WisDOT contract 20260414009 bid tabulation
STH 213 to the Rock River; CTH D Intersection (CTH Q, Rock County STH 213 to the Rock River). Let by Wisconsin DOT on April 14, 2026, Rock. 2 bids received; low bid $660,490 by Parisi Construction, LLC.
- Owner
- Wisconsin DOT
- Letting
- 14 APR 2026
- Pay items
- 107
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Parisi Construction, LLC | $660,490 | Low |
| 2 | Rock Road Companies, Inc. | $661,731 | 0.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Parisi Construction, LLC | 2. Rock Road Companies, Inc. |
|---|---|---|---|---|---|
| 1 | Removing asphaltic surface (204.0110) | SY | 605 | $10.00 | $7.29 |
| 2 | Removing curb & gutter (204.0150) | LF | 951 | $10.00 | $9.83 |
| 3 | Removing concrete sidewalk (204.0155) | SY | 1,806 | $0.01 | $0.01 |
| 4 | Removing concrete bases (204.0195) | EACH | 7 | $700.00 | $330.84 |
| 5 | Removing inlets (204.0220) | EACH | 3 | $760.00 | $991.99 |
| 6 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 17 | $43.75 | $43.76 |
| 7 | Sealing pipes (204.0280) | EACH | 1 | $320.00 | $2,544.73 |
| 8 | Excavation common (205.0100) | CY | 894 | $24.25 | $30.39 |
| 9 | Prepare foundation for asphaltic paving (project) 01. 5755-00-73 (211.0101) | EACH | 1 | $100.00 | $0.01 |
| 10 | Finishing roadway (project) 01. 5755-00-73 (213.0100) | EACH | 1 | $500.00 | $6,853.93 |
| 11 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,100 | $23.75 | $19.31 |
| 12 | Tack coat (455.0605) | GAL | 330 | $1.00 | $4.09 |
| 13 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 240 | $110.00 | $104.61 |
| 14 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 190 | $110.00 | $111.77 |
| 15 | Concrete collars for pipe (520.8000) | EACH | 1 | $1,800.00 | $954.25 |
| 16 | Concrete curb & gutter 18-inch type D (601.0407) | LF | 304 | $55.00 | $34.68 |
| 17 | Concrete sidewalk 5-inch (602.0410) | SF | 2,546 | $7.00 | $8.56 |
| 18 | Concrete safety islands (602.2400) | SF | 1,387 | $26.00 | $14.10 |
| 19 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 6 | $320.00 | $212.34 |
| 20 | Inlet covers type Z (611.0666) | EACH | 1 | $1,900.00 | $1,766.19 |
| 21 | Catch basins 3-FT diameter (611.1003) | EACH | 1 | $3,700.00 | $8,016.84 |
| 22 | Maintenance and repair of haul roads (project) 01. 5755-00-73 (618.0100) | EACH | 1 | $100.00 | $0.01 |
| 23 | Mobilization (619.1000) | EACH | 1 | $42,000 | $65,000 |
| 24 | Concrete median sloped nose (620.0300) | SF | 54 | $17.50 | $12.61 |
| 25 | Water (624.0100) | MGAL | 20 | $15.00 | $0.01 |
| 26 | Salvaged topsoil (625.0500) | SY | 100 | $10.00 | $0.01 |
| 27 | Silt fence (628.1504) | LF | 40 | $5.10 | $8.00 |
| 28 | Silt fence maintenance (628.1520) | LF | 40 | $0.01 | $0.01 |
| 29 | Mobilizations erosion control (628.1905) | EACH | 3 | $260.00 | $400.00 |
| 30 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $260.00 | $500.00 |
| 31 | Erosion mat class I type B (628.2004) | SY | 100 | $5.10 | $5.00 |
| 32 | Inlet protection type B (628.7010) | EACH | 1 | $77.00 | $100.00 |
| 33 | Inlet protection type C (628.7015) | EACH | 8 | $77.00 | $100.00 |
| 34 | Temporary ditch checks (628.7504) | LF | 37 | $8.10 | $12.00 |
| 35 | Culvert pipe checks (628.7555) | EACH | 3 | $20.50 | $20.00 |
| 36 | Fertilizer type B (629.0210) | CWT | 0.06 | $150.00 | $1,000.00 |
| 37 | Seeding mixture no. 30 (630.0130) | LB | 5 | $51.00 | $40.00 |
| 38 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 8 | $150.00 | $120.00 |
| 39 | Posts tubular steel 2X2-inch X 8-FT (634.0808) | EACH | 4 | $230.00 | $350.00 |
| 40 | Signs type II reflective H (637.2210) | SF | 138.63 | $25.50 | $30.00 |
| 41 | Signs type II reflective F (637.2230) | SF | 25 | $25.50 | $30.00 |
| 42 | Removing signs type II (638.2602) | EACH | 25 | $30.50 | $25.00 |
| 43 | Removing small sign supports (638.3000) | EACH | 10 | $30.50 | $25.00 |
| 44 | Field office type C (642.5201) | EACH | 1 | $5,200.00 | $5,000.00 |
| 45 | Traffic control drums (643.0300) | DAY | 10,741 | $0.50 | $0.50 |
| 46 | Traffic control barricades type III (643.0420) | DAY | 614 | $2.00 | $2.00 |
| 47 | Traffic control warning lights type A (643.0705) | DAY | 1,128 | $0.10 | $0.11 |
| 48 | Traffic control warning lights type C (643.0715) | DAY | 1,100 | $0.15 | $0.13 |
| 49 | Traffic control connected arrow boards (643.0810) | DAY | 55 | $20.50 | $20.00 |
| 50 | Traffic control signs (643.0900) | DAY | 8,867 | $0.75 | $0.75 |
| 51 | Traffic control covering signs type II (643.0920) | EACH | 1 | $40.75 | $40.00 |
| 52 | Traffic control signs PCMS (643.1050) | DAY | 124 | $61.00 | $60.00 |
| 53 | Temporary marking line removable tape 6-inch (643.3180) | LF | 725 | $3.10 | $3.00 |
| 54 | Temporary marking removable mask out tape 6-inch (643.3960) | LF | 625 | $3.30 | $3.25 |
| 55 | Temporary marking removable mask out tape 12-inch (643.3990) | LF | 100 | $6.60 | $6.50 |
| 56 | Traffic control (643.5000) | EACH | 1 | $13,300 | $13,000 |
| 57 | Marking line epoxy 6-inch (646.2020) | LF | 1,320 | $2.00 | $1.50 |
| 58 | Marking line epoxy 10-inch (646.4020) | LF | 935 | $3.70 | $3.00 |
| 59 | Marking arrow epoxy (646.5020) | EACH | 4 | $260.00 | $230.00 |
| 60 | Marking word epoxy (646.5120) | EACH | 2 | $360.00 | $250.00 |
| 61 | Marking stop line epoxy 18-inch (646.6120) | LF | 226 | $14.75 | $13.00 |
| 62 | Marking chevron epoxy 12-inch (646.7320) | LF | 82 | $13.25 | $9.75 |
| 63 | Marking island nose epoxy (646.8220) | EACH | 3 | $350.00 | $300.00 |
| 64 | Marking removal line wide (646.9200) | LF | 79 | $8.50 | $8.30 |
| 65 | Construction staking storm sewer (650.4000) | EACH | 1 | $500.00 | $1.00 |
| 66 | Construction staking base (650.5000) | LF | 728 | $0.01 | $0.01 |
| 67 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 304 | $2.00 | $1.00 |
| 68 | Construction staking resurfacing reference (650.8000) | LF | 728 | $0.50 | $0.03 |
| 69 | Construction staking sidewalk (project) 01. 5755-00-73 (650.9500) | EACH | 1 | $3,000.00 | $1,000.00 |
| 70 | Construction staking supplemental control (project) 01. 5755-00-73 (650.9911) | EACH | 1 | $1,250.00 | $4,000.00 |
| 71 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 40 | $6.50 | $6.39 |
| 72 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 115 | $8.50 | $8.32 |
| 73 | Conduit special 2-inch (652.0605) | LF | 131 | $16.75 | $16.44 |
| 74 | Conduit special 3-inch (652.0615) | LF | 854 | $25.00 | $24.40 |
| 75 | Install conduit into existing item (652.0700.S) | EACH | 4 | $250.00 | $249.71 |
| 76 | Pull boxes steel 24X42-inch (653.0140) | EACH | 7 | $1,300.00 | $1,237.24 |
| 77 | Removing pull boxes (653.0905) | EACH | 15 | $110.00 | $112.35 |
| 78 | Concrete bases type 1 (654.0101) | EACH | 4 | $910.00 | $895.29 |
| 79 | Concrete bases type 10-special (654.0120) | EACH | 4 | $9,800.00 | $9,621.46 |
| 80 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,800.00 | $2,793.07 |
| 81 | Cable traffic signal 5-14 AWG (655.0230) | LF | 744 | $1.50 | $1.51 |
| 82 | Cable traffic signal 12-14 AWG (655.0260) | LF | 1,705 | $2.90 | $2.88 |
| 83 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,436 | $1.10 | $1.09 |
| 84 | Traffic signal evp detector cable (655.0900) | LF | 688 | $1.40 | $1.32 |
| 85 | Electrical service meter breaker pedestal (location) 01. CTH Q & CTH D (656.0201) | EACH | 1 | $1,800.00 | $1,717.32 |
| 86 | Pedestal bases (657.0100) | EACH | 4 | $340.00 | $331.72 |
| 87 | Poles type 9-special (657.0347) | EACH | 4 | $13,300 | $13,056 |
| 88 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 2 | $970.00 | $950.09 |
| 89 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 2 | $1,000.00 | $1,006.21 |
| 90 | Monotube arms 35-FT-special (657.0536) | EACH | 2 | $5,800.00 | $5,707.71 |
| 91 | Monotube arms 40-FT-special (657.0541) | EACH | 1 | $6,000.00 | $5,844.89 |
| 92 | Monotube arms 45-FT-special (657.0546) | EACH | 1 | $6,400.00 | $6,247.99 |
| 93 | Traffic signal face 3S 12-inch (658.0173) | EACH | 16 | $830.00 | $818.29 |
| 94 | Traffic signal face 4S 12-inch (658.0174) | EACH | 4 | $1,100.00 | $1,056.86 |
| 95 | Signal mounting hardware (location) 01. CTH Q & CTH D (658.5070) | EACH | 1 | $6,600.00 | $6,468.80 |
| 96 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 14 | $38.25 | $37.44 |
| 97 | Temporary traffic signals for intersections (location) 01. CTH Q & CTH D (661.0201) | EACH | 1 | $28,700 | $28,165 |
| 98 | Public land survey monument verify and reset (680.0100) | EACH | 1 | $1,150.00 | $500.00 |
| 99 | Sawing asphalt (690.0150) | LF | 1,380 | $1.40 | $1.13 |
| 100 | Sawing concrete (690.0250) | LF | 8 | $10.00 | $5.01 |
| 101 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 |
| 102 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 |
| 103 | Special 01. remove traffic signal (CTH Q & CTH D) (SPV.0060) | EACH | 1 | $3,800.00 | $3,745.63 |
| 104 | Special 02. traffic signal cabinet and controller (CTH Q & CTH D) (SPV.0060) | EACH | 1 | $32,400 | $31,774 |
| 105 | Special 03. vehicle video detection system (CTH Q & CTH D) (SPV.0060) | EACH | 1 | $46,100 | $45,218 |
| 106 | Special 04. utility line opening (ulo) (SPV.0060) | EACH | 4 | $690.00 | $550.00 |
| 107 | Special 05. emergency vehicle preemption (CTH Q & CTH D) (SPV.0060) | EACH | 1 | $14,400 | $14,099 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 14, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.