WisDOT contract 20250211022 bid tabulation

C Whitewater, Walworth Ave; W City Limits to S Janesville St (LOC STR, Walworth County C Whitewater, Walworth Ave). Let by Wisconsin DOT on February 11, 2025, Walworth. 2 bids received; low bid $1,448,854 by Payne and Dolan, Inc.

Owner
Wisconsin DOT
Letting
11 FEB 2025
Pay items
85
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Payne and Dolan, Inc$1,448,854Low
2Rock Road Companies, Inc.$1,627,364+12%
WisDOT contract 20250211022: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Payne and Dolan, Inc2. Rock Road Companies, Inc.
1Removing asphaltic surface butt joints (204.0115)SY70$0.01$9.37
2Removing asphaltic surface milling (204.0120)SY18,010$2.10$2.48
3Removing curb & gutter (204.0150)LF2,550$3.44$5.00
4Removing concrete sidewalk (204.0155)SY1,420$5.02$5.00
5Excavation common (205.0100)CY10,200$17.68$21.90
6Prepare foundation for asphaltic paving (project) 01. 3835-05-74 (211.0101)EACH1$7,100.00$0.01
7Finishing roadway (project) 01. 3835-05-74 (213.0100)EACH1$550.00$5,805.62
8Base aggregate dense 3/4-inch (305.0110)TON350$24.99$23.81
9Base aggregate dense 1 1/4-inch (305.0120)TON5,560$17.21$16.40
10Base aggregate dense 3-inch (305.0130)TON8,532$17.21$17.02
11Shaping shoulders (305.0500)STA25$95.00$68.47
12Tack coat (455.0605)GAL770$10.00$3.12
13Incentive density HMA pavement (460.2000)DOL4,360$1.00$1.00
14HMA pavement 3 LT 58-28 S (460.5223)TON2,580$71.25$70.80
15HMA pavement 4 LT 58-28 S (460.5224)TON4,240$75.60$75.02
16Asphaltic surface (465.0105)TON10$300.00$171.42
17Asphaltic surface driveways and field entrances (465.0120)TON5$300.00$736.14
18Concrete curb & gutter 30-inch type D (601.0411)LF257$66.28$42.65
19Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553)LF200$68.31$48.25
20Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF35$68.01$42.65
21Concrete curb pedestrian (601.0600)LF5$85.25$50.00
22Concrete sidewalk 4-inch (602.0405)SF10,940$6.61$8.50
23Curb ramp detectable warning field yellow (602.0505)SF325$52.85$40.00
24Curb ramp detectable warning field radial yellow (602.0605)SF75$67.94$60.00
25Concrete driveway 6-inch (602.0810)SY230$66.65$71.30
26Concrete driveway 7-inch (602.0815)SY15$79.46$76.95
27Adjusting manhole covers (611.8110)EACH7$715.76$865.76
28Adjusting inlet covers (611.8115)EACH7$715.76$784.13
29Maintenance and repair of haul roads (project) 01. 3835-05-74 (618.0100)EACH1$0.01$0.01
30Mobilization (619.1000)EACH1$15,000$104,299
31Landmark reference monuments (621.0100)EACH4$0.01$1,200.00
32Water (624.0100)MGAL106.50$50.03$0.01
33Topsoil (625.0100)SY1,645$7.00$15.00
34Mulching (627.0200)SY5,264$1.00$0.25
35Mobilizations erosion control (628.1905)EACH6$350.00$250.00
36Mobilizations emergency erosion control (628.1910)EACH3$350.00$250.00
37Inlet protection type C (628.7015)EACH40$75.00$60.00
38Tracking pads (628.7560)EACH2$1,912.82$450.00
39Fertilizer type B (629.0210)CWT3.30$165.00$90.00
40Seeding mixture no. 40 (630.0140)LB88.80$12.00$8.75
41Seeding borrow pit (630.0300)LB44.40$10.00$8.75
42Seed water (630.0500)MGAL118.20$50.00$80.00
43Moving signs type II (638.2102)EACH8$150.00$75.00
44Field office type C (642.5201)EACH1$100.00$6,250.00
45Traffic control drums (643.0300)DAY2,667$0.01$0.35
46Traffic control barricades type III (643.0420)DAY3,892$0.51$0.55
47Traffic control warning lights type A (643.0705)DAY7,784$0.05$0.10
48Traffic control signs (643.0900)DAY12,793$1.52$0.40
49Traffic control covering signs type II (643.0920)EACH5$50.51$75.00
50Traffic control signs fixed message (643.1000)SF45$15.15$20.00
51Traffic control signs PCMS (643.1050)DAY28$25.25$35.00
52Temporary marking line removable tape 6-inch (643.3180)LF200$1.82$5.00
53Traffic control (643.5000)EACH1$2,525.25$8,500.00
54Temporary pedestrian surface matting (644.1440)SF3,165$2.02$3.50
55Temporary pedestrian curb ramp (644.1601)DAY105$10.10$8.00
56Temporary pedestrian detectable warning field (644.1605)SF70$10.10$25.00
57Temporary pedestrian barricade (644.1810)LF930$2.02$5.75
58Marking line paint 4-inch (646.1005)LF8,295$1.15$0.45
59Marking line paint 6-inch (646.2005)LF5,105$1.70$0.65
60Marking line paint 8-inch (646.3005)LF2,300$2.25$0.85
61Marking arrow paint (646.5005)EACH11$75.00$175.00
62Marking word paint (646.5105)EACH7$95.00$200.00
63Marking stop line paint 18-inch (646.6105)LF300$5.05$10.00
64Marking diagonal paint 12-inch (646.7105)LF180$3.35$6.00
65Marking crosswalk paint transverse line 6-inch (646.7405)LF1,400$1.70$5.00
66Marking crosswalk paint block style 24-inch (646.7505)LF400$6.75$10.00
67Marking corrugated median paint (646.8005)SF570$3.35$5.00
68Marking island nose paint (646.8205)EACH2$95.00$250.00
69Construction staking subgrade (650.4500)LF4,010$0.01$0.01
70Construction staking base (650.5000)LF4,010$1.50$2.00
71Construction staking curb gutter and curb & gutter (650.5500)LF2,600$2.00$1.00
72Construction staking curb ramps (650.9000)EACH27$200.00$300.00
73Construction staking sidewalk (project) 01. 3835-05-74 (650.9500)EACH1$1,641.00$2,500.00
74Construction staking supplemental control (project) 01. 3835-05-74 (650.9911)EACH1$1,500.00$2,500.00
75Sawing asphalt (690.0150)LF540$1.25$1.25
76Sawing concrete (690.0250)LF1,100$2.25$2.25
77Incentive iri ride (740.0440)DOL6,150$1.00$1.00
78On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS500$5.00$5.00
79On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,800$5.00$5.00
80Special 01. research and locate existing land parcel monuments (SPV.0060)EACH27$300.00$50.00
81Special 02. verify and replace existing land parcel monuments (SPV.0060)EACH27$150.00$50.00
82Special 03. adjusting water valve box (SPV.0060)EACH21$609.36$213.53
83Special 04. adjusting sanitary manhole covers (SPV.0060)EACH14$741.83$865.76
84Special 01. concrete curb and gutter 24-inch type D (SPV.0090)LF2,110$31.09$41.00
85Special 01. removing distressed pavement milling (SPV.0180)SY4,510$2.10$7.19
WisDOT contract 20250211022: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy