WisDOT contract 20260113017 bid tabulation

STH 35 - CTH Sn (CTH Ot); STH 35 to CTH Sn (CTH OT, La Crosse County STH 35 - CTH SN (CTH OT)). Let by Wisconsin DOT on January 13, 2026, La Crosse. 6 bids received; low bid $2,626,797 by Gerke Excavating Inc.

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
169
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Gerke Excavating Inc$2,626,797Low
2Chippewa Concrete Services, Inc.$2,669,469+2.0%
3McCabe Construction, Inc.$2,691,200+2.0%
4Integrity Grading and Excavating, Inc.$2,864,256+9.0%
5Pember Companies, Inc.$2,996,181+14%
6A-1 Excavating LLC$3,198,060+22%
WisDOT contract 20260113017: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Gerke Excavating Inc2. Chippewa Concrete Services, Inc.3. McCabe Construction, Inc.4. Integrity Grading and Excavating, Inc.5. Pember Companies, Inc.6. A-1 Excavating LLC
1Clearing (201.0105)STA13$514.98$547.36$1,114.15$1,061.17$1,125.00$300.00
2Grubbing (201.0205)STA13$499.69$531.10$263.02$250.51$265.00$1,100.00
3Removing concrete pavement (204.0100)SY424$4.27$4.54$10.64$15.08$10.60$10.00
4Removing asphaltic surface (204.0110)SY694$1.90$2.01$7.83$3.34$6.20$7.00
5Removing asphaltic surface milling (204.0120)SY278$17.75$18.20$17.17$35.97$19.25$32.00
6Removing curb & gutter (204.0150)LF5,061$1.78$1.89$3.24$6.53$4.60$5.00
7Removing concrete sidewalk (204.0155)SY36$5.76$6.12$28.57$17.20$21.00$21.00
8Removing guardrail (204.0165)LF290$3.85$3.93$4.04$3.85$4.10$4.00
9Removing surface drains (204.0190)EACH2$110.66$117.60$404.46$1,313.76$150.00$1,700.00
10Removing manholes (204.0210)EACH6$323.61$343.95$954.91$1,313.76$685.00$1,300.00
11Removing inlets (204.0220)EACH15$323.78$344.14$477.45$1,313.75$550.00$1,200.00
12Removing storm sewer (size) 01. 12-inch (204.0245)LF507$16.73$17.78$16.69$43.80$13.40$24.00
13Removing storm sewer (size) 02. 15-inch (204.0245)LF39$16.73$17.78$18.15$43.80$17.85$29.00
14Removing storm sewer (size) 03. 18-inch (204.0245)LF388$16.81$17.87$19.53$43.80$19.30$27.00
15Removing storm sewer (size) 04. 24-inch (204.0245)LF250$16.96$18.03$22.95$43.80$25.45$31.00
16Excavation common (205.0100)CY10,384$16.92$17.99$15.60$21.70$20.60$23.00
17Prepare foundation for asphaltic paving (project) 01. 5991-08-11 (211.0101)EACH1$20,176$21,444$36,147$12,000$70,000$30,000
18Finishing roadway (project) 01. 5991-08-11 (213.0100)EACH1$4,000.00$5,110.00$3,130.59$500.00$500.00$1,000.00
19Base aggregate dense 1 1/4-inch (305.0120)TON11,580$15.35$15.99$18.06$20.49$21.00$24.00
20Coloring concrete wisdot red (405.0100)CY121$98.51$84.83$104.46$98.51$105.50$104.00
21Concrete pavement 7 1/2-inch (415.0075)SY2,775$74.90$77.19$79.43$74.90$84.80$82.00
22Concrete truck apron 12-inch (415.2010)SY361$98.81$83.15$104.78$98.81$113.00$115.00
23Drilled tie bars (416.0610)EACH263$15.58$16.38$16.52$15.58$6.00$17.00
24Drilled dowel bars (416.0620)EACH105$19.30$20.02$20.47$19.30$11.00$21.00
25Tack coat (455.0605)GAL1,641$4.92$5.03$5.17$4.92$5.20$5.00
26Incentive density HMA pavement (460.2000)DOL3,650$1.00$1.00$1.00$1.00$1.00$1.00
27HMA pavement 3 MT 58-28 S (460.6223)TON2,042$100.07$102.27$105.07$100.07$106.80$110.00
28HMA pavement 4 MT 58-28 S (460.6224)TON3,659$102.18$104.43$107.28$102.18$108.40$110.00
29Asphaltic surface (465.0105)TON9$280.98$287.16$295.01$280.98$298.00$495.00
30Asphaltic surface driveways and field entrances (465.0120)TON2$983.75$1,005.39$1,032.87$983.75$1,045.00$1,828.00
31Asphaltic surface temporary (465.0125)TON382$126.53$129.31$132.85$126.53$134.20$144.00
32Asphaltic flumes (465.0315)SY8$255.15$260.76$267.89$255.15$270.60$424.00
33Apron endwalls for culvert pipe 18- inch (520.1018)EACH2$733.73$769.00$422.20$884.96$505.00$760.00
34Concrete collars for pipe (520.8000)EACH3$1,318.16$1,385.30$1,665.29$307.55$1,980.00$1,800.00
35Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048)EACH2$4,497.09$4,634.20$4,011.79$4,188.37$5,000.00$5,600.00
36Concrete curb & gutter 18-inch type A (601.0405)LF242$35.17$28.13$37.30$35.17$45.60$45.00
37Concrete curb & gutter 30-inch type A (601.0409)LF1,347$22.51$24.17$23.87$22.51$23.20$25.00
38Concrete curb & gutter 30-inch type D (601.0411)LF2,295$22.51$24.17$23.87$22.51$21.10$25.00
39Concrete curb & gutter 6-inch sloped 30-inch type J (601.0415)LF3,565$22.51$25.15$23.87$22.51$21.10$25.00
40Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557)LF73$49.69$36.24$52.69$49.69$51.00$60.00
41Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF289$38.48$27.14$40.81$38.48$40.00$45.00
42Concrete curb & gutter 4-inch sloped 30-inch type TBT (601.0584)LF320$49.69$34.08$52.69$49.69$48.50$57.00
43Concrete sidewalk 4-inch (602.0405)SF3,569$6.28$8.78$6.66$6.28$6.40$8.00
44Concrete driveway 6-inch (602.0810)SY12$107.91$258.74$114.43$107.91$83.00$150.00
45Concrete surface drains (602.3010)CY0.70$1,931.24$2,915.77$2,047.94$1,931.24$1,100.00$2,500.00
46Riprap light (606.0100)CY6$110.56$116.45$85.50$339.74$131.00$175.00
47Riprap heavy (606.0300)CY11$146.27$153.26$88.28$205.58$129.20$145.00
48Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF54$71.60$74.61$70.36$80.00$114.00$108.00
49Storm sewer pipe reinforced concrete class III 48-inch (608.0348)LF45$306.31$314.82$310.33$305.00$400.00$365.00
50Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF44$76.74$80.18$71.43$80.00$104.20$96.00
51Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF91$70.79$73.64$72.27$82.00$89.40$102.00
52Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF164$101.36$104.88$102.91$110.00$108.25$127.00
53Storm sewer pipe class III-A 12- inch (608.3012)LF419$47.17$49.53$43.01$51.00$56.80$53.00
54Storm sewer pipe class III-A 15- inch (608.3015)LF66$54.84$57.39$44.11$55.00$74.80$76.00
55Storm sewer pipe class III-A 18- inch (608.3018)LF411$56.47$59.06$51.48$57.00$60.00$59.00
56Storm sewer pipe class III-A 24- inch (608.3024)LF255$67.42$70.26$66.78$65.00$87.60$69.00
57Reconstructing inlets (611.0430)EACH5$1,165.51$1,210.23$1,243.29$965.06$630.00$1,600.00
58Manhole covers type J (611.0530)EACH2$781.31$811.34$797.73$734.78$1,085.00$1,300.00
59Inlet covers type BW (611.0610)EACH2$1,198.27$1,237.46$1,035.17$1,115.61$1,170.00$1,700.00
60Inlet covers type H (611.0624)EACH18$1,051.41$1,087.25$908.32$983.73$1,030.00$1,600.00
61Inlet covers type HM (611.0627)EACH2$1,080.46$1,117.06$931.66$998.50$1,060.00$1,600.00
62Inlet covers type HM-GJ (611.0630)EACH7$1,177.23$1,215.84$1,018.93$998.50$1,150.00$1,700.00
63Inlet covers type T (611.0652)EACH2$1,344.95$1,387.38$1,164.05$1,249.58$1,310.00$1,900.00
64Manholes 4-FT diameter (611.2004)EACH1$4,426.93$4,572.63$3,699.73$5,294.55$5,800.00$4,800.00
65Manholes 5-FT diameter (611.2005)EACH2$5,109.19$5,260.16$5,391.02$6,159.72$5,385.00$6,400.00
66Manholes 7-FT diameter (611.2007)EACH1$11,742$12,048$12,476$13,714$12,505$14,000
67Inlets 4-FT diameter (611.3004)EACH16$3,574.85$3,692.03$2,951.43$4,527.31$3,650.00$3,900.00
68Inlets 2X2.5-FT (611.3225)EACH1$2,391.28$2,482.54$1,833.17$3,231.84$2,030.00$2,800.00
69Inlets 2X3-FT (611.3230)EACH12$2,713.72$2,811.90$2,210.26$3,530.50$2,870.00$3,100.00
70Cover plates temporary (611.8120.S)EACH10$339.73$359.91$181.66$357.54$180.00$400.00
71MGS guardrail temporary thrie beam transition (614.1100)LF78$65.00$66.43$68.25$65.00$68.90$69.00
72MGS guardrail temporary terminal eat (614.1200)EACH2$2,653.00$2,711.37$2,785.46$2,653.00$2,815.00$3,430.00
73MGS thrie beam transition (614.2500)LF156$90.00$91.98$94.49$90.00$95.50$95.00
74MGS guardrail terminal eat (614.2610)EACH4$3,433.00$3,508.53$3,604.41$3,433.00$3,640.00$4,260.00
75Mobilization (619.1000)EACH1$164,986$129,737$105,635$126,000$163,060$220,000
76Concrete median sloped nose (620.0300)SF930$14.10$14.06$14.95$14.10$13.00$15.00
77Water (624.0100)MGAL231$27.46$28.60$45.31$52.14$76.00$20.00
78Topsoil (625.0100)SY17,028$4.56$4.74$4.61$5.28$6.45$5.00
79Silt fence (628.1504)LF4,175$1.75$1.79$1.84$1.75$1.86$2.00
80Silt fence maintenance (628.1520)LF4,175$0.03$0.03$0.03$0.03$0.03$0.04
81Mobilizations erosion control (628.1905)EACH3$233.00$238.13$244.63$233.00$250.00$250.00
82Mobilizations emergency erosion control (628.1910)EACH4$401.00$409.82$421.02$401.00$425.00$425.00
83Erosion mat urban class I type A (628.2006)SY13,730$1.75$1.79$1.84$1.75$1.85$2.00
84Erosion mat class II type B (628.2023)SY130$6.00$6.13$6.30$6.00$6.35$7.00
85Inlet protection type A (628.7005)EACH44$103.00$105.27$108.14$103.00$110.00$110.00
86Inlet protection type B (628.7010)EACH6$70.00$71.54$73.50$70.00$74.25$74.00
87Inlet protection type C (628.7015)EACH77$50.00$51.10$52.50$50.00$53.00$53.00
88Inlet protection type D (628.7020)EACH11$175.00$178.85$183.74$175.00$185.00$185.00
89Temporary ditch checks (628.7504)LF24$15.00$15.33$15.75$15.00$15.90$16.00
90Culvert pipe checks (628.7555)EACH4$35.00$35.77$36.75$35.00$37.15$37.00
91Fertilizer type B (629.0210)CWT10.70$115.00$117.53$120.74$115.00$122.00$122.00
92Seeding mixture no. 20 (630.0120)LB459.40$7.75$7.92$8.14$7.75$8.20$8.00
93Seeding mixture no. 40 (630.0140)LB95.40$12.50$12.78$13.12$12.50$13.25$13.00
94Seeding temporary (630.0200)LB312$5.25$5.37$5.51$5.25$5.60$5.50
95Seed water (630.0500)MGAL309$1.00$1.02$1.05$1.00$1.05$1.00
96Sod water (631.0300)MGAL85$50.00$51.10$52.50$50.00$53.00$53.00
97Sod lawn (631.1000)SY3,720$7.33$7.49$7.70$7.33$7.80$8.00
98Posts wood 4X6-inch X 14-FT (634.0614)EACH24$92.00$94.02$96.59$92.00$97.60$98.00
99Posts wood 4X6-inch X 16-FT (634.0616)EACH5$98.00$100.16$102.89$98.00$104.00$102.00
100Posts wood 4X6-inch X 18-FT (634.0618)EACH2$115.00$117.53$120.74$115.00$122.00$122.00
101Signs type II reflective H (637.2210)SF170.17$20.00$20.44$21.00$20.00$21.20$22.00
102Signs type II reflective F (637.2230)SF34$25.00$25.55$26.25$25.00$26.50$27.00
103Moving signs type II (638.2102)EACH29$75.00$76.65$78.74$75.00$79.55$80.00
104Removing signs type II (638.2602)EACH8$35.00$35.77$36.75$35.00$37.10$37.00
105Removing small sign supports (638.3000)EACH9$35.00$35.77$36.75$35.00$37.10$37.00
106Moving small sign supports (638.4000)EACH32$75.00$76.65$78.74$75.00$79.55$80.00
107Field office type C (642.5201)EACH1$7,507.50$7,665.00$9,000.00$20,000$10,500$10,000
108Traffic control drums (643.0300)DAY52,767$0.13$0.13$0.14$0.13$0.15$0.13
109Traffic control barricades type III (643.0420)DAY7,575$0.40$0.41$0.42$0.40$0.40$0.42
110Traffic control warning lights type A (643.0705)DAY4,360$0.10$0.10$0.11$0.10$0.10$0.11
111Traffic control warning lights type C (643.0715)DAY6,840$0.10$0.10$0.11$0.10$0.10$0.11
112Traffic control signs (643.0900)DAY23,740$0.25$0.26$0.27$0.25$0.30$0.27
113Traffic control covering signs type II (643.0920)EACH10$110.00$112.42$116.65$110.00$115.00$117.00
114Traffic control signs PCMS (643.1050)DAY21$45.00$45.99$47.72$45.00$48.00$48.00
115Temporary marking line paint 6- inch (643.3165)LF9,974$0.15$0.15$0.16$0.15$0.15$0.16
116Temporary marking line removable tape 6-inch (643.3180)LF12,949$2.10$2.15$2.23$2.10$2.25$2.23
117Temporary marking line removable tape 10-inch (643.3280)LF113$4.15$4.24$4.40$4.15$4.40$4.40
118Temporary marking stop line paint 18-inch (643.3805)LF60$4.50$4.60$4.77$4.50$4.80$5.00
119Temporary marking stop line removable tape 18-inch (643.3850)LF124$6.00$6.13$6.36$6.00$6.35$7.00
120Traffic control (643.5000)EACH1$39,000$39,858$41,357$39,000$63,000$70,000
121Geotextile type HR (645.0120)SY33$55.88$58.27$9.00$10.39$5.50$18.00
122Geotextile type R (645.0130)SY24$61.42$64.37$11.00$9.67$5.00$20.00
123Marking line epoxy 6-inch (646.2020)LF15,134$0.60$0.61$0.64$0.60$0.65$0.64
124Marking line epoxy 10-inch (646.4020)LF1,182$1.33$1.36$1.41$1.33$1.40$1.41
125Marking arrow epoxy (646.5020)EACH20$475.00$485.45$503.70$475.00$505.00$504.00
126Marking word epoxy (646.5120)EACH2$481.00$491.58$510.07$481.00$510.00$510.00
127Marking stop line epoxy 18-inch (646.6120)LF59$20.00$20.44$21.21$20.00$21.20$21.00
128Marking dotted extension epoxy 18-inch (646.6320)LF80$20.00$20.44$21.21$20.00$21.20$21.00
129Marking diagonal epoxy 12-inch (646.7120)LF511$19.50$19.93$20.68$19.50$20.70$21.00
130Marking curb epoxy (646.8120)LF210$9.50$9.71$10.07$9.50$10.10$10.00
131Marking island nose epoxy (646.8220)EACH10$358.00$365.88$379.63$358.00$380.00$380.00
132Marking removal line 4-inch (646.9000)LF7,237$0.20$0.20$0.21$0.20$0.20$0.21
133Marking removal line 8-inch (646.9100)LF740$0.80$0.82$0.85$0.80$0.90$0.85
134Marking removal line wide (646.9200)LF58$3.50$3.58$3.71$3.50$3.70$4.00
135Marking removal special marking (646.9300)EACH15$80.00$81.76$84.83$80.00$85.00$85.00
136Construction staking storm sewer (650.4000)EACH38$130.00$112.42$136.49$47.37$115.00$117.00
137Construction staking subgrade (650.4500)LF2,773$1.00$0.05$0.01$0.88$0.05$0.05
138Construction staking base (650.5000)LF3,287$1.10$1.02$1.15$0.74$1.05$1.10
139Construction staking curb gutter and curb & gutter (650.5500)LF6,213$0.85$1.28$0.89$0.61$1.35$1.30
140Construction staking structure layout (structure) 01. wall modular block gravity landscape (sta 31+30) (650.6501)EACH1$950.00$1,584.10$997.43$1,900.00$1,645.00$1,700.00
141Construction staking concrete pavement (650.7000)LF774$4.00$1.48$4.20$2.33$1.55$1.55
142Construction staking electrical installations (project) 01. 5991-08- 11 (650.8501)EACH1$1,200.00$2,120.65$1,259.91$1,200.00$2,200.00$2,200.00
143Construction staking supplemental control (project) 01. 5991-08-11 (650.9911)EACH1$1,300.00$1,022.00$2,047.36$1,500.00$1,060.00$1,060.00
144Construction staking slope stakes (650.9920)LF2,773$1.10$1.02$1.15$0.40$1.05$1.10
145Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF986$9.89$10.11$10.38$9.00$10.50$10.00
146Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF63$16.60$16.97$17.43$10.00$17.60$11.00
147Pull boxes non-conductive 24X42- inch (653.0164)EACH9$2,231.98$2,281.08$2,343.42$2,550.00$2,365.00$2,700.00
148Concrete bases type 5 (654.0105)EACH10$985.24$1,006.92$1,034.43$1,350.00$1,045.00$1,500.00
149Concrete control cabinet bases type L24 (654.0224)EACH1$1,920.00$1,962.29$2,015.92$1,900.00$2,035.00$2,700.00
150Electrical wire lighting 12 AWG (655.0610)LF1,620$1.35$1.38$1.42$1.75$1.45$2.00
151Electrical wire lighting 10 AWG (655.0615)LF4,500$1.45$1.48$1.52$2.10$1.55$2.20
152Electrical service meter breaker pedestal (location) 01. LCC B (656.0201)EACH1$2,990.18$3,055.96$3,139.48$2,500.00$3,170.00$3,300.00
153Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH10$877.06$896.36$920.85$800.00$930.00$1,100.00
154Poles type 5-aluminum (657.0322)EACH10$2,292.49$2,342.92$2,406.95$2,400.00$2,430.00$2,600.00
155Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615)EACH10$595.36$608.46$625.09$400.00$630.00$440.00
156Luminaires utility LED A (659.1115)EACH10$507.08$518.24$532.40$400.00$540.00$440.00
157Lighting control cabinets 120/240 24-inch (659.2124)EACH1$8,425.23$8,610.59$8,845.89$8,500.00$8,935.00$9,700.00
158Sawing asphalt (690.0150)LF3,407$1.49$1.89$1.94$1.85$1.85$2.00
159Sawing concrete (690.0250)LF603$2.65$3.03$3.11$2.96$3.05$3.00
160Incentive iri ride (740.0440)DOL2,500$1.00$1.00$1.00$1.00$1.00$1.00
161On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00$5.00$5.00$5.00$5.00$5.00
162On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,320$5.00$5.00$5.00$5.00$5.00$5.00
163Special 01. salvage and reinstall lighting unit (SPV.0060)EACH1$3,986.91$4,074.62$4,185.97$2,350.00$4,230.00$3,100.00
164Special 02. connect to existing storm sewer (SPV.0060)EACH1$1,176.96$1,241.51$1,243.29$7,882.56$1,065.00$2,600.00
165Special 03. abandon temporary pipe (SPV.0060)EACH2$1,578.93$1,652.24$2,644.83$7,199.33$5,030.00$5,400.00
166Special 04. temporary storm sewer plug (SPV.0060)EACH2$1,062.65$1,124.60$566.39$4,049.93$215.00$1,600.00
167Special 05. temporary inlet cover (SPV.0060)EACH3$1,200.05$1,239.34$729.71$1,423.15$210.00$1,700.00
168Special 01. temporary pipe 12-inch (SPV.0090)LF102$44.26$46.51$42.86$52.19$59.00$80.00
169Special 01. wall modular block gravity landscape (sta 31+30 LT) (SPV.0165)SF445$120.94$123.85$126.68$131.65$131.00$142.00
WisDOT contract 20260113017: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy