WisDOT contract 20250211027 bid tabulation

Appleton - De Pere; I-41 Mnln, CTH Jj - Miners Way Tmp (IH 041, Outagamie County Appleton - De Pere). Let by Wisconsin DOT on February 11, 2025, Outagamie. 4 bids received; low bid $13,172,405 by Michels Road & Stone, Inc..

Owner
Wisconsin DOT
Letting
11 FEB 2025
Pay items
132
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Michels Road & Stone, Inc.$13,172,405Low
2Vinton Construction Company$15,987,874+21%
3James Peterson Sons, Inc.$16,275,900+24%
4Hoffman Construction Company$20,741,613+57%
WisDOT contract 20250211027: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Michels Road & Stone, Inc.2. Vinton Construction Company3. James Peterson Sons, Inc.4. Hoffman Construction Company
1Removing concrete pavement (204.0100)SY1,840$3.00$3.00$2.89$10.00
2Removing curb (204.0130)LF55$10.00$10.00$25.00$10.00
3Removing guardrail (204.0165)LF2,275$5.00$5.00$5.00$5.00
4Removing delineators and markers (204.0180)EACH95$25.00$25.00$25.00$25.00
5Removing surface drains (204.0190)EACH2$250.00$250.00$500.00$500.00
6Removing inlets (204.0220)EACH9$310.00$535.00$300.00$535.00
7Removing storm sewer (size) 01. 12-inch (204.0245)LF110$12.00$15.00$35.84$15.00
8Removing storm sewer (size) 02. 18-inch (204.0245)LF211$15.00$15.00$40.84$15.00
9Removing storm sewer (size) 03. 24-inch (204.0245)LF415$16.00$20.00$45.84$20.00
10Removing storm sewer (size) 04. 30-inch (204.0245)LF28$18.00$20.00$50.84$20.00
11Removing ancillary structure (structure) 01. S-44-136 (204.0246)EACH1$10,000$10,000$10,000$10,000
12Removing ancillary structure (structure) 02. S-44-143 (204.0246)EACH1$10,000$10,000$10,000$10,000
13Sealing pipes (204.0280)EACH2$447.00$465.00$500.00$465.00
14Removing (item description) 01. apron endwalls (204.9060.S)EACH1$600.00$430.00$500.00$430.00
15Excavation common (205.0100)CY150,093$12.00$22.26$15.35$34.00
16Prepare foundation for asphaltic paving (project) 01. 1130-67-71 (211.0101)EACH1$51,350$214,750$214,750$100.00
17Finishing roadway (project) 01. 1130-67-71 (213.0100)EACH1$5,500.00$5,000.00$5,000.00$100.00
18Base aggregate dense 3/4-inch (305.0110)TON170$35.00$40.00$50.00$50.00
19Base aggregate dense 1 1/4-inch (305.0120)TON53,345$14.00$16.00$21.42$25.00
20Select crushed material (312.0110)TON214,335$13.20$14.80$20.39$28.00
21Tack coat (455.0605)GAL6,495$4.25$4.25$4.25$4.25
22Asphaltic surface (465.0105)TON25,930$89.20$89.20$89.20$89.20
23Asphaltic flumes (465.0315)SY20$65.00$65.00$65.00$65.00
24Culvert pipe reinforced concrete class IV 18-inch (522.0418)LF45$86.00$100.00$83.88$100.00
25Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015)EACH1$1,234.00$1,240.00$1,308.75$1,240.00
26Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH5$1,387.00$1,410.00$1,481.74$1,410.00
27Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH5$1,637.00$1,745.00$1,816.41$1,745.00
28Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH1$1,939.00$2,160.00$2,508.74$2,160.00
29Concrete curb & gutter 18-inch type A (601.0405)LF850$19.20$19.20$19.20$19.20
30Concrete curb & gutter 30-inch type A (601.0409)LF410$21.55$21.55$21.55$21.55
31Concrete barrier temporary precast delivered (603.8000)LF70,583$14.00$0.01$0.01$0.01
32Concrete barrier temporary precast installed (603.8125)LF74,373$1.50$12.00$12.00$12.00
33Anchoring concrete barrier temporary precast (603.8500)LF1,345$8.00$7.00$7.00$7.00
34Riprap medium (606.0200)CY35$155.00$117.00$100.00$175.00
35Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF14$114.00$121.00$106.48$121.00
36Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF117$73.00$81.70$80.04$81.70
37Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF487$78.00$90.50$83.67$90.50
38Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF1,391$109.00$100.30$117.24$100.30
39Storm sewer pipe reinforced concrete class IV 30-inch (608.0430)LF1,487$145.00$132.60$165.40$132.60
40Storm sewer pipe reinforced concrete class IV 36-inch (608.0436)LF311$175.00$176.00$205.34$176.00
41Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 14X23-inch (608.2314)LF222$120.00$116.60$137.14$116.60
42Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 24X38-inch (608.2324)LF9$147.00$285.00$401.40$285.00
43Reconstructing manholes (611.0420)EACH4$723.00$1,500.00$500.00$1,500.00
44Manhole covers type J (611.0530)EACH2$507.00$445.00$939.00$445.00
45Manhole covers type L (611.0545)EACH2$378.00$335.00$814.00$335.00
46Inlet covers type B (611.0606)EACH2$799.00$694.00$1,216.00$694.00
47Inlet covers type H-S (611.0639)EACH2$755.00$657.00$1,177.00$657.00
48Inlet covers type MS (611.0642)EACH14$520.00$455.00$951.00$455.00
49Manholes 4-FT diameter (611.2004)EACH1$3,224.00$3,600.00$2,586.27$3,600.00
50Manholes 5-FT diameter (611.2005)EACH23$5,043.00$4,135.00$4,343.85$4,135.00
51Manholes 6-FT diameter (611.2006)EACH3$6,943.00$5,928.00$6,668.29$5,928.00
52Manholes 7-FT diameter (611.2007)EACH1$8,960.00$8,305.00$8,112.78$8,305.00
53Inlets 3-FT diameter (611.3003)EACH3$2,313.50$2,530.00$1,912.25$2,530.00
54Inlets 4-FT diameter (611.3004)EACH2$3,339.50$3,910.00$2,174.86$3,910.00
55Inlets 2X3-FT (611.3230)EACH2$2,653.00$3,610.00$1,646.96$3,610.00
56Inlets median 1 grate (611.3901)EACH2$2,880.00$3,410.00$2,327.93$3,410.00
57Inlets median 2 grate (611.3902)EACH6$3,957.00$4,060.00$3,374.85$4,060.00
58Pipe underdrain 6-inch (612.0106)LF750$25.00$20.00$25.00$20.00
59Crash cushions temporary (614.0905)EACH2$4,850.00$9,000.00$4,850.00$10,750
60Fence chain link salvaged 5-FT (616.0405)LF3,910$10.00$10.00$10.00$10.00
61Fence safety (616.0700.S)LF5,585$0.01$0.01$1.00$0.01
62Maintenance and repair of haul roads (project) 01. 1130-67-71 (618.0100)EACH1$1.00$0.01$1.00$100.00
63Mobilization (619.1000)EACH1$1,176,260$1,280,500$833,000$1,103,450
64Water (624.0100)MGAL4,025$5.00$0.01$45.00$0.01
65Salvaged topsoil (625.0500)SY53,160$1.40$1.47$0.85$2.00
66Silt fence (628.1504)LF17,860$2.00$2.00$2.00$2.00
67Silt fence maintenance (628.1520)LF35,720$0.01$0.01$0.01$0.01
68Mobilizations erosion control (628.1905)EACH15$1.00$1.00$1.00$1.00
69Mobilizations emergency erosion control (628.1910)EACH10$1.00$1.00$1.00$1.00
70Erosion mat class I type A (628.2002)SY53,160$1.50$1.50$1.50$1.50
71Inlet protection type A (628.7005)EACH30$150.00$150.00$150.00$150.00
72Inlet protection type B (628.7010)EACH5$100.00$100.00$100.00$100.00
73Inlet protection type C (628.7015)EACH3$100.00$100.00$100.00$100.00
74Inlet protection type D (628.7020)EACH3$150.00$150.00$150.00$150.00
75Temporary ditch checks (628.7504)LF130$10.00$10.00$10.00$10.00
76Stone ditch checks (628.7515.S)CY550$50.00$50.00$50.00$45.00
77Culvert pipe checks (628.7555)EACH70$20.00$20.00$20.00$20.00
78Tracking pads (628.7560)EACH10$3,600.00$0.01$3,000.00$100.00
79Rock bags (628.7570)EACH750$2.00$2.00$2.00$2.00
80Fertilizer type B (629.0210)CWT34$150.00$150.00$150.00$150.00
81Seeding mixture no. 30 (630.0130)LB2,410$7.50$7.50$7.50$7.50
82Seed water (630.0500)MGAL1,180$0.01$0.01$0.01$0.01
83Markers culvert end (633.5200)EACH12$100.00$100.00$100.00$100.00
84Posts wood 4X6-inch X 18-FT (634.0618)EACH5$200.00$200.00$200.00$200.00
85Posts tubular steel 2X2-inch X 16- FT (634.0816)EACH30$250.00$250.00$250.00$250.00
86Moving signs type II (638.2102)EACH65$200.00$200.00$200.00$200.00
87Removing signs type I (638.2601)EACH6$750.00$750.00$750.00$750.00
88Removing signs type II (638.2602)EACH10$50.00$50.00$50.00$50.00
89Removing small sign supports (638.3000)EACH13$50.00$50.00$50.00$50.00
90Removing structural steel sign supports (638.3100)EACH8$500.00$500.00$500.00$500.00
91Moving small sign supports (638.4000)EACH70$1.00$1.00$1.00$1.00
92Traffic control drums (643.0300)DAY59,030$0.18$0.18$0.18$0.18
93Traffic control barricades type III (643.0420)DAY2,178$1.00$1.00$1.00$1.00
94Traffic control warning lights type A (643.0705)DAY4,356$0.20$0.20$0.20$0.20
95Traffic control warning lights type C (643.0715)DAY2,490$0.20$0.20$0.20$0.20
96Traffic control arrow boards (643.0800)DAY267$14.00$14.00$14.00$14.00
97Traffic control signs (643.0900)DAY29,472$0.30$0.30$0.30$0.30
98Traffic control covering signs type II (643.0920)EACH320$35.00$35.00$35.00$35.00
99Traffic control signs fixed message (643.1000)SF202.50$24.50$24.50$24.50$24.50
100Traffic control signs PCMS (643.1050)DAY67$24.25$24.25$24.50$24.25
101Temporary marking line paint 6- inch (643.3165)LF64,525$0.25$0.25$0.25$0.25
102Temporary marking line paint 10- inch (643.3265)LF1,130$0.50$0.50$0.50$0.50
103Temporary marking raised pavement marker type I (643.3760)EACH930$5.85$5.85$5.85$5.85
104Traffic control (643.5000)EACH1$275,000$275,000$275,000$275,000
105Geotextile type HR (645.0120)SY109$10.00$10.00$10.00$10.00
106Geotextile type R (645.0130)SY1,150$5.00$5.00$5.00$5.00
107Geotextile type sas (645.0140)SY31,550$2.00$1.65$1.82$2.00
108Geogrid type SR (645.0220)SY31,550$1.70$1.50$1.82$1.75
109Marking line epoxy 6-inch (646.2020)LF62,655$0.45$0.45$0.45$0.45
110Marking line epoxy 10-inch (646.4020)LF1,130$0.98$0.98$0.98$0.98
111Marking removal line 4-inch (646.9000)LF64,525$0.14$0.14$0.14$0.14
112Marking removal line 8-inch (646.9100)LF1,130$0.35$0.35$0.35$0.35
113Marking removal special marking (646.9300)EACH2$80.00$80.00$80.00$80.00
114Sawing asphalt (690.0150)LF22,230$1.39$1.39$1.55$1.39
115Sawing concrete (690.0250)LF560$2.50$4.50$2.35$2.50
116On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00
117On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS4,400$5.00$5.00$5.00$5.00
118Special 01. cover plates (SPV.0060)EACH55$150.00$305.00$440.00$305.00
119Special 02. reconnect storm sewer (SPV.0060)EACH13$593.00$845.00$500.00$845.00
120Special 03. storm sewer plug (SPV.0060)EACH2$250.00$695.00$500.00$695.00
121Special 04. fixed message sign portable support (SPV.0060)EACH2$1,250.00$1,250.00$1,250.00$1,250.00
122Special 05. emergency response to traffic involving concrete barrier temporary (SPV.0060)EACH10$2,000.00$250.00$250.00$2,750.00
123Special 06. emergency response to traffic involving crash cushion temporary (SPV.0060)EACH10$250.00$250.00$250.00$250.00
124Special 07. crash cushions temporary left in place (SPV.0060)EACH7$34,250$38,450$34,250$34,250
125Special 08. construction staking survey project 1130-67-71 (SPV.0060)EACH1$39,000$39,000$39,000$39,000
126Special 01. street sweeping (SPV.0075)HRS175$225.00$145.00$200.00$250.00
127Special 01. removal and salvage of high-tension cable guard and posts (SPV.0090)LF27,705$2.25$2.25$2.25$2.25
128Special 02. HMA longitudinal joint repair (SPV.0090)LF9,485$3.75$3.75$3.75$3.75
129Special 03. drain slotted vane permanent (SPV.0090)LF1,548$237.00$246.79$249.50$246.79
130Special 04. concrete barrier temporary precast left in place (SPV.0090)LF29,863$15.00$43.12$43.15$43.12
131Special 05. safety fence special (SPV.0090)LF200$12.00$12.00$12.00$12.00
132Special 06. removing asphaltic surface rumble strips (SPV.0090)LF8,210$3.95$3.95$3.95$3.95
WisDOT contract 20250211027: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy