WisDOT contract 20260113017 bid tabulation
STH 35 - CTH Sn (CTH Ot); STH 35 to CTH Sn (CTH OT, La Crosse County STH 35 - CTH SN (CTH OT)). Let by Wisconsin DOT on January 13, 2026, La Crosse. 6 bids received; low bid $2,626,797 by Gerke Excavating Inc.
- Owner
- Wisconsin DOT
- Letting
- 13 JAN 2026
- Pay items
- 169
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Gerke Excavating Inc | $2,626,797 | Low |
| 2 | Chippewa Concrete Services, Inc. | $2,669,469 | +2.0% |
| 3 | McCabe Construction, Inc. | $2,691,200 | +2.0% |
| 4 | Integrity Grading and Excavating, Inc. | $2,864,256 | +9.0% |
| 5 | Pember Companies, Inc. | $2,996,181 | +14% |
| 6 | A-1 Excavating LLC | $3,198,060 | +22% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Gerke Excavating Inc | 2. Chippewa Concrete Services, Inc. | 3. McCabe Construction, Inc. | 4. Integrity Grading and Excavating, Inc. | 5. Pember Companies, Inc. | 6. A-1 Excavating LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0105) | STA | 13 | $514.98 | $547.36 | $1,114.15 | $1,061.17 | $1,125.00 | $300.00 |
| 2 | Grubbing (201.0205) | STA | 13 | $499.69 | $531.10 | $263.02 | $250.51 | $265.00 | $1,100.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 424 | $4.27 | $4.54 | $10.64 | $15.08 | $10.60 | $10.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 694 | $1.90 | $2.01 | $7.83 | $3.34 | $6.20 | $7.00 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 278 | $17.75 | $18.20 | $17.17 | $35.97 | $19.25 | $32.00 |
| 6 | Removing curb & gutter (204.0150) | LF | 5,061 | $1.78 | $1.89 | $3.24 | $6.53 | $4.60 | $5.00 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 36 | $5.76 | $6.12 | $28.57 | $17.20 | $21.00 | $21.00 |
| 8 | Removing guardrail (204.0165) | LF | 290 | $3.85 | $3.93 | $4.04 | $3.85 | $4.10 | $4.00 |
| 9 | Removing surface drains (204.0190) | EACH | 2 | $110.66 | $117.60 | $404.46 | $1,313.76 | $150.00 | $1,700.00 |
| 10 | Removing manholes (204.0210) | EACH | 6 | $323.61 | $343.95 | $954.91 | $1,313.76 | $685.00 | $1,300.00 |
| 11 | Removing inlets (204.0220) | EACH | 15 | $323.78 | $344.14 | $477.45 | $1,313.75 | $550.00 | $1,200.00 |
| 12 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 507 | $16.73 | $17.78 | $16.69 | $43.80 | $13.40 | $24.00 |
| 13 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 39 | $16.73 | $17.78 | $18.15 | $43.80 | $17.85 | $29.00 |
| 14 | Removing storm sewer (size) 03. 18-inch (204.0245) | LF | 388 | $16.81 | $17.87 | $19.53 | $43.80 | $19.30 | $27.00 |
| 15 | Removing storm sewer (size) 04. 24-inch (204.0245) | LF | 250 | $16.96 | $18.03 | $22.95 | $43.80 | $25.45 | $31.00 |
| 16 | Excavation common (205.0100) | CY | 10,384 | $16.92 | $17.99 | $15.60 | $21.70 | $20.60 | $23.00 |
| 17 | Prepare foundation for asphaltic paving (project) 01. 5991-08-11 (211.0101) | EACH | 1 | $20,176 | $21,444 | $36,147 | $12,000 | $70,000 | $30,000 |
| 18 | Finishing roadway (project) 01. 5991-08-11 (213.0100) | EACH | 1 | $4,000.00 | $5,110.00 | $3,130.59 | $500.00 | $500.00 | $1,000.00 |
| 19 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 11,580 | $15.35 | $15.99 | $18.06 | $20.49 | $21.00 | $24.00 |
| 20 | Coloring concrete wisdot red (405.0100) | CY | 121 | $98.51 | $84.83 | $104.46 | $98.51 | $105.50 | $104.00 |
| 21 | Concrete pavement 7 1/2-inch (415.0075) | SY | 2,775 | $74.90 | $77.19 | $79.43 | $74.90 | $84.80 | $82.00 |
| 22 | Concrete truck apron 12-inch (415.2010) | SY | 361 | $98.81 | $83.15 | $104.78 | $98.81 | $113.00 | $115.00 |
| 23 | Drilled tie bars (416.0610) | EACH | 263 | $15.58 | $16.38 | $16.52 | $15.58 | $6.00 | $17.00 |
| 24 | Drilled dowel bars (416.0620) | EACH | 105 | $19.30 | $20.02 | $20.47 | $19.30 | $11.00 | $21.00 |
| 25 | Tack coat (455.0605) | GAL | 1,641 | $4.92 | $5.03 | $5.17 | $4.92 | $5.20 | $5.00 |
| 26 | Incentive density HMA pavement (460.2000) | DOL | 3,650 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 27 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 2,042 | $100.07 | $102.27 | $105.07 | $100.07 | $106.80 | $110.00 |
| 28 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 3,659 | $102.18 | $104.43 | $107.28 | $102.18 | $108.40 | $110.00 |
| 29 | Asphaltic surface (465.0105) | TON | 9 | $280.98 | $287.16 | $295.01 | $280.98 | $298.00 | $495.00 |
| 30 | Asphaltic surface driveways and field entrances (465.0120) | TON | 2 | $983.75 | $1,005.39 | $1,032.87 | $983.75 | $1,045.00 | $1,828.00 |
| 31 | Asphaltic surface temporary (465.0125) | TON | 382 | $126.53 | $129.31 | $132.85 | $126.53 | $134.20 | $144.00 |
| 32 | Asphaltic flumes (465.0315) | SY | 8 | $255.15 | $260.76 | $267.89 | $255.15 | $270.60 | $424.00 |
| 33 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 2 | $733.73 | $769.00 | $422.20 | $884.96 | $505.00 | $760.00 |
| 34 | Concrete collars for pipe (520.8000) | EACH | 3 | $1,318.16 | $1,385.30 | $1,665.29 | $307.55 | $1,980.00 | $1,800.00 |
| 35 | Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048) | EACH | 2 | $4,497.09 | $4,634.20 | $4,011.79 | $4,188.37 | $5,000.00 | $5,600.00 |
| 36 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 242 | $35.17 | $28.13 | $37.30 | $35.17 | $45.60 | $45.00 |
| 37 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 1,347 | $22.51 | $24.17 | $23.87 | $22.51 | $23.20 | $25.00 |
| 38 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 2,295 | $22.51 | $24.17 | $23.87 | $22.51 | $21.10 | $25.00 |
| 39 | Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415) | LF | 3,565 | $22.51 | $25.15 | $23.87 | $22.51 | $21.10 | $25.00 |
| 40 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 73 | $49.69 | $36.24 | $52.69 | $49.69 | $51.00 | $60.00 |
| 41 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 289 | $38.48 | $27.14 | $40.81 | $38.48 | $40.00 | $45.00 |
| 42 | Concrete curb & gutter 4-inch sloped 30-inch type TBT (601.0584) | LF | 320 | $49.69 | $34.08 | $52.69 | $49.69 | $48.50 | $57.00 |
| 43 | Concrete sidewalk 4-inch (602.0405) | SF | 3,569 | $6.28 | $8.78 | $6.66 | $6.28 | $6.40 | $8.00 |
| 44 | Concrete driveway 6-inch (602.0810) | SY | 12 | $107.91 | $258.74 | $114.43 | $107.91 | $83.00 | $150.00 |
| 45 | Concrete surface drains (602.3010) | CY | 0.70 | $1,931.24 | $2,915.77 | $2,047.94 | $1,931.24 | $1,100.00 | $2,500.00 |
| 46 | Riprap light (606.0100) | CY | 6 | $110.56 | $116.45 | $85.50 | $339.74 | $131.00 | $175.00 |
| 47 | Riprap heavy (606.0300) | CY | 11 | $146.27 | $153.26 | $88.28 | $205.58 | $129.20 | $145.00 |
| 48 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 54 | $71.60 | $74.61 | $70.36 | $80.00 | $114.00 | $108.00 |
| 49 | Storm sewer pipe reinforced concrete class III 48-inch (608.0348) | LF | 45 | $306.31 | $314.82 | $310.33 | $305.00 | $400.00 | $365.00 |
| 50 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 44 | $76.74 | $80.18 | $71.43 | $80.00 | $104.20 | $96.00 |
| 51 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 91 | $70.79 | $73.64 | $72.27 | $82.00 | $89.40 | $102.00 |
| 52 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 164 | $101.36 | $104.88 | $102.91 | $110.00 | $108.25 | $127.00 |
| 53 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 419 | $47.17 | $49.53 | $43.01 | $51.00 | $56.80 | $53.00 |
| 54 | Storm sewer pipe class III-A 15- inch (608.3015) | LF | 66 | $54.84 | $57.39 | $44.11 | $55.00 | $74.80 | $76.00 |
| 55 | Storm sewer pipe class III-A 18- inch (608.3018) | LF | 411 | $56.47 | $59.06 | $51.48 | $57.00 | $60.00 | $59.00 |
| 56 | Storm sewer pipe class III-A 24- inch (608.3024) | LF | 255 | $67.42 | $70.26 | $66.78 | $65.00 | $87.60 | $69.00 |
| 57 | Reconstructing inlets (611.0430) | EACH | 5 | $1,165.51 | $1,210.23 | $1,243.29 | $965.06 | $630.00 | $1,600.00 |
| 58 | Manhole covers type J (611.0530) | EACH | 2 | $781.31 | $811.34 | $797.73 | $734.78 | $1,085.00 | $1,300.00 |
| 59 | Inlet covers type BW (611.0610) | EACH | 2 | $1,198.27 | $1,237.46 | $1,035.17 | $1,115.61 | $1,170.00 | $1,700.00 |
| 60 | Inlet covers type H (611.0624) | EACH | 18 | $1,051.41 | $1,087.25 | $908.32 | $983.73 | $1,030.00 | $1,600.00 |
| 61 | Inlet covers type HM (611.0627) | EACH | 2 | $1,080.46 | $1,117.06 | $931.66 | $998.50 | $1,060.00 | $1,600.00 |
| 62 | Inlet covers type HM-GJ (611.0630) | EACH | 7 | $1,177.23 | $1,215.84 | $1,018.93 | $998.50 | $1,150.00 | $1,700.00 |
| 63 | Inlet covers type T (611.0652) | EACH | 2 | $1,344.95 | $1,387.38 | $1,164.05 | $1,249.58 | $1,310.00 | $1,900.00 |
| 64 | Manholes 4-FT diameter (611.2004) | EACH | 1 | $4,426.93 | $4,572.63 | $3,699.73 | $5,294.55 | $5,800.00 | $4,800.00 |
| 65 | Manholes 5-FT diameter (611.2005) | EACH | 2 | $5,109.19 | $5,260.16 | $5,391.02 | $6,159.72 | $5,385.00 | $6,400.00 |
| 66 | Manholes 7-FT diameter (611.2007) | EACH | 1 | $11,742 | $12,048 | $12,476 | $13,714 | $12,505 | $14,000 |
| 67 | Inlets 4-FT diameter (611.3004) | EACH | 16 | $3,574.85 | $3,692.03 | $2,951.43 | $4,527.31 | $3,650.00 | $3,900.00 |
| 68 | Inlets 2X2.5-FT (611.3225) | EACH | 1 | $2,391.28 | $2,482.54 | $1,833.17 | $3,231.84 | $2,030.00 | $2,800.00 |
| 69 | Inlets 2X3-FT (611.3230) | EACH | 12 | $2,713.72 | $2,811.90 | $2,210.26 | $3,530.50 | $2,870.00 | $3,100.00 |
| 70 | Cover plates temporary (611.8120.S) | EACH | 10 | $339.73 | $359.91 | $181.66 | $357.54 | $180.00 | $400.00 |
| 71 | MGS guardrail temporary thrie beam transition (614.1100) | LF | 78 | $65.00 | $66.43 | $68.25 | $65.00 | $68.90 | $69.00 |
| 72 | MGS guardrail temporary terminal eat (614.1200) | EACH | 2 | $2,653.00 | $2,711.37 | $2,785.46 | $2,653.00 | $2,815.00 | $3,430.00 |
| 73 | MGS thrie beam transition (614.2500) | LF | 156 | $90.00 | $91.98 | $94.49 | $90.00 | $95.50 | $95.00 |
| 74 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $3,433.00 | $3,508.53 | $3,604.41 | $3,433.00 | $3,640.00 | $4,260.00 |
| 75 | Mobilization (619.1000) | EACH | 1 | $164,986 | $129,737 | $105,635 | $126,000 | $163,060 | $220,000 |
| 76 | Concrete median sloped nose (620.0300) | SF | 930 | $14.10 | $14.06 | $14.95 | $14.10 | $13.00 | $15.00 |
| 77 | Water (624.0100) | MGAL | 231 | $27.46 | $28.60 | $45.31 | $52.14 | $76.00 | $20.00 |
| 78 | Topsoil (625.0100) | SY | 17,028 | $4.56 | $4.74 | $4.61 | $5.28 | $6.45 | $5.00 |
| 79 | Silt fence (628.1504) | LF | 4,175 | $1.75 | $1.79 | $1.84 | $1.75 | $1.86 | $2.00 |
| 80 | Silt fence maintenance (628.1520) | LF | 4,175 | $0.03 | $0.03 | $0.03 | $0.03 | $0.03 | $0.04 |
| 81 | Mobilizations erosion control (628.1905) | EACH | 3 | $233.00 | $238.13 | $244.63 | $233.00 | $250.00 | $250.00 |
| 82 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $401.00 | $409.82 | $421.02 | $401.00 | $425.00 | $425.00 |
| 83 | Erosion mat urban class I type A (628.2006) | SY | 13,730 | $1.75 | $1.79 | $1.84 | $1.75 | $1.85 | $2.00 |
| 84 | Erosion mat class II type B (628.2023) | SY | 130 | $6.00 | $6.13 | $6.30 | $6.00 | $6.35 | $7.00 |
| 85 | Inlet protection type A (628.7005) | EACH | 44 | $103.00 | $105.27 | $108.14 | $103.00 | $110.00 | $110.00 |
| 86 | Inlet protection type B (628.7010) | EACH | 6 | $70.00 | $71.54 | $73.50 | $70.00 | $74.25 | $74.00 |
| 87 | Inlet protection type C (628.7015) | EACH | 77 | $50.00 | $51.10 | $52.50 | $50.00 | $53.00 | $53.00 |
| 88 | Inlet protection type D (628.7020) | EACH | 11 | $175.00 | $178.85 | $183.74 | $175.00 | $185.00 | $185.00 |
| 89 | Temporary ditch checks (628.7504) | LF | 24 | $15.00 | $15.33 | $15.75 | $15.00 | $15.90 | $16.00 |
| 90 | Culvert pipe checks (628.7555) | EACH | 4 | $35.00 | $35.77 | $36.75 | $35.00 | $37.15 | $37.00 |
| 91 | Fertilizer type B (629.0210) | CWT | 10.70 | $115.00 | $117.53 | $120.74 | $115.00 | $122.00 | $122.00 |
| 92 | Seeding mixture no. 20 (630.0120) | LB | 459.40 | $7.75 | $7.92 | $8.14 | $7.75 | $8.20 | $8.00 |
| 93 | Seeding mixture no. 40 (630.0140) | LB | 95.40 | $12.50 | $12.78 | $13.12 | $12.50 | $13.25 | $13.00 |
| 94 | Seeding temporary (630.0200) | LB | 312 | $5.25 | $5.37 | $5.51 | $5.25 | $5.60 | $5.50 |
| 95 | Seed water (630.0500) | MGAL | 309 | $1.00 | $1.02 | $1.05 | $1.00 | $1.05 | $1.00 |
| 96 | Sod water (631.0300) | MGAL | 85 | $50.00 | $51.10 | $52.50 | $50.00 | $53.00 | $53.00 |
| 97 | Sod lawn (631.1000) | SY | 3,720 | $7.33 | $7.49 | $7.70 | $7.33 | $7.80 | $8.00 |
| 98 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 24 | $92.00 | $94.02 | $96.59 | $92.00 | $97.60 | $98.00 |
| 99 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 5 | $98.00 | $100.16 | $102.89 | $98.00 | $104.00 | $102.00 |
| 100 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 2 | $115.00 | $117.53 | $120.74 | $115.00 | $122.00 | $122.00 |
| 101 | Signs type II reflective H (637.2210) | SF | 170.17 | $20.00 | $20.44 | $21.00 | $20.00 | $21.20 | $22.00 |
| 102 | Signs type II reflective F (637.2230) | SF | 34 | $25.00 | $25.55 | $26.25 | $25.00 | $26.50 | $27.00 |
| 103 | Moving signs type II (638.2102) | EACH | 29 | $75.00 | $76.65 | $78.74 | $75.00 | $79.55 | $80.00 |
| 104 | Removing signs type II (638.2602) | EACH | 8 | $35.00 | $35.77 | $36.75 | $35.00 | $37.10 | $37.00 |
| 105 | Removing small sign supports (638.3000) | EACH | 9 | $35.00 | $35.77 | $36.75 | $35.00 | $37.10 | $37.00 |
| 106 | Moving small sign supports (638.4000) | EACH | 32 | $75.00 | $76.65 | $78.74 | $75.00 | $79.55 | $80.00 |
| 107 | Field office type C (642.5201) | EACH | 1 | $7,507.50 | $7,665.00 | $9,000.00 | $20,000 | $10,500 | $10,000 |
| 108 | Traffic control drums (643.0300) | DAY | 52,767 | $0.13 | $0.13 | $0.14 | $0.13 | $0.15 | $0.13 |
| 109 | Traffic control barricades type III (643.0420) | DAY | 7,575 | $0.40 | $0.41 | $0.42 | $0.40 | $0.40 | $0.42 |
| 110 | Traffic control warning lights type A (643.0705) | DAY | 4,360 | $0.10 | $0.10 | $0.11 | $0.10 | $0.10 | $0.11 |
| 111 | Traffic control warning lights type C (643.0715) | DAY | 6,840 | $0.10 | $0.10 | $0.11 | $0.10 | $0.10 | $0.11 |
| 112 | Traffic control signs (643.0900) | DAY | 23,740 | $0.25 | $0.26 | $0.27 | $0.25 | $0.30 | $0.27 |
| 113 | Traffic control covering signs type II (643.0920) | EACH | 10 | $110.00 | $112.42 | $116.65 | $110.00 | $115.00 | $117.00 |
| 114 | Traffic control signs PCMS (643.1050) | DAY | 21 | $45.00 | $45.99 | $47.72 | $45.00 | $48.00 | $48.00 |
| 115 | Temporary marking line paint 6- inch (643.3165) | LF | 9,974 | $0.15 | $0.15 | $0.16 | $0.15 | $0.15 | $0.16 |
| 116 | Temporary marking line removable tape 6-inch (643.3180) | LF | 12,949 | $2.10 | $2.15 | $2.23 | $2.10 | $2.25 | $2.23 |
| 117 | Temporary marking line removable tape 10-inch (643.3280) | LF | 113 | $4.15 | $4.24 | $4.40 | $4.15 | $4.40 | $4.40 |
| 118 | Temporary marking stop line paint 18-inch (643.3805) | LF | 60 | $4.50 | $4.60 | $4.77 | $4.50 | $4.80 | $5.00 |
| 119 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 124 | $6.00 | $6.13 | $6.36 | $6.00 | $6.35 | $7.00 |
| 120 | Traffic control (643.5000) | EACH | 1 | $39,000 | $39,858 | $41,357 | $39,000 | $63,000 | $70,000 |
| 121 | Geotextile type HR (645.0120) | SY | 33 | $55.88 | $58.27 | $9.00 | $10.39 | $5.50 | $18.00 |
| 122 | Geotextile type R (645.0130) | SY | 24 | $61.42 | $64.37 | $11.00 | $9.67 | $5.00 | $20.00 |
| 123 | Marking line epoxy 6-inch (646.2020) | LF | 15,134 | $0.60 | $0.61 | $0.64 | $0.60 | $0.65 | $0.64 |
| 124 | Marking line epoxy 10-inch (646.4020) | LF | 1,182 | $1.33 | $1.36 | $1.41 | $1.33 | $1.40 | $1.41 |
| 125 | Marking arrow epoxy (646.5020) | EACH | 20 | $475.00 | $485.45 | $503.70 | $475.00 | $505.00 | $504.00 |
| 126 | Marking word epoxy (646.5120) | EACH | 2 | $481.00 | $491.58 | $510.07 | $481.00 | $510.00 | $510.00 |
| 127 | Marking stop line epoxy 18-inch (646.6120) | LF | 59 | $20.00 | $20.44 | $21.21 | $20.00 | $21.20 | $21.00 |
| 128 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 80 | $20.00 | $20.44 | $21.21 | $20.00 | $21.20 | $21.00 |
| 129 | Marking diagonal epoxy 12-inch (646.7120) | LF | 511 | $19.50 | $19.93 | $20.68 | $19.50 | $20.70 | $21.00 |
| 130 | Marking curb epoxy (646.8120) | LF | 210 | $9.50 | $9.71 | $10.07 | $9.50 | $10.10 | $10.00 |
| 131 | Marking island nose epoxy (646.8220) | EACH | 10 | $358.00 | $365.88 | $379.63 | $358.00 | $380.00 | $380.00 |
| 132 | Marking removal line 4-inch (646.9000) | LF | 7,237 | $0.20 | $0.20 | $0.21 | $0.20 | $0.20 | $0.21 |
| 133 | Marking removal line 8-inch (646.9100) | LF | 740 | $0.80 | $0.82 | $0.85 | $0.80 | $0.90 | $0.85 |
| 134 | Marking removal line wide (646.9200) | LF | 58 | $3.50 | $3.58 | $3.71 | $3.50 | $3.70 | $4.00 |
| 135 | Marking removal special marking (646.9300) | EACH | 15 | $80.00 | $81.76 | $84.83 | $80.00 | $85.00 | $85.00 |
| 136 | Construction staking storm sewer (650.4000) | EACH | 38 | $130.00 | $112.42 | $136.49 | $47.37 | $115.00 | $117.00 |
| 137 | Construction staking subgrade (650.4500) | LF | 2,773 | $1.00 | $0.05 | $0.01 | $0.88 | $0.05 | $0.05 |
| 138 | Construction staking base (650.5000) | LF | 3,287 | $1.10 | $1.02 | $1.15 | $0.74 | $1.05 | $1.10 |
| 139 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 6,213 | $0.85 | $1.28 | $0.89 | $0.61 | $1.35 | $1.30 |
| 140 | Construction staking structure layout (structure) 01. wall modular block gravity landscape (sta 31+30) (650.6501) | EACH | 1 | $950.00 | $1,584.10 | $997.43 | $1,900.00 | $1,645.00 | $1,700.00 |
| 141 | Construction staking concrete pavement (650.7000) | LF | 774 | $4.00 | $1.48 | $4.20 | $2.33 | $1.55 | $1.55 |
| 142 | Construction staking electrical installations (project) 01. 5991-08- 11 (650.8501) | EACH | 1 | $1,200.00 | $2,120.65 | $1,259.91 | $1,200.00 | $2,200.00 | $2,200.00 |
| 143 | Construction staking supplemental control (project) 01. 5991-08-11 (650.9911) | EACH | 1 | $1,300.00 | $1,022.00 | $2,047.36 | $1,500.00 | $1,060.00 | $1,060.00 |
| 144 | Construction staking slope stakes (650.9920) | LF | 2,773 | $1.10 | $1.02 | $1.15 | $0.40 | $1.05 | $1.10 |
| 145 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 986 | $9.89 | $10.11 | $10.38 | $9.00 | $10.50 | $10.00 |
| 146 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 63 | $16.60 | $16.97 | $17.43 | $10.00 | $17.60 | $11.00 |
| 147 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 9 | $2,231.98 | $2,281.08 | $2,343.42 | $2,550.00 | $2,365.00 | $2,700.00 |
| 148 | Concrete bases type 5 (654.0105) | EACH | 10 | $985.24 | $1,006.92 | $1,034.43 | $1,350.00 | $1,045.00 | $1,500.00 |
| 149 | Concrete control cabinet bases type L24 (654.0224) | EACH | 1 | $1,920.00 | $1,962.29 | $2,015.92 | $1,900.00 | $2,035.00 | $2,700.00 |
| 150 | Electrical wire lighting 12 AWG (655.0610) | LF | 1,620 | $1.35 | $1.38 | $1.42 | $1.75 | $1.45 | $2.00 |
| 151 | Electrical wire lighting 10 AWG (655.0615) | LF | 4,500 | $1.45 | $1.48 | $1.52 | $2.10 | $1.55 | $2.20 |
| 152 | Electrical service meter breaker pedestal (location) 01. LCC B (656.0201) | EACH | 1 | $2,990.18 | $3,055.96 | $3,139.48 | $2,500.00 | $3,170.00 | $3,300.00 |
| 153 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 10 | $877.06 | $896.36 | $920.85 | $800.00 | $930.00 | $1,100.00 |
| 154 | Poles type 5-aluminum (657.0322) | EACH | 10 | $2,292.49 | $2,342.92 | $2,406.95 | $2,400.00 | $2,430.00 | $2,600.00 |
| 155 | Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615) | EACH | 10 | $595.36 | $608.46 | $625.09 | $400.00 | $630.00 | $440.00 |
| 156 | Luminaires utility LED A (659.1115) | EACH | 10 | $507.08 | $518.24 | $532.40 | $400.00 | $540.00 | $440.00 |
| 157 | Lighting control cabinets 120/240 24-inch (659.2124) | EACH | 1 | $8,425.23 | $8,610.59 | $8,845.89 | $8,500.00 | $8,935.00 | $9,700.00 |
| 158 | Sawing asphalt (690.0150) | LF | 3,407 | $1.49 | $1.89 | $1.94 | $1.85 | $1.85 | $2.00 |
| 159 | Sawing concrete (690.0250) | LF | 603 | $2.65 | $3.03 | $3.11 | $2.96 | $3.05 | $3.00 |
| 160 | Incentive iri ride (740.0440) | DOL | 2,500 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 161 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 162 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 163 | Special 01. salvage and reinstall lighting unit (SPV.0060) | EACH | 1 | $3,986.91 | $4,074.62 | $4,185.97 | $2,350.00 | $4,230.00 | $3,100.00 |
| 164 | Special 02. connect to existing storm sewer (SPV.0060) | EACH | 1 | $1,176.96 | $1,241.51 | $1,243.29 | $7,882.56 | $1,065.00 | $2,600.00 |
| 165 | Special 03. abandon temporary pipe (SPV.0060) | EACH | 2 | $1,578.93 | $1,652.24 | $2,644.83 | $7,199.33 | $5,030.00 | $5,400.00 |
| 166 | Special 04. temporary storm sewer plug (SPV.0060) | EACH | 2 | $1,062.65 | $1,124.60 | $566.39 | $4,049.93 | $215.00 | $1,600.00 |
| 167 | Special 05. temporary inlet cover (SPV.0060) | EACH | 3 | $1,200.05 | $1,239.34 | $729.71 | $1,423.15 | $210.00 | $1,700.00 |
| 168 | Special 01. temporary pipe 12-inch (SPV.0090) | LF | 102 | $44.26 | $46.51 | $42.86 | $52.19 | $59.00 | $80.00 |
| 169 | Special 01. wall modular block gravity landscape (sta 31+30 LT) (SPV.0165) | SF | 445 | $120.94 | $123.85 | $126.68 | $131.65 | $131.00 | $142.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.