WisDOT contract 20250708001 bid tabulation

Monroe - Beloit; CTH T Intersection (STH 081, Rock County Monroe - Beloit). Let by Wisconsin DOT on July 8, 2025, Rock. 5 bids received; low bid $1,719,136 by Rock Road Companies, Inc..

Owner
Wisconsin DOT
Letting
08 JUL 2025
Pay items
118
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rock Road Companies, Inc.$1,719,136Low
2Parisi Construction, LLC$1,870,994+9.0%
3Zignego Company, Inc.$1,900,980+11%
4James Peterson Sons, Inc.$1,946,301+13%
5Lalonde Contractors Incorporated$2,015,115+17%
WisDOT contract 20250708001: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rock Road Companies, Inc.2. Parisi Construction, LLC3. Zignego Company, Inc.4. James Peterson Sons, Inc.5. Lalonde Contractors Incorporated
1Clearing (201.0105)STA6$750.00$780.00$50.00$949.50$50.00
2Grubbing (201.0205)STA6$125.00$240.00$50.00$316.50$50.00
3Removing small pipe culverts (203.0100)EACH3$356.77$650.00$400.00$750.00$400.00
4Removing concrete pavement (204.0100)SY2,940$4.87$7.25$0.01$2.84$0.01
5Removing asphaltic surface (204.0110)SY69$8.51$16.50$10.00$20.00$10.00
6Removing curb & gutter (204.0150)LF80$7.21$9.50$10.00$10.00$10.00
7Excavation common (205.0100)CY11,900$8.94$13.50$10.25$11.98$10.25
8Finishing roadway (project) 01. 5340-00-74 (213.0100)EACH1$5,185.94$500.00$750.00$2,500.00$2,880.00
9Base aggregate dense 3/4-inch (305.0110)TON340$33.69$30.00$23.50$31.00$23.50
10Base aggregate dense 1 1/4-inch (305.0120)TON8,350$14.36$17.25$16.75$19.42$16.75
11Select crushed material (312.0110)TON12,200$13.53$17.75$16.75$16.11$16.75
12Coloring concrete wisdot red (405.0100)CY165$74.39$103.50$100.00$100.00$144.90
13Concrete pavement 8-inch (415.0080)SY4,640$74.56$88.00$85.00$85.50$80.38
14Concrete truck apron 12-inch (415.2010)SY485$102.01$101.00$100.00$115.65$100.96
15Concrete pavement joint filling (415.4100)SY6,270$2.05$2.10$1.50$2.05$2.05
16Rout and seal (415.6000.S)LF915$4.25$4.40$2.28$4.25$4.25
17Tack coat (455.0605)GAL315$3.12$2.10$2.00$3.12$2.00
18Incentive density HMA pavement (460.2000)DOL850$1.00$1.00$1.00$1.00$1.00
19HMA pavement 4 MT 58-28 H (460.6424)TON1,330$89.37$100.00$100.00$89.37$100.00
20Asphaltic surface (465.0105)TON12$149.64$100.00$100.00$149.64$100.00
21Asphaltic flumes (465.0315)SY56$70.03$57.00$55.00$70.03$55.00
22Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF340$118.81$99.00$88.00$142.00$88.00
23Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012)EACH5$938.15$1,700.00$1,400.00$1,217.00$1,400.00
24Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH6$1,239.54$2,100.00$1,650.00$1,476.00$1,650.00
25Concrete curb & gutter 18-inch type A (601.0405)LF230$57.89$33.00$60.00$26.60$52.44
26Concrete curb & gutter 30-inch type A (601.0409)LF2,132$23.80$23.50$37.00$25.50$38.17
27Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF1,099$34.94$32.50$38.00$32.15$43.27
28Concrete curb & gutter 4-inch sloped 36-inch type R (601.0580)LF318$50.07$40.00$60.00$32.15$47.36
29Concrete sidewalk 4-inch (602.0405)SF7,385$5.22$6.00$8.00$6.15$7.04
30Riprap medium (606.0200)CY25$66.80$120.00$85.00$150.00$85.00
31Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF293$107.81$74.00$66.45$148.90$66.45
32Inlet covers type H (611.0624)EACH2$1,183.62$960.00$950.00$950.00$950.00
33Inlet covers type HM (611.0627)EACH2$1,183.62$960.00$950.00$950.00$950.00
34Inlet covers type HM-S (611.0636)EACH3$1,183.62$970.00$950.00$950.00$950.00
35Inlet covers type H-S (611.0639)EACH3$1,183.62$970.00$950.00$950.00$950.00
36Inlet covers type T (611.0652)EACH2$1,454.52$1,300.00$1,200.00$1,320.00$1,200.00
37Inlets 2X2.5-FT (611.3225)EACH2$2,264.54$2,500.00$1,840.00$2,020.00$1,840.00
38Inlets 2X3-FT (611.3230)EACH10$2,491.58$2,500.00$1,800.00$2,250.00$1,800.00
39Pipe underdrain 6-inch (612.0106)LF1,350$21.34$14.00$9.90$12.87$9.90
40Apron endwalls for underdrain reinforced concrete 6-inch (612.0806)EACH2$419.44$430.00$850.00$250.00$850.00
41Maintenance and repair of haul roads (project) 01. 5340-00-74 (618.0100)EACH1$0.01$550.00$1.00$100.00$1.00
42Mobilization (619.1000)EACH1$107,000$26,500$132,000$124,458$258,499
43Concrete median sloped nose (620.0300)SF622$13.79$11.00$20.00$15.00$16.86
44Water (624.0100)MGAL300$0.01$33.25$0.01$60.00$0.01
45Salvaged topsoil (625.0500)SY11,800$2.12$2.00$2.25$1.62$2.25
46Mulching (627.0200)SY7,090$0.45$0.45$0.55$0.45$0.55
47Silt fence (628.1504)LF1,890$2.25$2.40$2.05$2.25$2.05
48Silt fence maintenance (628.1520)LF1,890$0.01$0.01$0.01$0.01$0.01
49Mobilizations erosion control (628.1905)EACH5$100.00$100.00$150.00$100.00$150.00
50Mobilizations emergency erosion control (628.1910)EACH3$100.00$100.00$150.00$100.00$150.00
51Erosion mat class I type B (628.2004)SY4,670$1.10$1.20$1.10$1.10$1.10
52Inlet protection type A (628.7005)EACH12$95.00$99.00$105.00$95.00$105.00
53Inlet protection type C (628.7015)EACH12$60.00$63.00$65.00$60.00$65.00
54Temporary ditch checks (628.7504)LF150$9.00$9.40$6.75$9.00$6.75
55Culvert pipe checks (628.7555)EACH11$25.00$26.00$25.00$25.00$25.00
56Tracking pads (628.7560)EACH2$750.00$670.00$100.00$3,000.00$100.00
57Fertilizer type B (629.0210)CWT5$90.00$94.00$90.00$90.00$90.00
58Seeding mixture no. 20 (630.0120)LB550$8.25$8.60$7.95$8.25$7.95
59Seeding mixture no. 40 (630.0140)LB26$15.00$15.75$12.75$15.00$12.75
60Seeding temporary (630.0200)LB350$4.00$4.20$3.45$4.00$3.45
61Seed water (630.0500)MGAL290$10.00$10.50$12.00$10.00$12.00
62Markers row (633.5100)EACH12$70.00$73.00$65.00$70.00$65.00
63Markers culvert end (633.5200)EACH11$65.00$68.00$65.00$65.00$65.00
64Posts wood 4X6-inch X 12-FT (634.0612)EACH8$75.00$78.00$90.00$75.00$90.00
65Posts wood 4X6-inch X 14-FT (634.0614)EACH17$80.00$84.00$95.00$80.00$95.00
66Posts wood 4X6-inch X 16-FT (634.0616)EACH4$90.00$94.00$100.00$90.00$100.00
67Posts wood 4X6-inch X 18-FT (634.0618)EACH13$95.00$99.00$120.00$95.00$120.00
68Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH10$200.00$210.00$210.00$200.00$210.00
69Signs type II reflective H (637.2210)SF370$20.00$21.00$21.00$20.00$21.00
70Signs type II reflective F (637.2230)SF54.12$22.00$23.00$25.00$22.00$25.00
71Moving signs type II (638.2102)EACH16$200.00$210.00$110.00$200.00$110.00
72Removing signs type II (638.2602)EACH12$35.00$36.50$35.00$35.00$35.00
73Removing small sign supports (638.3000)EACH18$35.00$36.50$35.00$35.00$35.00
74Moving small sign supports (638.4000)EACH10$150.00$160.00$80.00$150.00$80.00
75Field office type C (642.5201)EACH1$5,000.00$11,100$20,000$12,000$13,510
76Traffic control drums (643.0300)DAY80$2.50$2.60$2.50$2.25$0.23
77Traffic control barricades type III (643.0420)DAY4,809$0.55$0.55$0.55$0.55$0.63
78Traffic control warning lights type A (643.0705)DAY6,343$0.15$0.15$0.15$0.20$0.19
79Traffic control signs (643.0900)DAY15,857$0.19$0.20$0.19$0.22$0.35
80Traffic control covering signs type II (643.0920)EACH7$95.00$99.00$95.00$50.00$66.03
81Traffic control signs PCMS (643.1050)DAY14$45.00$47.00$45.00$50.00$80.00
82Traffic control (643.5000)EACH1$16,350$17,100$16,350$3,457.59$11,458
83Geotextile type HR (645.0120)SY85$2.29$4.10$5.00$10.00$5.00
84Marking line epoxy 6-inch (646.2020)LF5,645$0.58$0.60$0.58$1.20$1.20
85Marking line grooved wet ref epoxy 6-inch (646.2040)LF6,191$1.60$1.70$1.60$2.15$2.15
86Marking line epoxy 10-inch (646.4020)LF270$1.20$1.30$1.20$2.30$2.30
87Marking outfall epoxy (646.5520)EACH2$50.00$52.00$50.00$80.00$80.00
88Marking dotted extension epoxy 18-inch (646.6320)LF66$15.00$15.75$15.00$15.00$15.00
89Marking diagonal epoxy 12-inch (646.7120)LF255$14.50$15.25$14.50$14.75$14.75
90Marking curb epoxy (646.8120)LF306$7.00$7.30$7.00$12.00$12.00
91Marking island nose epoxy (646.8220)EACH4$275.00$290.00$275.00$250.00$250.00
92Marking removal line 4-inch (646.9000)LF70$3.00$3.10$3.00$1.25$1.25
93Construction staking storm sewer (650.4000)EACH17$50.00$260.00$250.00$250.00$250.00
94Construction staking subgrade (650.4500)LF949$0.01$0.01$0.01$0.01$0.01
95Construction staking base (650.5000)LF949$0.01$1.00$1.00$1.00$1.00
96Construction staking pipe culverts (650.6000)EACH3$100.00$210.00$200.00$200.00$200.00
97Construction staking electrical installations (project) 01. 5340-00- 74 (650.8501)EACH1$3,500.00$2,100.00$2,000.00$2,000.00$2,000.00
98Construction staking supplemental control (project) 01. 5340-00-74 (650.9911)EACH1$3,500.00$1,600.00$1,500.00$2,000.00$1,500.00
99Construction staking slope stakes (650.9920)LF1,025$0.11$1.00$1.00$1.00$1.00
100Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,790$6.53$6.80$6.53$9.00$6.53
101Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF102$8.46$8.80$8.46$12.00$8.46
102Conduit rigid nonmetallic schedule 80 2-inch (652.0325)LF453$7.34$7.70$7.34$12.00$7.34
103Pull boxes non-conductive 24X42- inch (653.0164)EACH13$2,280.60$2,400.00$2,280.60$1,950.00$2,280.60
104Concrete bases type 5 (654.0105)EACH16$1,055.19$1,100.00$1,055.19$1,150.00$1,055.19
105Concrete control cabinet bases type L30 (654.0230)EACH1$1,037.99$1,100.00$1,037.99$2,000.00$1,037.99
106Electrical wire lighting 12 AWG (655.0610)LF14,025$0.90$0.95$0.90$1.00$0.90
107Electrical service meter breaker pedestal (location) 01. sta. 106+53 'EB', 42.6' RT (656.0201)EACH1$1,483.28$1,500.00$1,483.28$2,000.00$1,483.28
108Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH16$668.30$700.00$668.30$575.00$668.30
109Poles type 5-aluminum (657.0322)EACH16$2,077.76$2,200.00$2,077.76$2,172.00$2,077.76
110Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710)EACH16$761.79$800.00$761.79$640.00$761.79
111Luminaires utility LED B (659.1120)EACH16$339.30$350.00$339.30$225.00$339.30
112Lighting control cabinets 120/240 30-inch (659.2130)EACH1$9,396.52$9,800.00$9,396.52$8,200.00$9,396.52
113Sawing asphalt (690.0150)LF290$1.20$2.00$1.89$1.95$1.20
114Sawing concrete (690.0250)LF48$3.25$3.10$3.25$2.95$3.25
115Incentive compressive strength concrete pavement (715.0720)DOL1,538$1.00$1.00$1.00$1.00$1.00
116On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00$5.00$5.00$5.00$5.00
117On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,320$5.00$5.00$5.00$5.00$5.00
118Special 01. construction roundabout staking (SPV.0060)EACH1$5,000.00$20,900$20,000$20,000$20,000
WisDOT contract 20250708001: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of July 8, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy