WisDOT contract 20250211030 bid tabulation
Main Street, City of Oshkosh; Fox River Bridge B-70-0056 (USH 045, Winnebago County Main Street, City of Oshkosh). Let by Wisconsin DOT on February 11, 2025, Winnebago. 2 bids received; low bid $6,056,201 by Lunda Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 63
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lunda Construction Company | $6,056,201 | Low |
| 2 | Zenith Tech., Inc. - Waukesha | $6,423,911 | +6.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lunda Construction Company | 2. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|
| 1 | Removing structure over waterway minimal debris (structure) 01. B-70- 0056 (203.0260) | EACH | 1 | $380,000 | $900,000 |
| 2 | Finishing roadway (project) 01. 4110-33-71 (213.0100) | EACH | 1 | $2,500.00 | $2,500.00 |
| 3 | Concrete masonry bridges (502.0100) | CY | 2 | $500.00 | $6,500.00 |
| 4 | Expansion device (502.3101) | LF | 124 | $266.00 | $265.00 |
| 5 | Protective surface treatment (502.3200) | SY | 2,103 | $2.00 | $4.00 |
| 6 | Adhesive anchors 5/8-inch (502.4105) | EACH | 8 | $35.00 | $45.00 |
| 7 | Adhesive anchors no. 4 bar (502.4204) | EACH | 112 | $32.50 | $35.00 |
| 8 | Adhesive anchors no. 5 bar (502.4205) | EACH | 124 | $35.00 | $35.00 |
| 9 | Bar steel reinforcement HS coated structures (505.0600) | LB | 3,490 | $2.80 | $3.00 |
| 10 | Preparation decks type 1 (509.0301) | SY | 652 | $185.00 | $150.00 |
| 11 | Preparation decks type 2 (509.0302) | SY | 522 | $225.00 | $185.00 |
| 12 | Cleaning decks to reapply concrete masonry overlay (509.0505.S) | SY | 2,096 | $30.00 | $12.00 |
| 13 | Joint repair (509.1000) | SY | 40 | $1,850.00 | $1,500.00 |
| 14 | Curb repair (509.1200) | LF | 400 | $125.00 | $85.00 |
| 15 | Concrete surface repair (509.1500) | SF | 2 | $500.00 | $550.00 |
| 16 | Concrete masonry overlay decks (509.2500) | CY | 194 | $925.00 | $850.00 |
| 17 | Polymer overlay (509.5100.S) | SY | 509 | $61.00 | $61.00 |
| 18 | Removing concrete masonry deck overlay (structure) 01. B-70-0056 (509.9005.S) | SY | 2,096 | $11.95 | $15.00 |
| 19 | Removing polymer overlay (structure) 01. B-70-0056 (509.9015.S) | SY | 509 | $34.00 | $34.00 |
| 20 | Painting epoxy system (structure) 01. B-70-0056 (517.0601) | EACH | 1 | $9,750.00 | $9,750.00 |
| 21 | Preparation and coating of top flanges (structure) 01. B-70-0056 (517.0901.S) | EACH | 1 | $9,000.00 | $9,000.00 |
| 22 | Structure repainting recycled abrasive (structure) 01. B-70-0056 (517.1801.S) | EACH | 1 | $401,234 | $401,234 |
| 23 | Structure overcoating cleaning and priming (structure) 01. B-70-0056 (517.3001.S) | EACH | 1 | $34,500 | $34,500 |
| 24 | Negative pressure containment and collection of waste materials (structure) 01. B-70-0056 (517.4501.S) | EACH | 1 | $118,010 | $118,010 |
| 25 | Portable decontamination facility (517.6001.S) | EACH | 1 | $1,000.00 | $1,000.00 |
| 26 | Maintenance and repair of haul roads (project) 01. 4110-33-71 (618.0100) | EACH | 1 | $250.00 | $1,000.00 |
| 27 | Mobilization (619.1000) | EACH | 1 | $604,933 | $467,500 |
| 28 | Mobilizations erosion control (628.1905) | EACH | 2 | $400.00 | $400.00 |
| 29 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $50.00 | $50.00 |
| 30 | Inlet protection type C (628.7015) | EACH | 8 | $100.00 | $100.00 |
| 31 | Field office type D (642.5401) | EACH | 1 | $7,500.00 | $20,000 |
| 32 | Traffic control drums (643.0300) | DAY | 18,500 | $0.17 | $0.17 |
| 33 | Traffic control barricades type III (643.0420) | DAY | 6,792 | $0.40 | $0.40 |
| 34 | Traffic control flexible tubular marker posts (643.0500) | EACH | 12 | $16.00 | $16.00 |
| 35 | Traffic control flexible tubular marker bases (643.0600) | EACH | 12 | $24.00 | $24.00 |
| 36 | Traffic control warning lights type A (643.0705) | DAY | 21,504 | $0.05 | $0.05 |
| 37 | Traffic control warning lights type C (643.0715) | DAY | 2,000 | $0.16 | $0.16 |
| 38 | Traffic control arrow boards (643.0800) | DAY | 500 | $6.00 | $6.00 |
| 39 | Traffic control signs (643.0900) | DAY | 34,588 | $0.21 | $0.21 |
| 40 | Traffic control covering signs type II (643.0920) | EACH | 4 | $75.00 | $75.00 |
| 41 | Traffic control signs PCMS (643.1050) | DAY | 14 | $35.00 | $35.00 |
| 42 | Temporary marking line paint 4- inch (643.3105) | LF | 156 | $6.00 | $6.00 |
| 43 | Temporary marking removable mask out tape 12-inch (643.3990) | LF | 25 | $5.00 | $5.00 |
| 44 | Traffic control (643.5000) | EACH | 1 | $100.00 | $100.00 |
| 45 | Temporary pedestrian barricade (644.1810) | LF | 510 | $5.00 | $5.00 |
| 46 | Marking line epoxy 4-inch (646.1020) | LF | 1,350 | $2.40 | $2.40 |
| 47 | Marking arrow epoxy (646.5020) | EACH | 4 | $280.00 | $280.00 |
| 48 | Marking word epoxy (646.5120) | EACH | 1 | $350.00 | $350.00 |
| 49 | Marking stop line epoxy 18-inch (646.6120) | LF | 48 | $16.00 | $16.00 |
| 50 | Marking diagonal epoxy 12-inch (646.7120) | LF | 10 | $18.00 | $18.00 |
| 51 | Special 01. bridge electrical work (SPV.0060) | EACH | 1 | $448,127 | $500,000 |
| 52 | Special 02. mechanical work (SPV.0060) | EACH | 1 | $930,000 | $1,950,000 |
| 53 | Special 03. replace hpu enclosures (SPV.0060) | EACH | 2 | $162,000 | $20,000 |
| 54 | Special 04. balance bascule bridge leaves (SPV.0060) | EACH | 1 | $135,250 | $150,000 |
| 55 | Special 05. replace operator house windows and door (SPV.0060) | EACH | 1 | $53,650 | $30,000 |
| 56 | Special 06. remove and replace membrane roof (SPV.0060) | EACH | 1 | $22,500 | $25,000 |
| 57 | Special 07. replace cylinder access platforms (SPV.0060) | EACH | 4 | $12,515 | $7,500.00 |
| 58 | Special 08. pipe railing base repairs (SPV.0060) | EACH | 2 | $1,280.00 | $1,150.00 |
| 59 | Special 09. bumper block (SPV.0060) | EACH | 1 | $5,500.00 | $1,150.00 |
| 60 | Special 01. street sweeping (SPV.0075) | HRS | 10 | $125.00 | $250.00 |
| 61 | Special 01. bridge structural steel (SPV.0085) | LB | 38,944 | $27.27 | $11.10 |
| 62 | Special 01. steel grid floor 5-inch (SPV.0165) | SF | 3,606 | $190.00 | $175.00 |
| 63 | Special 02. sidewalk slip resistant coating repair (SPV.0165) | SF | 20 | $125.00 | $125.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.