WisDOT contract 20260714005 bid tabulation
1130-65-71. Let by Wisconsin DOT on July 14, 2026, Outagamie. 6 bids received; low bid $167,824,856 by Vinton Construction Company.
- Owner
- Wisconsin DOT
- Letting
- 14 JUL 2026
- Pay items
- 516
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Vinton Construction Company | $167,824,856 | Low |
| 2 | Lunda Construction Company | $168,642,237 | 0.0% |
| 3 | Hoffman Construction Company | $170,277,793 | +1.0% |
| 4 | Michels Road & Stone, Inc. | $171,991,724 | +2.0% |
| 5 | Zenith Tech., Inc. - Waukesha | $178,200,085 | +6.0% |
| 6 | Zignego Company, Inc. | $184,645,649 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Vinton Construction Company | 2. Lunda Construction Company | 3. Hoffman Construction Company | 4. Michels Road & Stone, Inc. | 5. Zenith Tech., Inc. - Waukesha | 6. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 92 | $722.68 | $722.68 | $722.68 | $722.68 | $722.68 | $722.68 |
| 2 | Grubbing (201.0205) | STA | 106 | $263.75 | $263.75 | $263.75 | $263.75 | $263.75 | $263.75 |
| 3 | Removing small pipe culverts (203.0100) | EACH | 2 | $671.30 | $671.30 | $671.30 | $1,373.00 | $671.30 | $5,000.00 |
| 4 | Removing structure (structure) 0001. B-44-129 (203.0220) | EACH | 1 | $100,000 | $100,000 | $100,000 | $100,000 | $600,000 | $100,000 |
| 5 | Removing structure (structure) 0002. B-44-130 (203.0220) | EACH | 1 | $100,000 | $100,000 | $100,000 | $2,600,000 | $600,000 | $100,000 |
| 6 | Removing structure (structure) 0030. C-44-30 (203.0220) | EACH | 1 | $20,000 | $20,000 | $25,000 | $28,000 | $28,000 | $25,000 |
| 7 | Removing structure (structure) 0128. B-44-0128 (203.0220) | EACH | 1 | $300,000 | $300,000 | $300,000 | $2,800,000 | $600,000 | $300,000 |
| 8 | Removing structure (structure) 0180. C-44-018 (203.0220) | EACH | 1 | $24,000 | $24,000 | $30,000 | $43,000 | $43,000 | $30,000 |
| 9 | Removing concrete pavement (204.0100) | SY | 141,933 | $1.47 | $1.47 | $10.00 | $1.20 | $1.20 | $10.00 |
| 10 | Removing asphaltic surface (204.0110) | SY | 8,700 | $5.30 | $5.30 | $10.00 | $10.00 | $10.00 | $10.00 |
| 11 | Removing asphaltic surface milling (204.0120) | SY | 1,098 | $19.40 | $19.40 | $19.40 | $19.40 | $19.40 | $19.40 |
| 12 | Removing curb & gutter (204.0150) | LF | 1,840 | $2.50 | $2.50 | $10.00 | $2.00 | $2.00 | $10.00 |
| 13 | Removing concrete sidewalk (204.0155) | SY | 240 | $10.00 | $10.00 | $20.00 | $10.00 | $10.00 | $20.00 |
| 14 | Removing concrete barrier (204.0157) | LF | 3,592 | $10.30 | $10.30 | $20.00 | $20.00 | $20.00 | $20.00 |
| 15 | Removing guardrail (204.0165) | LF | 7,012 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 16 | Removing cable barrier (204.0167) | LF | 9,590 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 17 | Removing fence (204.0170) | LF | 28,415 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 | $2.25 |
| 18 | Removing delineators and markers (204.0180) | EACH | 148 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 19 | Removing concrete bases (204.0195) | EACH | 20 | $200.00 | $200.00 | $250.00 | $200.00 | $500.00 | $250.00 |
| 20 | Removing manholes (204.0210) | EACH | 6 | $595.17 | $595.17 | $595.17 | $400.00 | $595.17 | $350.00 |
| 21 | Removing inlets (204.0220) | EACH | 31 | $324.13 | $324.13 | $324.13 | $350.00 | $324.13 | $350.00 |
| 22 | Removing storm sewer (size) 0001. 12-inch (204.0245) | LF | 55 | $13.20 | $13.20 | $13.20 | $15.00 | $13.20 | $12.00 |
| 23 | Removing storm sewer (size) 0002. 15-inch (204.0245) | LF | 816 | $13.29 | $13.29 | $13.29 | $16.00 | $13.29 | $12.00 |
| 24 | Removing storm sewer (size) 0003. 18-inch (204.0245) | LF | 2,940 | $14.36 | $14.36 | $14.36 | $17.00 | $14.36 | $12.00 |
| 25 | Removing storm sewer (size) 0004. 24-inch (204.0245) | LF | 683 | $15.39 | $15.39 | $15.39 | $28.00 | $15.39 | $12.00 |
| 26 | Removing storm sewer (size) 0005. 30-inch (204.0245) | LF | 901 | $15.39 | $15.39 | $15.39 | $40.00 | $15.39 | $12.00 |
| 27 | Removing storm sewer (size) 0006. 36-inch (204.0245) | LF | 515 | $17.09 | $17.09 | $17.09 | $30.00 | $17.09 | $24.00 |
| 28 | Removing storm sewer (size) 0007. 48-inch (204.0245) | LF | 525 | $18.00 | $18.00 | $18.00 | $50.00 | $18.00 | $24.00 |
| 29 | Abandoning culvert pipes (204.0270) | EACH | 1 | $1,385.00 | $1,385.00 | $1,385.00 | $890.00 | $1,385.00 | $2,000.00 |
| 30 | Removing (item description) 0001. removing anchor bolt cover shroud (204.9060.S) | EACH | 4 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 31 | Removing (item description) 0002. removing street light assembly (204.9060.S) | EACH | 19 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 |
| 32 | Removing (item description) 0003. removing lighting control (204.9060.S) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 33 | Removing (item description) 0004. removing sign (204.9060.S) | EACH | 6 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 34 | Removing (item description) 0103. removing apron endwalls (204.9060.S) | EACH | 3 | $195.33 | $195.33 | $195.33 | $900.00 | $195.33 | $500.00 |
| 35 | Removing (item description) 0701. communication vault (204.9060.S) | EACH | 16 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 36 | Removing (item description) 0001. removing electrical conductors from existing conduit (204.9090.S) | LF | 3,405 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 37 | Removing (item description) 0002. removing or abandoning existing conduit (204.9090.S) | LF | 3,405 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 38 | Excavation common (205.0100) | CY | 763,406 | $16.18 | $16.18 | $20.00 | $13.50 | $13.50 | $20.00 |
| 39 | Excavation for structures bridges (structure) 0001. B-44-326 (206.1001) | EACH | 1 | $60,000 | $1,780,214 | $4,410,000 | $1,622,000 | $350,000 | $4,710,000 |
| 40 | Excavation for structures bridges (structure) 0002. B-44-327 (206.1001) | EACH | 1 | $150,000 | $3,578,429 | $4,500,000 | $2,793,000 | $700,000 | $4,800,000 |
| 41 | Excavation for structures bridges (structure) 0128. B-44-128 (206.1001) | EACH | 1 | $10,000 | $10,000 | $10,000 | $10,000 | $20,000 | $10,000 |
| 42 | Excavation for structures culverts (structure) 0146. C-44-0146 (206.2001) | EACH | 1 | $120,000 | $120,000 | $55,000 | $112,850 | $112,000 | $55,000 |
| 43 | Excavation for structures culverts (structure) 0147. C-44-0147 (206.2001) | EACH | 1 | $58,000 | $58,000 | $40,000 | $117,500 | $111,000 | $40,000 |
| 44 | Excavation for structures retaining walls (structure) 0070. R-44-0070 (206.3001) | EACH | 1 | $167,300 | $167,300 | $174,300 | $183,300 | $80,000 | $174,300 |
| 45 | Excavation for structures retaining walls (structure) 0071. R-44-0071 (206.3001) | EACH | 1 | $172,900 | $172,900 | $179,900 | $178,900 | $70,000 | $179,900 |
| 46 | Backfill controlled low strength (209.0200.S) | CY | 73 | $127.88 | $127.88 | $127.88 | $291.00 | $127.88 | $300.00 |
| 47 | Backfill structure type A (210.1500) | TON | 1,555 | $29.25 | $29.25 | $36.25 | $31.00 | $31.00 | $50.00 |
| 48 | Backfill structure type B (210.2500) | TON | 3,350 | $26.75 | $26.75 | $40.00 | $40.00 | $40.00 | $40.00 |
| 49 | Finishing roadway (project) 0001. 1130-65-71 (213.0100) | EACH | 1 | $5,000.00 | $5,000.00 | $0.01 | $2,500.00 | $1,000.00 | $1,000.00 |
| 50 | Finishing roadway (project) 0002. 1130-65-72 (213.0100) | EACH | 1 | $5,000.00 | $5,000.00 | $0.01 | $2,500.00 | $1,000.00 | $1,000.00 |
| 51 | Finishing roadway (project) 0003. 1130-65-73 (213.0100) | EACH | 1 | $5,000.00 | $5,000.00 | $0.01 | $2,500.00 | $1,000.00 | $1,000.00 |
| 52 | Finishing roadway (project) 0004. 1130-65-74 (213.0100) | EACH | 1 | $5,000.00 | $5,000.00 | $0.01 | $2,500.00 | $1,000.00 | $1,000.00 |
| 53 | Finishing roadway (project) 0005. 1130-65-78 (213.0100) | EACH | 1 | $5,000.00 | $5,000.00 | $0.01 | $2,500.00 | $1,000.00 | $1,000.00 |
| 54 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,770 | $35.00 | $35.00 | $50.00 | $52.00 | $52.00 | $50.00 |
| 55 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 236,524 | $13.53 | $13.53 | $0.01 | $13.90 | $15.79 | $0.01 |
| 56 | Breaker run (311.0110) | TON | 260 | $45.00 | $45.00 | $40.00 | $30.00 | $30.00 | $40.00 |
| 57 | Select crushed material (312.0110) | TON | 762,637 | $15.95 | $15.95 | $0.01 | $12.80 | $12.80 | $0.01 |
| 58 | Concrete base 4-inch (320.0105) | SY | 11,186 | $53.25 | $53.25 | $53.25 | $74.24 | $74.24 | $60.00 |
| 59 | Concrete base 7 1/2-inch (320.0140) | SY | 674 | $73.25 | $73.25 | $73.25 | $97.18 | $97.18 | $98.00 |
| 60 | Removing pavement for base patching (390.0100) | CY | 300 | $60.00 | $252.10 | $250.00 | $192.10 | $192.10 | $192.10 |
| 61 | Base patching asphaltic (390.0201) | TON | 500 | $204.90 | $204.90 | $204.90 | $204.90 | $204.90 | $204.90 |
| 62 | Concrete pavement 9-inch (415.0090) | SY | 84,591 | $62.76 | $62.76 | $62.76 | $53.85 | $53.85 | $73.00 |
| 63 | Concrete pavement approach slab (415.0410) | SY | 473 | $240.00 | $240.00 | $240.00 | $257.87 | $257.87 | $240.00 |
| 64 | Drilled tie bars (416.0610) | EACH | 10,892 | $0.01 | $0.01 | $0.01 | $1.00 | $1.00 | $5.00 |
| 65 | Drilled dowel bars (416.0620) | EACH | 885 | $18.50 | $18.50 | $18.50 | $24.53 | $24.53 | $30.00 |
| 66 | Tack coat (455.0605) | GAL | 6,406 | $4.40 | $4.40 | $4.40 | $4.40 | $4.40 | $4.40 |
| 67 | Incentive density HMA pavement (460.2000) | DOL | 3,320 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 68 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 2,258 | $119.40 | $119.40 | $119.40 | $119.40 | $119.40 | $119.40 |
| 69 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 2,791 | $141.30 | $141.30 | $141.30 | $141.30 | $141.30 | $141.30 |
| 70 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 76 | $149.70 | $149.70 | $149.70 | $149.70 | $149.70 | $149.70 |
| 71 | Asphaltic surface (465.0105) | TON | 37,573 | $134.20 | $134.20 | $134.20 | $134.20 | $134.20 | $134.20 |
| 72 | Asphaltic surface temporary (465.0125) | TON | 95 | $286.70 | $286.70 | $286.70 | $286.70 | $286.70 | $286.70 |
| 73 | Cold patch (495.1000.S) | TON | 500 | $190.00 | $190.00 | $450.00 | $10.00 | $500.00 | $190.00 |
| 74 | Ice hot weather concreting (501.1000.S) | LB | 45,000 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 75 | Concrete masonry bridges (502.0100) | CY | 4,429.10 | $800.00 | $800.00 | $800.00 | $800.00 | $900.00 | $800.00 |
| 76 | Expansion device (502.3101) | LF | 115 | $350.00 | $350.00 | $350.00 | $350.00 | $300.00 | $350.00 |
| 77 | Expansion device modular (502.3111.S) | LF | 208 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,000.00 | $3,500.00 |
| 78 | Protective surface treatment (502.3200) | SY | 16,065 | $2.00 | $2.00 | $2.00 | $2.00 | $3.50 | $2.00 |
| 79 | Pigmented surface sealer (502.3210) | SY | 5,388 | $3.00 | $3.00 | $3.00 | $3.00 | $12.00 | $3.00 |
| 80 | Adhesive anchors no. 6 bar (502.4206) | EACH | 34 | $35.00 | $35.00 | $35.00 | $35.00 | $40.00 | $35.00 |
| 81 | Adhesive anchors no. 9 bar (502.4209) | EACH | 9 | $50.00 | $50.00 | $50.00 | $50.00 | $180.00 | $50.00 |
| 82 | Prestressed girder type I 54W-inch (503.0155) | LF | 8,674 | $350.00 | $350.00 | $350.00 | $350.00 | $230.00 | $350.00 |
| 83 | Concrete masonry culverts (504.0100) | CY | 22 | $800.00 | $800.00 | $800.00 | $800.00 | $3,000.00 | $800.00 |
| 84 | Concrete masonry retaining walls (504.0500) | CY | 1,170 | $800.00 | $800.00 | $800.00 | $800.00 | $900.00 | $800.00 |
| 85 | Bar steel reinforcement HS structures (505.0400) | LB | 194,790 | $1.10 | $1.10 | $1.10 | $1.10 | $1.27 | $1.10 |
| 86 | Bar steel reinforcement HS coated structures (505.0600) | LB | 2,159,010 | $1.20 | $1.20 | $1.20 | $1.20 | $1.45 | $1.20 |
| 87 | Bar steel reinforcement HS stainless structures (505.0800.S) | LB | 16,400 | $3.60 | $3.60 | $3.60 | $3.60 | $3.82 | $3.60 |
| 88 | Structural steel HS (506.0605) | LB | 4,253,000 | $3.30 | $3.30 | $3.30 | $3.30 | $2.65 | $3.30 |
| 89 | Bearing pads elastomeric non- laminated (506.2605) | EACH | 52 | $150.00 | $150.00 | $150.00 | $150.00 | $160.00 | $150.00 |
| 90 | Bearing pads elastomeric laminated (506.2610) | EACH | 16 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 91 | Welded stud shear connectors 7/8X7-inch (506.3020) | EACH | 33,243 | $4.75 | $4.75 | $4.75 | $4.75 | $7.35 | $4.75 |
| 92 | Steel diaphragms (structure) 0001. B-44-326 (506.4000) | EACH | 30 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 93 | Steel diaphragms (structure) 0002. B-44-327 (506.4000) | EACH | 80 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,400.00 | $1,000.00 |
| 94 | Steel diaphragms (structure) 0128. B-44-128 (506.4000) | EACH | 4 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $1,800.00 | $2,000.00 |
| 95 | Bearing assemblies fixed (structure) 0001. B-44-327 (506.5000) | EACH | 12 | $3,600.00 | $3,600.00 | $3,600.00 | $3,600.00 | $3,200.00 | $3,600.00 |
| 96 | Bearing assemblies expansion (structure) 0001. B-44-326 (506.6000) | EACH | 20 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $4,500.00 | $7,500.00 |
| 97 | Bearing assemblies expansion (structure) 0002. B-44-327 (506.6000) | EACH | 120 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,500.00 | $4,000.00 |
| 98 | Concrete surface repair (509.1500) | SF | 5 | $250.00 | $250.00 | $250.00 | $250.00 | $500.00 | $250.00 |
| 99 | Polymer overlay (509.5100.S) | SY | 14,398 | $36.88 | $36.88 | $36.88 | $36.88 | $36.88 | $37.00 |
| 100 | Temporary shoring (511.1100) | SF | 1,480 | $45.00 | $21.28 | $47.84 | $75.00 | $90.00 | $40.00 |
| 101 | Temporary shoring (structure) 0128. B-44-128 (511.1200) | SF | 930 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 102 | Temporary shoring (structure) 0147. C-44-147 (511.1200) | SF | 1,000 | $40.00 | $41.50 | $45.00 | $75.00 | $90.00 | $40.00 |
| 103 | Temporary shoring (structure) 0327. B-44-327 (511.1200) | SF | 4,500 | $50.00 | $50.00 | $50.00 | $50.00 | $80.00 | $50.00 |
| 104 | Railing pipe (513.2001) | LF | 43 | $350.00 | $350.00 | $350.00 | $350.00 | $350.00 | $350.00 |
| 105 | Floor drains type GC (514.0445) | EACH | 4 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 106 | Floor drains type WF (514.0450) | EACH | 7 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 | $5,500.00 |
| 107 | Floor drains type H (514.0460) | EACH | 11 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 108 | Downspout 8-inch (514.2608) | LF | 883 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 109 | Dampproofing (516.0100) | SY | 1,534 | $82.00 | $42.75 | $82.00 | $82.00 | $89.00 | $82.00 |
| 110 | Rubberized membrane waterproofing (516.0500) | SY | 150 | $25.00 | $25.00 | $28.00 | $25.00 | $70.00 | $25.00 |
| 111 | Painting epoxy system (structure) 0001. B-44-326 (517.0601) | EACH | 1 | $95,000 | $95,000 | $95,000 | $95,000 | $100,000 | $95,000 |
| 112 | Painting epoxy system (structure) 0002. B-44-327 (517.0601) | EACH | 1 | $200,000 | $200,000 | $200,000 | $200,000 | $250,000 | $200,000 |
| 113 | Concrete staining (structure) 0001. B-44-326 (517.1010.S) | SF | 39,102 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 |
| 114 | Concrete staining (structure) 0002. B-44-327 (517.1010.S) | SF | 101,315 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 |
| 115 | Concrete staining (structure) 0003. R-44-0042 (517.1010.S) | SF | 17,130 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 |
| 116 | Concrete staining (structure) 0004. R-44-0045 (517.1010.S) | SF | 7,810 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 |
| 117 | Concrete staining (structure) 0005. R-44-0047 (517.1010.S) | SF | 960 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 |
| 118 | Concrete staining (structure) 0070. R-44-0070 (517.1010.S) | SF | 762 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 |
| 119 | Concrete staining (structure) 0071. R-44-0071 (517.1010.S) | SF | 808 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 |
| 120 | Concrete staining (structure) 0127. B-44-0127 (517.1010.S) | SF | 5,425 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 |
| 121 | Concrete staining (structure) 0128. B-44-0128 (517.1010.S) | SF | 5,830 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 | $2.09 |
| 122 | Concrete collars for pipe (520.8000) | EACH | 14 | $919.29 | $919.29 | $919.29 | $800.00 | $919.29 | $750.00 |
| 123 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 250 | $115.98 | $115.98 | $115.98 | $189.00 | $115.98 | $120.00 |
| 124 | Culvert pipe reinforced concrete class III 36-inch (522.0136) | LF | 1,001 | $150.52 | $150.52 | $150.52 | $224.00 | $150.52 | $140.00 |
| 125 | Culvert pipe reinforced concrete class IV 18-inch (522.0418) | LF | 51 | $78.15 | $78.15 | $78.15 | $126.00 | $78.15 | $65.00 |
| 126 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 119 | $99.21 | $99.21 | $99.21 | $153.00 | $99.21 | $85.00 |
| 127 | Culvert pipe reinforced concrete class IV 36-inch (522.0436) | LF | 236 | $176.69 | $176.69 | $176.69 | $236.00 | $176.69 | $165.00 |
| 128 | Culvert pipe reinforced concrete class V 18-inch (522.0518) | LF | 25 | $78.04 | $78.04 | $78.04 | $103.00 | $78.04 | $70.00 |
| 129 | Culvert pipe reinforced concrete class V 24-inch (522.0524) | LF | 24 | $102.57 | $102.57 | $102.57 | $134.00 | $102.57 | $95.00 |
| 130 | Culvert pipe reinforced concrete class V 42-inch (522.0542) | LF | 34 | $239.39 | $239.39 | $239.39 | $322.00 | $239.39 | $300.00 |
| 131 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 5 | $1,143.53 | $1,143.53 | $1,143.53 | $1,148.00 | $1,143.53 | $1,500.00 |
| 132 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 57 | $1,200.38 | $1,200.38 | $1,200.38 | $1,264.00 | $1,200.38 | $1,600.00 |
| 133 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 22 | $1,420.66 | $1,420.66 | $1,420.66 | $1,443.00 | $1,420.66 | $1,700.00 |
| 134 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 7 | $1,797.89 | $1,797.89 | $1,797.89 | $1,694.00 | $1,797.89 | $2,000.00 |
| 135 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 13 | $2,529.00 | $2,529.00 | $2,529.00 | $2,265.00 | $2,529.00 | $2,500.00 |
| 136 | Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042) | EACH | 2 | $2,889.35 | $2,889.35 | $2,889.35 | $2,668.00 | $2,889.35 | $3,000.00 |
| 137 | Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048) | EACH | 5 | $3,385.69 | $3,385.69 | $3,385.69 | $2,957.00 | $3,385.69 | $3,500.00 |
| 138 | Culvert pipe reinforced concrete horizontal elliptical class HE-III 38X60-inch (522.2338) | LF | 80 | $271.83 | $271.83 | $271.83 | $333.50 | $271.83 | $300.00 |
| 139 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (522.2419) | LF | 113 | $158.38 | $158.38 | $158.38 | $201.00 | $158.38 | $150.00 |
| 140 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424) | LF | 250 | $177.77 | $177.77 | $177.77 | $206.00 | $177.77 | $180.00 |
| 141 | Culvert pipe reinforced concrete horizontal elliptical class HE-IV 34X53-inch (522.2434) | LF | 17 | $326.17 | $326.17 | $326.17 | $336.00 | $326.17 | $300.00 |
| 142 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 19X30-inch (522.2619) | EACH | 6 | $1,488.31 | $1,488.31 | $1,488.31 | $1,560.00 | $1,488.31 | $2,000.00 |
| 143 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624) | EACH | 3 | $2,216.19 | $2,216.19 | $2,216.19 | $1,968.50 | $2,216.19 | $2,200.00 |
| 144 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 34X53-inch (522.2634) | EACH | 2 | $2,780.28 | $2,780.28 | $2,780.28 | $2,708.00 | $2,780.28 | $2,900.00 |
| 145 | Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 38X60-inch (522.2638) | EACH | 2 | $3,535.33 | $3,535.33 | $3,535.33 | $3,235.00 | $3,535.33 | $3,300.00 |
| 146 | Concrete masonry ancillary structures type NS (531.1100) | CY | 212.20 | $900.00 | $900.00 | $900.00 | $900.00 | $900.00 | $900.00 |
| 147 | Steel reinforcement HS ancillary structures type NS (531.1140) | LB | 18,943 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 148 | Steel reinforcement HS coated ancillary structures type NS (531.1160) | LB | 11,900 | $4.25 | $4.25 | $4.25 | $4.25 | $4.25 | $4.25 |
| 149 | Drilling shaft 24-inch (531.2024) | LF | 201 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 150 | Drilling shaft 36-inch (531.2036) | LF | 646 | $255.00 | $250.00 | $250.00 | $251.00 | $250.00 | $275.00 |
| 151 | Drilling shaft 42-inch (531.2042) | LF | 322 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 | $275.00 |
| 152 | Drilling shaft 48-inch (531.2048) | LF | 138 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 | $325.00 |
| 153 | Drilling shaft 54-inch (531.2054) | LF | 14 | $375.00 | $375.00 | $375.00 | $375.00 | $375.00 | $375.00 |
| 154 | Foundation camera pole 50-FT (531.4050) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 155 | Foundation camera pole 80-FT (531.4080) | EACH | 1 | $8,500.00 | $8,500.00 | $8,500.00 | $8,500.00 | $8,500.00 | $8,500.00 |
| 156 | Foundation two-shaft butterfly type B-I (structure) 0380. S-44-0380 (531.5030) | EACH | 1 | $18,750 | $18,750 | $18,750 | $18,750 | $18,750 | $18,750 |
| 157 | Foundation single-shaft type TC-III (structure) 0372. S-44-0372 (531.5330) | EACH | 1 | $16,000 | $16,000 | $16,000 | $16,000 | $16,000 | $16,000 |
| 158 | Foundation single-shaft type TC-III (structure) 0375. S-44-0375 (531.5330) | EACH | 1 | $16,000 | $16,000 | $16,000 | $16,000 | $16,000 | $16,000 |
| 159 | Foundation two-shaft type FC-I (structure) 0378. S-44-0378 (531.6010) | EACH | 1 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 |
| 160 | Foundation two-shaft type FC-I (structure) 0409. S-44-0409 (531.6010) | EACH | 1 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 |
| 161 | Foundation two-shaft type FF-I (structure) 0374. S-44-0374 (531.6110) | EACH | 1 | $26,500 | $26,500 | $26,500 | $26,500 | $26,500 | $26,500 |
| 162 | Foundation two-shaft type FF-I (structure) 0376. S-44-0376 (531.6110) | EACH | 1 | $26,500 | $26,500 | $26,500 | $26,500 | $26,500 | $26,500 |
| 163 | Foundation two-shaft type FF-I (structure) 0407. S-44-0407 (531.6110) | EACH | 1 | $26,500 | $26,500 | $26,500 | $26,500 | $26,500 | $26,500 |
| 164 | Foundation two-shaft type FF-I (structure) 0408. S-44-0408 (531.6110) | EACH | 2 | $26,500 | $26,500 | $26,500 | $26,500 | $26,500 | $26,500 |
| 165 | Foundation two-shaft type FF-II (structure) 0368. S-44-0368 (531.6120) | EACH | 2 | $31,500 | $31,500 | $31,500 | $31,500 | $31,500 | $31,500 |
| 166 | Foundation two-shaft type FF-II (structure) 0405. S-44-0405 (531.6120) | EACH | 2 | $31,500 | $31,500 | $31,500 | $31,500 | $31,500 | $31,500 |
| 167 | Foundation two-shaft type FF-II (structure) 0406. S-44-0406 (531.6120) | EACH | 2 | $31,500 | $31,500 | $31,500 | $31,500 | $31,500 | $31,500 |
| 168 | Foundation two-shaft type FF-III (structure) 0365. S-44-0365 (531.6130) | EACH | 2 | $40,500 | $40,500 | $40,500 | $40,500 | $40,500 | $40,500 |
| 169 | Foundation two-shaft type FF-III (structure) 0366. S-44-0366 (531.6130) | EACH | 2 | $40,500 | $40,500 | $40,500 | $40,500 | $40,500 | $40,500 |
| 170 | Foundation two-shaft type FF-III (structure) 0379. S-44-0379 (531.6130) | EACH | 2 | $40,500 | $40,500 | $40,500 | $40,500 | $40,500 | $40,500 |
| 171 | Anchor assemblies poles on structures (531.8990) | EACH | 24 | $700.00 | $700.00 | $700.00 | $700.00 | $1,080.00 | $700.00 |
| 172 | Butterfly 2-chord type I (structure) 0380. S-44-0380 (532.5030) | EACH | 1 | $32,500 | $32,500 | $32,500 | $32,500 | $32,500 | $32,500 |
| 173 | Truss cantilever 2-chord type III (structure) 0372. S-44-0372 (532.5330) | EACH | 1 | $43,500 | $43,500 | $43,500 | $43,500 | $43,500 | $43,500 |
| 174 | Truss cantilever 2-chord type III (structure) 0375. S-44-0375 (532.5330) | EACH | 1 | $43,500 | $43,500 | $43,500 | $43,500 | $43,500 | $43,500 |
| 175 | Truss cantilever 4-chord type I (structure) 0378. S-44-0378 (532.6010) | EACH | 1 | $52,500 | $52,500 | $52,500 | $52,500 | $52,500 | $52,500 |
| 176 | Truss cantilever 4-chord type I (structure) 0409. S-44-0409 (532.6010) | EACH | 1 | $52,500 | $52,500 | $52,500 | $52,500 | $52,500 | $52,500 |
| 177 | Truss full span 4-chord type I (structure) 0374. S-44-0374 (532.6110) | EACH | 1 | $69,000 | $69,000 | $69,000 | $69,000 | $69,000 | $69,000 |
| 178 | Truss full span 4-chord type I (structure) 0376. S-44.0376 (532.6110) | EACH | 1 | $69,000 | $69,000 | $69,000 | $69,000 | $69,000 | $69,000 |
| 179 | Truss full span 4-chord type I (structure) 0407. S-44-0407 (532.6110) | EACH | 1 | $69,000 | $69,000 | $69,000 | $69,000 | $69,000 | $69,000 |
| 180 | Truss full span 4-chord type I (structure) 0408. S-44-0408 (532.6110) | EACH | 1 | $82,000 | $82,000 | $82,000 | $82,000 | $82,000 | $82,000 |
| 181 | Truss full span 4-chord type II (structure) 0368. S-44-0368 (532.6120) | EACH | 1 | $97,000 | $97,000 | $97,000 | $97,000 | $97,000 | $97,000 |
| 182 | Truss full span 4-chord type II (structure) 0379. S-44-0379 (532.6120) | EACH | 1 | $97,000 | $97,000 | $97,000 | $97,000 | $97,000 | $97,000 |
| 183 | Truss full span 4-chord type II (structure) 0405. S-44-0405 (532.6120) | EACH | 1 | $82,000 | $82,000 | $82,000 | $82,000 | $82,000 | $82,000 |
| 184 | Truss full span 4-chord type II (structure) 0406. S-44-0406 (532.6120) | EACH | 1 | $83,000 | $83,000 | $83,000 | $83,000 | $83,000 | $83,000 |
| 185 | Truss full span 4-chord type III (structure) 0365. S-44-0365 (532.6130) | EACH | 1 | $111,000 | $111,000 | $111,000 | $111,000 | $111,000 | $111,000 |
| 186 | Truss full span 4-chord type III (structure) 0366. S-44-0366 (532.6130) | EACH | 1 | $112,000 | $112,000 | $112,000 | $112,000 | $112,000 | $112,000 |
| 187 | Truss full span 4-chord type III (structure) 0377. S-44-0377 (532.6130) | EACH | 1 | $116,000 | $116,000 | $116,000 | $116,000 | $116,000 | $116,000 |
| 188 | Noise barriers double-sided sound absorptive (structure) 0017. N-44- 0017 (541.0300.S) | SF | 88,420 | $80.00 | $80.00 | $82.00 | $80.90 | $74.00 | $82.00 |
| 189 | Pile points (550.0500) | EACH | 16 | $250.00 | $250.00 | $250.00 | $250.00 | $175.00 | $250.00 |
| 190 | Piling steel HP 12-inch X 53 LB (550.1120) | LF | 1,040 | $62.00 | $62.00 | $62.00 | $62.00 | $95.00 | $62.00 |
| 191 | Piling cip concrete 14 X 0.50-inch (550.2148) | LF | 35,655 | $97.00 | $97.00 | $97.00 | $97.00 | $120.00 | $97.00 |
| 192 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 480 | $39.75 | $39.75 | $39.75 | $99.00 | $99.00 | $52.00 |
| 193 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 257 | $45.00 | $45.00 | $45.00 | $99.00 | $99.00 | $66.00 |
| 194 | Concrete sidewalk 4-inch (602.0405) | SF | 2,485 | $8.50 | $8.50 | $8.50 | $18.00 | $18.00 | $9.00 |
| 195 | Concrete surface drains (602.3010) | CY | 2 | $1,500.00 | $1,500.00 | $1,500.00 | $2,500.00 | $2,500.00 | $1,000.00 |
| 196 | Concrete rumble strips, shoulder divided roadway (602.3210) | LF | 84,010 | $0.90 | $1.10 | $0.90 | $1.10 | $1.10 | $1.10 |
| 197 | Concrete barrier single-faced 32- inch (603.0105) | LF | 765 | $120.50 | $120.50 | $120.50 | $170.75 | $170.75 | $230.00 |
| 198 | Concrete barrier type S42A (603.1242) | LF | 293 | $345.00 | $345.00 | $345.00 | $491.03 | $491.03 | $260.00 |
| 199 | Concrete barrier type S42C (603.1442) | LF | 84 | $320.00 | $320.00 | $320.00 | $510.17 | $510.17 | $320.00 |
| 200 | Concrete barrier transition type NJ32SF to S36 (603.3113) | EACH | 6 | $5,450.00 | $5,450.00 | $5,450.00 | $6,669.71 | $6,669.71 | $10,000 |
| 201 | Concrete barrier transition type S32 to S36 (603.3513) | EACH | 16 | $4,400.00 | $4,400.00 | $4,400.00 | $5,904.35 | $5,904.35 | $7,000.00 |
| 202 | Concrete barrier transition type S36 to S42 (603.3535) | EACH | 20 | $4,550.00 | $4,550.00 | $4,550.00 | $6,222.54 | $6,222.54 | $7,500.00 |
| 203 | Concrete barrier transition type S42 to S56 (603.3559) | EACH | 20 | $8,650.00 | $8,650.00 | $8,650.00 | $14,126 | $14,126 | $12,000 |
| 204 | Concrete barrier temporary precast delivered (603.8000) | LF | 245,421 | $0.01 | $0.01 | $7.50 | $0.01 | $0.01 | $7.50 |
| 205 | Concrete barrier temporary precast installed (603.8125) | LF | 246,141 | $7.00 | $7.00 | $7.00 | $7.00 | $16.00 | $7.00 |
| 206 | Anchoring concrete barrier temporary precast (603.8500) | LF | 69,448 | $5.50 | $5.50 | $5.50 | $5.50 | $7.00 | $5.50 |
| 207 | Anchoring concrete barrier temporary precast on bridge decks (603.8505) | LF | 237 | $14.00 | $14.00 | $14.00 | $14.00 | $10.00 | $14.00 |
| 208 | Slope paving concrete (604.0400) | SY | 14 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 209 | Slope paving select crushed material (604.0600) | SY | 891 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 210 | Riprap light (606.0100) | CY | 5,684 | $70.10 | $70.10 | $95.00 | $85.00 | $85.00 | $95.00 |
| 211 | Riprap medium (606.0200) | CY | 1,290 | $87.10 | $87.10 | $130.00 | $109.00 | $109.00 | $130.00 |
| 212 | Riprap heavy (606.0300) | CY | 56 | $120.00 | $120.00 | $150.00 | $100.00 | $190.00 | $150.00 |
| 213 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 613 | $58.46 | $58.46 | $58.46 | $82.00 | $58.46 | $65.00 |
| 214 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 2,510 | $80.73 | $80.73 | $80.73 | $88.00 | $80.73 | $70.00 |
| 215 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 7,080 | $93.02 | $93.02 | $93.02 | $117.00 | $93.02 | $80.00 |
| 216 | Storm sewer pipe reinforced concrete class III 30-inch (608.0330) | LF | 850 | $122.10 | $122.10 | $122.10 | $182.00 | $122.10 | $120.00 |
| 217 | Storm sewer pipe reinforced concrete class III 36-inch (608.0336) | LF | 910 | $149.52 | $149.52 | $149.52 | $230.00 | $149.52 | $170.00 |
| 218 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 56 | $73.56 | $73.56 | $73.56 | $70.00 | $73.56 | $65.00 |
| 219 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 5,687 | $78.34 | $78.34 | $78.34 | $85.00 | $78.34 | $70.00 |
| 220 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 11,666 | $95.92 | $95.92 | $95.92 | $109.00 | $95.92 | $85.00 |
| 221 | Storm sewer pipe reinforced concrete class IV 30-inch (608.0430) | LF | 1,657 | $126.19 | $126.19 | $126.19 | $144.00 | $126.19 | $130.00 |
| 222 | Storm sewer pipe reinforced concrete class IV 36-inch (608.0436) | LF | 1,151 | $165.34 | $165.34 | $165.34 | $188.00 | $165.34 | $170.00 |
| 223 | Storm sewer pipe reinforced concrete class IV 42-inch (608.0442) | LF | 500 | $200.28 | $200.28 | $200.28 | $234.00 | $200.28 | $200.00 |
| 224 | Storm sewer pipe reinforced concrete class IV 48-inch (608.0448) | LF | 516 | $246.13 | $246.13 | $246.13 | $286.00 | $246.13 | $270.00 |
| 225 | Storm sewer pipe reinforced concrete class V 24-inch (608.0524) | LF | 8 | $116.65 | $116.65 | $116.65 | $115.00 | $116.65 | $200.00 |
| 226 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 19X30-inch (608.2419) | LF | 1,026 | $147.73 | $147.73 | $147.73 | $153.00 | $147.73 | $140.00 |
| 227 | Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (608.2424) | LF | 1,208 | $174.69 | $174.69 | $174.69 | $193.50 | $174.69 | $180.00 |
| 228 | Reconstructing inlets (611.0430) | EACH | 2 | $1,991.25 | $1,991.25 | $1,991.25 | $1,600.00 | $1,991.25 | $2,000.00 |
| 229 | Manhole covers type J (611.0530) | EACH | 4 | $537.43 | $537.43 | $537.43 | $558.00 | $537.43 | $850.00 |
| 230 | Manhole covers type J-special (611.0535) | EACH | 38 | $554.85 | $554.85 | $554.85 | $578.00 | $554.85 | $850.00 |
| 231 | Inlet covers type B (611.0606) | EACH | 1 | $817.25 | $817.25 | $817.25 | $868.00 | $817.25 | $1,200.00 |
| 232 | Inlet covers type H (611.0624) | EACH | 2 | $766.00 | $766.00 | $766.00 | $822.00 | $766.00 | $1,200.00 |
| 233 | Inlet covers type MS (611.0642) | EACH | 22 | $547.72 | $547.72 | $547.72 | $570.00 | $547.72 | $850.00 |
| 234 | Inlet covers type V (611.0654) | EACH | 8 | $714.11 | $714.11 | $714.11 | $761.00 | $714.11 | $1,000.00 |
| 235 | Inlet covers type VV-B (611.0656) | EACH | 394 | $1,578.31 | $1,578.31 | $1,578.31 | $1,872.00 | $1,578.31 | $2,100.00 |
| 236 | Manholes 4-FT diameter (611.2004) | EACH | 22 | $3,599.24 | $3,599.24 | $3,599.24 | $2,954.00 | $3,599.24 | $3,000.00 |
| 237 | Manholes 5-FT diameter (611.2005) | EACH | 332 | $4,937.42 | $4,937.42 | $4,937.42 | $4,481.00 | $4,937.42 | $5,000.00 |
| 238 | Manholes 6-FT diameter (611.2006) | EACH | 24 | $6,416.18 | $6,416.18 | $6,416.18 | $5,915.00 | $6,416.18 | $6,000.00 |
| 239 | Manholes 7-FT diameter (611.2007) | EACH | 3 | $8,007.46 | $8,007.46 | $8,007.46 | $7,585.00 | $8,007.46 | $10,000 |
| 240 | Manholes 8-FT diameter (611.2008) | EACH | 4 | $12,415 | $12,415 | $12,415 | $12,542 | $12,415 | $15,000 |
| 241 | Manholes 9-FT diameter (611.2009) | EACH | 1 | $15,900 | $15,900 | $15,900 | $15,375 | $15,900 | $20,000 |
| 242 | Manholes 4X4-FT (611.2044) | EACH | 10 | $6,769.79 | $6,769.79 | $6,769.79 | $5,875.00 | $6,769.79 | $6,000.00 |
| 243 | Manholes 5X5-FT (611.2055) | EACH | 3 | $9,727.79 | $9,727.79 | $9,727.79 | $6,440.00 | $9,727.79 | $7,000.00 |
| 244 | Inlets 3-FT diameter (611.3003) | EACH | 5 | $3,285.03 | $3,285.03 | $3,285.03 | $2,492.00 | $3,285.03 | $2,000.00 |
| 245 | Inlets 4-FT diameter (611.3004) | EACH | 1 | $3,687.25 | $3,687.25 | $3,687.25 | $3,095.00 | $3,687.25 | $3,000.00 |
| 246 | Inlets 2X2.5-FT (611.3225) | EACH | 8 | $2,533.06 | $2,533.06 | $2,533.06 | $2,287.00 | $2,533.06 | $2,000.00 |
| 247 | Inlets 2X3.5-FT (611.3260) | EACH | 36 | $2,832.75 | $2,832.75 | $2,832.75 | $2,556.00 | $2,832.75 | $2,500.00 |
| 248 | Inlets median 1 grate (611.3901) | EACH | 8 | $3,261.64 | $3,261.64 | $3,261.64 | $2,621.00 | $3,261.64 | $3,000.00 |
| 249 | Inlets median 2 grate (611.3902) | EACH | 7 | $3,658.11 | $3,658.11 | $3,658.11 | $2,867.00 | $3,658.11 | $3,200.00 |
| 250 | Adjusting inlet covers (611.8115) | EACH | 3 | $520.00 | $520.00 | $520.00 | $586.00 | $520.00 | $1,500.00 |
| 251 | Cover plates temporary (611.8120.S) | EACH | 59 | $247.08 | $247.08 | $247.08 | $155.00 | $247.08 | $250.00 |
| 252 | Pipe underdrain unperforated 6- inch (612.0206) | LF | 190 | $14.65 | $14.65 | $14.87 | $19.00 | $19.00 | $15.00 |
| 253 | Pipe underdrain wrapped 6-inch (612.0406) | LF | 527 | $9.11 | $9.11 | $9.43 | $5.00 | $5.00 | $10.00 |
| 254 | Apron endwalls for underdrain reinforced concrete 6-inch (612.0806) | EACH | 1 | $426.63 | $426.63 | $426.63 | $500.00 | $426.63 | $500.00 |
| 255 | Anchor assemblies for steel plate beam guard (614.0150) | EACH | 1 | $500.00 | $500.00 | $500.00 | $500.00 | $450.00 | $500.00 |
| 256 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 649 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 257 | Crash cushions permanent (614.0800) | EACH | 9 | $30,500 | $30,500 | $30,500 | $30,500 | $30,500 | $30,500 |
| 258 | Crash cushions temporary (614.0905) | EACH | 79 | $7,000.00 | $3,850.00 | $4,150.00 | $3,850.00 | $6,500.00 | $3,850.00 |
| 259 | MGS guardrail 3 (614.2300) | LF | 462.50 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 260 | MGS thrie beam transition (614.2500) | LF | 394 | $92.00 | $92.00 | $92.00 | $92.00 | $92.00 | $92.00 |
| 261 | MGS guardrail terminal eat (614.2610) | EACH | 10 | $4,900.00 | $4,900.00 | $4,900.00 | $4,900.00 | $4,900.00 | $4,900.00 |
| 262 | Fence chain link 6-FT (616.0206) | LF | 25,431 | $30.50 | $22.20 | $22.20 | $22.20 | $22.20 | $22.20 |
| 263 | Gates chain link (width) 0001. 12- FT (616.0329) | EACH | 1 | $4,200.00 | $3,100.00 | $3,100.00 | $3,100.00 | $3,100.00 | $3,100.00 |
| 264 | Fence safety (616.0700.S) | LF | 5,000 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 265 | Maintenance and repair of haul roads (project) 0001. 1130-65-71 (618.0100) | EACH | 1 | $0.01 | $0.01 | $0.01 | $1.00 | $2,500.00 | $10,000 |
| 266 | Maintenance and repair of haul roads (project) 0002. 1130-65-72 (618.0100) | EACH | 1 | $0.01 | $0.01 | $0.01 | $1.00 | $2,500.00 | $10,000 |
| 267 | Maintenance and repair of haul roads (project) 0003. 1130-65-73 (618.0100) | EACH | 1 | $0.01 | $0.01 | $0.01 | $1.00 | $2,500.00 | $10,000 |
| 268 | Maintenance and repair of haul roads (project) 0004. 1130-65-74 (618.0100) | EACH | 1 | $0.01 | $0.01 | $0.01 | $1.00 | $2,500.00 | $10,000 |
| 269 | Maintenance and repair of haul roads (project) 0005. 1130-65-78 (618.0100) | EACH | 1 | $0.01 | $0.01 | $0.01 | $1.00 | $2,500.00 | $10,000 |
| 270 | Mobilization (619.1000) | EACH | 1 | $19,253,000 | $15,086,331 | $18,458,776 | $16,888,922 | $27,400,000 | $29,088,000 |
| 271 | Concrete median sloped nose (620.0300) | SF | 27 | $15.00 | $15.00 | $15.00 | $25.00 | $25.00 | $20.00 |
| 272 | Dust control surface treatment (623.0200) | SY | 612,952 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 273 | Water (624.0100) | MGAL | 3,374 | $30.00 | $30.00 | $100.00 | $60.00 | $60.00 | $100.00 |
| 274 | Salvaged topsoil (625.0500) | SY | 564,831 | $0.01 | $0.01 | $0.01 | $1.50 | $1.50 | $0.01 |
| 275 | Mulching (627.0200) | SY | 7,388 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 276 | Silt fence (628.1504) | LF | 18,299 | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 | $2.50 |
| 277 | Silt fence maintenance (628.1520) | LF | 83,109 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 278 | Mobilizations erosion control (628.1905) | EACH | 132 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 279 | Mobilizations emergency erosion control (628.1910) | EACH | 130 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 280 | Erosion mat class I type B (628.2004) | SY | 447,888 | $1.18 | $1.18 | $1.18 | $1.18 | $1.18 | $1.18 |
| 281 | Erosion mat urban class I type B (628.2008) | SY | 43,960 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 |
| 282 | Erosion mat class II type C (628.2027) | SY | 5,570 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 283 | Erosion mat class III type C (628.2037) | SY | 15 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 284 | Inlet protection type A (628.7005) | EACH | 570 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 285 | Inlet protection type B (628.7010) | EACH | 634 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 286 | Inlet protection type C (628.7015) | EACH | 5 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 | $125.00 |
| 287 | Temporary ditch checks (628.7504) | LF | 5,582 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 288 | Culvert pipe checks (628.7555) | EACH | 311 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 289 | Tracking pads (628.7560) | EACH | 26 | $0.01 | $0.01 | $0.01 | $1,900.00 | $1,900.00 | $0.01 |
| 290 | Rock bags (628.7570) | EACH | 608 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 291 | Fertilizer type B (629.0210) | CWT | 2,852 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 292 | Seeding mixture no. 20 (630.0120) | LB | 200 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 293 | Seeding mixture no. 30 (630.0130) | LB | 28,004 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 | $7.00 |
| 294 | Seed water (630.0500) | MGAL | 11,364 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 295 | Delineators barrier wall (633.1000) | EACH | 843 | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 |
| 296 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 1 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 297 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 48 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 298 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 16 | $160.00 | $160.00 | $160.00 | $160.00 | $160.00 | $160.00 |
| 299 | Sign supports structural steel HS (635.0200) | LB | 13,700 | $7.75 | $7.75 | $7.75 | $7.75 | $7.75 | $7.75 |
| 300 | Signs type I reflective SH (637.1220) | SF | 6,640 | $36.00 | $36.00 | $36.00 | $36.00 | $36.00 | $36.00 |
| 301 | Signs type II reflective H (637.2210) | SF | 661.50 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 | $32.00 |
| 302 | Signs type II reflective F (637.2230) | SF | 162 | $34.00 | $34.00 | $34.00 | $34.00 | $34.00 | $34.00 |
| 303 | Moving signs type II (638.2102) | EACH | 19 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 304 | Removing signs type I (638.2601) | EACH | 18 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 |
| 305 | Removing signs type II (638.2602) | EACH | 140 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 306 | Removing small sign supports (638.3000) | EACH | 176 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 307 | Removing structural steel sign supports (638.3100) | EACH | 18 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 308 | Moving small sign supports (638.4000) | EACH | 15 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 | $50.00 |
| 309 | Pond liner clay (640.1303.S) | CY | 31,375 | $7.35 | $7.35 | $25.00 | $25.00 | $25.00 | $25.00 |
| 310 | Clay cover (640.1305.S) | CY | 650 | $47.00 | $47.00 | $25.00 | $35.00 | $35.00 | $25.00 |
| 311 | Traffic control drums (643.0300) | DAY | 600,925 | $0.17 | $0.17 | $0.17 | $0.17 | $0.17 | $0.17 |
| 312 | Temporary tape rumble strip orange (643.0320.S) | LF | 1,296 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 | $12.50 |
| 313 | Traffic control barricades type III (643.0420) | DAY | 53,187 | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 | $0.60 |
| 314 | Traffic control warning lights type A (643.0705) | DAY | 106,375 | $0.15 | $0.15 | $0.15 | $0.15 | $0.15 | $0.15 |
| 315 | Traffic control warning lights type C (643.0715) | DAY | 103,997 | $0.15 | $0.15 | $0.15 | $0.15 | $0.15 | $0.15 |
| 316 | Traffic control connected arrow boards (643.0810) | DAY | 2,700 | $14.50 | $14.50 | $14.50 | $14.50 | $14.50 | $14.50 |
| 317 | Traffic control signs (643.0900) | DAY | 171,644 | $0.20 | $0.20 | $0.20 | $0.20 | $0.20 | $0.20 |
| 318 | Traffic control covering signs type I (643.0910) | EACH | 35 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 319 | Traffic control covering signs type II (643.0920) | EACH | 18 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 320 | Traffic control signs fixed message (643.1000) | SF | 1,547 | $27.50 | $27.50 | $27.50 | $27.50 | $27.50 | $27.50 |
| 321 | Traffic control signs PCMS (643.1050) | DAY | 3,601 | $15.50 | $15.50 | $15.50 | $15.50 | $15.50 | $15.50 |
| 322 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 9,040 | $2.40 | $2.40 | $2.40 | $2.40 | $2.40 | $2.40 |
| 323 | Temporary marking line paint 6- inch (643.3165) | LF | 342,056 | $0.20 | $0.20 | $0.20 | $0.20 | $0.20 | $0.20 |
| 324 | Temporary marking line epoxy 6- inch (643.3170) | LF | 219,698 | $0.54 | $0.54 | $0.54 | $0.54 | $0.54 | $0.54 |
| 325 | Temporary marking line removable tape 6-inch (643.3180) | LF | 56,053 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 | $1.85 |
| 326 | Temporary marking line paint 10- inch (643.3265) | LF | 25,520 | $0.32 | $0.32 | $0.32 | $0.32 | $0.32 | $0.32 |
| 327 | Temporary marking line epoxy 10- inch (643.3270) | LF | 22,018 | $1.65 | $1.65 | $1.65 | $1.65 | $1.65 | $1.65 |
| 328 | Temporary marking line removable tape 10-inch (643.3280) | LF | 9,257 | $3.70 | $3.70 | $3.70 | $3.70 | $3.70 | $3.70 |
| 329 | Temporary marking raised pavement marker type I (643.3760) | EACH | 963 | $6.50 | $6.50 | $6.50 | $6.50 | $6.50 | $6.50 |
| 330 | Traffic control (643.5000) | EACH | 1 | $2,595,000 | $2,595,000 | $2,595,000 | $2,595,000 | $2,595,000 | $2,595,000 |
| 331 | Geotextile type C (645.0105) | SY | 450 | $5.00 | $5.00 | $5.00 | $6.50 | $5.00 | $5.00 |
| 332 | Geotextile type DF schedule A (645.0111) | SY | 267 | $5.95 | $5.95 | $0.25 | $6.50 | $6.00 | $5.00 |
| 333 | Geotextile type HR (645.0120) | SY | 2,486 | $3.50 | $3.50 | $6.00 | $8.00 | $8.00 | $6.00 |
| 334 | Geotextile type R (645.0130) | SY | 11,089 | $2.15 | $2.15 | $3.00 | $4.00 | $4.00 | $3.00 |
| 335 | Geotextile type sas (645.0140) | SY | 68,690 | $1.90 | $1.90 | $2.50 | $3.50 | $3.50 | $2.50 |
| 336 | Marking line epoxy 6-inch (646.2020) | LF | 709 | $0.55 | $0.55 | $0.55 | $0.55 | $0.55 | $0.55 |
| 337 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 24,699 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 | $0.80 |
| 338 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 163,075 | $1.40 | $1.40 | $1.40 | $1.40 | $1.40 | $1.40 |
| 339 | Marking line epoxy 10-inch (646.4020) | LF | 708 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 | $1.25 |
| 340 | Marking line grooved black epoxy 10-inch (646.4025) | LF | 6,000 | $2.20 | $2.20 | $2.20 | $2.20 | $2.20 | $2.20 |
| 341 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 24,529 | $3.20 | $3.20 | $3.20 | $3.20 | $3.20 | $3.20 |
| 342 | Marking arrow epoxy (646.5020) | EACH | 15 | $233.20 | $233.20 | $233.20 | $233.20 | $233.20 | $233.20 |
| 343 | Marking word epoxy (646.5120) | EACH | 4 | $311.40 | $311.40 | $311.40 | $311.40 | $311.40 | $311.40 |
| 344 | Marking stop line epoxy 18-inch (646.6120) | LF | 115 | $18.95 | $18.95 | $18.95 | $18.95 | $18.95 | $18.95 |
| 345 | Marking yield line epoxy 18-inch (646.6220) | EACH | 6 | $45.50 | $45.50 | $45.50 | $45.50 | $45.50 | $45.50 |
| 346 | Marking chevron epoxy 24-inch (646.7220) | LF | 1,407 | $23.75 | $23.75 | $23.75 | $23.75 | $23.75 | $23.75 |
| 347 | Marking curb paint (646.8105) | LF | 10 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
| 348 | Marking island nose paint (646.8205) | EACH | 1 | $310.90 | $310.90 | $310.90 | $310.90 | $310.90 | $310.90 |
| 349 | Marking removal line 4-inch (646.9000) | LF | 3,934 | $0.30 | $0.30 | $0.30 | $0.30 | $0.30 | $0.30 |
| 350 | Marking removal line 6-inch (646.9002) | LF | 67,208 | $0.40 | $0.40 | $0.40 | $0.40 | $0.40 | $0.40 |
| 351 | Marking removal line 10-inch (646.9102) | LF | 424 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 352 | Marking removal special marking (646.9300) | EACH | 2 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 |
| 353 | Conduit rigid metallic 2-inch (652.0125) | LF | 226 | $475.00 | $475.00 | $475.00 | $475.00 | $475.00 | $475.00 |
| 354 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 52,656 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 355 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 8,308 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 356 | Conduit rigid nonmetallic schedule 80 2-inch (652.0325) | LF | 5 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 357 | Conduit rigid nonmetallic schedule 80 3-inch (652.0335) | LF | 990 | $17.00 | $17.00 | $17.00 | $17.00 | $17.00 | $17.00 |
| 358 | Conduit special 3-inch (652.0615) | LF | 128 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 | $45.00 |
| 359 | Install conduit into existing item (652.0700.S) | EACH | 15 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 360 | Conduit loop detector (652.0800) | LF | 204 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 | $6.00 |
| 361 | Pull boxes non-conductive 24X36- inch (653.0154) | EACH | 9 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 362 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 57 | $3,575.00 | $3,575.00 | $3,575.00 | $3,575.00 | $3,575.00 | $3,575.00 |
| 363 | Junction boxes 18X12X6-inch (653.0222) | EACH | 33 | $2,950.00 | $2,950.00 | $2,950.00 | $2,950.00 | $2,950.00 | $2,950.00 |
| 364 | Removing pull boxes (653.0905) | EACH | 8 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 365 | Concrete bases type 2 (654.0102) | EACH | 1 | $1,700.00 | $1,700.00 | $1,700.00 | $1,700.00 | $1,700.00 | $1,700.00 |
| 366 | Concrete bases type 5 (654.0105) | EACH | 11 | $1,575.00 | $1,575.00 | $1,575.00 | $1,575.00 | $1,575.00 | $1,575.00 |
| 367 | Concrete bases type 7 (654.0107) | EACH | 63 | $1,750.00 | $1,750.00 | $1,750.00 | $1,750.00 | $1,750.00 | $1,750.00 |
| 368 | Concrete control cabinet bases type L30 (654.0230) | EACH | 2 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 | $2,400.00 |
| 369 | Cable traffic signal 5-14 AWG (655.0230) | LF | 138 | $2.85 | $2.85 | $2.85 | $2.85 | $2.85 | $2.85 |
| 370 | Cable traffic signal 12-14 AWG (655.0260) | LF | 263 | $4.25 | $4.25 | $4.25 | $4.25 | $4.25 | $4.25 |
| 371 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 263 | $1.90 | $1.90 | $1.90 | $1.90 | $1.90 | $1.90 |
| 372 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 319 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 |
| 373 | Electrical wire lighting 12 AWG (655.0610) | LF | 68,443 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 | $1.50 |
| 374 | Electrical wire lighting 6 AWG (655.0625) | LF | 48,698 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 375 | Electrical wire lighting 4 AWG (655.0630) | LF | 190,037 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 | $3.50 |
| 376 | Loop detector lead in cable (655.0700) | LF | 1,032 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 377 | Loop detector wire (655.0800) | LF | 424 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 | $1.20 |
| 378 | Electrical service meter breaker pedestal (location) 0001. MB3-3 (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 |
| 379 | Electrical service meter breaker pedestal (location) 0002. MB5-1 (656.0201) | EACH | 1 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 | $1,950.00 |
| 380 | Electrical service main lugs only meter pedestal (location) 0001. CB800 (656.0401) | EACH | 1 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 |
| 381 | Electrical service main lugs only meter pedestal (location) 0002. CB900 (656.0401) | EACH | 1 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 | $1,850.00 |
| 382 | Electrical service breaker disconnect box (location) 0001. CB3-3 (656.0501) | EACH | 1 | $850.00 | $850.00 | $850.00 | $850.00 | $850.00 | $850.00 |
| 383 | Electrical service breaker disconnect box (location) 0003. CB6-1 (656.0501) | EACH | 1 | $850.00 | $850.00 | $850.00 | $850.00 | $850.00 | $850.00 |
| 384 | Transformer bases breakaway 15- 17 inch bolt circle (657.0210) | EACH | 127 | $796.00 | $796.00 | $796.00 | $796.00 | $796.00 | $796.00 |
| 385 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 9 | $695.00 | $695.00 | $695.00 | $695.00 | $695.00 | $695.00 |
| 386 | Poles type 3 (657.0310) | EACH | 1 | $4,395.00 | $4,395.00 | $4,395.00 | $4,395.00 | $4,695.00 | $4,395.00 |
| 387 | Poles type 5-aluminum (657.0322) | EACH | 34 | $1,920.00 | $1,920.00 | $1,920.00 | $1,920.00 | $1,920.00 | $1,920.00 |
| 388 | Poles type 17-aluminum (657.0337) | EACH | 128 | $3,965.00 | $3,965.00 | $3,965.00 | $3,965.00 | $3,965.00 | $3,965.00 |
| 389 | Luminaire arms single member 4 1/2-inch clamp 4-FT (657.0605) | EACH | 23 | $355.00 | $355.00 | $355.00 | $355.00 | $355.00 | $355.00 |
| 390 | Luminaire arms single member 6- inch clamp 4-FT (657.0620) | EACH | 181 | $360.00 | $360.00 | $360.00 | $360.00 | $360.00 | $360.00 |
| 391 | Luminaires utility LED B (659.1120) | EACH | 23 | $410.00 | $410.00 | $410.00 | $410.00 | $410.00 | $410.00 |
| 392 | Luminaires utility LED C (659.1125) | EACH | 181 | $430.00 | $430.00 | $430.00 | $430.00 | $430.00 | $430.00 |
| 393 | Lighting control cabinets 240/480 30-inch (659.2230) | EACH | 2 | $12,000 | $12,000 | $12,000 | $12,000 | $12,000 | $12,000 |
| 394 | Lamp, ballast, LED, switch disposal by contractor (659.5000.S) | EACH | 19 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 395 | Field system integrator (670.0101) | EACH | 1 | $39,750 | $39,750 | $39,750 | $39,750 | $39,750 | $39,750 |
| 396 | ITS documentation (670.0201) | EACH | 1 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 397 | Conduit HDPE 3-duct 2-inch (671.0132) | LF | 12,615 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 398 | Conduit HDPE 4-duct 2-inch (671.0142) | LF | 4,731 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 | $12.00 |
| 399 | Conduit HDPE directional bore 3- duct 2-inch (671.0232) | LF | 1,480 | $28.00 | $28.00 | $28.00 | $28.00 | $28.00 | $28.00 |
| 400 | Conduit HDPE directional bore 4- duct 2-inch (671.0242) | LF | 368 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 | $30.00 |
| 401 | Fiber optic cable marker (671.0300) | EACH | 39 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 402 | Communication vault type 1 (673.0105) | EACH | 17 | $2,450.00 | $2,450.00 | $2,450.00 | $2,450.00 | $2,450.00 | $2,450.00 |
| 403 | Tracer wire marker posts (673.0200) | EACH | 34 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 404 | Install pole mounted cabinet (673.1225.S) | EACH | 14 | $2,875.00 | $2,875.00 | $2,875.00 | $2,875.00 | $2,875.00 | $2,875.00 |
| 405 | Cable microwave detector (674.0200) | LF | 16,960 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 406 | Remove cable (674.0300) | LF | 20,734 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 407 | Install mounted controller microwave detector assembly (675.0300) | EACH | 13 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 | $3,400.00 |
| 408 | Install camera pole 50-FT (677.0150) | EACH | 1 | $4,325.00 | $4,325.00 | $4,325.00 | $4,325.00 | $4,325.00 | $4,325.00 |
| 409 | Install camera pole 80-FT (677.0180) | EACH | 1 | $5,825.00 | $5,825.00 | $5,825.00 | $5,825.00 | $5,825.00 | $5,825.00 |
| 410 | Install camera assembly (677.0200) | EACH | 3 | $2,705.00 | $2,705.00 | $2,705.00 | $2,705.00 | $2,705.00 | $2,705.00 |
| 411 | Removing 50-FT camera pole (677.9051.S) | EACH | 1 | $2,870.00 | $2,870.00 | $2,870.00 | $2,870.00 | $2,870.00 | $2,870.00 |
| 412 | Install fiber optic cable outdoor plant 12-CT (678.0012) | LF | 1,768 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 413 | Install fiber optic cable outdoor plant 24-CT (678.0024) | LF | 1,488 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 414 | Install fiber optic cable outdoor plant 72-CT (678.0072) | LF | 28,752 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 415 | Fiber optic splice enclosure (678.0200) | EACH | 5 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 416 | Fiber optic splice (678.0300) | EACH | 406 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 | $100.00 |
| 417 | Fiber optic termination (678.0400) | EACH | 28 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 | $300.00 |
| 418 | Communication system testing (678.0501) | EACH | 4 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 419 | Install ethernet switches (678.0600) | EACH | 4 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 420 | Install wireless antennas (678.0700) | EACH | 6 | $3,100.00 | $3,100.00 | $3,100.00 | $3,100.00 | $3,100.00 | $3,100.00 |
| 421 | Sawing asphalt (690.0150) | LF | 46,340 | $1.25 | $1.95 | $1.25 | $1.25 | $1.25 | $1.25 |
| 422 | Sawing concrete (690.0250) | LF | 4,923 | $2.50 | $2.55 | $2.50 | $2.50 | $2.50 | $2.50 |
| 423 | Incentive strength concrete structures (715.0502) | DOL | 70,798 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 424 | Incentive strength concrete barrier (715.0603) | DOL | 41,438 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 425 | Incentive flexural strength concrete pavement (715.0715) | DOL | 108,480 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 426 | Railroad flagging reimbursement (801.0117) | DOL | 50,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 427 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,100 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 428 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 5,760 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 429 | Special 0100. roadway embankment (SPV.0035) | CY | 123,188 | $0.01 | $0.01 | $20.00 | $0.01 | $0.01 | $20.00 |
| 430 | Special 1000. HPC masonry structures (SPV.0035) | CY | 6,006 | $825.00 | $825.00 | $825.00 | $825.00 | $1,050.00 | $825.00 |
| 431 | Special 1010. concrete masonry bridges special (SPV.0035) | CY | 503 | $825.00 | $825.00 | $825.00 | $825.00 | $800.00 | $825.00 |
| 432 | Special 2000. excavation, hauling, and reuse of low-level contaminated material (SPV.0035) | CY | 31,500 | $23.63 | $23.63 | $20.00 | $17.40 | $17.40 | $20.00 |
| 433 | Special 4020. lightweight foamed concrete fill grade 1 (SPV.0035) | CY | 11,103 | $106.35 | $123.00 | $115.00 | $103.00 | $103.00 | $115.00 |
| 434 | Special 4030. lightweight foamed concrete fill grade 2 (SPV.0035) | CY | 4,893 | $127.52 | $133.00 | $120.00 | $113.00 | $113.00 | $120.00 |
| 435 | Special 0100. incentive iri ride PCC surfaces (SPV.0055) | DOL | 176,400 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 436 | Special 0003. concrete barrier transition type M1 (SPV.0060) | EACH | 3 | $56,900 | $56,900 | $56,900 | $36,002 | $36,002 | $41,000 |
| 437 | Special 0004. concrete barrier transition type M2 (SPV.0060) | EACH | 2 | $32,200 | $32,200 | $32,200 | $40,136 | $40,136 | $49,000 |
| 438 | Special 0090. fire hydrant sign mounting (SPV.0060) | EACH | 2 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 | $500.00 |
| 439 | Special 0100. construction staking survey project 1130-65-71 (SPV.0060) | EACH | 1 | $189,130 | $166,281 | $189,130 | $171,000 | $189,130 | $171,000 |
| 440 | Special 0105. baseline CPM progress schedule (SPV.0060) | EACH | 1 | $5,000.00 | $1,000.00 | $0.01 | $7,500.00 | $1,500.00 | $1,000.00 |
| 441 | Special 0110. CPM progress schedule and accepted revisions (SPV.0060) | EACH | 36 | $500.00 | $100.00 | $0.01 | $250.00 | $250.00 | $100.00 |
| 442 | Special 0127. sawing concrete barrier single faced (SPV.0060) | EACH | 4 | $1,000.00 | $250.00 | $500.00 | $500.00 | $1,000.00 | $500.00 |
| 443 | Special 0140. concrete barrier transition (SPV.0060) | EACH | 8 | $16,450 | $16,450 | $16,450 | $19,463 | $19,463 | $12,000 |
| 444 | Special 0150. adjusting sanitary manhole covers (SPV.0060) | EACH | 2 | $840.00 | $840.00 | $840.00 | $1,200.00 | $840.00 | $1,500.00 |
| 445 | Special 0165. emergency response to traffic involving concrete barrier temporary (SPV.0060) | EACH | 53 | $0.01 | $1,150.00 | $1,150.00 | $1,150.00 | $750.00 | $815.00 |
| 446 | Special 0170. emergency response to traffic involving crash cushion temporary (SPV.0060) | EACH | 35 | $0.01 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 447 | Special 0200. construction staking survey project 1130-65-72 (SPV.0060) | EACH | 1 | $207,687 | $170,287 | $207,687 | $190,000 | $207,687 | $190,000 |
| 448 | Special 0210. storm sewer plug (SPV.0060) | EACH | 3 | $505.63 | $505.63 | $505.63 | $237.00 | $505.63 | $300.00 |
| 449 | Special 0215. reconnect storm sewer (SPV.0060) | EACH | 2 | $917.50 | $917.50 | $917.50 | $1,305.50 | $917.50 | $1,500.00 |
| 450 | Special 0220. pond A outlet storm sewer structure (SPV.0060) | EACH | 1 | $9,410.13 | $9,410.13 | $9,410.13 | $10,101 | $9,410.13 | $15,000 |
| 451 | Special 0225. pond BC outlet storm sewer structure (SPV.0060) | EACH | 1 | $9,538.25 | $9,538.25 | $9,538.25 | $10,248 | $9,538.25 | $15,000 |
| 452 | Special 0230. inlet covers type Y (SPV.0060) | EACH | 5 | $665.55 | $665.55 | $665.55 | $706.00 | $665.55 | $2,000.00 |
| 453 | Special 0235. fastening sewer access covers (SPV.0060) | EACH | 65 | $191.19 | $191.19 | $191.19 | $400.00 | $191.19 | $500.00 |
| 454 | Special 0240. sealing storm sewer structure (SPV.0060) | EACH | 1 | $941.60 | $941.60 | $941.60 | $3,500.00 | $941.60 | $1,500.00 |
| 455 | Special 0300. construction staking survey project 1130-65-73 (SPV.0060) | EACH | 1 | $124,848 | $116,566 | $124,848 | $115,000 | $124,848 | $115,000 |
| 456 | Special 0400. construction staking survey project 1130-65-74 (SPV.0060) | EACH | 1 | $115,066 | $99,821 | $115,067 | $98,000 | $115,066 | $98,000 |
| 457 | Special 0440. fixed message sign portable support (SPV.0060) | EACH | 20 | $525.00 | $525.00 | $525.00 | $525.00 | $525.00 | $525.00 |
| 458 | Special 0500. anchor bolt cover shroud (SPV.0060) | EACH | 17 | $525.00 | $525.00 | $525.00 | $525.00 | $525.00 | $525.00 |
| 459 | Special 0501. concrete bases type 7 tall (SPV.0060) | EACH | 77 | $3,275.00 | $3,275.00 | $3,275.00 | $3,275.00 | $3,275.00 | $3,275.00 |
| 460 | Special 0502. temporary overhead sign structure (S-04-0001-temp) (SPV.0060) | EACH | 1 | $27,000 | $27,000 | $27,000 | $27,000 | $27,000 | $27,000 |
| 461 | Special 0504. temporary overhead sign structure (S-04-0002-temp) (SPV.0060) | EACH | 1 | $27,000 | $27,000 | $27,000 | $27,000 | $27,000 | $27,000 |
| 462 | Special 0510. remove traffic signal S-44-0510 (STH SB & OO) (SPV.0060) | EACH | 1 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 | $25,000 |
| 463 | Special 0520. temporary overhead sign structure (S-04-0003-temp) (SPV.0060) | EACH | 1 | $27,000 | $27,000 | $27,000 | $27,000 | $27,000 | $27,000 |
| 464 | Special 0530. temporary overhead sign structure (S-01-0004-temp) (SPV.0060) | EACH | 1 | $27,000 | $27,000 | $27,000 | $27,000 | $27,000 | $27,000 |
| 465 | Special 0540. relocating temporary overhead sign structure (S-01- 0003-temp) (SPV.0060) | EACH | 3 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 466 | Special 0550. relocating temporary overhead sign structure (S-01- 0004-temp) (SPV.0060) | EACH | 3 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 467 | Special 0560. transporting S-01- 0001-temp to project (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 468 | Special 0570. transporting S-01- 0002-temp to project (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 469 | Special 0580. transporting S-01- 0003-temp to project (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 470 | Special 0590. transporting S-01- 0004-temp to project (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 471 | Special 0600. anr pipeline protection (SPV.0060) | EACH | 1 | $8,200.00 | $8,200.00 | $2,500.00 | $3,700.00 | $3,700.00 | $3,646.00 |
| 472 | Special 0601. transporting S-01- 0001-temp to department (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 473 | Special 0610. transporting S-01- 0002-temp to department (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 474 | Special 0620. transporting S-01- 0003-temp to department (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 475 | Special 0630. transporting S-01- 0004-temp to department (SPV.0060) | EACH | 1 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 | $7,500.00 |
| 476 | Special 0701. install ethernet extender (SPV.0060) | EACH | 22 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 | $450.00 |
| 477 | Special 0702. salvaging microwave detector equipment (SPV.0060) | EACH | 1 | $2,220.00 | $2,220.00 | $2,220.00 | $2,220.00 | $2,220.00 | $2,220.00 |
| 478 | Special 0703. salvaging wireless antennas (SPV.0060) | EACH | 3 | $2,220.00 | $2,220.00 | $2,220.00 | $2,220.00 | $2,220.00 | $2,220.00 |
| 479 | Special 0704. remove and reinstall ITS equipment (SPV.0060) | EACH | 1 | $13,000 | $13,000 | $13,000 | $13,000 | $13,000 | $13,000 |
| 480 | Special 0705. wood pole 60-FT (SPV.0060) | EACH | 1 | $5,800.00 | $5,800.00 | $5,800.00 | $5,800.00 | $5,800.00 | $5,800.00 |
| 481 | Special 0706. remove poles wood (SPV.0060) | EACH | 1 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 |
| 482 | Special 0800. construction staking survey project 1130-65-78 (SPV.0060) | EACH | 1 | $214,207 | $207,634 | $214,207 | $125,000 | $214,207 | $125,000 |
| 483 | Special 0900. precast concrete wingwalls (C-44-0146) (SPV.0060) | EACH | 4 | $0.01 | $0.01 | $0.01 | $6,900.00 | $0.01 | $7,500.00 |
| 484 | Special 0901. precast concrete wingwalls (C-44-0147) (SPV.0060) | EACH | 1 | $0.01 | $0.01 | $0.01 | $29,182 | $0.01 | $37,500 |
| 485 | Special 1000. pile dynamic analyzer (pda) testing (SPV.0060) | EACH | 64 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 | $3,000.00 | $2,000.00 |
| 486 | Special 1010. pile dynamic analyzer (pda) restrikes (SPV.0060) | EACH | 64 | $500.00 | $500.00 | $500.00 | $500.00 | $1,500.00 | $500.00 |
| 487 | Special 1020. case pile wave analysis program (capwap) evaluation (SPV.0060) | EACH | 32 | $2,200.00 | $2,200.00 | $2,200.00 | $2,200.00 | $2,000.00 | $2,200.00 |
| 488 | Special 2000. inlet markers (SPV.0060) | EACH | 409 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 489 | Special 0100. street sweeping (SPV.0075) | HRS | 1,000 | $0.01 | $150.00 | $250.00 | $125.00 | $225.00 | $300.00 |
| 490 | Special 2000. roadway debris removal (SPV.0075) | HRS | 80 | $600.00 | $350.00 | $450.00 | $150.00 | $350.00 | $350.00 |
| 491 | Special 5000. animal carcass removal (SPV.0075) | HRS | 184 | $500.00 | $350.00 | $250.00 | $75.00 | $350.00 | $350.00 |
| 492 | Special 1000. post-tensioning integral pier cap (SPV.0085) | LB | 2,460 | $35.00 | $35.00 | $35.00 | $35.00 | $56.69 | $35.00 |
| 493 | Special 0100. HMA longitudinal joint repair (SPV.0090) | LF | 7,100 | $10.40 | $10.40 | $10.40 | $10.40 | $10.40 | $10.40 |
| 494 | Special 0115. concrete barrier type S42 special (SPV.0090) | LF | 44,407 | $75.57 | $75.57 | $75.57 | $81.06 | $81.06 | $79.00 |
| 495 | Special 0120. concrete barrier type S56 special (SPV.0090) | LF | 36,443 | $76.28 | $76.28 | $76.28 | $83.93 | $83.93 | $96.00 |
| 496 | Special 0125. single slope concrete barrier retaining wall (SPV.0090) | LF | 2,005 | $391.50 | $391.50 | $391.50 | $411.31 | $411.31 | $386.00 |
| 497 | Special 0154. concrete gutter 48- inch (SPV.0090) | LF | 1,008 | $49.50 | $49.50 | $49.50 | $58.47 | $58.47 | $64.00 |
| 498 | Special 0200. slotted vane drain permanent (SPV.0090) | LF | 1,294 | $265.00 | $265.00 | $265.00 | $265.00 | $265.00 | $300.00 |
| 499 | Special 0205. slotted vane drain temporary (SPV.0090) | LF | 1,080 | $265.00 | $265.00 | $265.00 | $265.00 | $265.00 | $300.00 |
| 500 | Special 0210. cure in place liner for 36-inch pipe (SPV.0090) | LF | 359 | $467.95 | $467.95 | $340.00 | $340.00 | $293.00 | $465.00 |
| 501 | Special 0215. jack and bore storm sewer pipe reinforced concrete pipe class V 36-inch (SPV.0090) | LF | 270 | $1,725.00 | $1,725.00 | $1,725.00 | $1,615.00 | $1,725.00 | $1,700.00 |
| 502 | Special 0220. jack and bore storm sewer pipe reinforced concrete pipe class V 48-inch (SPV.0090) | LF | 418 | $1,940.00 | $1,940.00 | $1,940.00 | $1,955.00 | $1,940.00 | $2,200.00 |
| 503 | Special 0305. glare screen temporary (SPV.0090) | LF | 4,300 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 | $9.50 |
| 504 | Special 0800. abutment anchorage (SPV.0090) | LF | 43 | $120.00 | $120.00 | $500.00 | $60.00 | $240.00 | $500.00 |
| 505 | Special 0900. precast concrete box culvert 8 FT X 4 FT (SPV.0090) | LF | 198 | $1,329.42 | $1,329.42 | $1,329.42 | $965.30 | $1,329.42 | $1,000.00 |
| 506 | Special 0910. precast concrete box culvert, 9FT X 5FT (SPV.0090) | LF | 200 | $1,665.00 | $1,665.00 | $1,665.00 | $1,063.20 | $1,665.00 | $1,350.00 |
| 507 | Special 1010. pile wrapping (SPV.0090) | LF | 325 | $12.00 | $12.00 | $12.00 | $12.00 | $20.00 | $12.00 |
| 508 | Special 1020. piling cip concrete 14 X 0.50-inch special (SPV.0090) | LF | 22,310 | $97.00 | $97.00 | $97.00 | $97.00 | $122.00 | $97.00 |
| 509 | Special 2000. pipe underdrain 6- inch special (SPV.0090) | LF | 49,732 | $4.90 | $4.90 | $15.00 | $15.40 | $15.40 | $15.00 |
| 510 | Special 0042. wall concrete panel mechanically stabilized earth (R-44- 0042) (SPV.0165) | SF | 2,945 | $108.77 | $108.77 | $110.00 | $103.00 | $103.00 | $110.00 |
| 511 | Special 0142. wall concrete panel mechanically stabilized earth, LFCF (R-44-0042) (SPV.0165) | SF | 12,610 | $120.68 | $120.68 | $120.00 | $157.00 | $158.36 | $120.00 |
| 512 | Special 0145. wall concrete panel mechanically stabilized earth, LFCF (R-44-0045) (SPV.0165) | SF | 6,555 | $110.80 | $110.80 | $90.00 | $157.00 | $157.00 | $90.00 |
| 513 | Special 0147. wall concrete panel mechanically stabilized earth, LFCF (R-44-0047) (SPV.0165) | SF | 940 | $207.45 | $207.45 | $100.00 | $157.00 | $157.00 | $100.00 |
| 514 | Special 1000. longitudinal grooving bridge deck (SPV.0165) | SF | 132,290 | $0.63 | $0.54 | $0.54 | $0.54 | $0.54 | $0.54 |
| 515 | Special 0100. concrete pavement 10 1/2-inch special (SPV.0180) | SY | 276,488 | $62.70 | $62.70 | $62.70 | $56.32 | $56.32 | $66.33 |
| 516 | Special 0127. methacrylate flood seal (SPV.0180) | SY | 1,911 | $21.35 | $21.35 | $21.35 | $21.35 | $21.35 | $21.50 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of July 14, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.