WisDOT contract 20250311001 bid tabulation

Beaver Dam - Fond Du Lac; CTH C Intersection (USH 151, Dodge County Beaver Dam - Fond Du Lac). Let by Wisconsin DOT on March 11, 2025, Dodge. 6 bids received; low bid $2,421,714 by Michels Road & Stone, Inc..

Owner
Wisconsin DOT
Letting
11 MAR 2025
Pay items
114
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Michels Road & Stone, Inc.$2,421,714Low
2James Peterson Sons, Inc.$2,443,204+1.0%
3Musson Bros., Inc.$2,534,213+5.0%
4Parisi Construction, LLC$2,579,423+7.0%
5Vinton Construction Company$2,665,753+10%
6Hoffman Construction Company$2,727,932+13%
WisDOT contract 20250311001: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Michels Road & Stone, Inc.2. James Peterson Sons, Inc.3. Musson Bros., Inc.4. Parisi Construction, LLC5. Vinton Construction Company6. Hoffman Construction Company
1Grubbing (201.0205)STA3$1,347.00$400.00$449.00$529.91$449.00$449.00
2Removing small pipe culverts (203.0100)EACH7$300.00$350.00$313.51$473.83$485.00$125.00
3Removing curb & gutter (204.0150)LF660$5.00$3.50$6.51$8.26$6.50$12.00
4Removing fence (204.0170)LF100$3.20$3.20$12.50$2.65$2.50$3.20
5Removing delineators and markers (204.0180)EACH1$10.00$10.00$50.00$10.60$10.00$10.00
6Removing inlets (204.0220)EACH3$700.00$350.00$480.26$698.99$608.00$350.00
7Removing storm sewer (size) 01. 24-inch (204.0245)LF14$15.00$15.00$34.86$48.29$18.75$35.00
8Removing (item description) 01. removing apron endwalls (204.9060.S)EACH1$500.00$250.00$754.29$360.60$285.00$350.00
9Excavation common (205.0100)CY10,490$13.40$17.17$15.85$22.14$19.85$15.00
10Borrow (208.0100)CY758$0.01$0.01$0.01$23.67$0.01$0.01
11Base aggregate dense 3/4-inch (305.0110)TON3,420$24.50$23.00$19.01$23.81$7.50$0.01
12Base aggregate dense 1 1/4-inch (305.0120)TON7,943$12.20$16.50$17.32$15.60$7.50$18.90
13Select crushed material (312.0110)TON12,701$11.80$14.00$14.07$14.57$16.90$18.90
14Tack coat (455.0605)GAL1,542$3.25$3.25$3.25$2.91$3.25$3.25
15Incentive density HMA pavement (460.2000)DOL3,540$1.00$1.00$1.00$1.00$1.00$1.00
16HMA pavement 4 MT 58-28 H (460.6424)TON5,524$94.10$94.10$94.10$96.97$94.10$94.10
17Asphaltic flumes (465.0315)SY67$65.50$65.50$65.50$26.50$65.50$65.50
18Apron endwalls for culvert pipe 15- inch (520.1015)EACH2$1,198.00$1,165.00$1,216.30$1,950.60$1,047.00$2,000.00
19Apron endwalls for culvert pipe 24- inch (520.1024)EACH1$1,442.00$1,445.00$3,753.26$2,123.98$1,477.00$2,000.00
20Concrete collars for pipe (520.8000)EACH4$600.00$800.00$851.92$629.78$910.00$1,300.00
21Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF2,731$27.20$27.20$27.20$34.50$27.20$27.20
22Concrete sidewalk 5-inch (602.0410)SF11,751$6.60$6.60$6.60$6.50$7.10$6.60
23Curb ramp detectable warning field yellow (602.0505)SF36$36.00$36.00$36.00$54.00$36.00$36.00
24Concrete barrier temporary precast delivered (603.8000)LF5,030$11.26$11.26$11.26$19.34$18.25$11.26
25Concrete barrier temporary precast installed (603.8125)LF8,170$4.11$4.11$4.11$3.44$3.25$4.11
26Riprap medium (606.0200)CY289$76.00$77.00$116.51$87.00$99.46$175.00
27Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF510$85.00$79.00$87.96$75.95$86.15$85.00
28Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF990$114.00$96.00$108.26$101.58$106.00$115.00
29Manhole covers type J (611.0530)EACH1$669.00$500.00$978.61$691.64$538.00$900.00
30Inlet covers type F (611.0615)EACH23$1,801.00$1,650.00$2,494.09$2,438.04$1,720.00$2,700.00
31Inlet covers type MS (611.0642)EACH7$680.00$500.00$646.58$989.48$550.00$925.00
32Catch basins 5-FT diameter (611.1005)EACH3$5,206.00$5,280.00$4,223.88$4,411.90$5,485.00$5,800.00
33Catch basins 6-FT diameter (611.1006)EACH1$6,248.00$6,535.00$6,062.87$4,922.25$6,820.00$7,500.00
34Manholes 4-FT diameter (611.2004)EACH1$3,874.00$4,055.00$3,166.08$3,267.23$4,615.00$4,500.00
35Inlets 2.5X3-FT (611.3253)EACH19$2,587.00$2,690.00$1,922.36$2,386.02$3,000.00$2,600.00
36Inlets median 1 grate (611.3901)EACH1$3,062.00$3,500.00$2,938.50$3,474.34$3,395.00$3,700.00
37Inlets median 2 grate (611.3902)EACH6$3,762.00$4,400.00$3,983.01$3,844.14$3,958.00$4,600.00
38Crash cushions temporary (614.0905)EACH4$4,750.00$4,750.00$4,750.00$4,769.17$5,200.00$4,750.00
39Fence woven wire (height) 01. 4 FT (616.0100)LF280$6.20$6.20$15.00$7.42$7.00$6.20
40Mobilization (619.1000)EACH1$163,538$106,000$268,000$77,753$342,000$344,250
41Concrete median sloped nose (620.0300)SF622$12.00$12.00$12.00$11.25$12.00$12.00
42Water (624.0100)MGAL178$60.00$40.00$1.00$36.53$0.01$0.01
43Salvaged topsoil (625.0500)SY13,857$2.20$3.00$1.00$2.47$2.95$2.50
44Silt fence (628.1504)LF3,636$2.10$2.10$2.10$2.25$2.12$2.10
45Silt fence maintenance (628.1520)LF3,636$0.01$0.01$0.10$0.01$0.01$0.01
46Mobilizations erosion control (628.1905)EACH11$215.00$215.00$175.00$52.99$50.00$215.00
47Mobilizations emergency erosion control (628.1910)EACH6$150.00$150.00$90.00$52.99$50.00$150.00
48Erosion mat class I type A (628.2002)SY13,857$0.99$0.99$1.12$1.17$1.10$0.99
49Inlet protection type A (628.7005)EACH6$100.00$100.00$100.00$137.78$130.00$100.00
50Inlet protection type B (628.7010)EACH19$52.00$52.00$62.00$71.01$67.00$52.00
51Inlet protection type D (628.7020)EACH4$110.00$110.00$115.00$132.48$125.00$110.00
52Temporary ditch checks (628.7504)LF228$6.15$6.15$9.80$7.42$7.00$6.15
53Culvert pipe checks (628.7555)EACH30$16.75$16.75$23.00$21.20$20.00$16.75
54Tracking pads (628.7560)EACH2$500.00$1,500.00$500.00$524.94$0.01$100.00
55Fertilizer type B (629.0210)CWT10$87.00$87.00$87.10$84.79$80.00$87.00
56Seeding mixture no. 30 (630.0130)LB257$9.00$9.00$11.30$10.07$9.50$9.00
57Seed water (630.0500)MGAL702$7.00$7.00$15.00$3.18$3.00$7.00
58Markers culvert end (633.5200)EACH3$62.00$62.00$65.00$74.19$70.00$62.00
59Posts wood 4X6-inch X 16-FT (634.0616)EACH121$95.00$95.00$89.00$127.18$120.00$95.00
60Signs type II reflective H (637.2210)SF1,526$24.00$24.00$20.30$22.26$21.00$24.00
61Moving signs type II (638.2102)EACH3$115.00$115.00$105.00$74.19$70.00$115.00
62Removing signs type II (638.2602)EACH18$30.00$30.00$25.00$19.08$18.00$30.00
63Removing small sign supports (638.3000)EACH12$30.00$30.00$25.00$19.08$18.00$30.00
64Field office type B (642.5001)EACH1$17,000$12,000$12,000$7,948.62$12,000$13,500
65Traffic control drums (643.0300)DAY25,868$0.10$0.25$0.19$0.11$0.25$0.10
66Traffic control barricades type III (643.0420)DAY3,008$0.50$0.98$0.50$0.53$0.98$0.50
67Traffic control warning lights type A (643.0705)DAY6,016$0.05$0.20$0.10$0.11$0.20$0.05
68Traffic control warning lights type C (643.0715)DAY5,120$0.05$0.20$0.10$0.11$0.20$0.05
69Traffic control arrow boards (643.0800)DAY344$8.00$16.50$12.00$5.30$16.50$8.00
70Traffic control signs (643.0900)DAY6,708$0.15$0.78$0.20$0.11$0.78$0.15
71Traffic control covering signs type II (643.0920)EACH1$250.00$65.00$25.00$105.98$65.00$250.00
72Traffic control signs PCMS (643.1050)DAY42$25.00$45.00$55.00$52.99$45.00$25.00
73Temporary marking line removable tape 6-inch (643.3180)LF17,316$1.85$1.05$1.10$1.80$1.05$1.85
74Traffic control (643.5000)EACH1$23,000$26,179$10,000$28,838$26,179$23,000
75Geotextile type HR (645.0120)SY600$5.00$5.00$3.11$2.75$4.00$6.00
76Geogrid type SR (645.0220)SY18,230$1.70$1.75$0.59$1.83$1.75$2.00
77Marking line epoxy 6-inch (646.2020)LF10,709$1.00$1.00$1.00$1.06$1.00$1.00
78Marking line grooved permanent tape 10-inch (646.4050)LF6,822$11.20$11.20$11.20$11.87$11.20$11.20
79Marking arrow epoxy (646.5020)EACH6$300.00$300.00$300.00$317.95$300.00$300.00
80Marking word epoxy (646.5120)EACH3$300.00$300.00$300.00$317.94$300.00$300.00
81Marking stop line epoxy 18-inch (646.6120)LF101$15.00$15.00$15.00$15.90$15.00$15.00
82Marking yield line epoxy 18-inch (646.6220)EACH4$100.00$100.00$100.00$105.98$100.00$100.00
83Marking diagonal epoxy 12-inch (646.7120)LF222$10.00$10.00$10.00$10.60$10.00$10.00
84Marking chevron epoxy 24-inch (646.7220)LF723$15.00$15.00$15.00$15.90$15.00$15.00
85Marking removal line water blasting 4-inch (646.9010)LF800$6.25$1.00$1.00$2.12$1.00$6.25
86Construction staking storm sewer (650.4000)EACH34$125.00$125.00$42.55$132.48$125.00$42.55
87Construction staking subgrade (650.4500)LF6,876$0.01$0.01$0.01$0.01$0.01$0.01
88Construction staking base (650.5000)LF6,876$0.40$0.40$1.24$0.42$0.40$0.01
89Construction staking curb gutter and curb & gutter (650.5500)LF2,728$0.90$0.90$0.67$0.95$0.90$0.67
90Construction staking pipe culverts (650.6000)EACH3$20.00$20.00$109.27$21.20$20.00$109.27
91Construction staking electrical installations (project) 01. 1112-06-75 (650.8501)EACH1$2,500.00$2,500.00$1,976.61$2,649.54$2,500.00$1,976.61
92Construction staking supplemental control (project) 01. 1112-06-75 (650.9911)EACH1$8.00$8.00$433.96$8.48$8.00$433.96
93Construction staking slope stakes (650.9920)LF3,655$0.85$0.85$0.87$0.90$0.85$0.01
94Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF2,339$7.00$7.00$7.00$7.42$7.00$7.00
95Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF55$10.00$10.00$10.00$10.60$10.00$10.00
96Conduit special 3-inch (652.0615)LF1,552$35.00$35.00$35.00$37.09$35.00$35.00
97Pull boxes non-conductive 24X42- inch (653.0164)EACH20$1,875.00$1,875.00$1,875.00$1,987.16$1,875.00$1,875.00
98Concrete bases type 5 (654.0105)EACH20$700.00$700.00$700.00$741.87$700.00$700.00
99Concrete control cabinet bases type L24 (654.0224)EACH1$1,200.00$1,200.00$1,200.00$1,271.78$1,200.00$1,200.00
100Electrical wire lighting 12 AWG (655.0610)LF3,900$0.80$0.80$0.80$0.85$0.80$0.80
101Electrical wire lighting 10 AWG (655.0615)LF20,304$0.95$0.95$0.95$1.01$0.95$0.95
102Electrical service meter breaker pedestal (location) 01. sta 2581+71 125.6 LT (656.0201)EACH1$1,500.00$1,500.00$1,500.00$1,589.72$1,500.00$1,500.00
103Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH20$575.00$575.00$575.00$609.39$575.00$575.00
104Poles type 5-aluminum (657.0322)EACH20$1,950.00$1,950.00$1,950.00$2,066.64$1,950.00$1,950.00
105Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710)EACH26$580.00$580.00$580.00$614.69$580.00$580.00
106Luminaires utility LED B (659.1120)EACH26$215.00$215.00$215.00$227.86$215.00$215.00
107Lighting control cabinets 120/240 24-inch (659.2124)EACH1$7,000.00$7,000.00$7,000.00$7,418.71$7,000.00$7,000.00
108Sawing asphalt (690.0150)LF52$2.35$1.10$10.00$2.49$10.00$2.35
109On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00$5.00$5.00$5.00$5.00$5.00
110On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,320$5.00$5.00$5.00$5.00$5.00$5.00
111Special 01. site mowing (SPV.0060)EACH16$700.00$700.00$550.00$264.95$250.00$0.01
112Special 02. public land survey system monuments (SPV.0060)EACH5$200.00$200.00$200.00$211.96$200.00$200.00
113Special 03. right of way monuments (SPV.0060)EACH8$100.00$100.00$200.00$105.98$100.00$200.00
114Special 01. special pipe underdrain 6-inch (SPV.0090)LF808$16.70$16.50$7.68$15.80$19.30$25.00
WisDOT contract 20250311001: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of March 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy