WisDOT contract 20250114041 bid tabulation
9925-00-70. Let by Wisconsin DOT on January 14, 2025, Ashland. 1 bid received; low bid $7,104,242 by Northwoods Paving, A Div. of Mathy Const.
- Owner
- Wisconsin DOT
- Letting
- 14 JAN 2025
- Pay items
- 121
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Northwoods Paving, A Div. of Mathy Const | $7,104,242 | Low |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Northwoods Paving, A Div. of Mathy Const |
|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 2 | $1,300.00 |
| 2 | Grubbing (201.0205) | STA | 2 | $1,300.00 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 11 | $500.00 |
| 4 | Removing structure over waterway debris capture (structure) 01. B-2- 26 (203.0270) | EACH | 1 | $150,000 |
| 5 | Removing asphaltic surface (204.0110) | SY | 459 | $6.00 |
| 6 | Removing asphaltic surface butt joints (204.0115) | SY | 268 | $11.41 |
| 7 | Removing asphaltic surface milling (204.0120) | SY | 149,431 | $2.48 |
| 8 | Removing curb & gutter (204.0150) | LF | 227 | $12.00 |
| 9 | Excavation common (205.0100) | CY | 198 | $34.50 |
| 10 | Grading shaping and finishing intersection (location) 01. STH 13/STH 169 (205.9016.S) | EACH | 1 | $8,500.00 |
| 11 | Excavation for structures bridges (structure) 01. B-2-26 (206.1001) | EACH | 1 | $3,000.00 |
| 12 | Borrow (208.0100) | CY | 154 | $66.00 |
| 13 | Select borrow (208.1100) | CY | 94 | $69.00 |
| 14 | Backfill structure type A (210.1500) | TON | 70 | $70.00 |
| 15 | Finishing roadway (project) 01. 9925-00-70 (213.0100) | EACH | 1 | $2,786.22 |
| 16 | Finishing roadway (project) 02. 9925-00-71 (213.0100) | EACH | 1 | $1,678.97 |
| 17 | Base aggregate dense 3/4-inch (305.0110) | TON | 5,057 | $29.08 |
| 18 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,564 | $23.50 |
| 19 | QMP pulverize and relay compaction (374.1020.S) | SY | 145,318 | $0.17 |
| 20 | Concrete pavement 12-inch (415.0120) | SY | 40 | $210.01 |
| 21 | Concrete pavement approach slab (415.0410) | SY | 118 | $310.26 |
| 22 | HMA cold weather paving (450.4000) | TON | 2,500 | $2.50 |
| 23 | Tack coat (455.0605) | GAL | 21,386 | $3.56 |
| 24 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $8,226.70 |
| 25 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $2,220.00 |
| 26 | Incentive density HMA pavement (460.2000) | DOL | 910 | $1.00 |
| 27 | Incentive density PWL HMA pavement (460.2005) | DOL | 28,483 | $1.00 |
| 28 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 21,800 | $1.00 |
| 29 | Incentive air voids HMA pavement (460.2010) | DOL | 28,483 | $1.00 |
| 30 | HMA pavement 4 MT 58-34 V (460.6644) | TON | 29,203 | $94.77 |
| 31 | Material transfer vehicle (460.9000.S) | EACH | 1 | $40,863 |
| 32 | Asphaltic surface (465.0105) | TON | 400 | $168.04 |
| 33 | Asphaltic surface patching (465.0110) | TON | 102 | $276.54 |
| 34 | Asphaltic surface detours (465.0115) | TON | 500 | $103.05 |
| 35 | Asphaltic surface driveways and field entrances (465.0120) | TON | 91 | $161.53 |
| 36 | Asphaltic surface safety islands (465.0305) | TON | 8 | $250.19 |
| 37 | Asphaltic rumble strips, centerline (465.0560) | LF | 52,427 | $0.37 |
| 38 | Concrete masonry bridges (502.0100) | CY | 115 | $1,300.00 |
| 39 | Protective surface treatment (502.3200) | SY | 279 | $3.00 |
| 40 | Adhesive anchors no. 4 bar (502.4204) | EACH | 16 | $15.00 |
| 41 | Adhesive anchors no. 5 bar (502.4205) | EACH | 107 | $15.00 |
| 42 | Bar steel reinforcement HS coated structures (505.0600) | LB | 24,940 | $1.47 |
| 43 | Concrete surface repair (509.1500) | SF | 20 | $185.00 |
| 44 | Railing tubular type M (513.4061) | LF | 138 | $325.00 |
| 45 | Rubberized membrane waterproofing (516.0500) | SY | 14 | $20.00 |
| 46 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 4 | $525.00 |
| 47 | Apron endwalls for culvert pipe steel 36-inch (521.1036) | EACH | 2 | $980.00 |
| 48 | Apron endwalls for pipe arch steel 28X20-inch (521.1228) | EACH | 14 | $488.00 |
| 49 | Apron endwalls for pipe arch steel 35X24-inch (521.1235) | EACH | 4 | $615.00 |
| 50 | Culvert pipe corrugated steel polymer coated 24-inch (521.5124) | LF | 100 | $140.00 |
| 51 | Culvert pipe corrugated steel polymer coated 36-inch (521.5136) | LF | 40 | $188.00 |
| 52 | Pipe arch polymer coated corrugated steel 28X20-inch (521.5728) | LF | 266 | $147.00 |
| 53 | Pipe arch polymer coated corrugated steel 35X24-inch (521.5735) | LF | 72 | $168.00 |
| 54 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 84 | $220.00 |
| 55 | Culvert pipe reinforced concrete class IV 15-inch (522.0415) | LF | 32 | $169.00 |
| 56 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 2 | $1,165.00 |
| 57 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 4 | $1,775.00 |
| 58 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 19X30-inch (522.2319) | LF | 72 | $232.00 |
| 59 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 4 | $1,725.00 |
| 60 | Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413) | LF | 164 | $65.78 |
| 61 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 140 | $68.00 |
| 62 | Riprap heavy (606.0300) | CY | 20 | $250.00 |
| 63 | Barrier system grading shaping finishing (614.0010) | EACH | 4 | $3,025.00 |
| 64 | Adjusting steel plate beam guard (614.0400) | LF | 458 | $10.00 |
| 65 | MGS thrie beam transition (614.2500) | LF | 156 | $97.00 |
| 66 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $4,220.00 |
| 67 | Maintenance and repair of haul roads (project) 01. 9925-00-70 (618.0100) | EACH | 1 | $781.25 |
| 68 | Maintenance and repair of haul roads (project) 02. 9925-00-71 (618.0100) | EACH | 1 | $575.00 |
| 69 | Mobilization (619.1000) | EACH | 1 | $433,014 |
| 70 | Water (624.0100) | MGAL | 660 | $45.00 |
| 71 | Topsoil (625.0100) | SY | 645 | $10.00 |
| 72 | Salvaged topsoil (625.0500) | SY | 2,540 | $4.00 |
| 73 | Mulching (627.0200) | SY | 2,540 | $0.40 |
| 74 | Erosion bales (628.1104) | EACH | 20 | $14.00 |
| 75 | Silt fence (628.1504) | LF | 2,850 | $2.10 |
| 76 | Silt fence maintenance (628.1520) | LF | 2,850 | $0.02 |
| 77 | Mobilizations erosion control (628.1905) | EACH | 3 | $240.00 |
| 78 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $240.00 |
| 79 | Erosion mat class II type B (628.2023) | SY | 680 | $2.30 |
| 80 | Erosion mat class III type D (628.2039) | SY | 680 | $15.00 |
| 81 | Culvert pipe checks (628.7555) | EACH | 1 | $15.00 |
| 82 | Fertilizer type B (629.0210) | CWT | 2.60 | $80.00 |
| 83 | Seeding mixture no. 20 (630.0120) | LB | 60 | $7.00 |
| 84 | Seeding mixture no. 80 (630.0180) | LB | 10 | $13.00 |
| 85 | Seeding temporary (630.0200) | LB | 60 | $4.00 |
| 86 | Seeding nurse crop (630.0400) | LB | 10 | $5.00 |
| 87 | Seed water (630.0500) | MGAL | 95 | $1.00 |
| 88 | Markers culvert end (633.5200) | EACH | 98 | $58.00 |
| 89 | Field office type C (642.5201) | EACH | 1 | $15,217 |
| 90 | Traffic control drums (643.0300) | DAY | 210 | $1.00 |
| 91 | Traffic control barricades type III (643.0420) | DAY | 3,295 | $1.00 |
| 92 | Traffic control warning lights type A (643.0705) | DAY | 3,476 | $0.25 |
| 93 | Traffic control warning lights type C (643.0715) | DAY | 210 | $0.35 |
| 94 | Traffic control signs (643.0900) | DAY | 14,208 | $0.75 |
| 95 | Traffic control covering signs type II (643.0920) | EACH | 14 | $0.01 |
| 96 | Temporary marking line paint 6- inch (643.3165) | LF | 286,231 | $0.29 |
| 97 | Traffic control (643.5000) | EACH | 1 | $5,812.00 |
| 98 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 196,856 | $1.20 |
| 99 | Marking stop line epoxy 18-inch (646.6120) | LF | 47 | $16.00 |
| 100 | Marking island nose epoxy (646.8220) | EACH | 3 | $350.00 |
| 101 | Locating no-passing zones (648.0100) | MI | 10.30 | $280.00 |
| 102 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 304 | $5.45 |
| 103 | Construction staking pipe culverts (650.6000) | EACH | 17 | $450.00 |
| 104 | Construction staking structure layout (structure) 01. B-2-26 (650.6501) | EACH | 1 | $250.00 |
| 105 | Construction staking resurfacing reference (650.8000) | LF | 54,688 | $0.11 |
| 106 | Construction staking supplemental control (project) 01. 9925-00-70 (650.9911) | EACH | 1 | $10.00 |
| 107 | Construction staking supplemental control (project) 02. 9925-00-71 (650.9911) | EACH | 1 | $10.00 |
| 108 | Construction staking slope stakes (650.9920) | LF | 450 | $3.44 |
| 109 | Temporary traffic signals for bridges (structure) 01. B-02-0026 (661.0101) | EACH | 1 | $11,600 |
| 110 | Sawing asphalt (690.0150) | LF | 604 | $9.08 |
| 111 | Incentive strength concrete structures (715.0502) | DOL | 690 | $1.00 |
| 112 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 |
| 113 | Incentive iri ride (740.0440) | DOL | 41,200 | $1.00 |
| 114 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,700 | $5.00 |
| 115 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,300 | $5.00 |
| 116 | Special 01. base repair for stabilized base reclamation layer (SPV.0035) | CY | 1,206 | $14.90 |
| 117 | Special 01. railroad crossing removal (SPV.0060) | EACH | 1 | $20,000 |
| 118 | Special 01. regrading ditch (SPV.0090) | LF | 150 | $30.00 |
| 119 | Special 02. flashing stainless steel (SPV.0090) | LF | 64 | $45.00 |
| 120 | Special 01. stabilized base reclamation (SPV.0180) | SY | 145,318 | $6.37 |
| 121 | Special 01. asphalt stabilizing agent (SPV.0195) | TON | 2,268 | $312.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 14, 2025. Compiled by Mirage Metrics.