WisDOT contract 20250211006 bid tabulation
Town of Bergen to STH 162 (CTH O); Skyline Lane to Sylvan Glen Road (CTH O, Vernon County Town of Bergen to STH 162 (CTH O)). Let by Wisconsin DOT on February 11, 2025, Vernon. 5 bids received; low bid $2,338,211 by H. James & Sons, Inc.
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 82
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | H. James & Sons, Inc | $2,338,211 | Low |
| 2 | Integrity Grading and Excavating, Inc. | $2,627,995 | +12% |
| 3 | James Peterson Sons, Inc. | $2,788,718 | +19% |
| 4 | Gerke Excavating Inc | $2,905,729 | +24% |
| 5 | A-1 Excavating LLC | $3,017,454 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. H. James & Sons, Inc | 2. Integrity Grading and Excavating, Inc. | 3. James Peterson Sons, Inc. | 4. Gerke Excavating Inc | 5. A-1 Excavating LLC |
|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 50 | $349.00 | $349.00 | $349.00 | $423.39 | $400.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 14 | $485.00 | $230.00 | $600.00 | $775.81 | $400.00 |
| 3 | Removing structure (structure) 01. sta 174+23, reinforced concrete cattle pass (203.0220) | EACH | 1 | $2,920.00 | $6,559.00 | $10,000 | $7,417.64 | $5,000.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 51 | $15.00 | $10.80 | $10.00 | $14.82 | $4.00 |
| 5 | Removing guardrail (204.0165) | LF | 3,372 | $1.65 | $1.65 | $1.65 | $1.73 | $2.00 |
| 6 | Excavation common (205.0100) | CY | 35,791 | $5.38 | $11.00 | $13.35 | $14.33 | $17.00 |
| 7 | Excavation rock (205.0200) | CY | 1,329 | $17.97 | $22.25 | $31.22 | $38.07 | $1.00 |
| 8 | Finishing roadway (project) 01. 5537-00-71 (213.0100) | EACH | 1 | $1,000.00 | $500.00 | $3,200.00 | $1,567.45 | $2,000.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 969 | $19.23 | $22.00 | $19.11 | $29.22 | $26.00 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 44,060 | $15.60 | $15.55 | $13.50 | $16.96 | $18.50 |
| 11 | Tack coat (455.0605) | GAL | 1,145 | $4.80 | $4.80 | $4.80 | $5.04 | $5.00 |
| 12 | Incentive density HMA pavement (460.2000) | DOL | 3,170 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 13 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 2,800 | $101.15 | $101.15 | $101.15 | $101.15 | $106.00 |
| 14 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 2,180 | $106.07 | $106.07 | $106.07 | $111.37 | $110.00 |
| 15 | Asphaltic surface (465.0105) | TON | 65 | $147.89 | $147.89 | $147.89 | $155.28 | $155.00 |
| 16 | Asphaltic surface driveways and field entrances (465.0120) | TON | 9 | $460.30 | $460.30 | $460.30 | $483.32 | $480.00 |
| 17 | Concrete masonry endwalls (504.0900) | CY | 9 | $1,936.00 | $1,500.00 | $1,825.00 | $1,916.25 | $1,915.00 |
| 18 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 6 | $445.00 | $710.00 | $265.00 | $341.91 | $350.00 |
| 19 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 16 | $495.00 | $800.00 | $392.00 | $397.34 | $400.00 |
| 20 | Apron endwalls for culvert pipe steel 30-inch (521.1030) | EACH | 6 | $840.00 | $1,000.00 | $704.00 | $593.70 | $625.00 |
| 21 | Culvert pipe corrugated steel 18- inch (521.3118) | LF | 110 | $72.13 | $70.00 | $60.00 | $51.06 | $82.00 |
| 22 | Culvert pipe corrugated steel 24- inch (521.3124) | LF | 383 | $82.13 | $75.00 | $187.00 | $118.50 | $92.00 |
| 23 | Culvert pipe corrugated steel 30- inch (521.3130) | LF | 128 | $96.90 | $96.00 | $224.00 | $157.28 | $114.00 |
| 24 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 2 | $1,500.00 | $1,637.00 | $1,353.00 | $1,249.46 | $1,850.00 |
| 25 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 1 | $1,845.00 | $1,850.00 | $1,566.00 | $1,482.52 | $2,100.00 |
| 26 | Pipe cattle pass reinforced concrete (522.1500) | LF | 40 | $614.00 | $608.00 | $912.00 | $1,048.47 | $765.00 |
| 27 | Riprap heavy (606.0300) | CY | 361 | $75.00 | $122.00 | $105.00 | $80.61 | $75.00 |
| 28 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 92 | $104.03 | $130.00 | $209.55 | $154.13 | $130.00 |
| 29 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 48 | $141.38 | $145.00 | $239.15 | $196.81 | $166.00 |
| 30 | Inlet covers type MS (611.0642) | EACH | 6 | $625.00 | $639.00 | $650.00 | $897.58 | $725.00 |
| 31 | Inlets median 2 grate (611.3902) | EACH | 3 | $4,170.00 | $5,454.00 | $4,010.00 | $3,925.27 | $3,550.00 |
| 32 | MGS guardrail 3 (614.2300) | LF | 225 | $20.50 | $20.50 | $20.50 | $21.53 | $21.50 |
| 33 | MGS guardrail 3 K (614.2330) | LF | 6,366.50 | $34.35 | $34.35 | $34.35 | $36.07 | $36.00 |
| 34 | MGS guardrail terminal eat (614.2610) | EACH | 6 | $3,245.00 | $3,245.00 | $3,245.00 | $3,407.25 | $3,400.00 |
| 35 | Maintenance and repair of haul roads (project) 01. 5537-00-71 (618.0100) | EACH | 1 | $1,000.00 | $500.00 | $1,500.00 | $0.01 | $1,000.00 |
| 36 | Mobilization (619.1000) | EACH | 1 | $116,553 | $151,575 | $229,594 | $183,283 | $127,000 |
| 37 | Water (624.0100) | MGAL | 450 | $25.00 | $40.00 | $40.00 | $33.99 | $30.00 |
| 38 | Salvaged topsoil (625.0500) | SY | 20,630 | $3.45 | $3.00 | $2.86 | $2.20 | $3.00 |
| 39 | Silt fence (628.1504) | LF | 9,800 | $1.70 | $1.70 | $1.70 | $1.79 | $1.80 |
| 40 | Silt fence maintenance (628.1520) | LF | 9,800 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 41 | Mobilizations erosion control (628.1905) | EACH | 10 | $100.00 | $100.00 | $100.00 | $105.00 | $105.00 |
| 42 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $50.00 | $50.00 | $50.00 | $52.50 | $52.00 |
| 43 | Erosion mat class II type B (628.2023) | SY | 20,630 | $1.60 | $1.60 | $1.60 | $1.68 | $1.70 |
| 44 | Inlet protection type A (628.7005) | EACH | 3 | $175.00 | $175.00 | $175.00 | $183.75 | $185.00 |
| 45 | Temporary ditch checks (628.7504) | LF | 1,310 | $5.50 | $5.50 | $5.50 | $5.78 | $5.75 |
| 46 | Stone ditch checks (628.7515.S) | CY | 560 | $15.00 | $90.00 | $69.00 | $47.04 | $75.00 |
| 47 | Culvert pipe checks (628.7555) | EACH | 42 | $15.00 | $15.00 | $15.00 | $15.75 | $16.00 |
| 48 | Tracking pads (628.7560) | EACH | 2 | $0.01 | $1,000.00 | $3,000.00 | $992.62 | $100.00 |
| 49 | Rock bags (628.7570) | EACH | 800 | $5.90 | $5.90 | $5.90 | $6.20 | $16.00 |
| 50 | Fertilizer type A (629.0205) | CWT | 13 | $73.00 | $73.00 | $73.00 | $76.65 | $7.00 |
| 51 | Seeding mixture no. 20 (630.0120) | LB | 560 | $6.50 | $6.50 | $6.50 | $6.83 | $75.00 |
| 52 | Seeding temporary (630.0200) | LB | 560 | $2.40 | $2.40 | $2.40 | $2.52 | $7.00 |
| 53 | Seed water (630.0500) | MGAL | 460 | $0.01 | $0.01 | $0.01 | $0.01 | $2.50 |
| 54 | Markers culvert end (633.5200) | EACH | 27 | $49.00 | $49.00 | $49.00 | $51.45 | $0.01 |
| 55 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 6 | $85.00 | $85.00 | $85.00 | $89.25 | $55.00 |
| 56 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 8 | $95.00 | $95.00 | $95.00 | $99.75 | $90.00 |
| 57 | Signs type II reflective H (637.2210) | SF | 27.67 | $15.80 | $15.80 | $15.80 | $16.59 | $100.00 |
| 58 | Signs type II reflective F (637.2230) | SF | 91.50 | $18.70 | $18.70 | $18.70 | $19.63 | $17.00 |
| 59 | Removing signs type II (638.2602) | EACH | 23 | $17.00 | $17.00 | $17.00 | $17.85 | $20.00 |
| 60 | Removing small sign supports (638.3000) | EACH | 16 | $17.00 | $17.00 | $17.00 | $17.85 | $18.00 |
| 61 | Field office type B (642.5001) | EACH | 1 | $8,500.00 | $13,200 | $10,000 | $7,301.73 | $10,017 |
| 62 | Traffic control drums (643.0300) | DAY | 3,150 | $0.20 | $0.20 | $0.20 | $0.21 | $0.40 |
| 63 | Traffic control barricades type III (643.0420) | DAY | 2,270 | $0.55 | $0.55 | $0.55 | $0.58 | $0.55 |
| 64 | Traffic control warning lights type A (643.0705) | DAY | 4,540 | $0.15 | $0.15 | $0.15 | $0.16 | $0.30 |
| 65 | Traffic control signs (643.0900) | DAY | 2,650 | $0.35 | $0.35 | $0.35 | $0.37 | $0.30 |
| 66 | Traffic control signs PCMS (643.1050) | DAY | 14 | $45.00 | $45.00 | $45.00 | $47.25 | $105.00 |
| 67 | Traffic control (643.5000) | EACH | 1 | $6,095.00 | $6,095.00 | $6,095.00 | $6,399.75 | $3,905.00 |
| 68 | Geotextile type HR (645.0120) | SY | 541 | $4.50 | $2.73 | $3.12 | $2.35 | $4.00 |
| 69 | Geotextile type R (645.0130) | SY | 2,360 | $3.75 | $1.06 | $1.25 | $1.76 | $3.00 |
| 70 | Geogrid type SSR (645.0260) | SY | 18,900 | $3.34 | $2.43 | $3.40 | $3.73 | $3.60 |
| 71 | Marking line paint 6-inch (646.2005) | LF | 33,068 | $0.25 | $0.25 | $0.25 | $0.26 | $0.40 |
| 72 | Construction staking storm sewer (650.4000) | EACH | 3 | $200.00 | $200.00 | $200.00 | $210.00 | $210.00 |
| 73 | Construction staking subgrade (650.4500) | LF | 8,290 | $0.01 | $0.01 | $0.01 | $0.53 | $0.01 |
| 74 | Construction staking base (650.5000) | LF | 8,290 | $0.50 | $0.50 | $0.50 | $0.01 | $0.55 |
| 75 | Construction staking pipe culverts (650.6000) | EACH | 14 | $200.00 | $200.00 | $200.00 | $210.00 | $210.00 |
| 76 | Construction staking supplemental control (project) 01. 5537-00-71 (650.9911) | EACH | 1 | $500.00 | $500.00 | $500.00 | $525.00 | $525.00 |
| 77 | Construction staking slope stakes (650.9920) | LF | 8,290 | $0.75 | $0.75 | $0.75 | $0.79 | $0.80 |
| 78 | Sawing asphalt (690.0150) | LF | 100 | $2.95 | $2.95 | $2.95 | $3.10 | $4.00 |
| 79 | Incentive iri ride (740.0440) | DOL | 6,280 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 80 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 81 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 82 | Special 01. utility line opening (SPV.0060) | EACH | 5 | $1,000.00 | $1,600.00 | $1,500.00 | $1,231.53 | $600.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.