WisDOT contract 20251209038 bid tabulation

7600-00-72. Let by Wisconsin DOT on December 9, 2025, Dunn. 1 bid received; low bid $8,999,987 by Monarch Paving Company.

Owner
Wisconsin DOT
Letting
09 DEC 2025
Pay items
144
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Monarch Paving Company$8,999,987Low
WisDOT contract 20251209038: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Monarch Paving Company
1Clearing (201.0105)STA46$585.00
2Grubbing (201.0205)STA46$15.00
3Removing small pipe culverts (203.0100)EACH2$1,360.00
4Removing structure (structure) 01. 6'X3.5' box culvert (203.0220)EACH2$2,055.00
5Debris containment over waterway (structure) 01. B-17-984 (203.0335)EACH1$1,500.00
6Removing concrete surface partial depth 01. 8620-00-75 (204.0109.S)SF6,690$0.69
7Removing asphaltic surface (204.0110)SY680$5.50
8Removing asphaltic surface butt joints (204.0115)SY3,765$13.54
9Removing asphaltic surface milling (204.0120)SY238,130$3.15
10Removing curb & gutter (204.0150)LF2,730$11.40
11Removing concrete sidewalk (204.0155)SY795$12.15
12Removing guardrail (204.0165)LF13,259$1.60
13Excavation common (205.0100)CY2,730$8.50
14Temporary lane shift during culvert work (208.1500.S)EACH4$10.00
15Prepare foundation for asphaltic paving (project) 01. 7600-00-72 (211.0101)EACH1$18,473
16Prepare foundation for asphaltic paving (project) 02. 8620-00-75 (211.0101)EACH1$10,302
17Prepare foundation for asphaltic shoulders (211.0400)STA780$41.77
18Finishing roadway (project) 01. 7600-00-72 (213.0100)EACH1$16,691
19Finishing roadway (project) 02. 8620-00-75 (213.0100)EACH1$5,181.39
20Base aggregate dense 3/4-inch (305.0110)TON3,490$36.53
21Base aggregate dense 1 1/4-inch (305.0120)TON100$58.00
22Drilled tie bars (416.0610)EACH15$16.03
23Tack coat (455.0605)GAL26,450$3.09
24HMA percent within limits (PWL) test strip volumetrics (460.0105.S)EACH1$12,230
25HMA percent within limits (PWL) test strip density (460.0110.S)EACH2$2,220.00
26Incentive density PWL HMA pavement (460.2005)DOL27,400$1.00
27Incentive density HMA pavement longitudinal joints (460.2007)DOL51,290$1.00
28Incentive air voids HMA pavement (460.2010)DOL42,800$1.00
29HMA pavement 5 MT 58-34 S (460.6245)TON46,650$95.36
30Material transfer vehicle (460.9000.S)EACH1$35,250
31Asphaltic surface (465.0105)TON12$13.54
32Asphaltic surface patching (465.0110)TON765$165.76
33Asphaltic surface driveways and field entrances (465.0120)TON70$345.47
34Asphaltic curb (465.0310)LF4,000$9.73
35Asphaltic flumes (465.0315)SY100$64.08
36Asphaltic rumble strips, shoulder (465.0520)LF77,020$0.19
37Asphaltic rumble strips, centerline (465.0560)LF43,830$0.27
38Expansion device (502.3101)LF80$540.00
39Protective surface treatment (502.3200)SY36$5.00
40Adhesive anchors no. 5 bar (502.4205)EACH74$45.00
41Bar steel reinforcement HS coated structures (505.0600)LB2,326$3.50
42Bar couplers no. 4 (505.0904)EACH8$35.00
43Bar couplers no. 5 (505.0905)EACH20$45.00
44Bar couplers no. 6 (505.0906)EACH10$50.00
45Joint repair (509.1000)SY32$1,876.00
46Concrete surface repair (509.1500)SF110$336.00
47Concrete masonry deck repair (509.2100.S)CY16$1,452.00
48Removing and resetting tubular railing (structure) 01. B-17-0984 (513.9006.S)EACH1$8,900.00
49Cleaning culvert pipes (520.8700)EACH11$1,390.00
50Culvert pipe liners (size) 01. 36- inch (520.9700.S)LF104$248.50
51Culvert pipe liners (size) 02. 24- inch (520.9700.S)LF74$156.50
52Cleaning culvert pipes for liner verification (520.9750.S)EACH2$250.00
53Culvert pipe reinforced concrete class III 42-inch (522.0142)LF74$373.00
54Culvert pipe reinforced concrete class III 48-inch (522.0148)LF64$425.00
55Culvert pipe reinforced concrete class III 60-inch (522.0160)LF142$606.00
56Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042)EACH2$4,268.00
57Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048)EACH2$4,750.00
58Apron endwalls for culvert pipe reinforced concrete 60-inch (522.1060)EACH4$6,395.00
59Concrete curb & gutter 30-inch type D (601.0411)LF2,640$64.93
60Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF80$56.70
61Concrete curb pedestrian (601.0600)LF82$28.75
62Concrete sidewalk 4-inch (602.0405)SF3,100$12.59
63Concrete sidewalk 6-inch (602.0415)SF3,935$14.45
64Curb ramp detectable warning field yellow (602.0505)SF470$62.51
65Curb ramp detectable warning field radial yellow (602.0605)SF175$67.84
66Concrete barrier temporary precast delivered (603.8000)LF625$12.38
67Concrete barrier temporary precast installed (603.8125)LF1,250$6.77
68Anchoring concrete barrier temporary precast on bridge decks (603.8505)LF150$15.25
69Riprap medium (606.0200)CY150$100.00
70Inlet covers type HM (611.0627)EACH1$1,340.00
71Adjusting inlet covers (611.8115)EACH21$610.00
72Barrier system grading shaping finishing (614.0010)EACH35$8,085.00
73Crash cushions temporary (614.0905)EACH2$4,750.00
74MGS guardrail 3 (614.2300)LF4,594$24.00
75MGS guardrail 3 K (614.2330)LF5,850$36.75
76MGS guardrail 3 L (614.2340)LF225$24.67
77MGS guardrail short radius (614.2350)LF161$32.00
78MGS thrie beam transition (614.2500)LF320$95.90
79MGS guardrail terminal eat (614.2610)EACH59$3,518.00
80MGS guardrail short radius terminal (614.2630)EACH3$2,500.00
81Maintenance and repair of haul roads (project) 01. 7600-00-72 (618.0100)EACH1$1.00
82Maintenance and repair of haul roads (project) 02. 8620-00-75 (618.0100)EACH1$1.00
83Mobilization (619.1000)EACH1$610,629
84Water (624.0100)MGAL35$52.13
85Topsoil (625.0100)SY1,640$5.50
86Silt fence (628.1504)LF16,900$1.50
87Silt fence maintenance (628.1520)LF8,450$0.01
88Mobilizations erosion control (628.1905)EACH41$1.00
89Mobilizations emergency erosion control (628.1910)EACH3$1.00
90Erosion mat urban class I type B (628.2008)SY1,640$1.80
91Inlet protection type C (628.7015)EACH44$35.00
92Culvert pipe checks (628.7555)EACH106$16.00
93Fertilizer type B (629.0210)CWT1.10$200.00
94Seeding mixture no. 20 (630.0120)LB25$21.00
95Seeding mixture no. 40 (630.0140)LB5$95.00
96Seeding temporary (630.0200)LB23$20.00
97Seed water (630.0500)MGAL41$1.00
98Markers culvert end (633.5200)EACH27$54.00
99Moving signs type I (638.2101)EACH20$60.00
100Moving small sign supports (638.4000)EACH20$60.00
101Field office type B (642.5001)EACH1$23,588
102Traffic control drums (643.0300)DAY5,430$0.45
103Traffic control barricades type III (643.0420)DAY95$0.45
104Traffic control warning lights type A (643.0705)DAY60$0.20
105Traffic control warning lights type C (643.0715)DAY160$0.08
106Traffic control signs (643.0900)DAY1,650$0.35
107Traffic control signs PCMS (643.1050)DAY14$25.00
108Temporary marking line paint 6- inch (643.3165)LF243,200$0.20
109Temporary marking line removable tape 6-inch (643.3180)LF675$2.10
110Temporary marking crosswalk removable tape 6-inch (643.3350)LF1,360$2.05
111Temporary marking stop line removable tape 18-inch (643.3850)LF55$6.75
112Traffic control (643.5000)EACH1$82,600
113Temporary pedestrian surface matting (644.1440)SF1,000$4.00
114Temporary pedestrian curb ramp (644.1601)DAY280$28.50
115Temporary pedestrian barricade (644.1810)LF1,200$6.50
116Geotextile type HR (645.0120)SY200$5.00
117Marking line grooved wet ref epoxy 6-inch (646.2040)LF188,900$1.19
118Marking line grooved wet ref epoxy 10-inch (646.4040)LF2,775$2.69
119Marking arrow epoxy (646.5020)EACH18$365.13
120Marking word epoxy (646.5120)EACH6$369.45
121Marking railroad crossing epoxy (646.5320)EACH4$3,584.18
122Marking stop line epoxy 18-inch (646.6120)LF330$15.29
123Marking crosswalk epoxy transverse line 6-inch (646.7420)LF2,650$14.52
124Marking curb epoxy (646.8120)LF275$7.33
125Marking island nose epoxy (646.8220)EACH8$274.44
126Marking removal line 4-inch (646.9000)LF455$1.15
127Construction staking curb gutter and curb & gutter (650.5500)LF2,720$1.00
128Construction staking pipe culverts (650.6000)EACH4$245.50
129Construction staking resurfacing reference (650.8000)LF56,150$0.05
130Construction staking curb ramps (650.9000)EACH56$150.00
131Construction staking supplemental control (project) 01. 7600-00-72 (650.9911)EACH1$300.50
132Construction staking supplemental control (project) 02. 8620-00-75 (650.9911)EACH1$510.00
133Temporary traffic signals for bridges (structure) 01. B-17-984 (661.0101)EACH1$2,400.00
134Public land reference monument verify and reset (680.0100)EACH6$5.00
135Sawing asphalt (690.0150)LF2,632$1.80
136Sawing concrete (690.0250)LF567$2.35
137Incentive iri ride (740.0440)DOL42,800$1.00
138Installing and maintaining bird deterrent system (station) 01. 943+00 (999.2000.S)EACH1$750.00
139On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,500$5.00
140On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS2,000$5.00
141Special 01. automated flagger assistance device (SPV.0045)DAY165$55.75
142Special 01. grading, shaping, and finishing culvert pipes and apron endwalls (SPV.0060)EACH8$1,345.00
143Special 01. concrete joint and crack cleaning and repair (SPV.0090)LF100$42.97
144Special 02. flashing stainless steel (SPV.0090)LF75$65.00
WisDOT contract 20251209038: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy