WisDOT contract 20250211024 bid tabulation
Addison - Barton; CTH Ww to Kettle View Dr S (CTH D, Washington County Addison - Barton). Let by Wisconsin DOT on February 11, 2025, Washington. 2 bids received; low bid $2,633,693 by Payne and Dolan, Inc.
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 73
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Payne and Dolan, Inc | $2,633,693 | Low |
| 2 | Stark Pavement Corporation | $2,947,888 | +12% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Payne and Dolan, Inc | 2. Stark Pavement Corporation |
|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 11 | $323.20 | $389.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 8 | $404.00 | $250.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 741 | $6.57 | $15.75 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 1,361 | $11.75 | $14.15 |
| 5 | Removing guardrail (204.0165) | LF | 3,571 | $1.77 | $1.75 |
| 6 | Excavation common (205.0100) | CY | 3,903 | $18.79 | $10.00 |
| 7 | Borrow (208.0100) | CY | 4,000 | $4.04 | $14.00 |
| 8 | Backfill granular grade 2 (209.2100) | CY | 193 | $46.19 | $22.25 |
| 9 | Finishing roadway (project) 01. 4869-03-70 (213.0100) | EACH | 1 | $4,700.00 | $1,000.00 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 3,875 | $21.89 | $25.15 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 949 | $24.95 | $25.41 |
| 12 | Pulverize and relay (325.0100) | SY | 98,270 | $1.80 | $1.75 |
| 13 | QMP pulverize and relay compaction (374.1020.S) | SY | 98,270 | $0.15 | $0.27 |
| 14 | Tack coat (455.0605) | GAL | 7,292 | $2.20 | $3.00 |
| 15 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $1,250.00 | $2,850.00 |
| 16 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $7,650.00 | $3,455.00 |
| 17 | Incentive density PWL HMA pavement (460.2005) | DOL | 24,971 | $1.00 | $1.00 |
| 18 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 10,580 | $1.00 | $1.00 |
| 19 | Incentive air voids HMA pavement (460.2010) | DOL | 24,971 | $1.00 | $1.00 |
| 20 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 11,097 | $69.50 | $73.80 |
| 21 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 13,874 | $61.20 | $71.35 |
| 22 | Asphaltic surface (465.0105) | TON | 360 | $110.00 | $100.00 |
| 23 | Asphaltic surface driveways and field entrances (465.0120) | TON | 239 | $116.60 | $109.75 |
| 24 | Apron endwalls for culvert pipe steel 18-inch (521.1018) | EACH | 4 | $404.00 | $300.00 |
| 25 | Apron endwalls for culvert pipe steel 24-inch (521.1024) | EACH | 8 | $555.50 | $400.00 |
| 26 | Apron endwalls for culvert pipe steel 30-inch (521.1030) | EACH | 2 | $848.40 | $800.00 |
| 27 | Apron endwalls for culvert pipe steel 42-inch (521.1042) | EACH | 2 | $2,156.86 | $1,800.00 |
| 28 | Culvert pipe corrugated polyethylene 18-inch (530.0118) | LF | 58 | $63.10 | $138.00 |
| 29 | Culvert pipe corrugated polyethylene 24-inch (530.0124) | LF | 295 | $98.60 | $145.00 |
| 30 | Culvert pipe corrugated polyethylene 30-inch (530.0130) | LF | 78 | $117.06 | $150.00 |
| 31 | Slope paving crushed aggregate (604.0500) | SY | 25 | $46.70 | $155.00 |
| 32 | Riprap heavy (606.0300) | CY | 5 | $90.90 | $90.00 |
| 33 | MGS guardrail 3 (614.2300) | LF | 2,525 | $27.17 | $26.90 |
| 34 | MGS guardrail 3 L (614.2340) | LF | 112.50 | $34.95 | $34.60 |
| 35 | MGS guardrail short radius (614.2350) | LF | 291 | $35.35 | $35.00 |
| 36 | MGS guardrail terminal eat (614.2610) | EACH | 16 | $3,181.50 | $3,150.00 |
| 37 | Mobilization (619.1000) | EACH | 1 | $20,200 | $79,344 |
| 38 | Water (624.0100) | MGAL | 491 | $25.00 | $30.00 |
| 39 | Salvaged topsoil (625.0500) | SY | 7,620 | $0.69 | $2.25 |
| 40 | Mulching (627.0200) | SY | 486 | $1.01 | $1.00 |
| 41 | Silt fence (628.1504) | LF | 5,100 | $1.81 | $1.79 |
| 42 | Silt fence maintenance (628.1520) | LF | 5,100 | $0.05 | $0.05 |
| 43 | Mobilizations erosion control (628.1905) | EACH | 3 | $126.25 | $125.00 |
| 44 | Mobilizations emergency erosion control (628.1910) | EACH | 1 | $75.75 | $75.00 |
| 45 | Erosion mat urban class I type B (628.2008) | SY | 7,134 | $1.67 | $1.65 |
| 46 | Erosion mat class III type D (628.2039) | SY | 1,240 | $14.54 | $14.40 |
| 47 | Soil stabilizer type A (628.6505) | ACRE | 0.27 | $3,030.00 | $3,000.00 |
| 48 | Culvert pipe checks (628.7555) | EACH | 9 | $40.40 | $40.00 |
| 49 | Fertilizer type B (629.0210) | CWT | 4.85 | $75.85 | $75.10 |
| 50 | Seeding mixture no. 20 (630.0120) | LB | 348 | $8.59 | $8.50 |
| 51 | Seed water (630.0500) | MGAL | 347 | $5.05 | $5.00 |
| 52 | Markers culvert end (633.5200) | EACH | 18 | $53.43 | $52.90 |
| 53 | Field office type B (642.5001) | EACH | 1 | $8,250.00 | $5,550.00 |
| 54 | Traffic control barricades type III (643.0420) | DAY | 620 | $2.02 | $2.00 |
| 55 | Traffic control warning lights type A (643.0705) | DAY | 1,230 | $0.51 | $0.50 |
| 56 | Traffic control signs (643.0900) | DAY | 15,610 | $0.51 | $0.50 |
| 57 | Traffic control (643.5000) | EACH | 1 | $1,767.50 | $1,750.00 |
| 58 | Geotextile type HR (645.0120) | SY | 5 | $25.25 | $25.00 |
| 59 | Marking line paint 4-inch (646.1005) | LF | 78,492 | $0.18 | $0.18 |
| 60 | Marking line paint 8-inch (646.3005) | LF | 110 | $1.52 | $1.50 |
| 61 | Marking stop line paint 18-inch (646.6105) | LF | 151 | $11.11 | $11.00 |
| 62 | Locating no-passing zones (648.0100) | MI | 5 | $515.10 | $510.00 |
| 63 | Construction staking pipe culverts (650.6000) | EACH | 8 | $101.00 | $100.00 |
| 64 | Construction staking resurfacing reference (650.8000) | LF | 26,416 | $0.20 | $0.20 |
| 65 | Construction staking supplemental control (project) 01. 4869-03-70 (650.9911) | EACH | 1 | $10.10 | $10.00 |
| 66 | Construction staking slope stakes (650.9920) | LF | 4,189 | $0.45 | $0.45 |
| 67 | Sawing asphalt (690.0150) | LF | 719 | $1.52 | $1.15 |
| 68 | Incentive iri ride (740.0440) | DOL | 19,900 | $1.00 | $1.00 |
| 69 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 800 | $5.00 | $5.00 |
| 70 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,280 | $5.00 | $5.00 |
| 71 | Special 01. culvert pipe corrugated polyethylene 42-inch (SPV.0090) | LF | 62 | $178.99 | $230.00 |
| 72 | Special 02. UV GRP cipp 24-inch (SPV.0090) | LF | 104 | $314.11 | $252.50 |
| 73 | Special 01. removing excess pulverized material (SPV.0180) | SY | 3,820 | $3.40 | $8.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.