WisDOT contract 20250211019 bid tabulation
C Milwaukee, N Holton St Phase 3; Br Ovr Milw River, Commerce, Water (LOC STR, Milwaukee County C Milwaukee, N Holton St Phase 3). Let by Wisconsin DOT on February 11, 2025, Milwaukee. 5 bids received; low bid $4,431,732 by Zenith Tech., Inc. - Waukesha.
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 36
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zenith Tech., Inc. - Waukesha | $4,431,732 | Low |
| 2 | Civil Coatings & Construction, Inc. | $4,444,208 | 0.0% |
| 3 | Omega Coatings & Construction, LLC | $4,684,348 | +6.0% |
| 4 | Lunda Construction Company | $8,646,575 | +95% |
| 5 | KMX Painting Inc | $9,641,410 | +118% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zenith Tech., Inc. - Waukesha | 2. Civil Coatings & Construction, Inc. | 3. Omega Coatings & Construction, LLC | 4. Lunda Construction Company | 5. KMX Painting Inc |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing structure over waterway debris capture (structure) 001. P- 40-875 (203.0270) | EACH | 1 | $10,186 | $10,400 | $15,000 | $250,000 | $15,000 |
| 2 | Removing concrete sidewalk (204.0155) | SY | 9 | $593.23 | $602.59 | $755.00 | $50.00 | $1,000.00 |
| 3 | Structural steel carbon (506.0105) | LB | 8,000 | $45.00 | $30.32 | $45.00 | $80.00 | $38.00 |
| 4 | Painting epoxy system (structure) 001. P-40-875 (517.0601) | EACH | 1 | $16,000 | $20,000 | $15,000 | $300,000 | $500,000 |
| 5 | Structure repainting recycled abrasive (structure) 001. P-40-875 (517.1801.S) | EACH | 1 | $1,951,650 | $2,227,000 | $1,550,000 | $3,400,000 | $4,200,000 |
| 6 | Negative pressure containment and collection of waste materials (structure) 001. P-40-875 (517.4501.S) | EACH | 1 | $867,400 | $1,219,554 | $1,000,000 | $418,000 | $2,100,000 |
| 7 | Portable decontamination facility (517.6001.S) | EACH | 1 | $1,000.00 | $10,000 | $2,000.00 | $5,000.00 | $60,000 |
| 8 | Concrete sidewalk 5-inch (602.0410) | SF | 81 | $40.74 | $40.74 | $50.00 | $25.00 | $80.00 |
| 9 | Mobilization (619.1000) | EACH | 1 | $725,000 | $210,000 | $1,100,000 | $529,615 | $1,400,000 |
| 10 | Mobilizations erosion control (628.1905) | EACH | 1 | $100.00 | $100.00 | $1,000.00 | $100.00 | $200.00 |
| 11 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $100.00 | $1.00 | $1,000.00 | $100.00 | $100.00 |
| 12 | Inlet protection type C (628.7015) | EACH | 24 | $60.00 | $80.00 | $150.00 | $60.00 | $100.00 |
| 13 | Field office type C (642.5201) | EACH | 1 | $20,000 | $1,000.00 | $10,000 | $10,000 | $60,000 |
| 14 | Traffic control barricades type II (643.0410) | DAY | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $5.00 |
| 15 | Traffic control barricades type III (643.0420) | DAY | 515 | $1.50 | $1.50 | $1.00 | $1.50 | $5.00 |
| 16 | Traffic control warning lights type A (643.0705) | DAY | 1,530 | $0.12 | $0.12 | $0.25 | $0.12 | $0.50 |
| 17 | Traffic control signs (643.0900) | DAY | 1,305 | $1.50 | $1.50 | $1.00 | $1.50 | $10.00 |
| 18 | Traffic control (643.5000) | EACH | 1 | $900.00 | $900.00 | $2,000.00 | $900.00 | $180,000 |
| 19 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 50 | $32.59 | $1.75 | $2.50 | $1.75 | $3.00 |
| 20 | Remove cable (674.0300) | LF | 2,400 | $1.01 | $2.38 | $3.00 | $2.38 | $3.00 |
| 21 | Installing and maintaining bird deterrent system (station) 001. P- 40-875 (999.2000.S) | EACH | 1 | $1.00 | $14,000 | $1,000.00 | $0.01 | $160,000 |
| 22 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,700 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 23 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 9,000 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 24 | Special 310. removing poles (SPV.0060) | EACH | 1 | $654.74 | $1,172.00 | $1,500.00 | $1,172.00 | $2,000.00 |
| 25 | Special 320. installing city furnished poles type 26-AL-BD (SPV.0060) | EACH | 4 | $2,941.77 | $1,312.00 | $1,600.00 | $1,312.00 | $1,500.00 |
| 26 | Special 330. install phase one purchased anchor base adapter (SPV.0060) | EACH | 4 | $163.69 | $382.20 | $475.00 | $382.00 | $500.00 |
| 27 | Special 342. submersible multitap 3 port pre-insulated connector (SPV.0060) | EACH | 60 | $38.32 | $155.00 | $190.00 | $155.00 | $200.00 |
| 28 | Special 343. submersible multitap 4 port pre-insulated connector (SPV.0060) | EACH | 6 | $81.84 | $165.00 | $205.00 | $165.00 | $200.00 |
| 29 | Special 345. installing city furnished luminaire arms single member 6-FT. (special) (SPV.0060) | EACH | 5 | $523.79 | $102.00 | $125.00 | $102.00 | $200.00 |
| 30 | Special 371. installing city furnished luminaire utility LED (SPV.0060) | EACH | 2 | $654.75 | $145.00 | $180.00 | $145.00 | $150.00 |
| 31 | Special 516. temporary shoring for pier 7 and 8 repairs (SPV.0060) | EACH | 1 | $25,000 | $25,000 | $30,000 | $150,000 | $70,000 |
| 32 | Special 597. protecting utilities (SPV.0060) | EACH | 1 | $10,000 | $500.00 | $2,500.00 | $0.01 | $10,000 |
| 33 | Special 314. remove aerial cable (SPV.0090) | LF | 2,280 | $0.57 | $2.82 | $3.50 | $2.82 | $3.00 |
| 34 | Special 321. electrical cable type 4#8/1#8 xlpe (SPV.0090) | LF | 1,800 | $2.91 | $8.10 | $9.75 | $8.10 | $10.00 |
| 35 | Special 322. electrical cable type 4#6/1#8 xlpe (SPV.0090) | LF | 600 | $4.36 | $9.64 | $11.55 | $9.64 | $10.00 |
| 36 | Special 571. concrete haunches removal (SPV.0090) | LF | 5,650 | $60.00 | $60.00 | $80.00 | $500.00 | $75.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.