CTH M - USH 8; South Fork Jump River, B-50-0095 (CTH O, Price County CTH M - USH 8). Let by Wisconsin DOT on February 11, 2025, Price. 5 bids received; low bid $1,332,221 by Sheet Piling Services LLC.

Owner
Wisconsin DOT
Letting
11 FEB 2025
Pay items
81
Data through
10 NOV 2026

4 of the 5 bids matched their published totals to within a dollar and are shown; the others are left out.

Bidders

RankBidderTotal bidAgainst the low bid
1Sheet Piling Services LLC$1,332,221Low
3Lunda Construction Company$1,635,502+23%
4Zenith Tech., Inc. - Waukesha$1,693,510+27%
5Janke General Contractors, Inc.$1,993,611+50%
WisDOT contract 20250211041: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Sheet Piling Services LLC2. Lunda Construction Company3. Zenith Tech., Inc. - Waukesha4. Janke General Contractors, Inc.
1Clearing (201.0105)STA6$395.00$395.00$250.00$100.00
2Grubbing (201.0205)STA6$191.00$191.00$250.00$1,600.00
3Removing small pipe culverts (203.0100)EACH1$409.00$409.00$400.00$2,000.00
4Removing structure over waterway minimal debris (structure) 01. B-50- 0006 (203.0260)EACH1$150,000$200,000$201,000$110,000
5Removing guardrail (204.0165)LF162$4.65$4.65$2.50$2.85
6Excavation common (205.0100)CY763$21.15$21.15$20.18$30.00
7Excavation for structures bridges (structure) 01. B-50-0095 (206.1001)EACH1$75,000$50,000$26,000$54,000
8Cofferdams (structure) 01. B-50- 0095 (206.5001)EACH1$75,000$175,000$100,000$96,000
9Borrow (208.0100)CY425$22.85$22.85$9.35$33.00
10Backfill structure type A (210.1500)TON340$28.85$28.85$35.44$43.00
11Finishing roadway (project) 01. 8700-00-70 (213.0100)EACH1$491.00$491.00$500.00$100.00
12Base aggregate dense 3/4-inch (305.0110)TON420$24.70$24.70$26.92$35.00
13Base aggregate dense 1 1/4-inch (305.0120)TON680$25.15$25.15$24.20$38.00
14Tack coat (455.0605)GAL70$15.50$15.50$15.50$15.50
15Asphaltic surface (465.0105)TON230$156.40$156.40$156.40$156.40
16Concrete masonry bridges (502.0100)CY349$850.00$800.00$1,020.00$1,400.00
17Protective surface treatment (502.3200)SY685$3.00$2.00$4.00$5.65
18Underwater substructure inspection (structure) 01. B-50-0095 (502.9000.S)EACH2$5,100.00$3,000.00$4,500.00$2,000.00
19Prestressed girder type I 36W-inch (503.0137)LF674$230.00$250.00$320.00$456.00
20Bar steel reinforcement HS structures (505.0400)LB8,800$1.30$1.49$1.41$2.00
21Bar steel reinforcement HS coated structures (505.0600)LB41,280$1.40$1.67$1.59$2.00
22Bearing pads elastomeric non- laminated (506.2605)EACH24$75.00$100.00$150.00$200.00
23Steel diaphragms (structure) 01. B- 50-0095 (506.4000)EACH9$1,500.00$700.00$1,000.00$1,200.00
24Railing tubular type M (513.4061)LF394.20$250.00$225.00$220.00$300.00
25Rubberized membrane waterproofing (516.0500)SY20$25.00$20.00$60.00$32.00
26Apron endwalls for culvert pipe 24- inch (520.1024)EACH2$455.25$455.25$750.00$570.00
27Culvert pipe class III-A 24-inch (520.3324)LF66$84.80$84.80$100.00$100.00
28Pre-boring rock or consolidated materials (550.0020)LF175$50.00$200.00$170.00$300.00
29Pile points (550.0500)EACH28$200.00$125.00$120.00$200.00
30Piling steel HP 12-inch X 53 LB (550.1120)LF1,820$50.00$45.00$48.00$60.00
31Riprap medium (606.0200)CY5$88.35$88.35$94.71$270.00
32Riprap heavy (606.0300)CY245$85.00$80.00$94.71$165.00
33Pipe underdrain wrapped 6-inch (612.0406)LF200$6.40$6.40$6.50$12.25
34Steel thrie beam structure approach (614.0200)LF21$86.45$86.45$95.10$87.00
35Steel plate beam guard class A (614.0305)LF25$22.25$22.25$30.51$27.00
36Steel plate beam guard short radius (614.0345)LF87.50$28.75$28.75$38.10$27.00
37Steel plate beam guard short radius terminal (614.0390)EACH1$2,279.00$2,279.00$2,500.00$1,933.00
38MGS guardrail 3 (614.2300)LF100$22.65$22.65$28.15$27.00
39MGS thrie beam transition (614.2500)LF120$86.00$86.00$100.00$87.00
40MGS guardrail terminal eat (614.2610)EACH3$3,369.00$3,369.00$3,800.00$3,233.00
41Maintenance and repair of haul roads (project) 01. 8700-00-70 (618.0100)EACH1$0.01$0.01$500.00$100.00
42Mobilization (619.1000)EACH1$64,479$236,506$250,000$240,000
43Water (624.0100)MGAL37$1.00$1.00$20.00$70.00
44Topsoil (625.0100)SY1,700$3.80$3.80$8.15$10.00
45Mulching (627.0200)SY1,995$0.60$0.60$0.45$0.50
46Silt fence (628.1504)LF1,690$1.95$1.95$3.10$2.00
47Silt fence maintenance (628.1520)LF3,380$0.01$0.01$0.10$0.03
48Mobilizations erosion control (628.1905)EACH4$500.00$500.00$200.00$51.00
49Mobilizations emergency erosion control (628.1910)EACH4$10.00$10.00$200.00$101.00
50Erosion mat class II type C (628.2027)SY480$3.86$3.86$3.80$5.03
51Temporary ditch checks (628.7504)LF56$6.95$6.95$12.50$8.25
52Culvert pipe checks (628.7555)EACH5$20.00$20.00$15.00$35.00
53Fertilizer type B (629.0210)CWT1.40$187.50$187.50$110.00$125.00
54Seeding mixture no. 20 (630.0120)LB95$15.15$15.15$6.89$8.31
55Seeding temporary (630.0200)LB66$6.95$6.95$3.10$4.25
56Seed water (630.0500)MGAL56$0.50$0.50$15.00$5.00
57Posts wood 4X6-inch X 14-FT (634.0614)EACH6$89.25$89.25$120.00$115.00
58Signs type II reflective H (637.2210)SF25.18$24.75$24.75$30.00$42.00
59Signs type II reflective F (637.2230)SF12$26.75$26.75$30.00$50.00
60Moving signs type II (638.2102)EACH2$57.00$57.00$15.00$100.00
61Removing signs type II (638.2602)EACH8$21.50$21.50$15.00$25.00
62Removing small sign supports (638.3000)EACH7$21.50$21.50$15.00$25.00
63Moving small sign supports (638.4000)EACH2$57.00$57.00$50.00$100.00
64Field office type B (642.5001)EACH1$2,000.00$4,500.00$4,000.00$1,000.00
65Traffic control barricades type III (643.0420)DAY3,840$0.40$0.40$0.40$0.40
66Traffic control warning lights type A (643.0705)DAY5,400$0.10$0.10$0.10$0.10
67Traffic control signs (643.0900)DAY2,840$0.40$0.40$0.40$0.40
68Traffic control (643.5000)EACH1$1,100.00$1,100.00$1,100.00$1,100.00
69Geotextile type DF schedule A (645.0111)SY100$4.40$4.40$5.95$3.35
70Geotextile type HR (645.0120)SY480$6.85$6.85$6.15$4.45
71Marking line epoxy 4-inch (646.1020)LF1,577$2.50$4.25$4.25$4.25
72Construction staking subgrade (650.4500)LF531$0.01$0.01$0.01$0.01
73Construction staking base (650.5000)LF531$0.01$0.01$0.01$0.01
74Construction staking structure layout (structure) 01. B-50-0095 (650.6501)EACH1$3,000.00$3,000.00$3,000.00$3,000.00
75Construction staking supplemental control (project) 01. 8700-00-70 (650.9911)EACH1$1,500.00$1,500.00$1,500.00$1,500.00
76Construction staking slope stakes (650.9920)LF531$1.25$1.25$1.25$1.25
77Sawing asphalt (690.0150)LF250$2.95$2.00$2.00$2.45
78Incentive strength concrete structures (715.0502)DOL2,094$1.00$1.00$1.00$1.00
79Maintaining bird deterrent system (station) 01. 10+00 (999.2005.S)EACH1$0.01$0.01$500.00$500.00
80On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00$5.00$5.00$5.00
81On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00$5.00$5.00
WisDOT contract 20250211041: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy