| 1 | Grubbing (201.0220) | ID | 48 | $69.00 | $32.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 355 | $10.00 | $16.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 190 | $15.00 | $25.00 |
| 4 | Removing curb & gutter (204.0150) | LF | 2,030 | $7.30 | $5.50 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 345 | $17.25 | $12.00 |
| 6 | Removing inlets (204.0220) | EACH | 7 | $670.00 | $800.00 |
| 7 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 593 | $26.00 | $20.00 |
| 8 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 25 | $26.00 | $30.00 |
| 9 | Removing storm sewer (size) 03. 18-inch (204.0245) | LF | 55 | $28.00 | $30.00 |
| 10 | Excavation common (205.0100) | CY | 3,350 | $21.75 | $22.00 |
| 11 | Backfill granular grade 2 (209.2100) | CY | 950 | $10.00 | $0.01 |
| 12 | Finishing roadway (project) 01. 5996-01-72 (213.0100) | EACH | 1 | $1,500.00 | $2,500.00 |
| 13 | Base aggregate dense 3/4-inch (305.0110) | TON | 420 | $25.00 | $32.50 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,620 | $17.25 | $18.50 |
| 15 | Select crushed material (312.0110) | TON | 2,500 | $17.25 | $18.50 |
| 16 | Tack coat (455.0605) | GAL | 205 | $4.20 | $4.00 |
| 17 | Incentive density HMA pavement (460.2000) | DOL | 800 | $1.00 | $1.00 |
| 18 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 850 | $98.00 | $92.05 |
| 19 | Asphaltic surface driveways and field entrances (465.0120) | TON | 1 | $240.00 | $225.00 |
| 20 | Concrete sidewalk 4-inch (602.0405) | SF | 4,620 | $7.25 | $6.50 |
| 21 | Curb ramp detectable warning field yellow (602.0505) | SF | 30 | $50.00 | $50.00 |
| 22 | Concrete driveway 6-inch (602.0810) | SY | 540 | $74.00 | $60.00 |
| 23 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 1,032 | $78.00 | $83.00 |
| 24 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 50 | $90.00 | $106.00 |
| 25 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 76 | $99.00 | $106.00 |
| 26 | Inlet covers type H (611.0624) | EACH | 17 | $1,300.00 | $1,030.00 |
| 27 | Inlets 4-FT diameter (611.3004) | EACH | 8 | $2,900.00 | $2,360.00 |
| 28 | Inlets 2X3-FT (611.3230) | EACH | 9 | $2,400.00 | $1,775.00 |
| 29 | Insulation board polystyrene (inch) 01. 2-inch (612.0902.S) | SY | 120 | $48.75 | $35.00 |
| 30 | Mobilization (619.1000) | EACH | 1 | $45,000 | $114,400 |
| 31 | Water (624.0100) | MGAL | 30 | $35.00 | $100.00 |
| 32 | Topsoil (625.0100) | SY | 1,400 | $9.30 | $11.50 |
| 33 | Mobilizations erosion control (628.1905) | EACH | 9 | $450.00 | $420.00 |
| 34 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $270.00 | $250.00 |
| 35 | Erosion mat urban class I type A (628.2006) | SY | 1,400 | $2.60 | $2.48 |
| 36 | Inlet protection type A (628.7005) | EACH | 20 | $100.00 | $96.00 |
| 37 | Inlet protection type C (628.7015) | EACH | 20 | $87.00 | $82.00 |
| 38 | Fertilizer type B (629.0210) | CWT | 1 | $110.00 | $99.00 |
| 39 | Seeding mixture no. 40 (630.0140) | LB | 65 | $13.75 | $13.00 |
| 40 | Seed water (630.0500) | MGAL | 40 | $26.50 | $25.00 |
| 41 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 7 | $270.00 | $250.00 |
| 42 | Signs type II reflective H (637.2210) | SF | 15.54 | $30.75 | $29.00 |
| 43 | Removing signs type II (638.2602) | EACH | 4 | $52.00 | $49.00 |
| 44 | Removing small sign supports (638.3000) | EACH | 4 | $64.00 | $60.00 |
| 45 | Field office type B (642.5001) | EACH | 1 | $8,100.00 | $32,135 |
| 46 | Traffic control drums (643.0300) | DAY | 3,737 | $0.25 | $0.25 |
| 47 | Traffic control barricades type III (643.0420) | DAY | 594 | $1.60 | $1.50 |
| 48 | Traffic control warning lights type A (643.0705) | DAY | 1,188 | $0.55 | $0.50 |
| 49 | Traffic control warning lights type C (643.0715) | DAY | 990 | $0.25 | $0.25 |
| 50 | Traffic control signs (643.0900) | DAY | 2,970 | $0.25 | $0.25 |
| 51 | Temporary marking line removable tape 6-inch (643.3180) | LF | 365 | $2.50 | $2.35 |
| 52 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 96 | $2.70 | $2.50 |
| 53 | Traffic control (643.5000) | EACH | 1 | $16,100 | $15,225 |
| 54 | Temporary pedestrian surface matting (644.1440) | SF | 5,350 | $3.70 | $3.50 |
| 55 | Temporary pedestrian curb ramp (644.1601) | DAY | 396 | $6.40 | $6.00 |
| 56 | Temporary pedestrian detectable warning field (644.1605) | SF | 32 | $16.75 | $15.70 |
| 57 | Temporary pedestrian barricade (644.1810) | LF | 1,225 | $7.10 | $6.70 |
| 58 | Geogrid type SR (645.0220) | SY | 5,000 | $1.90 | $2.50 |
| 59 | Marking line epoxy 6-inch (646.2020) | LF | 3,350 | $0.70 | $0.65 |
| 60 | Marking stop line epoxy 18-inch (646.6120) | LF | 41 | $21.25 | $20.00 |
| 61 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 226 | $18.25 | $17.25 |
| 62 | Marking curb epoxy (646.8120) | LF | 367 | $9.30 | $8.75 |
| 63 | Construction staking storm sewer (650.4000) | EACH | 17 | $130.00 | $120.00 |
| 64 | Construction staking subgrade (650.4500) | LF | 1,237 | $1.30 | $1.25 |
| 65 | Construction staking base (650.5000) | LF | 1,237 | $1.10 | $1.00 |
| 66 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 2,460 | $1.60 | $1.50 |
| 67 | Construction staking curb ramps (650.9000) | EACH | 3 | $420.00 | $400.00 |
| 68 | Construction staking sidewalk (project) 01. 5996-01-72 (650.9500) | EACH | 1 | $1,600.00 | $1,550.00 |
| 69 | Construction staking supplemental control (project) 01. 5996-01-72 (650.9911) | EACH | 1 | $1,100.00 | $1,000.00 |
| 70 | Construction staking slope stakes (650.9920) | LF | 1,237 | $1.10 | $1.00 |
| 71 | Sawing asphalt (690.0150) | LF | 197 | $2.10 | $2.00 |
| 72 | Sawing concrete (690.0250) | LF | 368 | $3.70 | $3.50 |
| 73 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 |
| 74 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 |
| 75 | Special 01. core & pour sanitary manhole adjustment (SPV.0060) | EACH | 3 | $1,600.00 | $1,600.00 |
| 76 | Special 02. core & pour water main valve adjustment (SPV.0060) | EACH | 9 | $640.00 | $1,200.00 |
| 77 | Special 03. water service valve adjustment (SPV.0060) | EACH | 6 | $240.00 | $600.00 |
| 78 | Special 04. salvage plastic pipe (SPV.0060) | EACH | 1 | $1,300.00 | $750.00 |
| 79 | Special 05. erecting city owned signs type II (SPV.0060) | EACH | 4 | $370.00 | $350.00 |
| 80 | Special 06. adjusting hydrant (SPV.0060) | EACH | 3 | $1,300.00 | $1,600.00 |
| 81 | Special 01. concrete curb and gutter 24 inch type D (SPV.0090) | LF | 2,460 | $22.00 | $20.00 |
| 82 | Special 02. void reducing asphalt membrane (SPV.0090) | LF | 1,154 | $12.75 | $13.00 |