WisDOT contract 20261110011 bid tabulation

C Madison, Mineral Point Road; USH 12 to High Point Road (LOC STR, Dane County C Madison, Mineral Point Road). Let by Wisconsin DOT on November 10, 2026, Dane. 4 bids received; low bid $3,526,335 by Rock Road Companies, Inc..

Owner
Wisconsin DOT
Letting
10 NOV 2026
Pay items
195
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rock Road Companies, Inc.$3,526,335Low
2Parisi Construction, LLC$3,945,695+12%
3Integrity Grading and Excavating, Inc.$4,307,421+22%
4Zignego Company, Inc.$4,391,469+25%
WisDOT contract 20261110011: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rock Road Companies, Inc.2. Parisi Construction, LLC3. Integrity Grading and Excavating, Inc.4. Zignego Company, Inc.
1Removing concrete pavement (204.0100)SY7,740$6.35$5.00$9.02$17.00
2Removing asphaltic surface (204.0110)SY3,250$3.64$12.00$2.29$10.23
3Removing asphaltic surface milling (204.0120)SY850$11.75$12.00$2.29$12.00
4Removing curb & gutter (204.0150)LF2,435$8.68$12.50$9.10$12.98
5Removing concrete sidewalk (204.0155)SY305$18.66$31.50$12.31$12.97
6Removing concrete bases (204.0195)EACH10$695.81$730.00$492.37$500.00
7Removing manholes (204.0210)EACH5$695.81$1,300.00$899.34$500.00
8Removing inlets (204.0220)EACH11$695.81$1,300.00$895.11$500.00
9Removing storm sewer (size) 01. 12-inch (204.0245)LF46$29.16$62.00$61.91$35.00
10Removing storm sewer (size) 02. 15-inch (204.0245)LF7$29.16$100.00$276.89$35.00
11Removing storm sewer (size) 03. 18-inch (204.0245)LF242$29.16$59.00$38.92$35.00
12Removing storm sewer (size) 04. 21-inch (204.0245)LF276$29.16$68.00$39.17$25.00
13Removing storm sewer (size) 05. 24-inch (204.0245)LF32$29.16$90.00$92.55$35.00
14Removing (item description) 01. light pole (204.9060.S)EACH6$800.00$840.00$800.00$1,000.00
15Removing (item description) 01. water main (204.9090.S)LF52$25.41$83.00$53.34$1.00
16Excavation common (205.0100)CY7,358$30.23$35.25$30.34$22.00
17Prepare foundation for concrete pavement (project) 01. 5992-10-20 (211.0201)EACH1$0.01$500.00$0.01$0.01
18Finishing roadway (project) 01. 5992-10-20 (213.0100)EACH1$5,789.49$500.00$500.00$1,000.00
19Base aggregate dense 3/4-inch (305.0110)TON159$44.07$45.75$63.51$49.88
20Base aggregate dense 1 1/4-inch (305.0120)TON3,865$19.17$22.50$30.12$29.16
21Base aggregate dense 3-inch (305.0130)TON4,042$19.93$20.25$25.07$27.00
22Coloring concrete wisdot red (405.0100)CY251$98.92$135.00$98.92$130.00
23Coloring concrete custom (405.0200)CY13$122.23$174.00$120.00$115.00
24Stamping colored concrete (405.1000)CY13$566.70$650.00$330.00$100.00
25Concrete pavement 9 1/2-inch (415.0095)SY8,308$82.50$125.00$100.00$103.56
26Concrete pavement gaps (415.0210)EACH3$856.40$2,100.00$900.00$1,000.00
27Concrete pavement hes 9 1/2-inch (415.1095)SY289$83.52$140.00$85.00$106.65
28Concrete pavement joint filling (415.4100)SY9,563$3.10$4.10$3.87$2.75
29Drilled tie bars (416.0610)EACH902$10.24$18.00$10.24$15.00
30Drilled dowel bars (416.0620)EACH70$15.25$24.00$15.25$30.00
31Tack coat (455.0605)GAL606$3.25$0.01$0.01$0.01
32Incentive density HMA pavement (460.2000)DOL230$1.00$1.00$1.00$1.00
33HMA pavement 3 MT 58-28 S (460.6223)TON432$107.50$110.00$105.00$105.00
34HMA pavement 4 MT 58-28 H (460.6424)TON248$145.00$130.00$120.00$120.00
35Asphaltic surface temporary (465.0125)TON593$95.00$84.00$80.00$80.00
36Concrete collars for pipe (520.8000)EACH6$950.27$1,700.00$1,705.62$1,000.00
37Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH1$2,511.53$3,300.00$5,349.52$2,000.00
38Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048)EACH2$3,394.35$4,700.00$6,494.50$3,200.00
39Concrete curb pedestrian (601.0600)LF150$116.27$85.00$57.00$86.04
40Concrete sidewalk 5-inch (602.0410)SF2,443$9.12$11.00$9.50$15.95
41Concrete sidewalk 7-inch (602.0420)SF1,575$17.42$20.50$10.50$20.03
42Curb ramp detectable warning field natural patina (602.0515)SF119$50.48$55.00$45.00$50.00
43Curb ramp detectable warning field radial natural patina (602.0615)SF28$70.96$100.00$65.00$100.00
44Concrete driveway 7-inch (602.0815)SY89$83.28$110.00$94.50$89.30
45Riprap heavy (606.0300)CY100$119.60$140.00$175.01$150.00
46Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF109$194.61$150.00$181.25$309.45
47Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF29$195.36$180.00$189.45$357.95
48Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF199$171.14$190.00$205.53$285.90
49Storm sewer pipe reinforced concrete class III 30-inch (608.0330)LF248$197.52$210.00$219.18$202.05
50Storm sewer pipe reinforced concrete class III 36-inch (608.0336)LF140$231.37$270.00$277.13$317.71
51Storm sewer pipe reinforced concrete class III 48-inch (608.0348)LF183$345.55$390.00$322.22$355.21
52Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 24X38-inch (608.2324)LF74$249.07$320.00$321.90$259.01
53Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 29X45-inch (608.2329)LF290$328.64$430.00$356.73$517.45
54Catch basins 6-FT diameter (611.1006)EACH1$10,845$6,300.00$33,471$28,199
55Manholes 4-FT diameter (611.2004)EACH1$3,465.47$4,200.00$31,666$4,319.31
56Manholes 5-FT diameter (611.2005)EACH6$4,900.41$3,600.00$31,766$6,026.58
57Manholes 6-FT diameter (611.2006)EACH3$5,813.98$4,900.00$33,471$11,184
58Inlets 2X3-FT (611.3230)EACH8$3,279.15$2,600.00$31,666$6,062.22
59Adjusting manhole covers (611.8110)EACH7$1,097.99$560.00$774.49$850.00
60Adjusting inlet covers (611.8115)EACH2$1,144.87$680.00$774.49$1,000.00
61Mobilization (619.1000)EACH1$460,000$250,000$398,560$199,000
62Concrete median sloped nose (620.0300)SF273$13.60$15.00$15.00$20.00
63Water (624.0100)MGAL158.40$0.01$34.50$65.49$1.00
64Topsoil (625.0100)SY2,940$12.94$12.25$24.67$7.15
65Silt fence (628.1504)LF84$5.00$5.30$5.00$2.05
66Silt fence maintenance (628.1520)LF84$0.01$0.01$0.01$0.01
67Mobilizations erosion control (628.1905)EACH4$100.00$110.00$100.00$300.00
68Mobilizations emergency erosion control (628.1910)EACH12$100.00$110.00$100.00$300.00
69Erosion mat urban class I type B (628.2008)SY718$3.00$3.20$3.00$1.75
70Inlet protection type A (628.7005)EACH12$150.00$160.00$150.00$100.00
71Inlet protection type C (628.7015)EACH51$70.00$74.00$70.00$60.00
72Tracking pads (628.7560)EACH6$100.00$800.00$500.00$0.01
73Fertilizer type B (629.0210)CWT1.50$300.00$320.00$300.00$90.00
74Seeding mixture no. 40 (630.0140)LB33$25.00$26.25$25.00$12.95
75Seeding temporary (630.0200)LB21$15.00$15.75$15.00$8.00
76Seed water (630.0500)MGAL17$10.00$10.50$10.00$10.00
77Sod water (631.0300)MGAL62$150.00$160.00$150.00$55.00
78Sod lawn (631.1000)SY2,419$10.00$10.50$10.00$7.95
79Signs type II reflective H (637.2210)SF87.50$30.00$31.50$30.00$25.00
80Moving signs type I (638.2101)EACH4$400.00$420.00$400.00$950.00
81Moving signs type II (638.2102)EACH18$200.00$210.00$200.00$110.00
82Removing signs type II (638.2602)EACH3$45.00$47.25$45.00$25.00
83Removing small sign supports (638.3000)EACH2$45.00$47.25$45.00$25.00
84Moving small sign supports (638.4000)EACH5$200.00$210.00$200.00$110.00
85Field office type C (642.5201)EACH1$8,100.00$27,100$20,000$30,000
86Traffic control drums (643.0300)DAY38,951$0.10$0.20$0.10$0.20
87Traffic control barricades type III (643.0420)DAY3,939$0.40$0.55$0.40$0.50
88Traffic control flexible tubular marker posts (643.0500)EACH20$37.00$26.25$37.00$25.00
89Traffic control flexible tubular marker bases (643.0600)EACH20$2.00$5.30$2.00$5.00
90Traffic control warning lights type A (643.0705)DAY7,878$0.06$0.10$0.06$0.10
91Traffic control warning lights type C (643.0715)DAY9,255$0.06$0.10$0.06$0.10
92Traffic control connected arrow boards (643.0810)DAY206$7.00$24.25$7.00$23.00
93Traffic control signs (643.0900)DAY10,605$0.30$0.35$0.30$0.35
94Traffic control signs PCMS (643.1050)DAY110$32.00$36.75$32.00$35.00
95Traffic control connected work zone end location marker (643.1222)DAY1,242$2.26$6.30$2.26$6.00
96Temporary marking line paint 6- inch (643.3165)LF6,054$0.35$0.45$0.35$0.45
97Temporary marking line removable tape 6-inch (643.3180)LF11,484$1.60$2.20$1.60$2.05
98Temporary marking arrow removable tape (643.3550)EACH19$75.00$150.00$75.00$140.00
99Temporary marking removable mask out tape 6-inch (643.3960)LF1,812$1.70$2.60$1.70$2.50
100Traffic control (643.5000)EACH1$36,900$50,400$36,900$48,000
101Temporary pedestrian barricade (644.1810)LF718$5.00$6.30$5.00$6.00
102Temporary audible message devices (644.1900.S)DAY1,908$3.00$5.30$3.00$5.00
103Geotextile type HR (645.0120)SY140$2.88$6.40$3.50$10.00
104Marking line epoxy 4-inch (646.1020)LF2,926$0.70$0.40$0.70$0.37
105Marking line epoxy 6-inch (646.2020)LF1,697$1.05$0.55$1.05$0.51
106Marking line epoxy 8-inch (646.3020)LF2,474$1.40$3.20$1.40$3.00
107Marking line epoxy 10-inch (646.4020)LF172$1.65$1.20$1.65$1.15
108Marking arrow epoxy (646.5020)EACH14$230.00$460.00$230.00$435.41
109Marking word epoxy (646.5120)EACH21$250.00$460.00$250.00$440.25
110Marking symbol epoxy (646.5220)EACH3$300.00$440.00$300.00$423.64
111Marking stop line epoxy 18-inch (646.6120)LF204$12.00$19.00$12.00$18.19
112Marking diagonal epoxy 12-inch (646.7120)LF34$9.50$18.75$9.50$17.76
113Marking crosswalk epoxy block style 24-inch (646.7520)LF966$18.00$31.50$18.00$29.88
114Marking curb epoxy (646.8120)LF235$8.50$9.20$8.50$8.73
115Marking island nose epoxy (646.8220)EACH11$305.00$340.00$305.00$325.09
116Marking removal line 6-inch (646.9002)LF755$1.00$1.10$1.00$1.00
117Marking removal special marking water blasting (646.9310)EACH9$250.00$210.00$250.00$200.00
118Construction staking storm sewer (650.4000)EACH31$10.00$150.00$100.00$100.00
119Construction staking subgrade (650.4500)LF2,532$0.01$0.01$1.25$0.01
120Construction staking base (650.5000)LF633$0.01$1.00$1.29$1.29
121Construction staking curb gutter and curb & gutter (650.5500)LF3,000$1.00$0.01$1.95$1.95
122Construction staking concrete pavement (650.7000)LF1,899$1.00$0.01$2.35$2.35
123Construction staking resurfacing reference (650.8000)LF198$0.01$0.50$3.00$3.00
124Construction staking electrical installations (project) 01. 5992-10- 20 (650.8501)EACH1$5,000.00$2,500.00$5,595.00$5,595.00
125Construction staking curb ramps (650.9000)EACH6$15.00$250.00$250.00$250.00
126Construction staking sidewalk (project) 01. 5992-10-20 (650.9500)EACH1$5,000.00$1,500.00$1,500.00$1,500.00
127Construction staking supplemental control (project) 01. 5992-10-20 (650.9911)EACH1$5,000.00$5,000.00$4,850.00$4,850.00
128Construction staking slope stakes (650.9920)LF2,532$0.01$0.01$1.56$1.56
129Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,802$10.00$10.50$10.00$20.00
130Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF1,530$12.00$12.50$12.00$24.00
131Conduit rigid nonmetallic schedule 80 2-inch (652.0325)LF300$11.00$11.50$11.00$24.00
132Conduit rigid nonmetallic schedule 80 3-inch (652.0335)LF364$14.00$14.75$14.00$26.00
133Install conduit into existing item (652.0700.S)EACH2$300.00$320.00$300.00$500.00
134Conduit loop detector (652.0800)LF837$8.00$8.40$8.00$10.00
135Pull boxes steel 24X36-inch (653.0135)EACH2$1,100.00$1,200.00$1,100.00$1,500.00
136Removing pull boxes (653.0905)EACH3$250.00$260.00$250.00$500.00
137Concrete bases type 1 (654.0101)EACH1$1,100.00$1,200.00$1,100.00$1,200.00
138Concrete bases type 2 (654.0102)EACH1$1,500.00$1,600.00$1,500.00$2,500.00
139Concrete bases type 5 (654.0105)EACH6$1,250.00$1,300.00$1,250.00$2,100.00
140Electrical wire lighting 12 AWG (655.0610)LF1,530$1.25$1.30$1.25$2.00
141Loop detector lead in cable (655.0700)LF3,840$1.75$1.80$1.75$2.50
142Loop detector wire (655.0800)LF3,400$1.25$1.30$1.25$2.00
143Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH7$625.00$660.00$625.00$825.00
144Poles type 5-aluminum (657.0322)EACH7$2,615.00$2,700.00$2,615.00$2,400.00
145Traffic signal standards aluminum 15-FT (657.0425)EACH2$1,413.00$1,500.00$1,413.00$850.00
146Luminaire arms truss type 4 1/2- inch clamp 15-FT (657.0715)EACH14$875.00$920.00$875.00$1,200.00
147Signal mounting hardware (location) 01. mineral point road & S. high point road (658.5070)EACH1$1,800.00$1,900.00$1,800.00$7,000.00
148Luminaires utility LED B (659.1120)EACH14$250.00$260.00$250.00$300.00
149Fiber optic splice enclosure (678.0200)EACH1$2,000.00$2,100.00$2,000.00$1,200.00
150Sawing asphalt (690.0150)LF579$1.25$1.50$1.39$1.25
151Sawing concrete (690.0250)LF8,690$2.10$1.90$1.85$2.10
152Incentive compressive strength concrete pavement (715.0720)DOL2,565$1.00$1.00$1.00$1.00
153On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,400$5.00$5.00$5.00$5.00
154On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,160$5.00$5.00$5.00$5.00
155Special 04. precast sign post base (SPV.0060)EACH14$250.00$260.00$250.00$250.00
156Special 05. sign post base for concrete installation (SPV.0060)EACH5$250.00$260.00$250.00$250.00
157Special 07. construction staking water main (SPV.0060)EACH1$500.00$500.00$850.00$850.00
158Special 09. furnish and install 16- inch water valve (SPV.0060)EACH1$9,233.99$14,400$8,131.89$10,000
159Special 11. cut-in or connect-to existing water system (SPV.0060)EACH2$5,036.00$5,700.00$10,469$7,000.00
160Special 12. adjust water valve box section (SPV.0060)EACH6$382.55$530.00$1,546.28$850.00
161Special 30. inlet cover type H special (SPV.0060)EACH12$1,982.28$1,400.00$1,238.40$1,000.00
162Special 32. manhole cover type J special (SPV.0060)EACH7$1,591.19$1,100.00$1,020.01$1,000.00
163Special 39. precast concrete culvert bend (SPV.0060)EACH2$12,899$4,000.00$6,666.06$3,000.00
164Special 50. temporary traffic signals (mineral point road & W. beltline highway) (SPV.0060)EACH1$125,000$131,300$125,000$250,000
165Special 51. temporary traffic signals (mineral point road & S. high point road) (SPV.0060)EACH1$60,000$63,000$60,000$250,000
166Special 52. removing, salvaging & reinstalling signal (mineral point RD/W beltline hwy) (SPV.0060)EACH1$4,500.00$4,700.00$4,500.00$50,000
167Special 53. removing, salvaging & reinstalling signal (mineral point RD/S high point RD) (SPV.0060)EACH1$4,500.00$4,700.00$4,500.00$50,000
168Special 54. removing & salvaging signal (mineral point RD & S high point RD) (SPV.0060)EACH1$4,500.00$4,700.00$4,500.00$20,000
169Special 55. electrical pull box, type III (SPV.0060)EACH1$600.00$630.00$600.00$800.00
170Special 56. electrical pull box, type V (SPV.0060)EACH4$1,200.00$1,300.00$1,200.00$1,800.00
171Special 57. electrical pull box, type VII (SPV.0060)EACH1$1,850.00$1,900.00$1,850.00$3,000.00
172Special 58. concrete base type LB- 8R (SPV.0060)EACH1$1,500.00$1,600.00$1,500.00$3,000.00
173Special 59. traffic signal heads 12- inch 4-section (SPV.0060)EACH4$1,050.00$1,100.00$1,050.00$1,350.00
174Special 60. backplates signal face, 4-section 12-inch (SPV.0060)EACH4$175.00$180.00$175.00$175.00
175Special 61. removing, salvaging & reinstalling cable/wire (mineral PT RD/W beltline hwy) (SPV.0060)EACH1$6,500.00$6,800.00$6,500.00$50,000
176Special 62. removing, salvaging & reinstalling cable/wire (mineral PT RD/S high PT RD) (SPV.0060)EACH1$8,000.00$8,400.00$8,000.00$30,000
177Special 63. fiber optic fusion splice (SPV.0060)EACH444$100.00$110.00$100.00$30.00
178Special 67. inlet covers flat, temporary (SPV.0060)EACH9$1,655.38$180.00$1,356.56$500.00
179Special 68. temporary bus stop (SPV.0060)EACH3$2,100.00$3,000.00$2,500.00$1,000.00
180Special 71. utility line opening (ulo) (SPV.0060)EACH5$200.00$650.00$1,733.86$500.00
181Special 72. termination panel (SPV.0060)EACH1$1,500.00$1,600.00$1,500.00$1,500.00
182Special 73. temporary lighting system mineral point road (SPV.0060)EACH1$27,000$28,400$27,000$100,000
183Special 01. furnish and install watermain pipe & fittings, 16-inch (SPV.0090)LF52$360.32$460.00$854.64$739.32
184Special 04. concrete curb & gutter 30-inch type D special (SPV.0090)LF143$74.70$65.00$58.60$62.18
185Special 05. concrete curb & gutter 24-inch type A special (SPV.0090)LF2,439$35.83$46.00$32.00$45.95
186Special 06. concrete curb & gutter 30-inch type A special (SPV.0090)LF373$89.21$65.00$58.60$64.18
187Special 08. reflective sign post (SPV.0090)LF246$18.00$19.00$18.00$45.00
188Special 09. staking temporary pavement (SPV.0090)LF1,200$0.01$0.10$1.25$1.25
189Special 10. select fill for water main (SPV.0090)LF52$275.24$1.00$0.01$125.00
190Special 11. fiber optic cable 12- count (SPV.0090)LF210$5.00$5.30$5.00$5.00
191Special 12. fiber optic cable 144- count (SPV.0090)LF3,060$7.00$7.40$7.00$7.00
192Special 01. high friction colored surface, green (SPV.0165)SF520$14.54$15.25$14.54$9.80
193Special 02. methyl methacrylate marking red (SPV.0165)SF3,000$13.04$6.60$6.30$6.30
194Special 03. marking removal water blasting area (SPV.0165)SF4,288$1.15$2.10$1.15$2.00
195Special 01. pavement cleanup (SPV.0170)STA43$100.00$180.00$1,090.52$300.00
WisDOT contract 20261110011: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy