| 1 | Grubbing (201.0220) | ID | 54 | $18.52 |
| 2 | Removing asphaltic surface (204.0110) | SY | 1,185 | $5.68 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 292 | $18.90 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 60,255 | $3.86 |
| 5 | Removing curb & gutter (204.0150) | LF | 3,240 | $8.89 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 944 | $12.31 |
| 7 | Removing inlets (204.0220) | EACH | 1 | $650.00 |
| 8 | Removing storm sewer (size) 01. 24-inch (204.0245) | LF | 8 | $30.00 |
| 9 | Excavation common (205.0100) | CY | 150 | $25.88 |
| 10 | Grading and shaping intersection (location) 01. chesak ave NE (205.9011.S) | EACH | 1 | $4,500.00 |
| 11 | Prepare foundation for asphaltic paving (project) 01. 9958-00-71 (211.0101) | EACH | 1 | $4,828.29 |
| 12 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 174 | $55.72 |
| 13 | Finishing roadway (project) 01. 9958-00-71 (213.0100) | EACH | 1 | $2,500.00 |
| 14 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,008 | $31.41 |
| 15 | Select crushed material (312.0110) | TON | 240 | $35.10 |
| 16 | Drilled tie bars (416.0610) | EACH | 552 | $10.34 |
| 17 | Tack coat (455.0605) | GAL | 6,647 | $5.33 |
| 18 | Incentive density HMA pavement (460.2000) | DOL | 11,290 | $1.00 |
| 19 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 12,189 | $81.53 |
| 20 | HMA pavement 5 MT 58-28 S (460.6225) | TON | 5,494 | $95.12 |
| 21 | Material transfer vehicle (460.9000.S) | EACH | 1 | $25,000 |
| 22 | Asphaltic surface (465.0105) | TON | 4 | $196.77 |
| 23 | Asphaltic surface patching (465.0110) | TON | 194 | $161.94 |
| 24 | Asphaltic surface driveways and field entrances (465.0120) | TON | 87 | $196.48 |
| 25 | Asphaltic rumble strips, transverse (465.0580) | SY | 99 | $92.23 |
| 26 | Concrete collars for pipe (520.8000) | EACH | 2 | $750.00 |
| 27 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 2,236 | $65.66 |
| 28 | Concrete curb pedestrian (601.0600) | LF | 237 | $72.56 |
| 29 | Concrete sidewalk 4-inch (602.0405) | SF | 9,381 | $6.79 |
| 30 | Curb ramp detectable warning field yellow (602.0505) | SF | 518 | $52.85 |
| 31 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 107 | $67.69 |
| 32 | Concrete driveway 6-inch (602.0810) | SY | 38 | $135.45 |
| 33 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 9 | $150.00 |
| 34 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 8 | $160.00 |
| 35 | Reconstructing inlets (611.0430) | EACH | 4 | $1,300.00 |
| 36 | Inlet covers type H (611.0624) | EACH | 2 | $1,000.00 |
| 37 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $3,250.00 |
| 38 | Inlets 2X3-FT (611.3230) | EACH | 1 | $2,600.00 |
| 39 | Adjusting manhole covers (611.8110) | EACH | 12 | $1,050.00 |
| 40 | Adjusting inlet covers (611.8115) | EACH | 27 | $975.00 |
| 41 | Cover plates temporary (611.8120.S) | EACH | 35 | $500.00 |
| 42 | Mobilization (619.1000) | EACH | 1 | $187,600 |
| 43 | Landmark reference monuments (621.0100) | EACH | 20 | $159.55 |
| 44 | Water (624.0100) | MGAL | 9 | $25.00 |
| 45 | Topsoil (625.0100) | SY | 1,110 | $9.25 |
| 46 | Mulching (627.0200) | SY | 535 | $1.30 |
| 47 | Silt fence (628.1504) | LF | 50 | $5.00 |
| 48 | Silt fence maintenance (628.1520) | LF | 50 | $0.13 |
| 49 | Mobilizations erosion control (628.1905) | EACH | 4 | $350.00 |
| 50 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $350.00 |
| 51 | Erosion mat urban class I type B (628.2008) | SY | 745 | $3.50 |
| 52 | Inlet protection type A (628.7005) | EACH | 2 | $135.00 |
| 53 | Inlet protection type C (628.7015) | EACH | 36 | $67.50 |
| 54 | Culvert pipe checks (628.7555) | EACH | 3 | $25.00 |
| 55 | Rock bags (628.7570) | EACH | 10 | $19.50 |
| 56 | Seeding mixture no. 40 (630.0140) | LB | 58 | $8.50 |
| 57 | Seed water (630.0500) | MGAL | 29 | $10.00 |
| 58 | Moving signs type II (638.2102) | EACH | 55 | $40.00 |
| 59 | Moving small sign supports (638.4000) | EACH | 23 | $150.00 |
| 60 | Field office type C (642.5201) | EACH | 1 | $9,955.00 |
| 61 | Traffic control drums (643.0300) | DAY | 16,730 | $0.23 |
| 62 | Traffic control barricades type III (643.0420) | DAY | 5,982 | $0.56 |
| 63 | Traffic control warning lights type A (643.0705) | DAY | 11,964 | $0.10 |
| 64 | Traffic control warning lights type C (643.0715) | DAY | 1,240 | $0.24 |
| 65 | Traffic control signs (643.0900) | DAY | 11,120 | $0.45 |
| 66 | Temporary marking line epoxy 6- inch (643.3170) | LF | 16,952 | $1.25 |
| 67 | Temporary marking line removable tape 6-inch (643.3180) | LF | 3,163 | $2.27 |
| 68 | Traffic control (643.5000) | EACH | 1 | $4,550.00 |
| 69 | Temporary pedestrian surface matting (644.1440) | SF | 1,533 | $2.25 |
| 70 | Temporary pedestrian curb ramp (644.1601) | DAY | 1,287 | $6.00 |
| 71 | Temporary pedestrian detectable warning field (644.1605) | SF | 570 | $7.25 |
| 72 | Temporary pedestrian barricade (644.1810) | LF | 4,596 | $3.00 |
| 73 | Marking line epoxy 6-inch (646.2020) | LF | 17,872 | $0.75 |
| 74 | Marking line epoxy 10-inch (646.4020) | LF | 100 | $2.50 |
| 75 | Marking line same day epoxy 6- inch (646.4720) | LF | 14,741 | $1.25 |
| 76 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 2,677 | $13.00 |
| 77 | Marking parking stall epoxy (646.8320) | LF | 66 | $6.00 |
| 78 | Locating no-passing zones (648.0100) | MI | 2.80 | $699.00 |
| 79 | Construction staking storm sewer (650.4000) | EACH | 2 | $42.55 |
| 80 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 3,158 | $0.73 |
| 81 | Construction staking resurfacing reference (650.8000) | LF | 15,023 | $0.32 |
| 82 | Construction staking curb ramps (650.9000) | EACH | 45 | $95.34 |
| 83 | Construction staking supplemental control (project) 01.9958-00-71 (650.9911) | EACH | 1 | $433.96 |
| 84 | Sawing asphalt (690.0150) | LF | 4,142 | $4.83 |
| 85 | Sawing concrete (690.0250) | LF | 986 | $9.10 |
| 86 | Incentive iri ride (740.0440) | DOL | 11,400 | $1.00 |
| 87 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 |
| 88 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,260 | $5.00 |
| 89 | Special 01. fertilizer for lawn type turf (SPV.0030) | CWT | 0.80 | $250.00 |
| 90 | Special 01. reestablish section corner monuments (SPV.0060) | EACH | 5 | $601.01 |
| 91 | Special 02. research and locate existing land parcel monuments (SPV.0060) | EACH | 40 | $41.75 |
| 92 | Special 03. verify and replace existing land parcel monuments (SPV.0060) | EACH | 40 | $42.76 |
| 93 | Special 04. grading and shaping curb ramps (SPV.0060) | EACH | 45 | $560.00 |
| 94 | Special 05. adjusting water valve box (SPV.0060) | EACH | 25 | $250.00 |
| 95 | Special 06. adjusting sanitary manhole covers (SPV.0060) | EACH | 23 | $1,250.00 |
| 96 | Special 01. concrete curb and gutter 24-inch type D (SPV.0090) | LF | 922 | $63.50 |
| 97 | Special 01. preparing topsoil for lawn type turf (SPV.0180) | SY | 1,280 | $2.50 |
| 98 | Special 02. salvage and replace landscaping stone (SPV.0180) | SY | 10 | $180.00 |
| 99 | Special 01. base aggregate disintegrated granite (SPV.0195) | TON | 19 | $51.20 |