| 1 | Clearing (201.0105) | STA | 1 | $1,135.00 | $1,135.00 |
| 2 | Grubbing (201.0205) | STA | 1 | $375.00 | $375.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 2 | $250.00 | $250.00 |
| 4 | Abatement of asbestos containing material (structure) 01. B-27-0053 (203.0211.S) | EACH | 1 | $10,000 | $7,500.00 |
| 5 | Debris containment (structure) 01. B-27-0053 (203.0330) | EACH | 1 | $1.00 | $500.00 |
| 6 | Removing concrete pavement (204.0100) | SY | 122 | $23.40 | $23.40 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 53 | $11.65 | $11.65 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 3,950 | $7.97 | $7.97 |
| 9 | Removing guardrail (204.0165) | LF | 2,772 | $2.10 | $2.10 |
| 10 | Removing surface drains (204.0190) | EACH | 2 | $200.00 | $200.00 |
| 11 | Excavation common (205.0100) | CY | 660 | $10.40 | $10.40 |
| 12 | Borrow (208.0100) | CY | 1,670 | $26.05 | $26.05 |
| 13 | Prepare foundation for asphaltic paving (project) 01. 1023-00-81 (211.0101) | EACH | 1 | $11,459 | $11,459 |
| 14 | Finishing roadway (project) 01. 1023-00-81 (213.0100) | EACH | 1 | $500.00 | $500.00 |
| 15 | Base aggregate dense 3/4-inch (305.0110) | TON | 370 | $27.75 | $27.75 |
| 16 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,300 | $25.85 | $25.85 |
| 17 | Concrete pavement approach slab (415.0410) | SY | 119 | $323.39 | $323.39 |
| 18 | Tack coat (455.0605) | GAL | 270 | $5.71 | $5.71 |
| 19 | Incentive density HMA pavement (460.2000) | DOL | 660 | $1.00 | $1.00 |
| 20 | HMA pavement 4 MT 58-34 S (460.6244) | TON | 905 | $146.77 | $146.77 |
| 21 | Asphaltic surface (465.0105) | TON | 100 | $336.39 | $336.39 |
| 22 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 1,000 | $7.31 | $3.50 |
| 23 | Expansion device (502.3101) | LF | 57 | $380.00 | $320.00 |
| 24 | Protective surface treatment (502.3200) | SY | 644 | $4.00 | $4.00 |
| 25 | Pigmented surface sealer reseal (502.3205) | SY | 123 | $30.00 | $10.00 |
| 26 | Protective surface treatment reseal (502.3215) | SY | 68 | $20.00 | $15.00 |
| 27 | Adhesive anchors no. 5 bar (502.4205) | EACH | 66 | $30.00 | $30.00 |
| 28 | Bar steel reinforcement HS coated structures (505.0600) | LB | 2,100 | $3.05 | $3.50 |
| 29 | Preparation decks type 1 (509.0301) | SY | 170 | $180.00 | $110.00 |
| 30 | Preparation decks type 2 (509.0302) | SY | 120 | $220.00 | $130.00 |
| 31 | Cleaning decks (509.0500) | SY | 630 | $54.00 | $50.00 |
| 32 | Joint repair (509.1000) | SY | 31 | $1,500.00 | $1,500.00 |
| 33 | Full-depth deck repair (509.2000) | SY | 6 | $0.01 | $100.00 |
| 34 | Concrete masonry overlay decks (509.2500) | CY | 74 | $1,300.00 | $1,600.00 |
| 35 | Preparation and coating of top flanges (structure) 01. B-27-53 (517.0901.S) | EACH | 1 | $2,000.00 | $2,000.00 |
| 36 | Structure repainting recycled abrasive (structure) 01. B-27-53 (517.1801.S) | EACH | 1 | $39,000 | $39,000 |
| 37 | Negative pressure containment and collection of waste materials (structure) 01. B-27-53 (517.4501.S) | EACH | 1 | $27,000 | $27,000 |
| 38 | Portable decontamination facility (517.6001.S) | EACH | 1 | $2,000.00 | $2,000.00 |
| 39 | Concrete collars for pipe (520.8000) | EACH | 1 | $975.00 | $975.00 |
| 40 | Culvert pipe reinforced concrete class III 18-inch (522.0118) | LF | 10 | $140.00 | $140.00 |
| 41 | Concrete curb & gutter 4-inch sloped 30-inch type TBT (601.0584) | LF | 98 | $90.31 | $90.31 |
| 42 | Concrete curb & gutter 4-inch sloped 30-inch type TBTT (601.0586) | LF | 14 | $90.31 | $90.31 |
| 43 | Concrete surface drains (602.3010) | CY | 4 | $1,610.04 | $1,610.04 |
| 44 | Riprap medium (606.0200) | CY | 16 | $97.50 | $97.50 |
| 45 | Inlet covers type MS (611.0642) | EACH | 2 | $965.00 | $965.00 |
| 46 | Inlets median 2 grate (611.3902) | EACH | 1 | $4,725.00 | $4,725.00 |
| 47 | Steel thrie beam bullnose terminal (614.0220) | EACH | 2 | $17,500 | $17,500 |
| 48 | Steel thrie beam (614.0230) | LF | 125 | $52.25 | $52.25 |
| 49 | MGS guardrail 3 (614.2300) | LF | 1,762.50 | $25.65 | $25.65 |
| 50 | MGS thrie beam transition (614.2500) | LF | 157.60 | $114.40 | $114.40 |
| 51 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,815.00 | $3,815.00 |
| 52 | Mobilization (619.1000) | EACH | 1 | $155,500 | $186,102 |
| 53 | Water (624.0100) | MGAL | 32 | $15.00 | $15.00 |
| 54 | Topsoil (625.0100) | SY | 9,610 | $1.40 | $1.40 |
| 55 | Silt fence (628.1504) | LF | 3,290 | $1.80 | $1.80 |
| 56 | Silt fence maintenance (628.1520) | LF | 3,290 | $0.01 | $0.01 |
| 57 | Silt fence heavy duty (628.1530.S) | LF | 170 | $16.00 | $16.00 |
| 58 | Silt fence heavy duty maintenance (628.1535.S) | LF | 170 | $1.20 | $1.20 |
| 59 | Mobilizations erosion control (628.1905) | EACH | 5 | $150.00 | $150.00 |
| 60 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $75.00 | $75.00 |
| 61 | Erosion mat urban class I type B (628.2008) | SY | 9,610 | $1.75 | $1.75 |
| 62 | Inlet protection type C (628.7015) | EACH | 1 | $74.50 | $74.50 |
| 63 | Fertilizer type B (629.0210) | CWT | 6.02 | $104.00 | $104.00 |
| 64 | Seeding mixture no. 20 (630.0120) | LB | 434 | $8.40 | $8.40 |
| 65 | Seeding mixture no. 60 (630.0160) | LB | 10 | $35.00 | $35.00 |
| 66 | Seeding temporary (630.0200) | LB | 258 | $2.80 | $2.80 |
| 67 | Seed water (630.0500) | MGAL | 436 | $0.01 | $0.01 |
| 68 | Field office type B (642.5001) | EACH | 1 | $6,000.00 | $3,000.00 |
| 69 | Traffic control drums (643.0300) | DAY | 9,450 | $0.20 | $0.20 |
| 70 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 80 | $22.00 | $22.00 |
| 71 | Traffic control barricades type III (643.0420) | DAY | 1,600 | $0.75 | $0.75 |
| 72 | Traffic control warning lights type A (643.0705) | DAY | 2,500 | $0.11 | $0.11 |
| 73 | Traffic control warning lights type C (643.0715) | DAY | 2,650 | $0.13 | $0.13 |
| 74 | Traffic control connected arrow boards (643.0810) | DAY | 80 | $23.00 | $23.00 |
| 75 | Traffic control signs (643.0900) | DAY | 2,700 | $0.30 | $0.30 |
| 76 | Traffic control signs fixed message (643.1000) | SF | 100 | $12.00 | $12.00 |
| 77 | Basic traffic queue warning system (643.1205.S) | DAY | 118 | $57.50 | $57.50 |
| 78 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 80 | $23.00 | $23.00 |
| 79 | Temporary marking line removable tape 6-inch (643.3180) | LF | 10,050 | $2.25 | $2.25 |
| 80 | Traffic control (643.5000) | EACH | 1 | $37,000 | $27,000 |
| 81 | Geotextile type HR (645.0120) | SY | 74 | $3.75 | $3.75 |
| 82 | Marking line epoxy 6-inch (646.2020) | LF | 3,500 | $3.30 | $3.50 |
| 83 | Marking removal line 6-inch (646.9002) | LF | 3,500 | $0.70 | $0.70 |
| 84 | Construction staking storm sewer (650.4000) | EACH | 1 | $300.00 | $300.00 |
| 85 | Construction staking subgrade (650.4500) | LF | 1,461 | $0.01 | $0.01 |
| 86 | Construction staking base (650.5000) | LF | 1,461 | $0.75 | $0.75 |
| 87 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 98 | $7.00 | $7.00 |
| 88 | Construction staking concrete pavement (650.7000) | LF | 44 | $22.50 | $22.50 |
| 89 | Construction staking supplemental control (project) 01. 1023-00-81 (650.9911) | EACH | 1 | $750.00 | $750.00 |
| 90 | Construction staking slope stakes (650.9920) | LF | 1,961 | $0.80 | $0.80 |
| 91 | Sawing asphalt (690.0150) | LF | 145 | $2.22 | $6.00 |
| 92 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 |
| 93 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 3,290 | $1.80 | $1.80 |