WisDOT contract 20251209002 bid tabulation
Dodgeville - Mount Horeb; CTH F Intersection (USH 018, Dane County Dodgeville - Mount Horeb). Let by Wisconsin DOT on December 9, 2025, Dane. 4 bids received; low bid $2,454,567 by Rock Road Companies, Inc..
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 146
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rock Road Companies, Inc. | $2,454,567 | Low |
| 2 | H. James & Sons, Inc | $2,526,124 | +3.0% |
| 3 | Parisi Construction, LLC | $2,678,325 | +9.0% |
| 4 | Integrity Grading and Excavating, Inc. | $2,728,027 | +11% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rock Road Companies, Inc. | 2. H. James & Sons, Inc | 3. Parisi Construction, LLC | 4. Integrity Grading and Excavating, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 2 | $1,000.00 | $1,160.00 | $1,500.00 | $1,300.00 |
| 2 | Removing asphaltic surface milling (204.0120) | SY | 1,065 | $17.14 | $16.00 | $18.00 | $16.00 |
| 3 | Removing curb & gutter (204.0150) | LF | 340 | $6.21 | $7.88 | $9.41 | $8.78 |
| 4 | Removing guardrail (204.0165) | LF | 472 | $4.00 | $4.00 | $4.50 | $4.00 |
| 5 | Removing delineators and markers (204.0180) | EACH | 1 | $25.00 | $25.00 | $28.25 | $25.00 |
| 6 | Removing inlets (204.0220) | EACH | 2 | $505.36 | $750.00 | $670.00 | $741.81 |
| 7 | Excavation common (205.0100) | CY | 8,368 | $13.18 | $14.00 | $14.50 | $20.00 |
| 8 | Borrow (208.0100) | CY | 4,551 | $29.94 | $21.00 | $20.00 | $29.00 |
| 9 | Prepare foundation for asphaltic paving (project) 01. 1204-05-77 (211.0101) | EACH | 1 | $0.01 | $12,285 | $4,300.00 | $10,000 |
| 10 | Finishing roadway (project) 01. 1204-05-77 (213.0100) | EACH | 1 | $5,352.17 | $1,000.00 | $500.00 | $500.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 664 | $30.13 | $31.84 | $27.00 | $57.54 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 19,061 | $14.79 | $22.13 | $18.25 | $17.25 |
| 13 | QMP base aggregate dense 1 1/4- inch compaction (371.2000.S) | EACH | 18 | $300.00 | $800.00 | $790.00 | $696.50 |
| 14 | Tack coat (455.0605) | GAL | 1,120 | $2.87 | $1.00 | $1.10 | $1.00 |
| 15 | Incentive density HMA pavement (460.2000) | DOL | 3,238 | $1.00 | $1.00 | $1.00 | $1.00 |
| 16 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 5,055 | $95.79 | $97.50 | $110.00 | $97.50 |
| 17 | Asphaltic flumes (465.0315) | SY | 12 | $65.86 | $65.00 | $74.00 | $65.00 |
| 18 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 4 | $870.33 | $990.74 | $1,000.00 | $885.62 |
| 19 | Culvert pipe class III-A 24-inch (520.3324) | LF | 220 | $77.49 | $77.27 | $73.00 | $87.27 |
| 20 | Concrete collars for pipe (520.8000) | EACH | 2 | $525.97 | $1,000.00 | $670.00 | $3,991.11 |
| 21 | Apron endwalls for culvert pipe sloped side drains steel 24-inch 10 to 1 (521.1624) | EACH | 2 | $4,217.13 | $4,214.07 | $4,700.00 | $1,475.79 |
| 22 | Culvert pipe corrugated steel 72- inch (521.3172) | LF | 8 | $860.58 | $526.07 | $360.00 | $1,092.21 |
| 23 | Culvert pipe reinforced concrete class III 60-inch (522.0160) | LF | 14 | $634.33 | $491.99 | $420.00 | $819.71 |
| 24 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 1 | $1,606.18 | $1,983.69 | $3,700.00 | $2,354.19 |
| 25 | Apron endwalls for culvert pipe salvaged 60-inch (524.0660) | EACH | 1 | $1,081.84 | $1,439.80 | $1,400.00 | $1,560.20 |
| 26 | Apron endwalls for culvert pipe salvaged 72-inch (524.0672) | EACH | 1 | $1,081.84 | $1,060.00 | $1,400.00 | $1,180.35 |
| 27 | Concrete masonry ancillary structures type NS (531.1100) | CY | 2 | $995.00 | $995.00 | $1,100.00 | $995.00 |
| 28 | Steel reinforcement HS ancillary structures type NS (531.1140) | LB | 220 | $4.00 | $4.00 | $4.50 | $4.00 |
| 29 | Drilling shaft 24-inch (531.2024) | LF | 16 | $75.00 | $75.00 | $85.00 | $75.00 |
| 30 | Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415) | LF | 2,711 | $25.00 | $25.00 | $25.00 | $25.00 |
| 31 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 1,222 | $29.75 | $26.00 | $29.75 | $29.75 |
| 32 | Concrete sidewalk 5-inch (602.0410) | SF | 6,225 | $6.60 | $7.00 | $6.60 | $6.60 |
| 33 | Riprap light (606.0100) | CY | 17 | $123.13 | $175.00 | $110.00 | $111.15 |
| 34 | Riprap medium (606.0200) | CY | 122 | $123.13 | $90.00 | $100.00 | $111.15 |
| 35 | Storm sewer rock excavation (608.0005) | CY | 207 | $55.00 | $65.00 | $130.02 | $260.00 |
| 36 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 16 | $231.08 | $146.42 | $78.00 | $116.84 |
| 37 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 115 | $106.04 | $98.87 | $98.00 | $109.88 |
| 38 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 426 | $77.50 | $71.99 | $95.00 | $88.11 |
| 39 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 420 | $79.66 | $75.00 | $98.00 | $90.54 |
| 40 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 714 | $102.32 | $98.56 | $120.00 | $111.55 |
| 41 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419) | LF | 90 | $163.27 | $160.27 | $180.00 | $200.43 |
| 42 | Inlet covers type HM-GJ (611.0630) | EACH | 18 | $1,035.23 | $1,221.37 | $1,100.00 | $1,101.20 |
| 43 | Inlet covers type MS (611.0642) | EACH | 1 | $709.52 | $550.00 | $920.00 | $748.54 |
| 44 | Catch basins 5-FT diameter (611.1005) | EACH | 2 | $3,933.79 | $3,530.00 | $4,100.00 | $4,692.12 |
| 45 | Inlets 4-FT diameter (611.3004) | EACH | 12 | $2,754.38 | $2,432.43 | $2,800.00 | $3,519.75 |
| 46 | Inlets 2X3-FT (611.3230) | EACH | 4 | $2,076.42 | $1,559.69 | $2,300.00 | $3,179.52 |
| 47 | Inlets median 1 grate (611.3901) | EACH | 3 | $2,743.07 | $2,432.60 | $3,300.00 | $3,989.21 |
| 48 | Salvaged inlet covers (611.9710) | EACH | 2 | $214.52 | $722.50 | $720.00 | $558.11 |
| 49 | Pipe grates (size) 01. 24-inch (611.9850.S) | EACH | 6 | $1,694.64 | $1,615.62 | $2,200.00 | $1,819.88 |
| 50 | Pipe grates (size) 02. 19X30-inch (611.9850.S) | EACH | 1 | $1,139.30 | $1,260.75 | $1,600.00 | $1,314.95 |
| 51 | MGS guardrail 3 (614.2300) | LF | 462 | $30.00 | $30.00 | $34.00 | $30.00 |
| 52 | MGS guardrail terminal eat (614.2610) | EACH | 1 | $4,200.00 | $4,200.00 | $4,800.00 | $4,200.00 |
| 53 | MGS guardrail terminal type 2 (614.2620) | EACH | 1 | $2,500.00 | $2,500.00 | $2,800.00 | $2,500.00 |
| 54 | Fence woven wire (height) 01. 4.5- FT (616.0100) | LF | 440 | $15.00 | $15.00 | $17.00 | $15.00 |
| 55 | Maintenance and repair of haul roads (project) 01. 1204-05-77 (618.0100) | EACH | 1 | $0.01 | $1,000.00 | $350.00 | $500.00 |
| 56 | Mobilization (619.1000) | EACH | 1 | $164,000 | $61,250 | $60,000 | $148,000 |
| 57 | Concrete median sloped nose (620.0300) | SF | 402 | $12.50 | $13.00 | $12.50 | $12.50 |
| 58 | Water (624.0100) | MGAL | 300 | $0.01 | $25.00 | $38.75 | $46.66 |
| 59 | Salvaged topsoil (625.0500) | SY | 20,629 | $0.01 | $2.66 | $3.10 | $2.00 |
| 60 | Silt fence (628.1504) | LF | 2,178 | $2.10 | $2.10 | $2.40 | $2.10 |
| 61 | Silt fence maintenance (628.1520) | LF | 2,178 | $0.01 | $0.01 | $0.01 | $0.01 |
| 62 | Mobilizations erosion control (628.1905) | EACH | 6 | $100.00 | $100.00 | $110.00 | $100.00 |
| 63 | Mobilizations emergency erosion control (628.1910) | EACH | 5 | $100.00 | $100.00 | $110.00 | $100.00 |
| 64 | Erosion mat urban class I type A (628.2006) | SY | 2,202 | $1.65 | $1.65 | $1.90 | $1.65 |
| 65 | Erosion mat class II type B (628.2023) | SY | 18,428 | $1.65 | $1.65 | $1.90 | $1.65 |
| 66 | Inlet protection type A (628.7005) | EACH | 3 | $110.00 | $110.00 | $120.00 | $110.00 |
| 67 | Inlet protection type C (628.7015) | EACH | 18 | $60.00 | $60.00 | $68.00 | $60.00 |
| 68 | Temporary ditch checks (628.7504) | LF | 140 | $8.50 | $8.50 | $9.60 | $8.50 |
| 69 | Culvert pipe checks (628.7555) | EACH | 13 | $20.00 | $20.00 | $22.75 | $20.00 |
| 70 | Tracking pads (628.7560) | EACH | 5 | $700.00 | $0.01 | $860.00 | $1,000.00 |
| 71 | Fertilizer type B (629.0210) | CWT | 12 | $90.00 | $90.00 | $100.00 | $90.00 |
| 72 | Seeding mixture no. 30 (630.0130) | LB | 934 | $8.75 | $8.75 | $9.90 | $8.75 |
| 73 | Seeding temporary (630.0200) | LB | 560 | $4.00 | $4.00 | $4.50 | $4.00 |
| 74 | Seed water (630.0500) | MGAL | 1,163 | $10.00 | $10.00 | $11.25 | $10.00 |
| 75 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 83 | $87.00 | $87.00 | $98.00 | $87.00 |
| 76 | Sign supports structural steel HS (635.0200) | LB | 1,928 | $4.00 | $4.00 | $4.50 | $4.00 |
| 77 | Signs type II reflective H (637.2210) | SF | 1,300.25 | $20.00 | $20.00 | $22.75 | $20.00 |
| 78 | Moving signs type I (638.2101) | EACH | 1 | $800.00 | $800.00 | $910.00 | $800.00 |
| 79 | Moving signs type II (638.2102) | EACH | 5 | $200.00 | $200.00 | $230.00 | $200.00 |
| 80 | Removing signs type II (638.2602) | EACH | 31 | $35.00 | $35.00 | $39.50 | $35.00 |
| 81 | Removing small sign supports (638.3000) | EACH | 26 | $35.00 | $35.00 | $39.50 | $35.00 |
| 82 | Field office type B (642.5001) | EACH | 1 | $6,750.00 | $7,840.00 | $8,400.00 | $12,000 |
| 83 | Traffic control drums (643.0300) | DAY | 10,408 | $0.25 | $0.25 | $0.30 | $0.25 |
| 84 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 140 | $199.00 | $199.00 | $230.00 | $199.00 |
| 85 | Traffic control barricades type III (643.0420) | DAY | 950 | $1.00 | $1.00 | $1.10 | $1.00 |
| 86 | Traffic control warning lights type A (643.0705) | DAY | 1,900 | $0.25 | $0.25 | $0.30 | $0.25 |
| 87 | Traffic control warning lights type C (643.0715) | DAY | 1,891 | $0.25 | $0.25 | $0.30 | $0.25 |
| 88 | Traffic control connected arrow boards (643.0810) | DAY | 114 | $30.00 | $30.00 | $34.00 | $30.00 |
| 89 | Traffic control signs (643.0900) | DAY | 2,548 | $0.25 | $0.25 | $0.30 | $0.25 |
| 90 | Traffic control covering signs type II (643.0920) | EACH | 22 | $25.00 | $25.00 | $28.25 | $25.00 |
| 91 | Traffic control signs PCMS (643.1050) | DAY | 140 | $35.00 | $35.00 | $39.50 | $35.00 |
| 92 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 70 | $25.00 | $25.00 | $28.25 | $25.00 |
| 93 | Temporary marking line paint 6- inch (643.3165) | LF | 160 | $1.10 | $1.10 | $1.20 | $1.10 |
| 94 | Temporary marking line removable tape 6-inch (643.3180) | LF | 4,899 | $1.10 | $1.10 | $1.20 | $1.10 |
| 95 | Temporary marking arrow removable tape (643.3550) | EACH | 4 | $79.99 | $79.99 | $91.00 | $79.99 |
| 96 | Temporary marking word removable tape (643.3650) | EACH | 2 | $105.00 | $105.00 | $120.00 | $105.00 |
| 97 | Temporary marking diagonal paint 12-inch (643.3905) | LF | 23 | $5.00 | $5.00 | $5.70 | $5.00 |
| 98 | Traffic control (643.5000) | EACH | 1 | $7,600.00 | $7,600.00 | $8,600.00 | $7,600.00 |
| 99 | Geotextile type HR (645.0120) | SY | 320 | $2.08 | $4.83 | $3.90 | $2.37 |
| 100 | Geotextile type R (645.0130) | SY | 53 | $1.24 | $15.00 | $6.10 | $4.88 |
| 101 | Marking line epoxy 4-inch (646.1020) | LF | 1,453 | $1.00 | $1.00 | $1.10 | $1.00 |
| 102 | Marking line epoxy 6-inch (646.2020) | LF | 397 | $1.50 | $1.50 | $1.70 | $1.50 |
| 103 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 3,759 | $1.32 | $1.32 | $1.50 | $1.32 |
| 104 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 29,825 | $1.37 | $1.37 | $1.60 | $1.37 |
| 105 | Marking line grooved permanent tape 6-inch (646.2050) | LF | 3,759 | $8.00 | $8.00 | $9.10 | $8.00 |
| 106 | Marking line grooved permanent tape 10-inch (646.4050) | LF | 8,321 | $10.25 | $10.25 | $11.50 | $10.25 |
| 107 | Marking arrow epoxy (646.5020) | EACH | 20 | $230.00 | $230.00 | $260.00 | $230.00 |
| 108 | Marking word epoxy (646.5120) | EACH | 8 | $250.00 | $250.00 | $280.00 | $250.00 |
| 109 | Marking stop line epoxy 18-inch (646.6120) | LF | 63 | $13.00 | $13.00 | $14.75 | $13.00 |
| 110 | Marking yield line epoxy 18-inch (646.6220) | EACH | 40 | $45.00 | $45.00 | $51.00 | $45.00 |
| 111 | Marking diagonal epoxy 12-inch (646.7120) | LF | 263 | $10.00 | $10.00 | $11.25 | $10.00 |
| 112 | Marking chevron epoxy 12-inch (646.7320) | LF | 630 | $10.00 | $10.00 | $11.25 | $10.00 |
| 113 | Marking curb epoxy (646.8120) | LF | 258 | $7.50 | $7.50 | $8.50 | $7.50 |
| 114 | Marking island nose epoxy (646.8220) | EACH | 8 | $300.00 | $300.00 | $340.00 | $300.00 |
| 115 | Marking removal line 4-inch (646.9000) | LF | 8,705 | $0.45 | $0.45 | $0.50 | $0.45 |
| 116 | Construction staking storm sewer (650.4000) | EACH | 24 | $200.00 | $200.00 | $230.00 | $200.00 |
| 117 | Construction staking subgrade (650.4500) | LF | 8,910 | $0.02 | $0.02 | $0.02 | $0.02 |
| 118 | Construction staking base (650.5000) | LF | 8,910 | $0.30 | $0.30 | $0.35 | $0.30 |
| 119 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 2,711 | $0.50 | $0.50 | $0.55 | $0.50 |
| 120 | Construction staking pipe culverts (650.6000) | EACH | 4 | $200.00 | $200.00 | $230.00 | $200.00 |
| 121 | Construction staking electrical installations (project) 01. 1204-05- 77 (650.8501) | EACH | 1 | $300.00 | $300.00 | $340.00 | $300.00 |
| 122 | Construction staking sidewalk (project) 01. 1204-05-77 (650.9500) | EACH | 1 | $1,000.00 | $1,000.00 | $1,100.00 | $1,000.00 |
| 123 | Construction staking supplemental control (project) 01. 1204-05-77 (650.9911) | EACH | 1 | $100.00 | $100.00 | $110.00 | $100.00 |
| 124 | Construction staking slope stakes (650.9920) | LF | 6,085 | $0.50 | $0.50 | $0.55 | $0.50 |
| 125 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 3,460 | $12.00 | $12.00 | $13.50 | $12.00 |
| 126 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 60 | $16.00 | $16.00 | $18.00 | $16.00 |
| 127 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 430 | $14.00 | $14.00 | $15.75 | $14.00 |
| 128 | Conduit special 2-inch (652.0605) | LF | 355 | $30.00 | $30.00 | $34.00 | $30.00 |
| 129 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 13 | $2,100.00 | $2,100.00 | $2,400.00 | $2,100.00 |
| 130 | Concrete bases type 5 (654.0105) | EACH | 21 | $1,250.00 | $1,250.00 | $1,400.00 | $1,250.00 |
| 131 | Concrete control cabinet bases type L30 (654.0230) | EACH | 1 | $2,000.00 | $2,000.00 | $2,300.00 | $2,000.00 |
| 132 | Electrical wire lighting 12 AWG (655.0610) | LF | 6,464 | $1.25 | $1.25 | $1.40 | $1.25 |
| 133 | Electrical wire lighting 6 AWG (655.0625) | LF | 22,880 | $1.90 | $1.90 | $2.20 | $1.90 |
| 134 | Electrical service meter breaker pedestal (location) 01. CB100 (656.0201) | EACH | 1 | $2,500.00 | $2,500.00 | $2,800.00 | $2,500.00 |
| 135 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 21 | $650.00 | $650.00 | $740.00 | $650.00 |
| 136 | Poles type 5-aluminum (657.0322) | EACH | 21 | $2,159.00 | $2,159.00 | $2,400.00 | $2,159.00 |
| 137 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 38 | $675.00 | $675.00 | $760.00 | $675.00 |
| 138 | Luminaires utility LED B (659.1120) | EACH | 38 | $325.00 | $325.00 | $370.00 | $325.00 |
| 139 | Lighting control cabinets 120/240 30-inch (659.2130) | EACH | 1 | $8,500.00 | $8,500.00 | $9,600.00 | $8,500.00 |
| 140 | Sawing asphalt (690.0150) | LF | 9,497 | $1.10 | $1.09 | $1.20 | $1.09 |
| 141 | Incentive iri ride (740.0440) | DOL | 1,290 | $1.00 | $1.00 | $1.00 | $1.00 |
| 142 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 |
| 143 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 | $5.00 | $5.00 |
| 144 | Special 01. research and locate existing land parcel monuments (SPV.0060) | EACH | 1 | $200.00 | $200.00 | $230.00 | $200.00 |
| 145 | Special 02. verify and replace existing land parcel monuments (SPV.0060) | EACH | 1 | $200.00 | $200.00 | $230.00 | $200.00 |
| 146 | Special 01. foundation drilling 20- inch diameter (SPV.0090) | LF | 105 | $100.00 | $100.00 | $110.00 | $100.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.