WisDOT contract 20260310002 bid tabulation
Portage - Packwaukee; STH 78 to USH 51 (IH 039, Columbia County Portage - Packwaukee). Let by Wisconsin DOT on March 10, 2026, Columbia. 5 bids received; low bid $2,192,723 by Parisi Construction, LLC.
- Owner
- Wisconsin DOT
- Letting
- 10 MAR 2026
- Pay items
- 74
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Parisi Construction, LLC | $2,192,723 | Low |
| 2 | Michels Road & Stone, Inc. | $2,938,613 | +34% |
| 3 | Chippewa Concrete Services, Inc. | $3,008,708 | +37% |
| 4 | Sommers Construction Co., Inc. | $3,550,150 | +62% |
| 5 | Zignego Company, Inc. | $3,591,209 | +64% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Parisi Construction, LLC | 2. Michels Road & Stone, Inc. | 3. Chippewa Concrete Services, Inc. | 4. Sommers Construction Co., Inc. | 5. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 2 | $750.00 | $500.00 | $1,002.25 | $1,500.00 | $1,000.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 370 | $12.00 | $35.00 | $52.75 | $42.00 | $100.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 50 | $15.00 | $40.00 | $52.75 | $15.00 | $100.00 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 1,940 | $13.65 | $11.50 | $15.93 | $15.10 | $15.10 |
| 5 | Removing curb & gutter (204.0150) | LF | 135 | $9.00 | $15.00 | $21.10 | $12.00 | $100.00 |
| 6 | Removing guardrail (204.0165) | LF | 6,505 | $2.50 | $1.95 | $2.06 | $1.95 | $1.95 |
| 7 | Removing delineators and markers (204.0180) | EACH | 185 | $25.00 | $10.00 | $10.55 | $10.00 | $10.00 |
| 8 | Removing surface drains (204.0190) | EACH | 3 | $350.00 | $500.00 | $1,055.00 | $1,500.00 | $1,000.00 |
| 9 | Removing inlets (204.0220) | EACH | 2 | $750.00 | $700.00 | $633.00 | $1,500.00 | $1,000.00 |
| 10 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 48 | $1.00 | $25.00 | $1.06 | $1.00 | $1.00 |
| 11 | Finishing roadway (project) 01. 1161-00-78 (213.0100) | EACH | 1 | $3,057.97 | $5,000.00 | $3,692.50 | $4,500.00 | $1,000.00 |
| 12 | Base aggregate dense 3/4-inch (305.0110) | TON | 670 | $41.00 | $50.00 | $41.73 | $39.00 | $39.00 |
| 13 | Select crushed material (312.0110) | TON | 30 | $28.00 | $33.00 | $85.58 | $75.00 | $100.00 |
| 14 | Concrete pavement 10-inch (415.0100) | SY | 50 | $105.14 | $125.00 | $131.88 | $150.00 | $200.00 |
| 15 | Concrete pavement approach slab (415.0410) | SY | 120 | $395.10 | $270.00 | $316.50 | $375.00 | $280.00 |
| 16 | Rout and seal (415.6000.S) | LF | 4,470 | $5.05 | $3.25 | $3.43 | $3.25 | $3.25 |
| 17 | Drilled tie bars (416.0610) | EACH | 1,348 | $9.33 | $12.00 | $8.44 | $11.00 | $30.00 |
| 18 | Drilled dowel bars (416.0620) | EACH | 6,624 | $12.17 | $23.00 | $15.83 | $19.00 | $30.00 |
| 19 | Concrete pavement partial depth repair surface repair (416.0754.S) | SF | 640 | $105.19 | $90.00 | $263.75 | $99.00 | $200.00 |
| 20 | Concrete pavement repair (416.1710) | SY | 2,912 | $109.79 | $132.00 | $158.25 | $175.00 | $151.00 |
| 21 | Concrete pavement repair shes (416.1715) | SY | 275 | $121.00 | $133.00 | $226.83 | $195.00 | $182.00 |
| 22 | Concrete pavement replacement (416.1720) | SY | 4,562 | $120.07 | $133.00 | $158.25 | $175.00 | $151.00 |
| 23 | Concrete pavement replacement shes (416.1725) | SY | 868 | $122.10 | $134.00 | $226.83 | $195.00 | $182.00 |
| 24 | Continuous diamond grinding concrete pavement (420.1000) | SY | 1,200 | $25.06 | $25.06 | $26.44 | $25.06 | $45.06 |
| 25 | Tack coat (455.0605) | GAL | 136 | $2.80 | $4.00 | $2.95 | $2.80 | $2.80 |
| 26 | Incentive density HMA pavement (460.2000) | DOL | 260 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 27 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 404 | $107.50 | $91.00 | $113.41 | $107.50 | $107.50 |
| 28 | Asphaltic rumble strips, shoulder divided roadway (465.0510) | LF | 1,990 | $2.00 | $2.00 | $2.11 | $2.00 | $2.00 |
| 29 | Apron endwalls for culvert pipe steel 12-inch (521.1012) | EACH | 2 | $350.00 | $2,400.00 | $2,057.25 | $1,200.00 | $2,000.00 |
| 30 | Culvert pipe corrugated steel 12- inch (521.3112) | LF | 20 | $95.00 | $185.00 | $121.33 | $150.00 | $600.00 |
| 31 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 80 | $63.85 | $57.00 | $121.33 | $99.00 | $200.00 |
| 32 | Concrete curb & gutter 4-inch sloped 30-inch type TBTT (601.0586) | LF | 55 | $65.54 | $57.00 | $121.33 | $99.00 | $200.00 |
| 33 | Inlet covers type V (611.0654) | EACH | 2 | $1,150.00 | $1,250.00 | $1,582.50 | $1,500.00 | $3,000.00 |
| 34 | Inlets 2X2-FT (611.3220) | EACH | 2 | $3,675.00 | $5,200.00 | $5,802.50 | $4,500.00 | $10,000 |
| 35 | Barrier system grading shaping finishing (614.0010) | EACH | 15 | $1,127.60 | $2,995.00 | $7,590.73 | $695.00 | $7,695.00 |
| 36 | Steel thrie beam bullnose terminal (614.0220) | EACH | 2 | $15,500 | $13,501 | $14,244 | $13,501 | $13,501 |
| 37 | Steel thrie beam (614.0230) | LF | 72 | $38.00 | $35.00 | $36.93 | $35.00 | $35.00 |
| 38 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 117 | $41.06 | $30.00 | $31.65 | $30.00 | $30.00 |
| 39 | MGS guardrail 3 (614.2300) | LF | 3,264 | $28.00 | $26.00 | $27.43 | $26.00 | $26.00 |
| 40 | MGS guardrail 3 K (614.2330) | LF | 2,050 | $38.00 | $38.00 | $40.09 | $38.00 | $38.00 |
| 41 | MGS thrie beam transition (614.2500) | LF | 628 | $90.00 | $90.00 | $94.95 | $90.00 | $90.00 |
| 42 | MGS guardrail terminal eat (614.2610) | EACH | 9 | $4,800.00 | $3,413.00 | $3,600.72 | $3,413.00 | $3,413.00 |
| 43 | MGS guardrail terminal type 2 (614.2620) | EACH | 3 | $3,200.00 | $2,713.00 | $2,862.22 | $2,713.00 | $2,713.00 |
| 44 | Maintenance and repair of haul roads (project) 01. 1161-00-78 (618.0100) | EACH | 1 | $1.00 | $1.00 | $1.06 | $1.00 | $1.00 |
| 45 | Mobilization (619.1000) | EACH | 1 | $108,438 | $675,831 | $263,043 | $892,225 | $829,000 |
| 46 | Water (624.0100) | MGAL | 6 | $50.00 | $65.00 | $26.38 | $150.00 | $200.00 |
| 47 | Silt fence (628.1504) | LF | 920 | $3.00 | $3.00 | $3.17 | $3.00 | $3.00 |
| 48 | Silt fence maintenance (628.1520) | LF | 920 | $0.01 | $0.03 | $0.03 | $0.03 | $0.03 |
| 49 | Mobilizations erosion control (628.1905) | EACH | 2 | $750.00 | $401.00 | $423.06 | $401.00 | $401.00 |
| 50 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $250.00 | $402.00 | $424.11 | $402.00 | $402.00 |
| 51 | Delineator posts steel (633.0100) | EACH | 185 | $50.00 | $35.00 | $36.93 | $35.00 | $35.00 |
| 52 | Delineator reflectors (633.0500) | EACH | 185 | $15.00 | $15.00 | $15.83 | $15.00 | $15.00 |
| 53 | Field office type B (642.5001) | EACH | 1 | $12,458 | $8,000.00 | $7,912.50 | $18,000 | $20,000 |
| 54 | Traffic control drums (643.0300) | DAY | 7,460 | $1.00 | $1.00 | $1.06 | $1.00 | $1.00 |
| 55 | Traffic control barricades type III (643.0420) | DAY | 554 | $2.50 | $2.50 | $2.64 | $2.50 | $2.50 |
| 56 | Traffic control warning lights type A (643.0705) | DAY | 1,098 | $0.75 | $0.75 | $0.79 | $0.75 | $0.75 |
| 57 | Traffic control warning lights type C (643.0715) | DAY | 1,790 | $0.75 | $0.75 | $0.79 | $0.75 | $0.75 |
| 58 | Traffic control connected arrow boards (643.0810) | DAY | 90 | $45.00 | $45.00 | $47.48 | $45.00 | $45.00 |
| 59 | Traffic control signs (643.0900) | DAY | 9,217 | $0.25 | $0.25 | $0.26 | $0.25 | $0.25 |
| 60 | Traffic control covering signs type I (643.0910) | EACH | 1 | $550.00 | $550.00 | $580.25 | $550.00 | $550.00 |
| 61 | Traffic control covering signs type II (643.0920) | EACH | 38 | $50.00 | $50.00 | $52.75 | $50.00 | $50.00 |
| 62 | Traffic control signs PCMS (643.1050) | DAY | 98 | $45.00 | $45.00 | $47.48 | $45.00 | $45.00 |
| 63 | Truck or trailer mounted attenuator (643.1055.S) | DAY | 4 | $2,400.00 | $2,400.00 | $2,532.00 | $2,400.00 | $2,400.00 |
| 64 | Traffic control (643.5000) | EACH | 1 | $118,125 | $118,125 | $124,622 | $118,125 | $118,125 |
| 65 | Marking line epoxy 6-inch (646.2020) | LF | 6,650 | $0.67 | $0.67 | $0.71 | $0.67 | $0.67 |
| 66 | Marking line epoxy 10-inch (646.4020) | LF | 400 | $1.60 | $1.60 | $1.69 | $1.60 | $1.60 |
| 67 | Marking outfall epoxy (646.5520) | EACH | 145 | $62.00 | $62.00 | $65.41 | $62.00 | $62.00 |
| 68 | Construction staking resurfacing reference (650.8000) | LF | 36,144 | $0.13 | $0.15 | $0.16 | $0.15 | $0.15 |
| 69 | Construction staking supplemental control (project) 01. 1161-00-78 (650.9911) | EACH | 1 | $1,750.00 | $500.00 | $949.50 | $900.00 | $500.00 |
| 70 | Sawing asphalt (690.0150) | LF | 238 | $1.39 | $4.00 | $2.06 | $1.50 | $1.95 |
| 71 | Sawing concrete (690.0250) | LF | 22,286 | $2.75 | $4.00 | $2.69 | $3.00 | $2.55 |
| 72 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 73 | Installing and maintaining climbing turtle exclusion fence (999.2100.S) | LF | 600 | $4.00 | $5.00 | $5.28 | $5.00 | $5.00 |
| 74 | Special 01. removing raised pavement markers and filling voids (SPV.0060) | EACH | 370 | $142.86 | $45.00 | $100.23 | $175.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.