WisDOT contract 20250211028 bid tabulation
1470-27-71. Let by Wisconsin DOT on February 11, 2025, Manitowoc. 3 bids received; low bid $6,060,408 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 175
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $6,060,408 | Low |
| 2 | Northeast Asphalt, Inc | $6,197,812 | +2.0% |
| 3 | Michels Road & Stone, Inc. | $6,366,483 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Northeast Asphalt, Inc | 3. Michels Road & Stone, Inc. |
|---|---|---|---|---|---|---|
| 1 | Removing structure (structure) 01. C-36-1016 (203.0220) | EACH | 1 | $2,600.00 | $2,600.00 | $11,500 |
| 2 | Removing structure (structure) 02. C-36-13 (203.0220) | EACH | 1 | $6,500.00 | $7,000.00 | $15,000 |
| 3 | Debris containment over waterway (structure) 01. B-36-117 (203.0335) | EACH | 1 | $0.01 | $0.01 | $0.01 |
| 4 | Removing concrete pavement (204.0100) | SY | 8,417 | $0.01 | $0.01 | $21.10 |
| 5 | Removing concrete pavement butt joints (204.0105) | SY | 720 | $14.60 | $14.60 | $14.60 |
| 6 | Removing asphaltic surface (204.0110) | SY | 1,165 | $17.60 | $20.80 | $19.10 |
| 7 | Removing asphaltic surface butt joints (204.0115) | SY | 255 | $28.90 | $28.90 | $28.90 |
| 8 | Removing asphaltic surface milling (204.0120) | SY | 191,050 | $2.20 | $2.80 | $2.20 |
| 9 | Removing curb & gutter (204.0150) | LF | 935 | $10.00 | $10.00 | $7.00 |
| 10 | Removing concrete sidewalk (204.0155) | SY | 370 | $18.00 | $18.00 | $10.00 |
| 11 | Removing guardrail (204.0165) | LF | 11,085 | $2.00 | $2.00 | $2.00 |
| 12 | Removing surface drains (204.0190) | EACH | 1 | $250.00 | $250.00 | $250.00 |
| 13 | Removing inlets (204.0220) | EACH | 13 | $356.00 | $356.00 | $350.00 |
| 14 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 715 | $7.70 | $7.70 | $12.50 |
| 15 | Removing storm sewer (size) 02. 18-inch (204.0245) | LF | 16 | $12.00 | $12.00 | $15.50 |
| 16 | Removing storm sewer (size) 03. 24-inch (204.0245) | LF | 104 | $16.00 | $16.00 | $20.00 |
| 17 | Removing storm sewer (size) 04. 42-inch (204.0245) | LF | 8 | $40.00 | $40.00 | $22.50 |
| 18 | Excavation common (205.0100) | CY | 1,343 | $19.55 | $19.55 | $19.00 |
| 19 | Excavation for structures culverts (structure) 01. C-36-13 (206.2001) | EACH | 1 | $7,500.00 | $11,000 | $14,450 |
| 20 | Backfill structure type B (210.2500) | TON | 215 | $30.00 | $28.35 | $22.00 |
| 21 | Prepare foundation for asphaltic paving (project) 01. 1470-27-71 (211.0101) | EACH | 1 | $15,800 | $15,800 | $15,800 |
| 22 | Prepare foundation for asphaltic paving (project) 02. 1470-33-71 (211.0101) | EACH | 1 | $15,800 | $15,800 | $15,800 |
| 23 | Prepare foundation for asphaltic paving (project) 03. 1470-37-71 (211.0101) | EACH | 1 | $6,700.00 | $6,700.00 | $6,700.00 |
| 24 | Prepare foundation for concrete base (project) 01. 1470-27-71 (211.0301) | EACH | 1 | $1,000.00 | $1,000.00 | $10,000 |
| 25 | Finishing roadway (project) 01. 1470-27-71 (213.0100) | EACH | 1 | $2,000.00 | $200.00 | $5,500.00 |
| 26 | Finishing roadway (project) 02. 1470-33-71 (213.0100) | EACH | 1 | $2,000.00 | $200.00 | $5,500.00 |
| 27 | Finishing roadway (project) 03. 1470-37-71 (213.0100) | EACH | 1 | $2,000.00 | $200.00 | $5,500.00 |
| 28 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,225 | $33.92 | $33.92 | $27.30 |
| 29 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,095 | $20.00 | $20.00 | $27.30 |
| 30 | Hauling excess shoulder material (305.0504.S) | CY | 75 | $95.00 | $95.00 | $76.00 |
| 31 | Breaker run (311.0110) | TON | 55 | $22.00 | $36.25 | $18.00 |
| 32 | Concrete base 9-inch (320.0155) | SY | 780 | $70.96 | $70.96 | $67.04 |
| 33 | Concrete base hes 7-inch (320.0335) | SY | 13 | $83.99 | $83.99 | $109.99 |
| 34 | Concrete base hes 9-inch (320.0355) | SY | 7,260 | $81.99 | $81.99 | $67.99 |
| 35 | Drilled tie bars (416.0610) | EACH | 3,461 | $8.50 | $8.50 | $8.71 |
| 36 | Drilled dowel bars (416.0620) | EACH | 10,027 | $16.50 | $16.50 | $12.18 |
| 37 | Tack coat (455.0605) | GAL | 23,422 | $3.25 | $3.25 | $3.25 |
| 38 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $2,980.00 | $2,980.00 | $2,980.00 |
| 39 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $4,350.00 | $4,350.00 | $4,350.00 |
| 40 | Incentive density PWL HMA pavement (460.2005) | DOL | 20,154 | $1.00 | $1.00 | $1.00 |
| 41 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 9,590 | $1.00 | $1.00 | $1.00 |
| 42 | Incentive air voids HMA pavement (460.2010) | DOL | 27,320 | $1.00 | $1.00 | $1.00 |
| 43 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 27,320 | $79.80 | $79.80 | $79.80 |
| 44 | Asphaltic surface (465.0105) | TON | 115 | $290.00 | $290.00 | $290.00 |
| 45 | Asphaltic surface patching (465.0110) | TON | 50 | $290.00 | $290.00 | $290.00 |
| 46 | Asphaltic surface driveways and field entrances (465.0120) | TON | 7 | $270.00 | $270.00 | $270.00 |
| 47 | Protective surface treatment (502.3200) | SY | 1,016 | $2.00 | $2.00 | $2.00 |
| 48 | Protective surface treatment reseal (502.3215) | SY | 210 | $3.00 | $3.00 | $3.00 |
| 49 | Adhesive anchors no. 5 bar (502.4205) | EACH | 44 | $30.00 | $30.00 | $30.00 |
| 50 | Concrete masonry culverts (504.0100) | CY | 40 | $1,400.00 | $550.00 | $550.00 |
| 51 | Bar steel reinforcement HS structures (505.0400) | LB | 4,665 | $3.00 | $1.90 | $1.90 |
| 52 | Bar steel reinforcement HS coated structures (505.0600) | LB | 1,190 | $4.00 | $2.00 | $2.00 |
| 53 | Preparation decks type 1 (509.0301) | SY | 2 | $250.00 | $250.00 | $250.00 |
| 54 | Preparation decks type 2 (509.0302) | SY | 1 | $350.00 | $350.00 | $350.00 |
| 55 | Cleaning decks (509.0500) | SY | 1,016 | $41.35 | $41.40 | $41.35 |
| 56 | Concrete surface repair (509.1500) | SF | 22 | $150.00 | $150.00 | $150.00 |
| 57 | Full-depth deck repair (509.2000) | SY | 1 | $0.01 | $0.01 | $0.01 |
| 58 | Concrete masonry overlay decks (509.2500) | CY | 78 | $1,000.00 | $1,000.00 | $1,000.00 |
| 59 | Epoxy crack sealing (509.9020.S) | LF | 65 | $150.00 | $150.00 | $150.00 |
| 60 | Temporary shoring (511.1100) | SF | 1,241 | $0.01 | $0.01 | $52.50 |
| 61 | Rubberized membrane waterproofing (516.0500) | SY | 15 | $50.00 | $25.00 | $25.00 |
| 62 | Concrete collars for pipe (520.8000) | EACH | 1 | $1,000.00 | $1,000.00 | $600.00 |
| 63 | Cleaning culvert pipes (520.8700) | EACH | 5 | $735.00 | $735.00 | $250.00 |
| 64 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 5 | $1,353.00 | $1,353.00 | $1,445.00 |
| 65 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,560.00 | $1,560.00 | $1,588.00 |
| 66 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $1,718.00 | $1,718.00 | $1,750.00 |
| 67 | Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042) | EACH | 1 | $2,910.00 | $2,910.00 | $3,250.00 |
| 68 | Apron endwalls for culvert pipe reinforced concrete 66-inch (522.1066) | EACH | 1 | $5,210.00 | $5,210.00 | $5,200.00 |
| 69 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 720 | $43.95 | $43.95 | $62.00 |
| 70 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 240 | $55.60 | $55.60 | $55.00 |
| 71 | Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413) | LF | 1,050 | $55.60 | $55.60 | $58.00 |
| 72 | Concrete curb pedestrian (601.0600) | LF | 20 | $45.00 | $45.00 | $50.00 |
| 73 | Concrete sidewalk 4-inch (602.0405) | SF | 3,560 | $11.00 | $11.00 | $10.20 |
| 74 | Curb ramp detectable warning field natural patina (602.0515) | SF | 196 | $35.00 | $35.00 | $35.00 |
| 75 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 127.79 | $65.00 | $65.00 | $55.00 |
| 76 | Concrete driveway 6-inch (602.0810) | SY | 75 | $75.00 | $75.00 | $74.50 |
| 77 | Riprap heavy (606.0300) | CY | 135 | $85.00 | $86.80 | $75.00 |
| 78 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 767 | $84.10 | $84.10 | $91.50 |
| 79 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 10 | $157.80 | $157.80 | $94.20 |
| 80 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 97 | $173.50 | $173.50 | $117.00 |
| 81 | Storm sewer pipe reinforced concrete class IV 66-inch (608.0466) | LF | 154 | $367.00 | $367.00 | $526.90 |
| 82 | Reconstructing inlets (611.0430) | EACH | 2 | $1,000.00 | $1,000.00 | $1,250.00 |
| 83 | Manhole covers type J (611.0530) | EACH | 8 | $474.00 | $474.00 | $895.00 |
| 84 | Inlet covers type A (611.0600) | EACH | 1 | $1,012.00 | $1,012.00 | $1,200.00 |
| 85 | Inlet covers type C (611.0612) | EACH | 2 | $474.00 | $474.00 | $800.00 |
| 86 | Inlet covers type H (611.0624) | EACH | 12 | $676.00 | $676.00 | $1,100.00 |
| 87 | Manholes 4-FT diameter (611.2004) | EACH | 7 | $3,290.00 | $3,290.00 | $3,800.00 |
| 88 | Inlets 3-FT diameter (611.3003) | EACH | 2 | $2,600.00 | $2,600.00 | $2,100.00 |
| 89 | Inlets 2X3-FT (611.3230) | EACH | 12 | $2,844.00 | $2,844.00 | $2,700.00 |
| 90 | Adjusting manhole covers (611.8110) | EACH | 15 | $535.00 | $535.00 | $500.00 |
| 91 | Adjusting inlet covers (611.8115) | EACH | 1 | $560.00 | $560.00 | $500.00 |
| 92 | MGS guardrail 3 (614.2300) | LF | 9,030 | $30.00 | $30.00 | $30.00 |
| 93 | MGS guardrail 3 L (614.2340) | LF | 112.50 | $36.00 | $36.00 | $36.00 |
| 94 | MGS guardrail terminal eat (614.2610) | EACH | 6 | $4,200.00 | $4,200.00 | $4,200.00 |
| 95 | MGS guardrail terminal type 2 (614.2620) | EACH | 6 | $2,800.00 | $2,800.00 | $2,800.00 |
| 96 | Maintenance and repair of haul roads (project) 01. 1470-27-71 (618.0100) | EACH | 1 | $0.01 | $10.00 | $1.00 |
| 97 | Maintenance and repair of haul roads (project) 02. 1470-33-71 (618.0100) | EACH | 1 | $0.01 | $10.00 | $1.00 |
| 98 | Maintenance and repair of haul roads (project) 03. 1470-37-71 (618.0100) | EACH | 1 | $0.01 | $10.00 | $1.00 |
| 99 | Mobilization (619.1000) | EACH | 1 | $572,000 | $624,380 | $726,118 |
| 100 | Concrete median sloped nose (620.0300) | SF | 360 | $15.00 | $15.00 | $15.00 |
| 101 | Water (624.0100) | MGAL | 48 | $40.00 | $40.00 | $60.00 |
| 102 | Topsoil (625.0100) | SY | 4,210 | $7.50 | $7.50 | $12.00 |
| 103 | Silt fence (628.1504) | LF | 12,850 | $0.25 | $0.25 | $0.25 |
| 104 | Silt fence maintenance (628.1520) | LF | 12,850 | $0.01 | $0.01 | $0.01 |
| 105 | Mobilizations erosion control (628.1905) | EACH | 24 | $1.00 | $1.00 | $1.00 |
| 106 | Mobilizations emergency erosion control (628.1910) | EACH | 12 | $1.00 | $1.00 | $1.00 |
| 107 | Erosion mat urban class I type A (628.2006) | SY | 4,210 | $3.50 | $3.50 | $3.50 |
| 108 | Inlet protection type A (628.7005) | EACH | 10 | $125.00 | $125.00 | $125.00 |
| 109 | Inlet protection type D (628.7020) | EACH | 85 | $125.00 | $125.00 | $125.00 |
| 110 | Culvert pipe checks (628.7555) | EACH | 23 | $20.00 | $20.00 | $20.00 |
| 111 | Fertilizer type B (629.0210) | CWT | 2.70 | $150.00 | $150.00 | $150.00 |
| 112 | Seeding mixture no. 40 (630.0140) | LB | 185 | $10.00 | $10.00 | $10.00 |
| 113 | Seeding mixture no. 60 (630.0160) | LB | 3 | $100.00 | $100.00 | $100.00 |
| 114 | Seed water (630.0500) | MGAL | 243 | $0.01 | $0.01 | $0.01 |
| 115 | Markers culvert end (633.5200) | EACH | 9 | $85.00 | $85.00 | $85.00 |
| 116 | Posts tubular steel 2X2-inch X 8-FT (634.0808) | EACH | 1 | $250.00 | $250.00 | $250.00 |
| 117 | Signs type II reflective H (637.2210) | SF | 5.50 | $100.00 | $100.00 | $100.00 |
| 118 | Moving signs type II (638.2102) | EACH | 54 | $150.00 | $150.00 | $150.00 |
| 119 | Moving small sign supports (638.4000) | EACH | 48 | $25.00 | $25.00 | $25.00 |
| 120 | Field office type D (642.5401) | EACH | 1 | $8,500.00 | $14,980 | $13,000 |
| 121 | Traffic control drums (643.0300) | DAY | 6,000 | $0.25 | $0.25 | $0.25 |
| 122 | Traffic control barricades type III (643.0420) | DAY | 8,200 | $0.40 | $0.40 | $0.40 |
| 123 | Traffic control warning lights type A (643.0705) | DAY | 16,400 | $0.13 | $0.13 | $0.13 |
| 124 | Traffic control warning lights type C (643.0715) | DAY | 3,400 | $0.15 | $0.15 | $0.15 |
| 125 | Traffic control arrow boards (643.0800) | DAY | 300 | $8.00 | $8.00 | $8.00 |
| 126 | Traffic control signs (643.0900) | DAY | 26,200 | $0.15 | $0.15 | $0.15 |
| 127 | Traffic control covering signs type II (643.0920) | EACH | 4 | $90.00 | $90.00 | $90.00 |
| 128 | Traffic control signs fixed message (643.1000) | SF | 30 | $22.50 | $22.50 | $22.50 |
| 129 | Traffic control signs PCMS (643.1050) | DAY | 28 | $25.00 | $25.00 | $25.00 |
| 130 | Traffic control cones 42-inch (643.1070) | DAY | 125,000 | $0.12 | $0.12 | $0.12 |
| 131 | Temporary marking line paint 6- inch (643.3165) | LF | 97,525 | $0.22 | $0.22 | $0.22 |
| 132 | Traffic control (643.5000) | EACH | 1 | $60,850 | $60,850 | $60,850 |
| 133 | Temporary pedestrian surface matting (644.1440) | SF | 70 | $5.00 | $5.00 | $5.00 |
| 134 | Temporary pedestrian curb ramp (644.1601) | DAY | 50 | $18.50 | $18.50 | $18.50 |
| 135 | Temporary pedestrian detectable warning field (644.1605) | SF | 20 | $12.50 | $12.50 | $12.50 |
| 136 | Temporary pedestrian barricade (644.1810) | LF | 332 | $4.95 | $4.95 | $4.95 |
| 137 | Geotextile type C (645.0105) | SY | 105 | $8.00 | $5.00 | $4.00 |
| 138 | Geotextile type HR (645.0120) | SY | 255 | $8.00 | $5.00 | $5.00 |
| 139 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 100,420 | $1.07 | $1.07 | $1.07 |
| 140 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 3,940 | $2.25 | $2.25 | $2.25 |
| 141 | Marking arrow epoxy (646.5020) | EACH | 4 | $307.38 | $307.38 | $307.38 |
| 142 | Marking word epoxy (646.5120) | EACH | 1 | $353.16 | $353.16 | $353.16 |
| 143 | Marking stop line epoxy 18-inch (646.6120) | LF | 145 | $13.08 | $13.08 | $13.08 |
| 144 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,255 | $10.00 | $10.00 | $10.00 |
| 145 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 90 | $21.20 | $21.20 | $21.20 |
| 146 | Marking island nose epoxy (646.8220) | EACH | 7 | $242.34 | $242.34 | $242.34 |
| 147 | Construction staking storm sewer (650.4000) | EACH | 31 | $41.31 | $41.31 | $41.31 |
| 148 | Construction staking subgrade (650.4500) | LF | 404 | $0.01 | $0.01 | $0.01 |
| 149 | Construction staking base (650.5000) | LF | 455 | $0.40 | $0.40 | $0.40 |
| 150 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 2,030 | $0.65 | $0.65 | $0.65 |
| 151 | Construction staking structure layout (structure) 01. C-36-13 (650.6501) | EACH | 1 | $1,245.40 | $1,245.40 | $1,245.40 |
| 152 | Construction staking concrete pavement (650.7000) | LF | 487 | $1.21 | $1.21 | $1.21 |
| 153 | Construction staking resurfacing reference (650.8000) | LF | 24,061 | $0.08 | $0.08 | $0.08 |
| 154 | Construction staking curb ramps (650.9000) | EACH | 24 | $87.71 | $87.71 | $87.71 |
| 155 | Construction staking sidewalk (project) 01. 1470-27-71 (650.9500) | EACH | 1 | $252.85 | $252.85 | $252.85 |
| 156 | Construction staking sidewalk (project) 02. 1470-33-71 (650.9500) | EACH | 1 | $158.60 | $158.60 | $158.60 |
| 157 | Construction staking sidewalk (project) 03. 1470-37-71 (650.9500) | EACH | 1 | $51.35 | $51.35 | $51.35 |
| 158 | Construction staking supplemental control (project) 01. 1470-27-71 (650.9911) | EACH | 1 | $422.81 | $422.81 | $422.81 |
| 159 | Construction staking supplemental control (project) 02. 1470-33-71 (650.9911) | EACH | 1 | $422.81 | $422.81 | $422.81 |
| 160 | Construction staking supplemental control (project) 03. 1470-37-71 (650.9911) | EACH | 1 | $422.81 | $422.81 | $422.81 |
| 161 | Construction staking slope stakes (650.9920) | LF | 713 | $0.84 | $0.84 | $0.84 |
| 162 | Sawing asphalt (690.0150) | LF | 7,737 | $2.00 | $2.00 | $1.69 |
| 163 | Sawing concrete (690.0250) | LF | 20,743 | $2.30 | $2.30 | $2.25 |
| 164 | Incentive strength concrete structures (715.0502) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 165 | Incentive iri ride (740.0440) | DOL | 73,480 | $1.00 | $1.00 | $1.00 |
| 166 | Special 01. removing modular block wall (SPV.0035) | CY | 2 | $250.00 | $250.00 | $450.00 |
| 167 | Special 01. adjusting water valve boxes (SPV.0060) | EACH | 4 | $370.00 | $370.00 | $450.00 |
| 168 | Special 02. cleaning ditch (SPV.0060) | EACH | 1 | $1,250.00 | $1,250.00 | $1,115.00 |
| 169 | Special 03. reconnect storm sewer laterals (SPV.0060) | EACH | 1 | $1,055.00 | $1,055.00 | $800.00 |
| 170 | Special 04. manholes 6-FT X 14-FT special (SPV.0060) | EACH | 1 | $58,416 | $58,416 | $36,000 |
| 171 | Special 05. temporary water diversion C-36-0013 (SPV.0060) | EACH | 1 | $3,000.00 | $6,800.00 | $32,000 |
| 172 | Special 01. remove, salvage, and reinstall wood fence (SPV.0090) | LF | 25 | $75.00 | $75.00 | $75.00 |
| 173 | Special 02. treated timber rub rail (SPV.0090) | LF | 6,200 | $2.10 | $2.10 | $2.10 |
| 174 | Special 03. UV GRP cipp 12-inch (SPV.0090) | LF | 121 | $299.00 | $299.00 | $197.00 |
| 175 | Special 01. remove, salvage, and reinstall riprap heavy (SPV.0180) | SY | 315 | $30.00 | $30.00 | $14.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.