WisDOT contract 20250211018 bid tabulation

T Merton, Hartling Rd; Bark River Bridge B67-0210 (CTH EF, Waukesha County T Merton, Hartling Rd). Let by Wisconsin DOT on February 11, 2025, Waukesha. 2 bids received; low bid $249,682 by Zenith Tech., Inc. - Waukesha.

Owner
Wisconsin DOT
Letting
11 FEB 2025
Pay items
58
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Zenith Tech., Inc. - Waukesha$249,682Low
2Lunda Construction Company$286,212+15%
WisDOT contract 20250211018: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Zenith Tech., Inc. - Waukesha2. Lunda Construction Company
1Removing asphaltic surface butt joints (204.0115)SY100$16.00$16.00
2Removing asphaltic surface milling (204.0120)SY150$16.00$16.00
3Removing guardrail (204.0165)LF311$3.00$7.00
4Excavation common (205.0100)CY304$18.00$25.00
5Prepare foundation for asphaltic paving (project) 01. 2756-05-71 (211.0101)EACH1$3,335.00$335.00
6Finishing roadway (project) 01. 2756-05-71 (213.0100)EACH1$500.00$500.00
7Base aggregate dense 3/4-inch (305.0110)TON130$18.00$28.00
8Base aggregate dense 1 1/4-inch (305.0120)TON530$20.00$24.00
9Tack coat (455.0605)GAL48$2.00$2.00
10Incentive density HMA pavement (460.2000)DOL90$1.00$1.00
11HMA pavement 3 LT 58-28 S (460.5223)TON54$140.00$140.00
12HMA pavement 4 LT 58-28 S (460.5224)TON75$120.00$120.00
13Protective surface treatment (502.3200)SY110$5.00$15.00
14Preparation decks type 1 (509.0301)SY15$275.00$220.00
15Preparation decks type 2 (509.0302)SY8$325.00$240.00
16Cleaning decks (509.0500)SY110$65.00$90.00
17Concrete surface repair (509.1500)SF82$160.00$195.00
18Full-depth deck repair (509.2000)SY2$1,500.00$500.00
19Concrete masonry overlay decks (509.2500)CY8$5,500.00$4,500.00
20MGS guardrail 3 L (614.2340)LF224$38.80$32.00
21MGS guardrail terminal eat (614.2610)EACH4$4,200.00$4,300.00
22Mobilization (619.1000)EACH1$53,000$92,261
23Water (624.0100)MGAL14$0.01$0.01
24Topsoil (625.0100)SY530$9.00$8.00
25Silt fence (628.1504)LF690$3.00$3.00
26Silt fence maintenance (628.1520)LF690$0.10$0.01
27Mobilizations erosion control (628.1905)EACH5$50.00$100.00
28Mobilizations emergency erosion control (628.1910)EACH3$1.00$100.00
29Erosion mat class I type A (628.2002)SY530$4.00$2.00
30Rock bags (628.7570)EACH40$15.00$25.00
31Fertilizer type B (629.0210)CWT1$90.00$250.00
32Seeding mixture no. 30 (630.0130)LB29$13.00$25.00
33Seeding temporary (630.0200)LB44$3.00$15.00
34Seed water (630.0500)MGAL17$30.00$100.00
35Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH8$240.00$250.00
36Signs type II reflective H (637.2210)SF29$31.00$30.00
37Signs type II reflective F (637.2230)SF12$31.00$30.00
38Moving signs type II (638.2102)EACH2$80.00$250.00
39Removing signs type II (638.2602)EACH4$15.00$40.00
40Removing small sign supports (638.3000)EACH6$15.00$40.00
41Field office type B (642.5001)EACH1$6,000.00$1,500.00
42Traffic control barricades type III (643.0420)DAY735$1.80$1.80
43Traffic control warning lights type A (643.0705)DAY1,190$0.15$0.15
44Traffic control signs (643.0900)DAY2,030$1.00$1.00
45Traffic control covering signs type II (643.0920)EACH8$75.00$75.00
46Traffic control signs PCMS (643.1050)DAY14$50.00$50.00
47Traffic control (643.5000)EACH1$3,400.00$3,400.00
48Marking line epoxy 6-inch (646.2020)LF1,220$4.05$4.05
49Construction staking subgrade (650.4500)LF484$0.01$0.01
50Construction staking base (650.5000)LF484$2.00$2.00
51Construction staking structure layout (structure) 01. B-67-210 (650.6501)EACH1$0.01$0.01
52Construction staking resurfacing reference (650.8000)LF97$1.00$1.00
53Construction staking supplemental control (project) 01. 2756-05-71 (650.9911)EACH1$1,500.00$1,500.00
54Construction staking slope stakes (650.9920)LF484$2.00$2.00
55Sawing asphalt (690.0150)LF614$1.25$2.00
56Special 01. strapping B-67-210 (SPV.0060)EACH4$2,500.00$3,000.00
57Special 02. removing guardrail posts and assembly mounted to box culvert (SPV.0060)EACH8$325.00$100.00
58Special 01. flashing stainless steel (SPV.0090)LF43$50.00$75.00
WisDOT contract 20250211018: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy