Parisi Construction, LLC: WisDOT bid record
Parisi Construction, LLC submitted 49 bids on Wisconsin DOT contracts in the data, from 13 DEC 2022 to 10 NOV 2026, and was the low bidder on 11 of them (22%). When it was not low, its total sat a median +9.0% above the low bid.
- Owner
- Wisconsin DOT
- Low bid volume
- $15,903,820
- Latest bid
- 10 NOV 2026
- Data through
- 10 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 2 | 0 | 0% |
| 2023 | 8 | 0 | 0% |
| 2024 | 10 | 1 | 10% |
| 2025 | 15 | 5 | 33% |
| 2026 | 14 | 5 | 36% |
By county
| County | Bids | Low bids | Win rate |
|---|---|---|---|
| Dane | 26 | 7 | 27% |
| Rock | 6 | 2 | 33% |
| Dodge | 3 | 0 | 0% |
| Sauk | 2 | 0 | 0% |
| Jefferson | 2 | 0 | 0% |
| Iowa | 2 | 0 | 0% |
| Columbia | 2 | 1 | 50% |
| Green | 2 | 0 | 0% |
| Richland | 1 | 0 | 0% |
| Grant | 1 | 1 | 100% |
| Lafayette | 1 | 0 | 0% |
| Milwaukee | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| On-the-job training graduate at $5.00/HR | ASP.1T0G | HRS | 46 | 46 (100%) | $5.00 | $5.00 |
| On-the-job training apprentice at $5.00/HR | ASP.1T0A | HRS | 46 | 46 (100%) | $5.00 | $5.00 |
| Incentive density HMA pavement | 460.2000 | DOL | 39 | 39 (100%) | $1.00 | $1.00 |
| Construction staking subgrade | 650.4500 | LF | 39 | 31 (79%) | $0.01 | $0.01 |
| Silt fence maintenance | 628.1520 | LF | 36 | 30 (83%) | $0.01 | $0.02 |
| Mobilization | 619.1000 | EACH | 48 | 28 (58%) | $122,500 | $136,364 |
| Traffic control warning lights type A | 643.0705 | DAY | 48 | 25 (52%) | $0.15 | $0.12 |
| Traffic control drums | 643.0300 | DAY | 48 | 25 (52%) | $0.25 | $0.25 |
| Incentive compressive strength concrete pavement | 715.0720 | DOL | 25 | 25 (100%) | $1.00 | $1.00 |
| Traffic control signs | 643.0900 | DAY | 49 | 24 (49%) | $0.30 | $0.40 |
| Concrete median sloped nose | 620.0300 | SF | 32 | 23 (72%) | $12.38 | $15.00 |
| Water | 624.0100 | MGAL | 42 | 22 (52%) | $36.77 | $32.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Rock Road Companies, Inc. | 31 | 21 of 31 |
| Zignego Company, Inc. | 27 | 12 of 27 |
| Integrity Grading and Excavating, Inc. | 22 | 10 of 22 |
| James Peterson Sons, Inc. | 19 | 11 of 19 |
| R.G. Huston Company, Inc. | 12 | 4 of 12 |
| Lalonde Contractors Incorporated | 12 | 8 of 12 |
| Michels Road & Stone, Inc. | 11 | 7 of 11 |
| Hoffman Construction Company | 8 | 4 of 8 |
| Musson Bros., Inc. | 8 | 7 of 8 |
| Speedway Sand & Gravel, Inc. | 4 | 1 of 4 |
Latest bids
| Let | Contract | County | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 10 NOV 2026 | 20261110002 | Green | Monroe - Brodhead; CTH S Intersection (STH 011, Green County Monroe - Broadhead) | 2 of 4 | $2,793,861 | +5.0% |
| 10 NOV 2026 | 20261110003 | Green | Monroe - Brodhead; E Jct STH 81 Intersection (STH 011, Green County Monroe - Brodhead) | 3 of 4 | $3,073,965 | +9.0% |
| 10 NOV 2026 | 20261110011 | Dane | C Madison, Mineral Point Road; USH 12 to High Point Road (LOC STR, Dane County C Madison, Mineral Point Road) | 2 of 4 | $3,945,695 | +12% |
| 10 NOV 2026 | 20261110013 | Dane | V Deforest, North Towne Road; Vinburn Road Intersection (LOC STR, Dane County Village of Deforest, N Towne Road) | 2 of 2 | $1,010,468 | +3.0% |
| 13 OCT 2026 | 20261013007 | Milwaukee | 2568-00-71 | 4 of 4 | $4,174,400 | +8.0% |
| 15 SEP 2026 | 20260915003 | Dane | 5992-10-74 | 1 of 6 | $2,119,322 | Low, 12% under the second |
| 12 MAY 2026 | 20260512003 | Rock | 5350-02-65 | 1 of 2 | $864,916 | Low, 24% under the second |
| 14 APR 2026 | 20260414001 | Columbia | Madison - Portage; STH 60 to CTH Cs (IH 039, Columbia County Madison - Portage) | 3 of 4 | $3,286,163 | +10% |
| 14 APR 2026 | 20260414009 | Rock | STH 213 to the Rock River; CTH D Intersection (CTH Q, Rock County STH 213 to the Rock River) | 1 of 2 | $660,490 | Low, 0.0% under the second |
| 10 MAR 2026 | 20260310002 | Columbia | Portage - Packwaukee; STH 78 to USH 51 (IH 039, Columbia County Portage - Packwaukee) | 1 of 5 | $2,192,723 | Low, 34% under the second |
| 10 MAR 2026 | 20260310012 | Dane | 6085-02-76 | 1 of 6 | $2,488,456 | Low, 7.0% under the second |
| 10 FEB 2026 | 20260210003 | Dane | 5627-00-71 | 5 of 6 | $3,999,038 | +47% |
| 10 FEB 2026 | 20260210047 | Dane | 5845-16-73 | 3 of 7 | $43,295,923 | +4.0% |
| 13 JAN 2026 | 20260113006 | Jefferson | 3997-01-79 | 7 of 7 | $4,536,022 | +40% |
| 09 DEC 2025 | 20251209002 | Dane | Dodgeville - Mount Horeb; CTH F Intersection (USH 018, Dane County Dodgeville - Mount Horeb) | 3 of 4 | $2,678,325 | +9.0% |
| 09 DEC 2025 | 20251209004 | Iowa | 1662-00-77 | 2 of 2 | $2,149,093 | +5.0% |
| 09 DEC 2025 | 20251209005 | Dane | Sauk City - Madison; STH 188/Tetiva Road Intersection (USH 012, Dane County Sauk City - Madison) | 1 of 3 | $1,353,407 | Low, 2.0% under the second |
| 09 DEC 2025 | 20251209048 | Dane | Stoughton - Madison; Tower Road to Exchange Street (USH 051, Dane County Stoughton - Madison) | 7 of 9 | $6,117,488 | +9.0% |
| 11 NOV 2025 | 20251111002 | Dane | Madison - Cambridge; CTH W/Oak Park Road Intersection (USH 012, Dane County Madison - Cambridge) | 1 of 6 | $2,670,241 | Low, 2.0% under the second |
| 11 NOV 2025 | 20251111008 | Rock | 5990-02-41 | 2 of 2 | $1,599,143 | +4.0% |
| 14 OCT 2025 | 20251014003 | Lafayette | Shullsburg - Monroe; STH 23 Intersection (STH 011, Lafayette County Shullsburg - Monroe) | 3 of 4 | $3,607,402 | +4.0% |
| 14 OCT 2025 | 20251014006 | Dodge | 6995-04-74 | 8 of 8 | $4,944,913 | +46% |
| 12 AUG 2025 | 20250812002 | Dane | C Sun Prairie, Intersection Imprvmt; Main/Walker;Main/Bird;Bird/Linnerud (LOC STR, Dane County C Sun Prairie, Intersection Imprvmt) | 1 of 4 | $1,374,607 | Low, 1.0% under the second |
| 08 JUL 2025 | 20250708001 | Rock | Monroe - Beloit; CTH T Intersection (STH 081, Rock County Monroe - Beloit) | 2 of 5 | $1,870,994 | +9.0% |
| 13 MAY 2025 | 20250513006 | Grant | City of Platteville, Camp Street; Lancaster Street to Elm Street (LOC STR, Grant County City Platteville, Camp Street) | 1 of 2 | $813,555 | Low, 8.0% under the second |
How this record was read
WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
- Every bid counted here matched its published total to within one dollar; WisDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.