WisDOT contract 20260915002 bid tabulation
CTH M - CTH Q; Blue River Bridge B-22-0309 (CTH G, Grant County CTH M – CTH Q). Let by Wisconsin DOT on September 15, 2026, Grant. 5 bids received; low bid $1,634,400 by Lunda Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 73
- Data through
- 10 NOV 2026
4 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lunda Construction Company | $1,634,400 | Low |
| 2 | Sheet Piling Services LLC | $1,679,675 | +3.0% |
| 4 | Radtke Contractors Inc. | $1,882,307 | +15% |
| 5 | Zenith Tech., Inc. - Waukesha | $1,996,277 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lunda Construction Company | 2. Sheet Piling Services LLC | 3. Radtke Contractors Inc. | 4. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|---|
| 1 | Removing structure over waterway minimal debris (structure) 01. B-22- 13 (203.0260) | EACH | 1 | $150,000 | $350,000 | $178,594 | $275,000 |
| 2 | Removing asphaltic surface milling (204.0120) | SY | 667 | $19.54 | $23.11 | $19.54 | $19.54 |
| 3 | Removing guardrail (204.0165) | LF | 114 | $4.00 | $4.00 | $4.00 | $4.00 |
| 4 | Excavation common (205.0100) | CY | 863 | $12.75 | $12.75 | $12.75 | $12.75 |
| 5 | Excavation for structures bridges (structure) 01. B-22-309 (206.1001) | EACH | 1 | $50,000 | $100,000 | $119,008 | $125,000 |
| 6 | Borrow (208.0100) | CY | 232 | $0.50 | $0.50 | $0.50 | $0.50 |
| 7 | Backfill structure type A (210.1500) | TON | 499 | $28.00 | $28.00 | $36.09 | $30.00 |
| 8 | Finishing roadway (project) 01. 5905-00-70 (213.0100) | EACH | 1 | $750.00 | $750.00 | $750.00 | $4,000.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 187 | $27.00 | $27.00 | $27.00 | $27.00 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 868 | $24.00 | $24.00 | $24.00 | $24.00 |
| 11 | Select crushed material (312.0110) | TON | 869 | $23.00 | $23.00 | $23.00 | $23.00 |
| 12 | Tack coat (455.0605) | GAL | 79 | $7.00 | $7.00 | $7.00 | $7.00 |
| 13 | Incentive density HMA pavement (460.2000) | DOL | 200 | $1.00 | $1.00 | $1.00 | $1.00 |
| 14 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 311 | $125.00 | $125.00 | $125.00 | $125.00 |
| 15 | Concrete masonry bridges (502.0100) | CY | 369 | $950.00 | $850.00 | $1,078.84 | $1,200.00 |
| 16 | Protective surface treatment (502.3200) | SY | 529 | $5.00 | $3.00 | $3.69 | $4.25 |
| 17 | Pigmented surface sealer (502.3210) | SY | 188 | $8.00 | $3.00 | $14.06 | $14.00 |
| 18 | Prestressed girder type I 36W-inch (503.0137) | LF | 628 | $300.00 | $300.00 | $305.35 | $265.00 |
| 19 | Bar steel reinforcement HS structures (505.0400) | LB | 6,980 | $1.30 | $1.50 | $1.41 | $1.70 |
| 20 | Bar steel reinforcement HS coated structures (505.0600) | LB | 51,890 | $1.40 | $1.60 | $1.44 | $1.80 |
| 21 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 16 | $110.00 | $125.00 | $217.71 | $150.00 |
| 22 | Steel diaphragms (structure) 01. B- 22-309 (506.4000) | EACH | 6 | $1,500.00 | $1,300.00 | $1,100.49 | $1,500.00 |
| 23 | Floor drains type WF (514.0450) | EACH | 2 | $6,000.00 | $7,500.00 | $4,089.65 | $5,500.00 |
| 24 | Downspout 8-inch (514.2608) | LF | 9 | $275.00 | $575.00 | $221.19 | $300.00 |
| 25 | Rubberized membrane waterproofing (516.0500) | SY | 18 | $25.00 | $18.00 | $65.60 | $68.00 |
| 26 | Pre-boring rock or consolidated materials (550.0020) | LF | 900 | $120.00 | $100.00 | $275.00 | $300.00 |
| 27 | Piling steel HP 12-inch X 53 LB (550.1120) | LF | 1,035 | $66.00 | $55.00 | $41.25 | $85.00 |
| 28 | Riprap heavy (606.0300) | CY | 360 | $65.00 | $65.00 | $75.47 | $65.00 |
| 29 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 180 | $9.00 | $9.00 | $4.26 | $9.00 |
| 30 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $150.00 | $250.00 | $365.69 | $300.00 |
| 31 | MGS guardrail 3 (614.2300) | LF | 225 | $28.50 | $28.50 | $28.50 | $28.50 |
| 32 | MGS thrie beam transition (614.2500) | LF | 157.60 | $94.00 | $94.00 | $94.00 | $94.00 |
| 33 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 |
| 34 | Maintenance and repair of haul roads (project) 01. 5905-00-70 (618.0100) | EACH | 1 | $1.00 | $0.01 | $250.00 | $4,000.00 |
| 35 | Mobilization (619.1000) | EACH | 1 | $340,065 | $180,624 | $319,662 | $200,000 |
| 36 | Water (624.0100) | MGAL | 11 | $0.05 | $0.05 | $0.05 | $0.05 |
| 37 | Salvaged topsoil (625.0500) | SY | 2,993 | $4.00 | $4.00 | $4.00 | $4.00 |
| 38 | Silt fence (628.1504) | LF | 1,294 | $2.25 | $2.25 | $2.25 | $2.25 |
| 39 | Silt fence maintenance (628.1520) | LF | 1,294 | $0.01 | $0.01 | $0.01 | $0.01 |
| 40 | Mobilizations erosion control (628.1905) | EACH | 3 | $200.00 | $200.00 | $200.00 | $200.00 |
| 41 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $250.00 | $250.00 | $250.00 | $250.00 |
| 42 | Erosion mat class II type C (628.2027) | SY | 2,993 | $2.25 | $2.25 | $2.25 | $2.25 |
| 43 | Turbidity barriers (628.6005) | SY | 134 | $48.00 | $48.00 | $48.00 | $48.00 |
| 44 | Seeding mixture no. 20 (630.0120) | LB | 136 | $9.25 | $9.25 | $9.25 | $9.25 |
| 45 | Seeding temporary (630.0200) | LB | 82 | $2.50 | $2.50 | $2.50 | $2.50 |
| 46 | Seed water (630.0500) | MGAL | 4 | $1.00 | $1.00 | $1.00 | $1.00 |
| 47 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 4 | $100.00 | $100.00 | $100.00 | $100.00 |
| 48 | Signs type II reflective F (637.2230) | SF | 12 | $30.00 | $30.00 | $30.00 | $30.00 |
| 49 | Moving signs type II (638.2102) | EACH | 2 | $150.00 | $150.00 | $150.00 | $150.00 |
| 50 | Removing signs type II (638.2602) | EACH | 4 | $30.00 | $30.00 | $30.00 | $30.00 |
| 51 | Removing small sign supports (638.3000) | EACH | 4 | $30.00 | $30.00 | $30.00 | $30.00 |
| 52 | Moving small sign supports (638.4000) | EACH | 2 | $100.00 | $100.00 | $100.00 | $100.00 |
| 53 | Field office type B (642.5001) | EACH | 1 | $3,000.00 | $2,500.00 | $3,238.72 | $11,000 |
| 54 | Traffic control drums (643.0300) | DAY | 140 | $1.00 | $0.30 | $1.00 | $1.00 |
| 55 | Traffic control barricades type III (643.0420) | DAY | 1,530 | $1.00 | $0.60 | $1.00 | $1.00 |
| 56 | Traffic control warning lights type A (643.0705) | DAY | 2,040 | $0.20 | $0.01 | $0.20 | $0.20 |
| 57 | Traffic control signs (643.0900) | DAY | 1,190 | $1.00 | $0.50 | $1.00 | $1.00 |
| 58 | Traffic control signs PCMS (643.1050) | DAY | 14 | $50.00 | $100.00 | $50.00 | $50.00 |
| 59 | Traffic control (643.5000) | EACH | 1 | $1,200.00 | $5,728.00 | $2,400.00 | $1,200.00 |
| 60 | Geotextile type DF schedule A (645.0111) | SY | 60 | $9.00 | $9.00 | $4.89 | $9.00 |
| 61 | Geotextile type HR (645.0120) | SY | 615 | $10.00 | $10.00 | $5.80 | $10.00 |
| 62 | Marking line epoxy 6-inch (646.2020) | LF | 2,356 | $2.57 | $2.57 | $2.57 | $2.57 |
| 63 | Construction staking subgrade (650.4500) | LF | 591 | $0.01 | $0.01 | $0.01 | $0.01 |
| 64 | Construction staking base (650.5000) | LF | 591 | $1.75 | $0.01 | $0.01 | $1.75 |
| 65 | Construction staking structure layout (structure) 01. B-22-0309 (650.6501) | EACH | 1 | $3,500.00 | $7,500.00 | $4,000.00 | $3,500.00 |
| 66 | Construction staking supplemental control (project) 01. 5905-00-70 (650.9911) | EACH | 1 | $1,000.00 | $1.00 | $2,000.00 | $1,000.00 |
| 67 | Construction staking slope stakes (650.9920) | LF | 591 | $2.00 | $0.01 | $0.01 | $2.00 |
| 68 | Sawing asphalt (690.0150) | LF | 592 | $1.94 | $1.94 | $1.94 | $2.35 |
| 69 | Incentive strength concrete structures (715.0502) | DOL | 3,732 | $1.00 | $1.00 | $1.00 | $1.00 |
| 70 | Installing and maintaining bird deterrent system (station) 01. 9+94.50 (999.2000.S) | EACH | 1 | $1.00 | $0.01 | $911.77 | $8,000.00 |
| 71 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 |
| 72 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 | $5.00 | $5.00 |
| 73 | Special 01. salvage and reinstall fence (SPV.0090) | LF | 50 | $15.00 | $15.00 | $15.00 | $15.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.