WisDOT contract 20251209004 bid tabulation
1662-00-77. Let by Wisconsin DOT on December 9, 2025, Iowa. 2 bids received; low bid $2,040,741 by Zignego Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 170
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zignego Company, Inc. | $2,040,741 | Low |
| 2 | Parisi Construction, LLC | $2,149,093 | +5.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zignego Company, Inc. | 2. Parisi Construction, LLC |
|---|---|---|---|---|---|
| 1 | Removing concrete pavement (204.0100) | SY | 910 | $17.00 | $20.25 |
| 2 | Removing asphaltic surface (204.0110) | SY | 70 | $20.00 | $6.90 |
| 3 | Removing curb & gutter (204.0150) | LF | 3,862 | $8.50 | $11.75 |
| 4 | Removing concrete sidewalk (204.0155) | SY | 395 | $9.00 | $29.25 |
| 5 | Removing concrete bases (204.0195) | EACH | 25 | $500.00 | $560.00 |
| 6 | Removing inlets (204.0220) | EACH | 12 | $550.00 | $1,300.00 |
| 7 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 39 | $20.00 | $65.00 |
| 8 | Sealing pipes (204.0280) | EACH | 1 | $750.00 | $380.00 |
| 9 | Removing (item description) 01. remove traffic signals ush 18 & STH 23 (204.9060.S) | EACH | 1 | $5,000.00 | $5,600.00 |
| 10 | Removing (item description) 02. remove traffic signals ush 18 & N johns ST) (204.9060.S) | EACH | 1 | $5,000.00 | $5,600.00 |
| 11 | Excavation common (205.0100) | CY | 1,172 | $18.00 | $35.50 |
| 12 | Finishing roadway (project) 01. 1662-00-77 (213.0100) | EACH | 1 | $1,000.00 | $350.00 |
| 13 | Finishing roadway (project) 02. 1662-00-78 (213.0100) | EACH | 1 | $1,000.00 | $350.00 |
| 14 | Finishing roadway (project) 03. 5525-01-74 (213.0100) | EACH | 1 | $1,000.00 | $70.00 |
| 15 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 1,589 | $17.25 | $30.50 |
| 16 | Concrete pavement hes 9-inch (415.1090) | SY | 2,085 | $110.14 | $110.00 |
| 17 | Drilled tie bars (416.0610) | EACH | 1,904 | $12.00 | $7.10 |
| 18 | Drilled dowel bars (416.0620) | EACH | 193 | $30.00 | $14.25 |
| 19 | Asphaltic material seal coat (455.0505) | GAL | 180 | $96.00 | $110.00 |
| 20 | Tack coat (455.0605) | GAL | 18 | $22.00 | $3.40 |
| 21 | Asphaltic surface (465.0105) | TON | 60 | $188.50 | $220.00 |
| 22 | Seal coat (475.0100) | CY | 36 | $231.00 | $260.00 |
| 23 | Concrete collars for pipe (520.8000) | EACH | 2 | $750.00 | $660.00 |
| 24 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 216 | $60.00 | $85.00 |
| 25 | Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413) | LF | 449 | $60.00 | $55.00 |
| 26 | Concrete curb & gutter integral 30- inch type J (601.0454) | LF | 132 | $60.00 | $56.00 |
| 27 | Concrete curb pedestrian (601.0600) | LF | 37 | $60.00 | $48.75 |
| 28 | Concrete sidewalk 4-inch (602.0405) | SF | 2,145 | $9.82 | $12.75 |
| 29 | Concrete sidewalk 6-inch (602.0415) | SF | 980 | $12.68 | $13.25 |
| 30 | Curb ramp detectable warning field natural patina (602.0515) | SF | 80 | $100.00 | $38.50 |
| 31 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 49 | $200.00 | $56.00 |
| 32 | Concrete loading zone (602.1000) | SF | 3,890 | $12.68 | $15.25 |
| 33 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 65 | $90.00 | $170.00 |
| 34 | Reconstructing catch basins (611.0410) | EACH | 2 | $850.00 | $3,100.00 |
| 35 | Manhole covers type J (611.0530) | EACH | 2 | $750.00 | $1,200.00 |
| 36 | Inlet covers type B (611.0606) | EACH | 7 | $1,050.00 | $990.00 |
| 37 | Inlet covers type H-S (611.0639) | EACH | 1 | $1,050.00 | $1,600.00 |
| 38 | Inlet covers type S (611.0651) | EACH | 1 | $1,050.00 | $1,500.00 |
| 39 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $3,600.00 | $5,000.00 |
| 40 | Inlets 2X2-FT (611.3220) | EACH | 7 | $1,950.00 | $3,500.00 |
| 41 | Inlets 2X3-FT (611.3230) | EACH | 1 | $2,100.00 | $3,800.00 |
| 42 | Maintenance and repair of haul roads (project) 01. 1662-00-77 (618.0100) | EACH | 1 | $1.00 | $100.00 |
| 43 | Maintenance and repair of haul roads (project) 02. 1662-00-78 (618.0100) | EACH | 1 | $1.00 | $100.00 |
| 44 | Maintenance and repair of haul roads (project) 03. 5255-01-74 (618.0100) | EACH | 1 | $1.00 | $100.00 |
| 45 | Mobilization (619.1000) | EACH | 1 | $231,000 | $115,000 |
| 46 | Concrete median sloped nose (620.0300) | SF | 139 | $20.00 | $12.25 |
| 47 | Water (624.0100) | MGAL | 15.90 | $0.01 | $48.50 |
| 48 | Topsoil (625.0100) | SY | 155 | $15.00 | $31.75 |
| 49 | Silt fence (628.1504) | LF | 177 | $4.00 | $4.50 |
| 50 | Silt fence maintenance (628.1520) | LF | 177 | $0.01 | $0.01 |
| 51 | Mobilizations erosion control (628.1905) | EACH | 4 | $300.00 | $340.00 |
| 52 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $100.00 | $110.00 |
| 53 | Erosion mat urban class I type A (628.2006) | SY | 155 | $2.50 | $2.80 |
| 54 | Inlet protection type C (628.7015) | EACH | 15 | $60.00 | $67.00 |
| 55 | Inlet protection type D (628.7020) | EACH | 8 | $125.00 | $140.00 |
| 56 | Fertilizer type B (629.0210) | CWT | 0.10 | $1,000.00 | $1,100.00 |
| 57 | Seeding mixture no. 40 (630.0140) | LB | 2.90 | $50.00 | $56.00 |
| 58 | Seed water (630.0500) | MGAL | 4 | $100.00 | $110.00 |
| 59 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 5 | $100.00 | $110.00 |
| 60 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 2 | $110.00 | $120.00 |
| 61 | Posts tubular steel 2X2-inch X 12- FT (634.0812) | EACH | 1 | $200.00 | $220.00 |
| 62 | Signs type II reflective H (637.2210) | SF | 177.51 | $18.00 | $20.25 |
| 63 | Removing signs type II (638.2602) | EACH | 31 | $25.00 | $28.00 |
| 64 | Removing small sign supports (638.3000) | EACH | 10 | $25.00 | $28.00 |
| 65 | Field office type C (642.5201) | EACH | 1 | $20,000 | $6,200.00 |
| 66 | Traffic control drums (643.0300) | DAY | 9,975 | $0.25 | $0.30 |
| 67 | Traffic control barricades type III (643.0420) | DAY | 704 | $1.00 | $1.10 |
| 68 | Traffic control warning lights type A (643.0705) | DAY | 1,384 | $0.15 | $0.15 |
| 69 | Traffic control warning lights type C (643.0715) | DAY | 1,930 | $0.15 | $0.15 |
| 70 | Traffic control connected arrow boards (643.0810) | DAY | 263 | $12.00 | $13.50 |
| 71 | Traffic control signs (643.0900) | DAY | 9,399 | $0.35 | $0.40 |
| 72 | Traffic control covering signs type II (643.0920) | EACH | 8 | $25.00 | $28.00 |
| 73 | Traffic control signs PCMS (643.1050) | DAY | 188 | $40.00 | $45.00 |
| 74 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 263 | $12.00 | $13.50 |
| 75 | Temporary marking line paint 6- inch (643.3165) | LF | 30,500 | $0.23 | $0.25 |
| 76 | Temporary marking line paint 10- inch (643.3265) | LF | 5,580 | $0.30 | $0.35 |
| 77 | Temporary marking crosswalk paint 6-inch (643.3305) | LF | 2,490 | $0.35 | $0.40 |
| 78 | Temporary marking arrow paint (643.3505) | EACH | 34 | $50.00 | $56.00 |
| 79 | Temporary marking diagonal paint 12-inch (643.3905) | LF | 270 | $3.00 | $3.40 |
| 80 | Traffic control (643.5000) | EACH | 1 | $10,000 | $11,200 |
| 81 | Temporary pedestrian surface plate (644.1430) | SF | 499 | $5.99 | $6.70 |
| 82 | Temporary pedestrian curb ramp (644.1601) | DAY | 90 | $15.00 | $16.75 |
| 83 | Temporary pedestrian detectable warning field (644.1605) | SF | 170 | $10.00 | $11.25 |
| 84 | Temporary pedestrian barricade (644.1810) | LF | 1,314 | $4.98 | $5.60 |
| 85 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 24,250 | $1.40 | $1.60 |
| 86 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 5,460 | $2.90 | $3.30 |
| 87 | Marking arrow epoxy (646.5020) | EACH | 41 | $388.00 | $440.00 |
| 88 | Marking word epoxy (646.5120) | EACH | 6 | $395.00 | $440.00 |
| 89 | Marking stop line epoxy 18-inch (646.6120) | LF | 622 | $16.50 | $18.50 |
| 90 | Marking diagonal epoxy 12-inch (646.7120) | LF | 540 | $16.25 | $18.25 |
| 91 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 1,066 | $15.50 | $17.50 |
| 92 | Marking curb epoxy (646.8120) | LF | 213 | $7.80 | $8.80 |
| 93 | Marking island nose paint (646.8205) | EACH | 8 | $285.00 | $320.00 |
| 94 | Marking removal line water blasting 4-inch (646.9010) | LF | 16,060 | $0.35 | $0.45 |
| 95 | Marking removal line water blasting 6-inch (646.9012) | LF | 17,180 | $0.35 | $0.45 |
| 96 | Marking removal line water blasting 8-inch (646.9110) | LF | 1,750 | $1.50 | $0.75 |
| 97 | Marking removal line water blasting 10-inch (646.9112) | LF | 2,730 | $1.50 | $0.85 |
| 98 | Marking removal line water blasting wide (646.9210) | LF | 100 | $3.00 | $1.10 |
| 99 | Marking removal special marking water blasting (646.9310) | EACH | 8 | $500.00 | $110.00 |
| 100 | Construction staking storm sewer (650.4000) | EACH | 9 | $300.00 | $340.00 |
| 101 | Construction staking subgrade (650.4500) | LF | 1,745 | $0.02 | $0.02 |
| 102 | Construction staking concrete pavement (650.7000) | LF | 1,745 | $1.00 | $1.10 |
| 103 | Construction staking electrical installations (project) 01. 1662-00- 77 (650.8501) | EACH | 1 | $200.00 | $220.00 |
| 104 | Construction staking electrical installations (project) 02. 1662-00- 78 (650.8501) | EACH | 1 | $200.00 | $220.00 |
| 105 | Construction staking curb ramps (650.9000) | EACH | 10 | $300.00 | $340.00 |
| 106 | Construction staking sidewalk (project) 01. 1662-00-77 (650.9500) | EACH | 1 | $300.00 | $340.00 |
| 107 | Construction staking sidewalk (project) 02. 1662-00-78 (650.9500) | EACH | 1 | $300.00 | $340.00 |
| 108 | Construction staking supplemental control (project) 01. 1662-00-77 (650.9911) | EACH | 1 | $100.00 | $110.00 |
| 109 | Construction staking supplemental control (project) 02. 1662-00-78 (650.9911) | EACH | 1 | $100.00 | $110.00 |
| 110 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 325 | $16.00 | $18.00 |
| 111 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 796 | $18.00 | $20.25 |
| 112 | Conduit special 3-inch (652.0615) | LF | 1,662 | $70.00 | $79.00 |
| 113 | Install conduit into existing item (652.0700.S) | EACH | 6 | $200.00 | $220.00 |
| 114 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 16 | $2,200.00 | $2,500.00 |
| 115 | Removing pull boxes (653.0905) | EACH | 31 | $200.00 | $220.00 |
| 116 | Concrete bases type 1 (654.0101) | EACH | 13 | $1,200.00 | $1,300.00 |
| 117 | Concrete bases type 13 (654.0113) | EACH | 6 | $15,000 | $16,800 |
| 118 | Concrete bases type 10-special (654.0120) | EACH | 2 | $16,000 | $18,000 |
| 119 | Concrete control cabinet bases type 9 special (654.0217) | EACH | 2 | $2,200.00 | $2,500.00 |
| 120 | Cable traffic signal 5-14 AWG (655.0230) | LF | 1,984 | $1.50 | $1.70 |
| 121 | Cable traffic signal 9-14 AWG (655.0250) | LF | 271 | $2.00 | $2.30 |
| 122 | Cable traffic signal 12-14 AWG (655.0260) | LF | 4,284 | $3.00 | $3.40 |
| 123 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 1,267 | $1.75 | $2.00 |
| 124 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 2,666 | $1.30 | $1.50 |
| 125 | Electrical wire lighting 12 AWG (655.0610) | LF | 1,200 | $1.20 | $1.40 |
| 126 | Loop detector lead in cable (655.0700) | LF | 5,715 | $1.50 | $1.70 |
| 127 | Electrical service meter breaker pedestal (location) 01. ush 18 & STH 23 (656.0201) | EACH | 1 | $2,500.00 | $2,800.00 |
| 128 | Electrical service meter breaker pedestal (location) 02. ush 18 & johns ST (656.0201) | EACH | 1 | $2,500.00 | $2,800.00 |
| 129 | Pedestal bases (657.0100) | EACH | 13 | $265.00 | $300.00 |
| 130 | Poles type 10-special (657.0352) | EACH | 2 | $15,500 | $17,400 |
| 131 | Poles type 13 (657.0360) | EACH | 4 | $19,700 | $22,100 |
| 132 | Poles type 13-over height (657.0361) | EACH | 2 | $19,750 | $22,200 |
| 133 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 3 | $685.00 | $770.00 |
| 134 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 7 | $750.00 | $840.00 |
| 135 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 3 | $625.00 | $700.00 |
| 136 | Monotube arms 45-FT (657.0545) | EACH | 1 | $11,500 | $12,900 |
| 137 | Monotube arms 45-FT-special (657.0546) | EACH | 2 | $5,150.00 | $5,800.00 |
| 138 | Monotube arms 50-FT (657.0550) | EACH | 2 | $13,500 | $15,200 |
| 139 | Monotube arms 55-FT (657.0555) | EACH | 3 | $15,650 | $17,600 |
| 140 | Luminaire arms steel type 10 pole clamp 15-FT (657.0820) | EACH | 2 | $970.00 | $1,100.00 |
| 141 | Luminaire arms steel type 13 pole clamp 15-FT (657.0825) | EACH | 6 | $975.00 | $1,100.00 |
| 142 | Traffic signal face 3S 12-inch (658.0173) | EACH | 28 | $725.00 | $810.00 |
| 143 | Traffic signal face 4S 12-inch (658.0174) | EACH | 12 | $1,000.00 | $1,100.00 |
| 144 | Pedestrian signal face 16-inch (658.0416) | EACH | 10 | $500.00 | $560.00 |
| 145 | Signal mounting hardware (location) 01. ush 18 & STH 23 (658.5070) | EACH | 1 | $8,775.00 | $9,900.00 |
| 146 | Signal mounting hardware (location) 02. ush 18 & johns ST (658.5070) | EACH | 1 | $7,550.00 | $8,500.00 |
| 147 | Luminaires utility LED A (659.1115) | EACH | 8 | $205.00 | $230.00 |
| 148 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 8 | $200.00 | $220.00 |
| 149 | Temporary traffic signals for intersections (location) 01. ush 18 & STH 23 (661.0201) | EACH | 1 | $85,000 | $95,000 |
| 150 | Temporary traffic signals for intersections (location) 02. ush 18 and johns ST (661.0201) | EACH | 1 | $75,000 | $85,000 |
| 151 | Sawing asphalt (690.0150) | LF | 16 | $1.45 | $2.30 |
| 152 | Sawing concrete (690.0250) | LF | 4,860 | $2.25 | $2.70 |
| 153 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 |
| 154 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 |
| 155 | Special 01. install state furnished APS push buttons (SPV.0060) | EACH | 10 | $200.00 | $220.00 |
| 156 | Special 02. salvage transformer bases breakaway 11 1/2-inch bolt circle (SPV.0060) | EACH | 8 | $50.00 | $56.00 |
| 157 | Special 03. salvage & reinstall traffic signal comm. equipment (ush 18 & STH 23) (SPV.0060) | EACH | 1 | $1,000.00 | $1,100.00 |
| 158 | Special 04. salvage & reinstall traffic signal comm. equipment (ush 18 & johns ST) (SPV.0060) | EACH | 1 | $1,000.00 | $1,100.00 |
| 159 | Special 05. transport & install ST furn traffic signal cab. & cont (ush 18 & STH 23) (SPV.0060) | EACH | 1 | $3,500.00 | $3,900.00 |
| 160 | Special 06. transport & install ST furn traffic signal cab. & cont (ush 18 & johns ST) (SPV.0060) | EACH | 1 | $3,500.00 | $3,900.00 |
| 161 | Special 07. install ST furn non- intrusive video detection system (ush 18 & STH 23) (SPV.0060) | EACH | 1 | $5,000.00 | $5,600.00 |
| 162 | Special 08. install ST furn non- intrusive video detection system (ush 18 & john ST) (SPV.0060) | EACH | 1 | $5,000.00 | $5,600.00 |
| 163 | Special 09. install ST furn non- intrusive video detection system (STH 23 & CTH YZ) (SPV.0060) | EACH | 1 | $6,000.00 | $6,700.00 |
| 164 | Special 01. install state furnished cat-5E cable (SPV.0090) | LF | 3,510 | $1.00 | $1.10 |
| 165 | Special 02. foundation drilling 42- inch diameter (SPV.0090) | LF | 37 | $690.00 | $770.00 |
| 166 | Special 03. foundation drilling 36- inch diameter (SPV.0090) | LF | 35 | $675.00 | $760.00 |
| 167 | Special 01. prepare existing pavement for asphaltic seal coat (SPV.0125) | MI | 0.09 | $164,000 | $164,000 |
| 168 | Special 01. concrete pavement shes 9-inch (SPV.0180) | SY | 7 | $400.00 | $350.00 |
| 169 | Special 01. excavation, hauling, dewatering, and disposal of petroleum contaminated soil (SPV.0195) | TON | 2.20 | $200.00 | $300.00 |
| 170 | Special 02. excavation, hauling, dewatering, and disposal of lead contaminated soil (SPV.0195) | TON | 5.10 | $200.00 | $200.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.