WisDOT contract 20251209014 bid tabulation
V Brown Deer - N 51st St; Bridge Over Beaver Creek P-40-0550 (LOC STR, Milwaukee County V Brown Deer - N 51st St). Let by Wisconsin DOT on December 9, 2025, Milwaukee. 4 bids received; low bid $1,313,949 by Lunda Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 123
- Data through
- 10 NOV 2026
3 of the 4 bids matched their published totals to within a dollar and are shown; the others are left out.
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Lunda Construction Company | $1,313,949 | Low |
| 3 | Zignego Company, Inc. | $1,510,730 | +15% |
| 4 | Zenith Tech., Inc. - Waukesha | $1,843,556 | +40% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Lunda Construction Company | 2. Zignego Company, Inc. | 3. Zenith Tech., Inc. - Waukesha |
|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0210) | SY | 223 | $14.30 | $14.30 | $10.00 |
| 2 | Abatement of asbestos containing material (structure) 01. P-40-0550 (203.0211.S) | EACH | 1 | $6,500.00 | $2,300.00 | $2,210.00 |
| 3 | Removing structure over waterway remove debris (structure) 01. P-40- 0550 (203.0250) | EACH | 1 | $80,000 | $64,700 | $148,000 |
| 4 | Removing curb & gutter (204.0150) | LF | 120 | $7.00 | $20.00 | $10.00 |
| 5 | Removing concrete sidewalk (204.0155) | SY | 5 | $40.00 | $100.00 | $21.81 |
| 6 | Removing fence (204.0170) | LF | 88 | $3.50 | $4.00 | $3.50 |
| 7 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 9 | $40.00 | $40.00 | $30.00 |
| 8 | Removing storm sewer (size) 02. 60-inch (204.0245) | LF | 133 | $60.00 | $60.00 | $46.00 |
| 9 | Removing (item description) 01. modular block wall (204.9090.S) | LF | 90 | $36.00 | $100.00 | $15.00 |
| 10 | Removing (item description) 02. timber retaining wall (204.9090.S) | LF | 35 | $80.00 | $100.00 | $35.00 |
| 11 | Removing (item description) 01. concrete channel (204.9180.S) | SY | 265 | $30.00 | $40.00 | $14.00 |
| 12 | Excavation common (205.0100) | CY | 1,007 | $33.00 | $54.00 | $31.34 |
| 13 | Excavation marsh (205.0400) | CY | 40 | $54.00 | $100.00 | $27.05 |
| 14 | Excavation for structures bridges (structure) 01. B-40-1102 (206.1001) | EACH | 1 | $33,200 | $21,000 | $48,000 |
| 15 | Backfill structure type A (210.1500) | TON | 406 | $35.00 | $41.00 | $46.25 |
| 16 | Finishing roadway (project) 01. 2020-00-71 (213.0100) | EACH | 1 | $100.00 | $1,000.00 | $2,500.00 |
| 17 | Base aggregate dense 3/4-inch (305.0110) | TON | 17 | $108.00 | $100.00 | $200.00 |
| 18 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 823 | $27.00 | $28.00 | $21.00 |
| 19 | Breaker run (311.0110) | TON | 24 | $55.00 | $100.00 | $30.12 |
| 20 | Concrete pavement approach slab (415.0410) | SY | 80 | $260.00 | $400.00 | $260.00 |
| 21 | Drilled tie bars (416.0610) | EACH | 4 | $10.00 | $100.00 | $11.00 |
| 22 | Tack coat (455.0605) | GAL | 82 | $2.30 | $2.30 | $2.30 |
| 23 | Incentive density HMA pavement (460.2000) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 24 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 195 | $127.00 | $127.00 | $127.00 |
| 25 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 48 | $165.00 | $165.00 | $165.00 |
| 26 | HMA pavement 4 LT 58-28 H (460.5424) | TON | 54 | $170.00 | $170.00 | $170.00 |
| 27 | Asphaltic surface (465.0105) | TON | 39 | $240.00 | $240.00 | $240.00 |
| 28 | Asphaltic surface driveways and field entrances (465.0120) | TON | 10 | $240.00 | $240.00 | $240.00 |
| 29 | Concrete masonry bridges (502.0100) | CY | 255 | $1,300.00 | $940.00 | $1,175.00 |
| 30 | Protective surface treatment (502.3200) | SY | 239 | $6.00 | $4.80 | $4.00 |
| 31 | Pigmented surface sealer (502.3210) | SY | 54 | $8.00 | $12.00 | $12.50 |
| 32 | Bar steel reinforcement HS structures (505.0400) | LB | 6,440 | $1.40 | $1.30 | $1.40 |
| 33 | Bar steel reinforcement HS coated structures (505.0600) | LB | 36,720 | $1.50 | $1.41 | $1.50 |
| 34 | Temporary shoring (511.1100) | SF | 415 | $70.00 | $44.00 | $12.00 |
| 35 | Railing steel type C2 (513.7011) | LF | 127 | $245.00 | $270.00 | $285.00 |
| 36 | Rubberized membrane waterproofing (516.0500) | SY | 28 | $35.00 | $61.00 | $69.00 |
| 37 | Concrete collars for pipe (520.8000) | EACH | 1 | $1,200.00 | $1,000.00 | $900.00 |
| 38 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,390.00 | $1,390.00 | $1,584.00 |
| 39 | Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048) | EACH | 1 | $3,180.00 | $3,180.00 | $3,320.00 |
| 40 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 58X91-inch (522.2658) | EACH | 1 | $6,200.00 | $6,200.00 | $6,680.00 |
| 41 | Pre-boring unconsolidated materials (550.0010) | LF | 82 | $10.00 | $110.00 | $60.98 |
| 42 | Piling steel HP 10-inch X 42 LB (550.1100) | LF | 440 | $43.00 | $24.00 | $80.00 |
| 43 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 60 | $33.00 | $100.00 | $49.00 |
| 44 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 205 | $33.00 | $100.00 | $48.00 |
| 45 | Concrete sidewalk 5-inch (602.0410) | SF | 1,727 | $10.00 | $20.00 | $10.00 |
| 46 | Curb ramp detectable warning field yellow (602.0505) | SF | 75 | $45.00 | $100.00 | $45.00 |
| 47 | Concrete driveway 7-inch (602.0815) | SY | 20 | $80.00 | $200.00 | $100.00 |
| 48 | Riprap heavy (606.0300) | CY | 476 | $112.00 | $170.00 | $132.00 |
| 49 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 17 | $120.00 | $120.00 | $178.00 |
| 50 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 8 | $166.00 | $166.00 | $124.00 |
| 51 | Storm sewer pipe reinforced concrete class III 48-inch (608.0348) | LF | 60 | $250.00 | $250.00 | $404.00 |
| 52 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-III 58X91-inch (608.2358) | LF | 57 | $872.00 | $872.00 | $740.00 |
| 53 | Manhole covers type J (611.0530) | EACH | 2 | $1,000.00 | $1,000.00 | $544.00 |
| 54 | Inlet covers type WM (611.0660) | EACH | 1 | $3,000.00 | $3,000.00 | $1,572.00 |
| 55 | Catch basins 4-FT diameter (611.1004) | EACH | 1 | $3,200.00 | $3,200.00 | $4,949.00 |
| 56 | Pipe grates (size) 01. 48-inch (611.9850.S) | EACH | 1 | $5,775.00 | $5,775.00 | $4,596.00 |
| 57 | Pipe grates (size) 02. 58X91-inch (611.9850.S) | EACH | 1 | $9,917.00 | $9,917.00 | $7,546.00 |
| 58 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 176 | $8.00 | $40.00 | $6.50 |
| 59 | Insulation board polystyrene (inch) 01. 2-inch (612.0902.S) | SY | 8 | $85.00 | $100.00 | $56.00 |
| 60 | Fence safety (616.0700.S) | LF | 100 | $4.00 | $3.95 | $5.00 |
| 61 | Mobilization (619.1000) | EACH | 1 | $152,492 | $275,000 | $505,000 |
| 62 | Water (624.0100) | MGAL | 9 | $75.00 | $100.00 | $50.00 |
| 63 | Topsoil (625.0100) | SY | 1,344 | $11.00 | $5.95 | $9.50 |
| 64 | Mulching (627.0200) | SY | 1,295 | $0.18 | $0.55 | $0.20 |
| 65 | Erosion bales (628.1104) | EACH | 80 | $12.00 | $12.50 | $12.00 |
| 66 | Silt fence heavy duty (628.1530.S) | LF | 323 | $12.00 | $14.50 | $13.00 |
| 67 | Silt fence heavy duty maintenance (628.1535.S) | LF | 323 | $1.00 | $2.45 | $1.00 |
| 68 | Mobilizations erosion control (628.1905) | EACH | 1 | $200.00 | $200.00 | $250.00 |
| 69 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $200.00 | $200.00 | $250.00 |
| 70 | Erosion mat urban class I type B (628.2008) | SY | 1,244 | $1.65 | $1.25 | $2.00 |
| 71 | Inlet protection type A (628.7005) | EACH | 1 | $300.00 | $105.00 | $300.00 |
| 72 | Inlet protection type D (628.7020) | EACH | 4 | $125.00 | $95.00 | $130.00 |
| 73 | Culvert pipe checks (628.7555) | EACH | 2 | $15.00 | $20.00 | $30.00 |
| 74 | Rock bags (628.7570) | EACH | 24 | $15.00 | $10.00 | $15.00 |
| 75 | Fertilizer type B (629.0210) | CWT | 0.80 | $100.00 | $95.00 | $100.00 |
| 76 | Seeding mixture no. 40 (630.0140) | LB | 49 | $10.00 | $12.95 | $14.00 |
| 77 | Seeding temporary (630.0200) | LB | 35 | $2.00 | $5.00 | $3.00 |
| 78 | Seed water (630.0500) | MGAL | 30 | $25.00 | $15.00 | $30.00 |
| 79 | Sod water (631.0300) | MGAL | 1.10 | $120.00 | $150.00 | $120.00 |
| 80 | Sod lawn (631.1000) | SY | 100 | $15.00 | $9.95 | $20.00 |
| 81 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 4 | $85.00 | $135.00 | $160.00 |
| 82 | Signs type II reflective H (637.2210) | SF | 19 | $23.50 | $35.00 | $30.00 |
| 83 | Signs type II reflective F (637.2230) | SF | 9 | $24.00 | $40.00 | $30.00 |
| 84 | Removing signs type II (638.2602) | EACH | 8 | $20.00 | $35.00 | $20.00 |
| 85 | Removing small sign supports (638.3000) | EACH | 5 | $20.00 | $35.00 | $20.00 |
| 86 | Field office type B (642.5001) | EACH | 1 | $5,000.00 | $20,000 | $15,000 |
| 87 | Traffic control barricades type III (643.0420) | DAY | 2,184 | $0.56 | $0.56 | $0.56 |
| 88 | Traffic control warning lights type A (643.0705) | DAY | 4,368 | $0.19 | $0.19 | $0.19 |
| 89 | Traffic control signs (643.0900) | DAY | 11,752 | $0.50 | $0.50 | $0.50 |
| 90 | Traffic control signs PCMS (643.1050) | DAY | 14 | $45.00 | $45.00 | $45.00 |
| 91 | Traffic control (643.5000) | EACH | 1 | $1,900.00 | $1,900.00 | $1,900.00 |
| 92 | Temporary pedestrian barricade (644.1810) | LF | 37 | $4.73 | $4.73 | $4.73 |
| 93 | Temporary audible message devices (644.1900.S) | DAY | 520 | $4.00 | $4.00 | $4.00 |
| 94 | Geotextile type DF schedule A (645.0111) | SY | 146 | $3.50 | $10.00 | $5.00 |
| 95 | Geotextile type HR (645.0120) | SY | 1,157 | $4.00 | $10.00 | $5.25 |
| 96 | Geogrid type SR (645.0220) | SY | 40 | $6.00 | $10.00 | $5.00 |
| 97 | Marking line epoxy 4-inch (646.1020) | LF | 416 | $8.35 | $8.35 | $8.00 |
| 98 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 66 | $22.50 | $22.50 | $50.00 |
| 99 | Construction staking storm sewer (650.4000) | EACH | 5 | $130.00 | $125.00 | $125.00 |
| 100 | Construction staking subgrade (650.4500) | LF | 260 | $0.01 | $1.50 | $1.50 |
| 101 | Construction staking base (650.5000) | LF | 230 | $0.01 | $3.00 | $3.00 |
| 102 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 265 | $1.50 | $2.00 | $2.00 |
| 103 | Construction staking structure layout (structure) 01. B-40-1102 (650.6501) | EACH | 1 | $5,000.00 | $1,600.00 | $1,600.00 |
| 104 | Construction staking concrete pavement (650.7000) | LF | 30 | $1.50 | $3.00 | $3.00 |
| 105 | Construction staking curb ramps (650.9000) | EACH | 3 | $175.00 | $250.00 | $250.00 |
| 106 | Construction staking sidewalk (project) 01. 2020-00-71 (650.9500) | EACH | 1 | $2,500.00 | $800.00 | $800.00 |
| 107 | Construction staking supplemental control (project) 01. 2020-00-71 (650.9911) | EACH | 1 | $2,500.00 | $1,500.00 | $1,500.00 |
| 108 | Construction staking slope stakes (650.9920) | LF | 260 | $1.25 | $2.25 | $2.25 |
| 109 | Sawing asphalt (690.0150) | LF | 199 | $2.95 | $2.95 | $1.25 |
| 110 | Sawing concrete (690.0250) | LF | 25 | $2.95 | $2.95 | $2.55 |
| 111 | Incentive strength concrete structures (715.0502) | DOL | 1,530 | $1.00 | $1.00 | $1.00 |
| 112 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 |
| 113 | Crack and damage survey (999.1501.S) | EACH | 3 | $3,600.00 | $3,600.00 | $1,200.00 |
| 114 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 400 | $5.00 | $5.00 | $5.00 |
| 115 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 900 | $5.00 | $5.00 | $5.00 |
| 116 | Special 01. concrete masonry cut- off walls (SPV.0035) | CY | 4 | $1,500.00 | $2,000.00 | $3,500.00 |
| 117 | Special 01. utility line opening (ulo) (SPV.0060) | EACH | 10 | $500.00 | $1.00 | $1,000.00 |
| 118 | Special 02. round steel post system (SPV.0060) | EACH | 1 | $500.00 | $325.00 | $500.00 |
| 119 | Special 03. manholes 17X5-FT (SPV.0060) | EACH | 1 | $45,500 | $45,500 | $85,000 |
| 120 | Special 04. maintaining temporary drainage at beaver creek (SPV.0060) | EACH | 1 | $5,000.00 | $54,000 | $80,000 |
| 121 | Special 01. coarse aggregate mix for stream bed (SPV.0195) | TON | 157 | $55.00 | $150.00 | $43.50 |
| 122 | Special 02. excavation, hauling, and disposal of pah contaminated soil (SPV.0195) | TON | 197 | $65.00 | $100.00 | $65.50 |
| 123 | Special 03. excavation, hauling, and disposal of pah and voc contaminated sediment (SPV.0195) | TON | 262 | $90.00 | $100.00 | $85.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.