Apron endwalls for culvert pipe reinforced concrete 48-inch, WisDOT 522.1048

Low bidders on WisDOT contracts carried a median of $3,650.11 per EACH for this item, over the 24 months to 10 NOV 2026, across 26 low bids. Half of all 85 bids fell between $3,364.90 and $4,375.70.

Owner
Wisconsin DOT
Item
522.1048
Unit
EACH
Data through
10 NOV 2026

WisDOT prints this item as “Apron Endwalls for Culvert Pipe Reinforced Concrete 48-Inch”.

$3,650.11Low bidder's median, per EACH
$3,800.00Median of all bids, per EACH
26Contracts in the window

By year of letting

Apron endwalls for culvert pipe reinforced concrete 48-inch, WisDOT: unit prices by year
YearContractsLow bidsLow-bid medianAll bidsMedian, all bids
20221512$2,948.0048$3,010.44
20231212$3,364.9331$3,187.90
20241111$3,300.0037$3,365.00
202588$3,353.0723$3,500.00
20261313$3,750.0046$4,093.12

Bid prices as published, not adjusted for inflation.

By quantity

Quantity (EACH)Low bidsLow-bid median
1 to 26$3,868.78
2 to 27$3,800.00
2 to 46$4,059.50
4 to 57$3,385.69
Apron endwalls for culvert pipe reinforced concrete 48-inch, WisDOT: low bidder's median by quantity band

The low bids split into four bands of equal count by the quantity on the contract. Larger quantities usually carry lower unit prices.

Who is lowest on this line

Apron endwalls for culvert pipe reinforced concrete 48-inch, WisDOT: bidders most often lowest on this line

The lowest unit price on each line, whoever won the contract, over all lettings in the data, for firms with five lines or more.

Latest contracts with this item

LetContractCountyQuantityLow bidder's priceMedianBidsLow bidderSource
10 NOV 202620261110011Dane2$3,394.35$4,047.184Rock Road Companies, Inc.WisDOT
13 OCT 202620261013012Calumet2$4,602.39$4,602.392Northeast Asphalt, IncWisDOT
13 OCT 202620261013026Taylor2$3,750.00$3,750.001American Asphalt of WisconsinWisDOT
13 OCT 202620261013028Polk2$3,700.22$3,700.221Monarch Paving CompanyWisDOT
15 SEP 202620260915016Portage2$4,000.00$4,000.002American Asphalt of WisconsinWisDOT
15 SEP 202620260915021Portage2$4,800.00$4,800.002American Asphalt of WisconsinWisDOT
11 AUG 202620260811009Walworth4$2,980.00$3,851.026Musson Bros., Inc.WisDOT
11 AUG 202620260811011Brown1$6,521.65$5,760.822Northeast Asphalt, IncWisDOT
11 AUG 202620260811015Portage4$4,500.00$4,500.007Hoffman Construction CompanyWisDOT
14 JUL 202620260714005Outagamie5$3,385.69$3,385.696Vinton Construction CompanyWisDOT
10 FEB 202620260210011Washington1$3,479.00$3,479.001Zenith Tech., Inc. - WaukeshaWisDOT
13 JAN 202620260113017La Crosse2$4,497.09$4,565.656Gerke Excavating IncWisDOT
13 JAN 202620260113056Waukesha4$3,600.00$4,129.476Hoffman Construction CompanyWisDOT
09 DEC 202520251209014Milwaukee1$3,180.00$3,180.003Lunda Construction CompanyWisDOT
09 DEC 202520251209038Dunn2$4,750.00$4,750.001Monarch Paving CompanyWisDOT
Latest WisDOT contracts carrying Apron endwalls for culvert pipe reinforced concrete 48-inch

Filter this item by your own quantity, county and period, or check your price against it, in the WisDOT explorer.

How these prices were read

WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

  • Statistics leave out bids over three times the low bid, zero or negative prices and token prices under 5% of the median.
  • Item codes and units are WisDOT's own: this item is compared with WisDOT contracts only.
  • Prices are bid prices, not paid prices. Use them as a reference range, never as a quote.
  • The data runs to the WisDOT letting of 10 NOV 2026 and was rebuilt on 26 NOV 2026.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy