WisDOT contract 20251209005 bid tabulation
Sauk City - Madison; STH 188/Tetiva Road Intersection (USH 012, Dane County Sauk City - Madison). Let by Wisconsin DOT on December 9, 2025, Dane. 3 bids received; low bid $1,353,407 by Parisi Construction, LLC.
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 133
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Parisi Construction, LLC | $1,353,407 | Low |
| 2 | Rock Road Companies, Inc. | $1,382,530 | +2.0% |
| 3 | Zignego Company, Inc. | $1,496,107 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Parisi Construction, LLC | 2. Rock Road Companies, Inc. | 3. Zignego Company, Inc. |
|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 2 | $670.00 | $455.45 | $450.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 3,070 | $10.00 | $9.06 | $8.50 |
| 3 | Removing asphaltic surface (204.0110) | SY | 54 | $16.00 | $16.71 | $10.00 |
| 4 | Removing curb (204.0130) | LF | 25 | $20.25 | $11.50 | $15.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 30 | $17.00 | $11.14 | $15.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 40 | $26.50 | $12.78 | $15.00 |
| 7 | Removing concrete bases (204.0195) | EACH | 4 | $400.00 | $350.00 | $300.00 |
| 8 | Removing inlets (204.0220) | EACH | 1 | $1,300.00 | $592.50 | $850.00 |
| 9 | Excavation common (205.0100) | CY | 2,209 | $14.50 | $22.27 | $15.00 |
| 10 | Finishing roadway (project) 01. 1670-01-76 (213.0100) | EACH | 1 | $400.00 | $6,545.24 | $1,000.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 220 | $26.75 | $53.67 | $24.00 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,210 | $14.75 | $19.38 | $19.50 |
| 13 | Concrete pavement 9-inch (415.0090) | SY | 3,570 | $95.00 | $90.00 | $110.00 |
| 14 | Concrete pavement hes 9-inch (415.1090) | SY | 690 | $105.00 | $100.00 | $115.00 |
| 15 | Drilled tie bars (416.0610) | EACH | 680 | $15.25 | $12.00 | $30.00 |
| 16 | Drilled dowel bars (416.0620) | EACH | 595 | $12.00 | $18.00 | $30.00 |
| 17 | Tack coat (455.0605) | GAL | 6 | $4.60 | $32.42 | $4.00 |
| 18 | Asphaltic surface (465.0105) | TON | 86 | $160.00 | $239.98 | $140.00 |
| 19 | Asphaltic flumes (465.0315) | SY | 40 | $34.50 | $102.06 | $30.00 |
| 20 | Apron endwalls for culvert pipe 12- inch (520.1012) | EACH | 8 | $1,500.00 | $1,585.72 | $350.00 |
| 21 | Culvert pipe class IV 12-inch (520.4112) | LF | 134 | $69.00 | $102.63 | $65.00 |
| 22 | Concrete collars for pipe (520.8000) | EACH | 1 | $660.00 | $620.85 | $650.00 |
| 23 | Concrete curb type A (601.0105) | LF | 25 | $71.00 | $70.00 | $60.00 |
| 24 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 1,990 | $28.25 | $23.00 | $51.00 |
| 25 | Concrete sidewalk 4-inch (602.0405) | SF | 4,934 | $6.90 | $6.00 | $9.25 |
| 26 | Curb ramp detectable warning field yellow (602.0505) | SF | 51 | $46.75 | $60.00 | $100.00 |
| 27 | Curb ramp detectable warning field radial yellow (602.0605) | SF | 56 | $56.00 | $70.00 | $100.00 |
| 28 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 110 | $150.00 | $164.70 | $85.00 |
| 29 | Inlet covers type H-S (611.0639) | EACH | 2 | $870.00 | $1,546.72 | $1,050.00 |
| 30 | Inlet covers type MS (611.0642) | EACH | 1 | $1,100.00 | $905.59 | $900.00 |
| 31 | Inlets 2X3-FT (611.3230) | EACH | 2 | $2,300.00 | $3,071.76 | $3,500.00 |
| 32 | Inlets median 2 grate (611.3902) | EACH | 2 | $3,800.00 | $3,263.02 | $4,750.00 |
| 33 | Adjusting inlet covers (611.8115) | EACH | 1 | $730.00 | $888.54 | $650.00 |
| 34 | Maintenance and repair of haul roads (project) 01. 1670-01-76 (618.0100) | EACH | 1 | $72.00 | $0.01 | $1.00 |
| 35 | Mobilization (619.1000) | EACH | 1 | $11,000 | $150,925 | $90,000 |
| 36 | Concrete median sloped nose (620.0300) | SF | 394 | $10.75 | $12.00 | $20.00 |
| 37 | Water (624.0100) | MGAL | 50 | $39.50 | $0.01 | $0.01 |
| 38 | Topsoil (625.0100) | SY | 4,230 | $4.00 | $0.01 | $7.50 |
| 39 | Mobilizations erosion control (628.1905) | EACH | 3 | $350.00 | $300.00 | $300.00 |
| 40 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $120.00 | $100.00 | $100.00 |
| 41 | Erosion mat class I type B (628.2004) | SY | 4,230 | $1.40 | $1.25 | $1.25 |
| 42 | Inlet protection type B (628.7010) | EACH | 2 | $58.00 | $50.00 | $50.00 |
| 43 | Inlet protection type C (628.7015) | EACH | 3 | $69.00 | $60.00 | $60.00 |
| 44 | Temporary ditch checks (628.7504) | LF | 80 | $10.25 | $9.00 | $9.00 |
| 45 | Culvert pipe checks (628.7555) | EACH | 7 | $17.25 | $15.00 | $15.00 |
| 46 | Fertilizer type B (629.0210) | CWT | 6 | $92.00 | $80.00 | $80.00 |
| 47 | Seeding mixture no. 30 (630.0130) | LB | 56.90 | $10.00 | $8.75 | $8.75 |
| 48 | Seed water (630.0500) | MGAL | 78 | $23.00 | $20.00 | $20.00 |
| 49 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 8 | $92.00 | $80.00 | $80.00 |
| 50 | Signs type II reflective H (637.2210) | SF | 190.68 | $20.75 | $18.00 | $18.00 |
| 51 | Removing signs type II (638.2602) | EACH | 17 | $28.75 | $25.00 | $25.00 |
| 52 | Removing small sign supports (638.3000) | EACH | 13 | $28.75 | $25.00 | $25.00 |
| 53 | Field office type B (642.5001) | EACH | 1 | $7,300.00 | $5,200.00 | $20,000 |
| 54 | Traffic control drums (643.0300) | DAY | 17,600 | $0.15 | $0.12 | $0.12 |
| 55 | Traffic control barricades type III (643.0420) | DAY | 1,900 | $0.85 | $0.50 | $0.50 |
| 56 | Traffic control warning lights type A (643.0705) | DAY | 3,800 | $0.10 | $0.10 | $0.10 |
| 57 | Traffic control warning lights type C (643.0715) | DAY | 1,350 | $0.10 | $0.10 | $0.10 |
| 58 | Traffic control connected arrow boards (643.0810) | DAY | 228 | $44.75 | $12.00 | $12.00 |
| 59 | Traffic control signs (643.0900) | DAY | 15,200 | $0.70 | $0.25 | $0.25 |
| 60 | Traffic control covering signs type II (643.0920) | EACH | 1 | $75.00 | $35.00 | $35.00 |
| 61 | Traffic control signs PCMS (643.1050) | DAY | 32 | $52.00 | $50.00 | $50.00 |
| 62 | Temporary marking line removable tape 6-inch (643.3180) | LF | 8,960 | $1.60 | $1.10 | $1.10 |
| 63 | Temporary marking line removable tape 10-inch (643.3280) | LF | 1,670 | $2.70 | $2.10 | $2.10 |
| 64 | Temporary marking arrow paint (643.3505) | EACH | 2 | $86.00 | $50.00 | $50.00 |
| 65 | Traffic control (643.5000) | EACH | 1 | $29,000 | $10,000 | $10,000 |
| 66 | Marking line epoxy 6-inch (646.2020) | LF | 2,966 | $1.00 | $0.90 | $0.90 |
| 67 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 1,629 | $2.20 | $1.90 | $1.90 |
| 68 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 1,629 | $2.70 | $2.35 | $2.35 |
| 69 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 2,172 | $4.50 | $3.90 | $3.90 |
| 70 | Marking arrow epoxy (646.5020) | EACH | 10 | $260.00 | $230.00 | $230.00 |
| 71 | Marking word epoxy (646.5120) | EACH | 5 | $300.00 | $265.00 | $265.00 |
| 72 | Marking stop line epoxy 18-inch (646.6120) | LF | 166 | $13.75 | $12.00 | $12.00 |
| 73 | Marking diagonal epoxy 12-inch (646.7120) | LF | 179 | $11.00 | $9.50 | $9.50 |
| 74 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 359 | $12.00 | $10.50 | $10.50 |
| 75 | Marking curb epoxy (646.8120) | LF | 48 | $9.20 | $8.00 | $8.00 |
| 76 | Marking island nose epoxy (646.8220) | EACH | 4 | $330.00 | $290.00 | $290.00 |
| 77 | Marking removal line 4-inch (646.9000) | LF | 1,840 | $2.00 | $0.44 | $0.44 |
| 78 | Marking removal line 8-inch (646.9100) | LF | 205 | $2.30 | $1.00 | $1.00 |
| 79 | Construction staking storm sewer (650.4000) | EACH | 3 | $220.00 | $190.00 | $200.00 |
| 80 | Construction staking pipe culverts (650.6000) | EACH | 4 | $200.00 | $175.00 | $200.00 |
| 81 | Construction staking concrete pavement (650.7000) | LF | 1,173 | $2.30 | $2.00 | $6.80 |
| 82 | Construction staking electrical installations (project) 01. 1670-01- 76 (650.8501) | EACH | 1 | $1,700.00 | $1,450.00 | $4,000.00 |
| 83 | Construction staking curb ramps (650.9000) | EACH | 7 | $220.00 | $190.00 | $300.00 |
| 84 | Construction staking sidewalk (project) 01. 1670-01-76 (650.9500) | EACH | 7 | $220.00 | $207.14 | $300.00 |
| 85 | Construction staking supplemental control (project) 01. 1670-01-76 (650.9911) | EACH | 1 | $1,000.00 | $885.00 | $2,000.00 |
| 86 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,455 | $11.50 | $10.00 | $10.00 |
| 87 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 430 | $16.00 | $14.00 | $14.00 |
| 88 | Conduit special 3-inch (652.0615) | LF | 740 | $40.25 | $35.00 | $35.00 |
| 89 | Conduit loop detector (652.0800) | LF | 1,320 | $9.20 | $8.00 | $8.00 |
| 90 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 19 | $2,500.00 | $2,200.00 | $2,200.00 |
| 91 | Removing pull boxes (653.0905) | EACH | 6 | $230.00 | $200.00 | $200.00 |
| 92 | Concrete bases type 1 (654.0101) | EACH | 11 | $1,200.00 | $1,000.00 | $1,000.00 |
| 93 | Concrete bases type 2 (654.0102) | EACH | 6 | $1,600.00 | $1,350.00 | $1,350.00 |
| 94 | Concrete bases type 10 (654.0110) | EACH | 2 | $11,500 | $10,000 | $10,000 |
| 95 | Concrete bases type 13 (654.0113) | EACH | 2 | $17,300 | $15,000 | $15,000 |
| 96 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 1 | $2,300.00 | $2,000.00 | $2,000.00 |
| 97 | Cable traffic signal 5-14 AWG (655.0230) | LF | 2,330 | $2.30 | $2.00 | $2.00 |
| 98 | Cable traffic signal 9-14 AWG (655.0250) | LF | 1,605 | $3.50 | $3.00 | $3.00 |
| 99 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 1,700 | $2.00 | $1.75 | $1.75 |
| 100 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 1,980 | $1.70 | $1.50 | $1.50 |
| 101 | Electrical wire lighting 12 AWG (655.0610) | LF | 960 | $1.40 | $1.25 | $1.25 |
| 102 | Loop detector lead in cable (655.0700) | LF | 6,440 | $1.70 | $1.50 | $1.50 |
| 103 | Loop detector wire (655.0800) | LF | 4,665 | $1.40 | $1.25 | $1.25 |
| 104 | Electrical service meter breaker pedestal (location) 01. sta 1042 'WB'+88 RT (656.0201) | EACH | 1 | $2,900.00 | $2,500.00 | $2,500.00 |
| 105 | Pedestal bases (657.0100) | EACH | 11 | $400.00 | $350.00 | $350.00 |
| 106 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 6 | $690.00 | $600.00 | $600.00 |
| 107 | Poles type 3 (657.0310) | EACH | 2 | $4,100.00 | $3,600.00 | $3,600.00 |
| 108 | Poles type 5-steel (657.0321) | EACH | 4 | $2,600.00 | $2,270.00 | $2,270.00 |
| 109 | Poles type 10 (657.0350) | EACH | 2 | $11,900 | $10,357 | $10,357 |
| 110 | Poles type 13-over height (657.0361) | EACH | 2 | $19,100 | $16,597 | $16,597 |
| 111 | Traffic signal standards aluminum 11-FT (657.0415) | EACH | 4 | $950.00 | $825.00 | $825.00 |
| 112 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 5 | $1,000.00 | $875.00 | $875.00 |
| 113 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 2 | $1,120.00 | $975.00 | $975.00 |
| 114 | Monotube arms 30-FT (657.0530) | EACH | 2 | $6,700.00 | $5,851.00 | $5,851.00 |
| 115 | Monotube arms 50-FT (657.0550) | EACH | 2 | $13,900 | $12,100 | $12,100 |
| 116 | Luminaire arms truss type 4-inch clamp 12-FT (657.0709) | EACH | 6 | $810.00 | $700.00 | $700.00 |
| 117 | Luminaire arms steel 12-FT (657.0812) | EACH | 2 | $1,400.00 | $1,175.00 | $1,175.00 |
| 118 | Luminaire arms steel 15-FT (657.0815) | EACH | 2 | $1,400.00 | $1,250.00 | $1,250.00 |
| 119 | Traffic signal face 3S 12-inch (658.0173) | EACH | 17 | $1,000.00 | $900.00 | $900.00 |
| 120 | Traffic signal face 4S 12-inch (658.0174) | EACH | 3 | $1,400.00 | $1,200.00 | $1,200.00 |
| 121 | Pedestrian signal face 16-inch (658.0416) | EACH | 6 | $750.00 | $650.00 | $650.00 |
| 122 | Pedestrian push buttons (658.0500) | EACH | 6 | $350.00 | $300.00 | $300.00 |
| 123 | Signal mounting hardware (location) 01. ush 12 & STH 188/tetiva road (658.5070) | EACH | 1 | $5,200.00 | $4,500.00 | $4,500.00 |
| 124 | Luminaires utility LED C (659.1125) | EACH | 10 | $400.00 | $350.00 | $350.00 |
| 125 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 4 | $120.00 | $100.00 | $100.00 |
| 126 | Sawing asphalt (690.0150) | LF | 255 | $1.60 | $1.39 | $1.39 |
| 127 | Sawing concrete (690.0250) | LF | 2,630 | $2.60 | $2.25 | $2.25 |
| 128 | Incentive compressive strength concrete pavement (715.0720) | DOL | 4,260 | $1.00 | $1.00 | $1.00 |
| 129 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 |
| 130 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 |
| 131 | Special 01. temporary lighting system (SPV.0060) | EACH | 1 | $17,300 | $15,000 | $15,000 |
| 132 | Special 02. retroreflective backplate 3S (SPV.0060) | EACH | 6 | $190.00 | $165.00 | $165.00 |
| 133 | Special 03. retroreflective backplate 4S (SPV.0060) | EACH | 2 | $290.00 | $250.00 | $250.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.