239 | Special 15. culvert pipe replacement limits exploration and removal (SPV.0060) | EACH | 1 | $2,500.00 | $2,500.00 |
| 240 | Special 01. cleaning ditch (SPV.0090) | LF | 8,195 | $8.65 | $8.65 |
| 241 | Special 01. fiber wrap reinforcing non-structural (SPV.0165) | SF | 4,181 | $49.75 | $49.75 |
| 242 | Special 02. prestressed girder surface repair (SPV.0165) | SF | 57 | $200.00 | $600.00 |
| 243 | Special 01. rapid concrete pavement repair (SPV.0180) | SY | 1,761 | $219.39 | $224.99 |
| 244 | Special 02. rapid concrete pavement replacement (SPV.0180) | SY | 4,336 | $224.99 | $224.99 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.