WisDOT contract 20260915003 bid tabulation
5992-10-74. Let by Wisconsin DOT on September 15, 2026, Dane. 6 bids received; low bid $2,119,322 by Parisi Construction, LLC.
- Owner
- Wisconsin DOT
- Letting
- 15 SEP 2026
- Pay items
- 165
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Parisi Construction, LLC | $2,119,322 | Low |
| 2 | James Peterson Sons, Inc. | $2,368,151 | +12% |
| 3 | Hoffman Construction Company | $2,483,046 | +17% |
| 4 | Rock Road Companies, Inc. | $2,572,436 | +21% |
| 5 | R.G. Huston Company, Inc. | $2,607,400 | +23% |
| 6 | Zignego Company, Inc. | $4,246,960 | +100% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Parisi Construction, LLC | 2. James Peterson Sons, Inc. | 3. Hoffman Construction Company | 4. Rock Road Companies, Inc. | 5. R.G. Huston Company, Inc. | 6. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 13 | $540.00 | $530.00 | $530.00 | $530.00 | $190.00 | $530.00 |
| 2 | Clearing (201.0120) | ID | 40 | $1.00 | $1.00 | $1.00 | $1.00 | $70.00 | $1.00 |
| 3 | Grubbing (201.0205) | STA | 13 | $360.00 | $450.00 | $350.00 | $350.00 | $370.00 | $350.00 |
| 4 | Grubbing (201.0220) | ID | 40 | $1.00 | $1.00 | $1.00 | $1.00 | $60.00 | $1.00 |
| 5 | Removing small pipe culverts (203.0100) | EACH | 2 | $660.00 | $750.00 | $500.00 | $708.00 | $800.00 | $1,000.00 |
| 6 | Removing curb & gutter (204.0150) | LF | 1,260 | $8.50 | $3.50 | $4.50 | $6.41 | $7.00 | $10.00 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 250 | $19.00 | $10.00 | $6.50 | $9.40 | $7.00 | $30.00 |
| 8 | Removing fence (204.0170) | LF | 560 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $3.00 |
| 9 | Removing concrete bases (204.0195) | EACH | 1 | $340.00 | $500.00 | $500.00 | $652.42 | $700.00 | $500.00 |
| 10 | Removing manholes (204.0210) | EACH | 1 | $660.00 | $600.00 | $650.00 | $652.42 | $700.00 | $1,000.00 |
| 11 | Removing inlets (204.0220) | EACH | 1 | $660.00 | $500.00 | $650.00 | $652.42 | $600.00 | $1,000.00 |
| 12 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 72 | $27.00 | $23.00 | $18.00 | $27.47 | $26.00 | $50.00 |
| 13 | Removing storm sewer (size) 02. 21-inch (204.0245) | LF | 42 | $30.75 | $25.00 | $18.00 | $27.47 | $42.00 | $50.00 |
| 14 | Excavation common (205.0100) | CY | 12,900 | $16.75 | $11.76 | $10.50 | $20.27 | $20.30 | $29.00 |
| 15 | Excavation rock (205.0200) | CY | 59 | $58.00 | $65.00 | $200.00 | $80.18 | $200.00 | $300.00 |
| 16 | Finishing roadway (project) 01. 5992-10-74 (213.0100) | EACH | 1 | $500.00 | $2,500.00 | $100.00 | $5,388.88 | $3,100.00 | $1,000.00 |
| 17 | Base aggregate dense 3/4-inch (305.0110) | TON | 215 | $35.75 | $30.84 | $60.00 | $41.37 | $47.00 | $50.00 |
| 18 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 4,100 | $19.50 | $25.14 | $25.00 | $19.58 | $22.00 | $20.00 |
| 19 | Base aggregate dense 3-inch (305.0130) | TON | 4,000 | $17.00 | $19.24 | $25.00 | $21.81 | $20.50 | $26.00 |
| 20 | Coloring concrete wisdot red (405.0100) | CY | 97 | $155.00 | $120.00 | $155.00 | $120.00 | $121.21 | $200.00 |
| 21 | Concrete truck apron 12-inch (415.2010) | SY | 290 | $110.00 | $106.40 | $110.00 | $106.40 | $107.47 | $124.00 |
| 22 | Tack coat (455.0605) | GAL | 380 | $2.00 | $2.00 | $2.00 | $5.00 | $2.00 | $2.00 |
| 23 | Incentive density HMA pavement (460.2000) | DOL | 1,600 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 24 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 130 | $97.00 | $95.00 | $95.00 | $105.00 | $95.00 | $95.00 |
| 25 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 1,615 | $85.00 | $83.00 | $83.00 | $85.00 | $83.00 | $83.00 |
| 26 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 755 | $88.00 | $86.25 | $86.25 | $90.00 | $86.25 | $86.25 |
| 27 | Asphaltic surface driveways and field entrances (465.0120) | TON | 23 | $160.00 | $160.00 | $160.00 | $220.00 | $160.00 | $160.00 |
| 28 | Asphaltic flumes (465.0315) | SY | 8 | $40.75 | $40.00 | $40.00 | $67.00 | $40.00 | $40.00 |
| 29 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 4 | $840.00 | $264.00 | $650.00 | $745.82 | $600.00 | $1,000.00 |
| 30 | Culvert pipe corrugated steel 12- inch (521.3112) | LF | 63 | $75.00 | $73.00 | $65.00 | $106.67 | $55.00 | $120.00 |
| 31 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 1 | $2,000.00 | $1,518.00 | $1,750.00 | $1,935.94 | $3,300.00 | $1,250.00 |
| 32 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 173 | $40.00 | $27.70 | $40.00 | $27.70 | $27.98 | $80.00 |
| 33 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 258 | $37.00 | $30.30 | $37.00 | $30.30 | $30.61 | $80.00 |
| 34 | Concrete curb pedestrian (601.0600) | LF | 123 | $60.00 | $55.00 | $60.00 | $55.00 | $55.56 | $80.00 |
| 35 | Concrete sidewalk 5-inch (602.0410) | SF | 15,300 | $7.50 | $7.60 | $7.50 | $7.60 | $7.68 | $9.22 |
| 36 | Concrete sidewalk 7-inch (602.0420) | SF | 195 | $16.50 | $9.20 | $16.50 | $9.20 | $9.29 | $10.00 |
| 37 | Curb ramp detectable warning field natural patina (602.0515) | SF | 272 | $50.00 | $45.00 | $50.00 | $45.00 | $45.45 | $50.00 |
| 38 | Riprap heavy (606.0300) | CY | 6 | $130.00 | $161.00 | $200.00 | $228.32 | $155.00 | $300.00 |
| 39 | Storm sewer rock excavation (608.0005) | CY | 100 | $110.00 | $145.00 | $122.00 | $90.20 | $200.00 | $500.00 |
| 40 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 506 | $72.00 | $91.00 | $75.00 | $127.76 | $95.00 | $203.21 |
| 41 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 1,006 | $100.00 | $104.00 | $100.00 | $120.53 | $118.00 | $308.67 |
| 42 | Manhole covers type J-special (611.0535) | EACH | 10 | $890.00 | $1,135.00 | $800.00 | $1,654.96 | $900.00 | $1,000.00 |
| 43 | Inlet covers type H (611.0624) | EACH | 15 | $1,100.00 | $1,480.00 | $1,100.00 | $1,984.18 | $1,200.00 | $1,000.00 |
| 44 | Inlet covers type MS (611.0642) | EACH | 1 | $880.00 | $600.00 | $830.00 | $1,213.36 | $900.00 | $1,000.00 |
| 45 | Inlet covers type T (611.0652) | EACH | 2 | $1,400.00 | $1,450.00 | $1,500.00 | $2,340.29 | $1,500.00 | $1,000.00 |
| 46 | Catch basins 5-FT diameter (611.1005) | EACH | 1 | $4,700.00 | $6,068.00 | $5,800.00 | $6,413.13 | $7,700.00 | $16,126 |
| 47 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $2,700.00 | $2,453.00 | $3,400.00 | $3,268.43 | $4,900.00 | $5,584.37 |
| 48 | Manholes 5-FT diameter (611.2005) | EACH | 5 | $3,400.00 | $4,176.00 | $4,700.00 | $4,224.92 | $6,600.00 | $6,766.03 |
| 49 | Inlets 4-FT diameter (611.3004) | EACH | 6 | $2,700.00 | $2,609.00 | $3,200.00 | $3,231.37 | $4,800.00 | $5,504.04 |
| 50 | Inlets 2X2.5-FT (611.3225) | EACH | 1 | $2,100.00 | $1,188.00 | $2,000.00 | $2,700.08 | $2,000.00 | $3,001.54 |
| 51 | Inlets 2X3-FT (611.3230) | EACH | 7 | $2,100.00 | $1,715.00 | $2,100.00 | $2,619.76 | $2,200.00 | $3,855.32 |
| 52 | Inlets median 1 grate (611.3901) | EACH | 1 | $3,200.00 | $3,321.00 | $3,700.00 | $3,317.76 | $2,800.00 | $5,854.87 |
| 53 | Pipe grates (size) 01. 24-inch (611.9850.S) | EACH | 1 | $700.00 | $1,981.00 | $850.00 | $593.07 | $2,100.00 | $2,500.00 |
| 54 | Insulation board polystyrene (inch) 01. 2-inch (612.0902.S) | SY | 28.48 | $57.00 | $30.00 | $40.00 | $22.74 | $40.00 | $35.00 |
| 55 | Mobilization (619.1000) | EACH | 1 | $90,000 | $179,901 | $281,368 | $209,287 | $289,854 | $384,000 |
| 56 | Concrete median sloped nose (620.0300) | SF | 320 | $12.00 | $15.00 | $12.00 | $15.00 | $15.15 | $20.00 |
| 57 | Water (624.0100) | MGAL | 95 | $31.75 | $70.00 | $95.00 | $0.01 | $42.00 | $30.00 |
| 58 | Topsoil (625.0100) | SY | 11,400 | $4.90 | $2.45 | $3.50 | $3.70 | $0.01 | $5.95 |
| 59 | Topsoil (625.0105) | CY | 90 | $45.00 | $60.00 | $35.00 | $65.65 | $35.00 | $75.00 |
| 60 | Silt fence (628.1504) | LF | 1,250 | $2.30 | $2.25 | $2.25 | $2.25 | $2.25 | $2.05 |
| 61 | Silt fence maintenance (628.1520) | LF | 1,250 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 62 | Mobilizations erosion control (628.1905) | EACH | 6 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $250.00 |
| 63 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $250.00 |
| 64 | Erosion mat urban class I type B (628.2008) | SY | 11,400 | $1.80 | $1.75 | $1.75 | $1.75 | $1.75 | $1.75 |
| 65 | Turbidity barriers (628.6005) | SY | 50 | $46.00 | $45.00 | $45.00 | $45.00 | $45.00 | $40.00 |
| 66 | Inlet protection type A (628.7005) | EACH | 18 | $97.00 | $95.00 | $95.00 | $95.00 | $95.00 | $95.00 |
| 67 | Inlet protection type C (628.7015) | EACH | 23 | $71.00 | $70.00 | $70.00 | $70.00 | $70.00 | $65.00 |
| 68 | Temporary ditch checks (628.7504) | LF | 80 | $9.20 | $9.00 | $9.00 | $9.00 | $9.00 | $6.75 |
| 69 | Culvert pipe checks (628.7555) | EACH | 3 | $25.50 | $25.00 | $25.00 | $25.00 | $25.00 | $18.00 |
| 70 | Tracking pads (628.7560) | EACH | 2 | $1,000.00 | $1,500.00 | $500.00 | $950.00 | $2,900.00 | $2,000.00 |
| 71 | Fertilizer type B (629.0210) | CWT | 7.50 | $97.00 | $95.00 | $95.00 | $95.00 | $95.00 | $80.00 |
| 72 | Seeding mixture no. 40 (630.0140) | LB | 240 | $14.25 | $14.00 | $14.00 | $14.00 | $14.00 | $10.95 |
| 73 | Seeding mixture no. 70 (630.0170) | LB | 25 | $130.00 | $125.00 | $125.00 | $125.00 | $125.00 | $150.00 |
| 74 | Seed water (630.0500) | MGAL | 640 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $10.00 |
| 75 | Signs type II reflective H (637.2210) | SF | 99.04 | $22.50 | $22.00 | $22.00 | $22.00 | $22.00 | $22.00 |
| 76 | Signs type II reflective F (637.2230) | SF | 100 | $23.50 | $23.00 | $23.00 | $23.00 | $23.00 | $24.00 |
| 77 | Moving signs type II (638.2102) | EACH | 1 | $260.00 | $250.00 | $250.00 | $250.00 | $250.00 | $110.00 |
| 78 | Removing signs type II (638.2602) | EACH | 11 | $35.75 | $35.00 | $35.00 | $35.00 | $35.00 | $25.00 |
| 79 | Removing small sign supports (638.3000) | EACH | 11 | $35.75 | $35.00 | $35.00 | $35.00 | $35.00 | $25.00 |
| 80 | Moving small sign supports (638.4000) | EACH | 1 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 81 | Field office type D (642.5401) | EACH | 1 | $9,500.00 | $15,000 | $5,000.00 | $8,100.00 | $25,000 | $20,000 |
| 82 | Traffic control drums (643.0300) | DAY | 1,400 | $0.15 | $0.25 | $0.14 | $0.20 | $0.20 | $0.20 |
| 83 | Traffic control barricades type III (643.0420) | DAY | 2,600 | $0.45 | $0.70 | $0.44 | $0.60 | $0.60 | $0.65 |
| 84 | Traffic control warning lights type A (643.0705) | DAY | 4,150 | $0.10 | $0.07 | $0.10 | $0.11 | $0.11 | $0.10 |
| 85 | Traffic control signs (643.0900) | DAY | 9,300 | $0.15 | $0.50 | $0.16 | $0.30 | $0.30 | $0.45 |
| 86 | Traffic control signs fixed message (643.1000) | SF | 72 | $12.75 | $18.00 | $12.50 | $12.00 | $12.00 | $12.00 |
| 87 | Traffic control signs PCMS (643.1050) | DAY | 30 | $12.25 | $55.00 | $12.00 | $60.00 | $60.00 | $55.00 |
| 88 | Temporary marking line removable tape 6-inch (643.3180) | LF | 70 | $2.00 | $2.00 | $2.00 | $5.00 | $5.00 | $2.50 |
| 89 | Traffic control (643.5000) | EACH | 1 | $22,700 | $16,000 | $22,290 | $12,000 | $12,000 | $11,923 |
| 90 | Temporary pedestrian surface matting (644.1440) | SF | 160 | $8.20 | $12.00 | $8.00 | $10.00 | $10.00 | $8.00 |
| 91 | Temporary pedestrian curb ramp (644.1601) | DAY | 300 | $3.60 | $4.00 | $3.50 | $5.00 | $5.00 | $6.00 |
| 92 | Temporary pedestrian detectable warning field (644.1605) | SF | 20 | $13.25 | $15.00 | $13.00 | $12.00 | $12.00 | $20.00 |
| 93 | Temporary pedestrian barricade (644.1810) | LF | 150 | $7.70 | $4.00 | $7.50 | $6.00 | $6.00 | $8.00 |
| 94 | Temporary audible message devices (644.1900.S) | DAY | 850 | $9.70 | $3.45 | $9.50 | $2.25 | $2.25 | $1.25 |
| 95 | Geotextile type HR (645.0120) | SY | 18 | $40.00 | $16.00 | $5.00 | $2.84 | $5.00 | $10.00 |
| 96 | Marking line epoxy 4-inch (646.1020) | LF | 6,000 | $0.40 | $0.75 | $0.39 | $0.39 | $0.39 | $0.75 |
| 97 | Marking line epoxy 6-inch (646.2020) | LF | 2,750 | $0.55 | $1.15 | $0.53 | $0.53 | $0.54 | $1.15 |
| 98 | Marking line epoxy 8-inch (646.3020) | LF | 210 | $1.10 | $1.50 | $1.05 | $1.05 | $1.06 | $1.50 |
| 99 | Marking arrow epoxy (646.5020) | EACH | 4 | $230.00 | $230.00 | $229.38 | $229.38 | $231.70 | $230.00 |
| 100 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 70 | $19.00 | $19.00 | $18.60 | $18.60 | $18.79 | $19.00 |
| 101 | Marking diagonal epoxy 12-inch (646.7120) | LF | 120 | $18.50 | $9.75 | $18.15 | $18.15 | $18.33 | $9.75 |
| 102 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 275 | $12.25 | $11.50 | $11.95 | $11.95 | $12.07 | $11.50 |
| 103 | Marking curb epoxy (646.8120) | LF | 30 | $9.10 | $7.75 | $8.92 | $8.92 | $9.01 | $7.75 |
| 104 | Marking island nose epoxy (646.8220) | EACH | 3 | $340.00 | $325.00 | $333.36 | $333.36 | $336.73 | $325.00 |
| 105 | Marking removal line 4-inch (646.9000) | LF | 700 | $0.80 | $1.00 | $0.80 | $0.80 | $1.70 | $0.75 |
| 106 | Construction staking storm sewer (650.4000) | EACH | 23 | $200.00 | $200.00 | $200.00 | $15.00 | $200.00 | $200.00 |
| 107 | Construction staking subgrade (650.4500) | LF | 2,024 | $0.10 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 108 | Construction staking base (650.5000) | LF | 2,024 | $1.00 | $1.25 | $0.01 | $0.01 | $1.25 | $1.25 |
| 109 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,624 | $1.50 | $2.00 | $2.00 | $1.00 | $2.00 | $2.00 |
| 110 | Construction staking pipe culverts (650.6000) | EACH | 2 | $260.00 | $300.00 | $300.00 | $100.00 | $300.00 | $300.00 |
| 111 | Construction staking electrical installations (project) 01. 5992-10- 74 (650.8501) | EACH | 1 | $2,600.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 112 | Construction staking sidewalk (project) 01. 5992-10-74 (650.9500) | EACH | 1 | $1,500.00 | $10,000 | $10,000 | $5,000.00 | $10,000 | $10,000 |
| 113 | Construction staking supplemental control (project) 01. 5992-10-74 (650.9911) | EACH | 1 | $1,000.00 | $10,000 | $10,000 | $5,000.00 | $10,000 | $10,000 |
| 114 | Construction staking slope stakes (650.9920) | LF | 2,039 | $1.50 | $2.00 | $2.00 | $0.80 | $2.00 | $2.00 |
| 115 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 1,505 | $8.20 | $8.00 | $8.00 | $8.00 | $10.61 | $8.00 |
| 116 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,180 | $10.25 | $10.00 | $10.00 | $10.00 | $13.38 | $10.00 |
| 117 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 300 | $10.25 | $10.00 | $10.00 | $10.00 | $12.12 | $10.00 |
| 118 | Conduit rigid nonmetallic schedule 80 3-inch (652.0335) | LF | 155 | $14.25 | $14.00 | $14.00 | $14.00 | $14.65 | $14.00 |
| 119 | Install conduit into existing item (652.0700.S) | EACH | 3 | $100.00 | $100.00 | $100.00 | $100.00 | $505.05 | $100.00 |
| 120 | Removing pull boxes (653.0905) | EACH | 3 | $200.00 | $200.00 | $200.00 | $200.00 | $505.05 | $200.00 |
| 121 | Electrical wire lighting 10 AWG (655.0615) | LF | 1,770 | $1.50 | $1.50 | $1.50 | $1.50 | $1.46 | $1.50 |
| 122 | Electrical wire lighting 8 AWG (655.0620) | LF | 9,070 | $1.80 | $1.75 | $1.75 | $1.75 | $1.87 | $1.75 |
| 123 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 1 | $150.00 | $150.00 | $150.00 | $150.00 | $505.05 | $150.00 |
| 124 | Sawing asphalt (690.0150) | LF | 620 | $2.10 | $1.55 | $1.55 | $1.47 | $1.55 | $1.55 |
| 125 | Sawing concrete (690.0250) | LF | 58.50 | $15.00 | $2.55 | $2.55 | $9.14 | $2.55 | $2.55 |
| 126 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 127 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 128 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 129 | Special 01. sanitary sewer rock excavation (SPV.0035) | CY | 250 | $99.00 | $108.00 | $103.50 | $90.20 | $200.00 | $900.00 |
| 130 | Special 02. water main rock excavation (SPV.0035) | CY | 100 | $110.00 | $145.00 | $103.50 | $90.20 | $200.00 | $900.00 |
| 131 | Special 01. street light removal (SPV.0060) | EACH | 1 | $510.00 | $500.00 | $500.00 | $500.00 | $757.58 | $500.00 |
| 132 | Special 02. construction staking roundabout (SPV.0060) | EACH | 1 | $20,400 | $25,000 | $25,000 | $2,500.00 | $25,000 | $25,000 |
| 133 | Special 03. precast sign post base (SPV.0060) | EACH | 16 | $230.00 | $225.00 | $225.00 | $225.00 | $225.00 | $500.00 |
| 134 | Special 04. sign post base for concrete installation (SPV.0060) | EACH | 11 | $230.00 | $225.00 | $225.00 | $225.00 | $225.00 | $500.00 |
| 135 | Special 05. electrical pullbox, type (SPV.0060) | IEACH | 8 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,515.15 | $1,000.00 |
| 136 | Special 06. electrical pullbox, type V (SPV.0060) | EACH | 9 | $1,300.00 | $1,250.00 | $1,250.00 | $1,250.00 | $1,666.67 | $1,250.00 |
| 137 | Special 07. concrete base type LB- 3R (SPV.0060) | EACH | 15 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,616.16 | $1,200.00 |
| 138 | Special 08. pole 30-foot, 11 gauge (SPV.0060) | EACH | 15 | $2,600.00 | $2,530.00 | $2,530.00 | $2,530.00 | $2,575.76 | $2,530.00 |
| 139 | Special 09. LED light assembly type 1 (SPV.0060) | EACH | 11 | $830.00 | $810.00 | $810.00 | $810.00 | $732.32 | $810.00 |
| 140 | Special 10. LED light assembly type 2 (SPV.0060) | EACH | 4 | $830.00 | $810.00 | $810.00 | $810.00 | $732.32 | $810.00 |
| 141 | Special 11. sanitary sewer access structure, 4-foot diameter (SPV.0060) | EACH | 6 | $5,600.00 | $4,827.00 | $7,625.00 | $5,975.35 | $6,600.00 | $16,289 |
| 142 | Special 12. doghouse manhole (SPV.0060) | EACH | 1 | $47,500 | $17,573 | $8,120.00 | $39,308 | $28,000 | $69,309 |
| 143 | Special 13. construction staking sanitary sewer (SPV.0060) | EACH | 1 | $2,600.00 | $5,000.00 | $5,000.00 | $2,500.00 | $5,000.00 | $5,000.00 |
| 144 | Special 14. cut-in or connect-to existing water system (SPV.0060) | EACH | 3 | $3,400.00 | $2,779.00 | $4,610.00 | $8,902.13 | $6,700.00 | $6,000.00 |
| 145 | Special 15. remove, salvage and reinstall existing hydrant (SPV.0060) | EACH | 2 | $4,000.00 | $3,500.00 | $2,150.00 | $5,802.82 | $1,200.00 | $7,000.00 |
| 146 | Special 16. furnish and install hydrant (SPV.0060) | EACH | 1 | $7,100.00 | $7,142.00 | $7,090.00 | $8,530.92 | $7,700.00 | $12,000 |
| 147 | Special 17. adjust water valve box section (SPV.0060) | EACH | 2 | $490.00 | $350.00 | $500.00 | $355.47 | $300.00 | $1,000.00 |
| 148 | Special 18. furnish and install 6- inch valve (SPV.0060) | EACH | 3 | $4,200.00 | $2,669.00 | $2,350.00 | $3,118.28 | $3,100.00 | $3,000.00 |
| 149 | Special 19. furnish and install 12- inch valve (SPV.0060) | EACH | 3 | $8,200.00 | $6,566.00 | $9,110.00 | $6,653.62 | $6,800.00 | $9,000.00 |
| 150 | Special 20. construction staking water main (SPV.0060) | EACH | 1 | $2,600.00 | $5,000.00 | $5,000.00 | $2,500.00 | $5,000.00 | $5,000.00 |
| 151 | Special 21. manhole covers type J- special - MMSD (SPV.0060) | EACH | 1 | $1,600.00 | $1,298.00 | $900.00 | $1,734.35 | $900.00 | $1,000.00 |
| 152 | Special 22. sanitary sewer internal chimney seal (SPV.0060) | EACH | 3 | $370.00 | $567.00 | $1,200.00 | $0.01 | $500.00 | $1,000.00 |
| 153 | Special 23. utility line opening (ulo) (SPV.0060) | EACH | 3 | $850.00 | $750.00 | $500.00 | $1,250.00 | $1,600.00 | $2,000.00 |
| 154 | Special 24. manhole liner (SPV.0060) | EACH | 1 | $9,200.00 | $9,926.00 | $4,200.00 | $8,977.00 | $9,000.00 | $10,000 |
| 155 | Special 25. wastewater control MMSD (SPV.0060) | EACH | 1 | $2,200.00 | $12,500 | $5,000.00 | $8,120.21 | $7,400.00 | $10,000 |
| 156 | Special 26. external sewer access structure joint seal (SPV.0060) | EACH | 2 | $360.00 | $350.00 | $450.00 | $689.44 | $500.00 | $1,000.00 |
| 157 | Special 01. reflective sign post (SPV.0090) | LF | 238 | $20.50 | $20.00 | $20.00 | $20.00 | $20.00 | $35.00 |
| 158 | Special 02. concrete curb & gutter 30-inch type D special (SPV.0090) | LF | 4,138 | $25.50 | $20.90 | $25.50 | $20.90 | $21.11 | $44.51 |
| 159 | Special 03. electrical wire lighting, 14-3 grounded (SPV.0090) | LF | 600 | $1.80 | $1.75 | $1.75 | $1.75 | $1.72 | $1.75 |
| 160 | Special 04. sanitary sewer pipe PVC, 8-inch (SPV.0090) | LF | 1,599 | $79.00 | $82.00 | $124.00 | $148.53 | $142.00 | $290.17 |
| 161 | Special 05. select fill for sanitary sewer (SPV.0090) | LF | 1,599 | $0.50 | $100.00 | $51.00 | $49.16 | $0.01 | $53.33 |
| 162 | Special 06. furnish & install 6-inch pipe & fittings (SPV.0090) | LF | 52 | $140.00 | $146.00 | $127.00 | $135.37 | $116.00 | $228.64 |
| 163 | Special 07. furnish & install 12-inch pipe & fittings (SPV.0090) | LF | 855 | $130.00 | $169.00 | $184.00 | $165.47 | $175.00 | $318.72 |
| 164 | Special 08. select fill for water main (SPV.0090) | LF | 907 | $0.50 | $38.00 | $15.50 | $26.03 | $0.01 | $44.44 |
| 165 | Special 01. construct outside drop, 8-inch (SPV.0200) | VF | 3.58 | $750.00 | $796.00 | $1,075.42 | $2,149.59 | $523.00 | $4,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of September 15, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way