WisDOT contract 20250211053 bid tabulation
STH 29 - STH 64; Yellow River Bridge B-09-0394 (CTH G, Chippewa County STH 29 - STH 64). Let by Wisconsin DOT on February 11, 2025, Chippewa. 3 bids received; low bid $1,294,563 by Sheet Piling Services LLC.
- Owner
- Wisconsin DOT
- Letting
- 11 FEB 2025
- Pay items
- 66
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Sheet Piling Services LLC | $1,294,563 | Low |
| 2 | Lunda Construction Company | $1,461,665 | +13% |
| 3 | Kraemer North America, LLC | $1,499,521 | +16% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Sheet Piling Services LLC | 2. Lunda Construction Company | 3. Kraemer North America, LLC |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 6 | $350.00 | $350.00 | $350.00 |
| 2 | Removing structure over waterway remove debris (structure) 01. B-09- 0379 (203.0250) | EACH | 1 | $220,000 | $200,000 | $200,000 |
| 3 | Removing asphaltic surface (204.0110) | SY | 660 | $4.95 | $4.95 | $4.95 |
| 4 | Excavation common (205.0100) | CY | 275 | $10.40 | $10.40 | $10.40 |
| 5 | Excavation for structures bridges (structure) 01. B-09-0394 (206.1001) | EACH | 1 | $19,000 | $69,000 | $100,000 |
| 6 | Cofferdams (structure) 01. B-09- 0394 (206.5001) | EACH | 1 | $75,000 | $125,000 | $1.00 |
| 7 | Borrow (208.0100) | CY | 200 | $23.30 | $23.30 | $23.30 |
| 8 | Backfill structure type A (210.1500) | TON | 250 | $17.20 | $17.20 | $17.20 |
| 9 | Finishing roadway (project) 01. 8902-05-70 (213.0100) | EACH | 1 | $500.00 | $500.00 | $500.00 |
| 10 | Base aggregate dense 3/4-inch (305.0110) | TON | 115 | $30.00 | $30.00 | $30.00 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 415 | $21.25 | $21.25 | $21.25 |
| 12 | Tack coat (455.0605) | GAL | 76 | $14.58 | $14.58 | $14.58 |
| 13 | Asphaltic surface (465.0105) | TON | 240 | $150.94 | $150.94 | $150.94 |
| 14 | Concrete masonry bridges (502.0100) | CY | 630 | $850.00 | $800.00 | $950.00 |
| 15 | Protective surface treatment (502.3200) | SY | 490 | $3.00 | $2.00 | $4.00 |
| 16 | Underwater substructure inspection (structure) 01. B-09-0394 (502.9000.S) | EACH | 2 | $5,100.00 | $5,000.00 | $6,000.00 |
| 17 | Bar steel reinforcement HS structures (505.0400) | LB | 9,680 | $1.00 | $1.10 | $1.40 |
| 18 | Bar steel reinforcement HS coated structures (505.0600) | LB | 75,700 | $1.10 | $1.25 | $1.40 |
| 19 | Rubberized membrane waterproofing (516.0500) | SY | 18 | $25.00 | $20.00 | $10.00 |
| 20 | Pile points (550.0500) | EACH | 26 | $250.00 | $150.00 | $160.00 |
| 21 | Piling steel HP 14-inch X 73 LB (550.1140) | LF | 1,250 | $57.00 | $60.00 | $70.00 |
| 22 | Riprap heavy (606.0300) | CY | 605 | $59.85 | $59.85 | $59.85 |
| 23 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 180 | $7.50 | $7.50 | $7.50 |
| 24 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 4 | $500.00 | $200.00 | $30.00 |
| 25 | MGS guardrail 3 (614.2300) | LF | 25 | $27.00 | $27.00 | $27.00 |
| 26 | MGS thrie beam transition (614.2500) | LF | 160 | $84.75 | $84.75 | $84.75 |
| 27 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,475.00 | $3,475.00 | $3,475.00 |
| 28 | Maintenance and repair of haul roads (project) 01. 8902-05-70 (618.0100) | EACH | 1 | $0.01 | $0.01 | $1,000.00 |
| 29 | Mobilization (619.1000) | EACH | 1 | $45,385 | $145,849 | $147,936 |
| 30 | Water (624.0100) | MGAL | 20 | $1.00 | $1.00 | $1.00 |
| 31 | Topsoil (625.0100) | SY | 1,015 | $3.55 | $3.55 | $3.55 |
| 32 | Mulching (627.0200) | SY | 1,280 | $0.50 | $0.50 | $0.50 |
| 33 | Silt fence (628.1504) | LF | 1,145 | $1.95 | $1.95 | $1.95 |
| 34 | Silt fence maintenance (628.1520) | LF | 2,290 | $0.01 | $0.01 | $0.01 |
| 35 | Mobilizations erosion control (628.1905) | EACH | 4 | $625.00 | $625.00 | $625.00 |
| 36 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $1.00 | $1.00 | $1.00 |
| 37 | Erosion mat class II type C (628.2027) | SY | 325 | $4.30 | $4.30 | $4.30 |
| 38 | Temporary ditch checks (628.7504) | LF | 50 | $7.30 | $7.30 | $7.30 |
| 39 | Fertilizer type B (629.0210) | CWT | 1 | $140.00 | $140.00 | $140.00 |
| 40 | Seeding mixture no. 20 (630.0120) | LB | 71 | $25.25 | $25.25 | $25.25 |
| 41 | Seeding temporary (630.0200) | LB | 43 | $9.30 | $9.30 | $9.30 |
| 42 | Seed water (630.0500) | MGAL | 36 | $1.00 | $1.00 | $1.00 |
| 43 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 4 | $87.00 | $87.00 | $87.00 |
| 44 | Signs type II reflective F (637.2230) | SF | 12 | $30.00 | $30.00 | $30.00 |
| 45 | Removing signs type II (638.2602) | EACH | 4 | $15.00 | $15.00 | $15.00 |
| 46 | Removing small sign supports (638.3000) | EACH | 4 | $15.00 | $15.00 | $15.00 |
| 47 | Field office type B (642.5001) | EACH | 1 | $2,000.00 | $6,000.00 | $12,000 |
| 48 | Traffic control barricades type III (643.0420) | DAY | 3,340 | $0.30 | $0.30 | $0.62 |
| 49 | Traffic control warning lights type A (643.0705) | DAY | 5,470 | $0.10 | $0.10 | $0.10 |
| 50 | Traffic control signs (643.0900) | DAY | 17,940 | $0.27 | $0.27 | $0.20 |
| 51 | Traffic control (643.5000) | EACH | 1 | $1,100.00 | $1,100.00 | $1,500.00 |
| 52 | Geotextile type DF schedule A (645.0111) | SY | 60 | $5.00 | $5.00 | $5.00 |
| 53 | Geotextile type HR (645.0120) | SY | 950 | $3.80 | $3.80 | $3.80 |
| 54 | Marking line epoxy 4-inch (646.1020) | LF | 2,168 | $2.50 | $3.00 | $2.50 |
| 55 | Construction staking subgrade (650.4500) | LF | 373 | $0.01 | $0.01 | $0.01 |
| 56 | Construction staking base (650.5000) | LF | 373 | $0.01 | $0.01 | $0.01 |
| 57 | Construction staking structure layout (structure) 01. B-09-0394 (650.6501) | EACH | 1 | $2,103.00 | $2,103.00 | $2,103.00 |
| 58 | Construction staking supplemental control (project) 01. 8902-05-70 (650.9911) | EACH | 1 | $465.90 | $465.90 | $465.90 |
| 59 | Construction staking slope stakes (650.9920) | LF | 373 | $0.68 | $0.68 | $0.68 |
| 60 | Sawing asphalt (690.0150) | LF | 44 | $2.95 | $5.00 | $5.00 |
| 61 | Incentive strength concrete structures (715.0502) | DOL | 3,780 | $1.00 | $1.00 | $1.00 |
| 62 | Installing and maintaining bird deterrent system (station) 01. 10+00 (999.2000.S) | EACH | 1 | $0.01 | $0.01 | $10,000 |
| 63 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 64 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 300 | $5.00 | $5.00 | $5.00 |
| 65 | Special 01. mussel relocation (SPV.0060) | EACH | 1 | $28,530 | $30,000 | $20,000 |
| 66 | Special 01. select crushed material for travel corridor (SPV.0195) | TON | 135 | $80.00 | $80.00 | $80.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 11, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.