| 1 | Removing small pipe culverts (203.0100) | EACH | 26 | $514.00 | $514.00 |
| 2 | Removing concrete pavement (204.0100) | SY | 780 | $3.00 | $3.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 380 | $10.00 | $10.00 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 700 | $23.10 | $11.45 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 152,200 | $3.00 | $1.72 |
| 6 | Removing curb & gutter (204.0150) | LF | 160 | $30.00 | $30.00 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 600 | $30.00 | $30.00 |
| 8 | Removing guardrail (204.0165) | LF | 440 | $4.00 | $4.00 |
| 9 | Removing delineators and markers (204.0180) | EACH | 37 | $20.00 | $26.20 |
| 10 | Removing concrete bases (204.0195) | EACH | 1 | $350.00 | $500.00 |
| 11 | Removing (item description) 01. removing apron endwalls (204.9060.S) | EACH | 11 | $460.91 | $460.91 |
| 12 | Excavation common (205.0100) | CY | 2,300 | $59.10 | $59.10 |
| 13 | Borrow (208.0100) | CY | 160 | $0.01 | $0.01 |
| 14 | Temporary lane shift during culvert work (208.1500.S) | EACH | 7 | $0.01 | $0.01 |
| 15 | Prepare foundation for asphaltic paving (project) 01. 4085-66-71 (211.0101) | EACH | 1 | $41,450 | $26,834 |
| 16 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 650 | $63.90 | $49.85 |
| 17 | Finishing roadway (project) 01.4085-66-71 (213.0100) | EACH | 1 | $2,426.41 | $3,220.00 |
| 18 | Base aggregate dense 3/4-inch (305.0110) | TON | 5,480 | $24.80 | $25.20 |
| 19 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 3,140 | $18.96 | $18.96 |
| 20 | Select crushed material (312.0110) | TON | 363 | $22.94 | $22.94 |
| 21 | Concrete pavement repair (416.1710) | SY | 53 | $185.00 | $110.00 |
| 22 | Tack coat (455.0605) | GAL | 19,597 | $3.00 | $2.60 |
| 23 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 2 | $2,250.00 | $2,773.00 |
| 24 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 2 | $3,250.00 | $3,339.00 |
| 25 | Incentive density PWL HMA pavement (460.2005) | DOL | 23,442 | $1.00 | $1.00 |
| 26 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 15,740 | $1.00 | $1.00 |
| 27 | Incentive air voids HMA pavement (460.2010) | DOL | 36,100 | $1.00 | $1.00 |
| 28 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 20,260 | $70.20 | $78.30 |
| 29 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 15,770 | $76.70 | $79.85 |
| 30 | Asphaltic surface (465.0105) | TON | 786 | $106.90 | $184.40 |
| 31 | Asphaltic surface patching (465.0110) | TON | 162 | $261.90 | $295.65 |
| 32 | Asphaltic surface driveways and field entrances (465.0120) | TON | 93 | $261.90 | $147.05 |
| 33 | Asphaltic flumes (465.0315) | SY | 4 | $88.10 | $200.00 |
| 34 | Asphaltic rumble strips, shoulder (465.0520) | LF | 56,900 | $0.31 | $0.16 |
| 35 | Asphaltic rumble strips, centerline (465.0560) | LF | 24,500 | $0.29 | $0.16 |
| 36 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 6 | $885.94 | $885.94 |
| 37 | Apron endwalls for culvert pipe 36- inch (520.1036) | EACH | 2 | $1,735.95 | $1,753.95 |
| 38 | Culvert pipe class III-A 24-inch (520.3324) | LF | 214 | $128.73 | $128.73 |
| 39 | Culvert pipe class III-A 36-inch (520.3336) | LF | 76 | $188.25 | $188.25 |
| 40 | Concrete collars for pipe (520.8000) | EACH | 17 | $1,266.37 | $1,266.37 |
| 41 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 48 | $172.27 | $172.27 |
| 42 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 72 | $208.18 | $208.18 |
| 43 | Culvert pipe reinforced concrete class III 48-inch (522.0148) | LF | 16 | $378.71 | $378.71 |
| 44 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 9 | $2,369.90 | $2,369.90 |
| 45 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 14 | $2,750.63 | $2,750.63 |
| 46 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 3 | $3,464.73 | $3,464.73 |
| 47 | Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048) | EACH | 2 | $4,602.39 | $4,602.39 |
| 48 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 1,450 | $71.55 | $85.00 |
| 49 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 80 | $71.55 | $85.00 |
| 50 | Concrete curb & gutter 4-inch sloped 30-inch type J (601.0576) | LF | 75 | $71.55 | $90.00 |
| 51 | Concrete curb pedestrian (601.0600) | LF | 160 | $71.55 | $50.00 |
| 52 | Concrete sidewalk 5-inch (602.0410) | SF | 6,620 | $8.88 | $8.25 |
| 53 | Curb ramp detectable warning field natural patina (602.0515) | SF | 410 | $55.00 | $40.00 |
| 54 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 58 | $75.00 | $60.00 |
| 55 | Concrete driveway 6-inch (602.0810) | SY | 29 | $135.00 | $76.50 |
| 56 | Inlet covers type H (611.0624) | EACH | 1 | $775.20 | $775.20 |
| 57 | Adjusting manhole covers (611.8110) | EACH | 10 | $300.00 | $300.00 |
| 58 | Adjusting inlet covers (611.8115) | EACH | 12 | $300.00 | $300.00 |
| 59 | MGS guardrail 3 (614.2300) | LF | 225 | $32.00 | $34.60 |
| 60 | MGS thrie beam transition (614.2500) | LF | 160 | $95.00 | $94.50 |
| 61 | MGS guardrail terminal eat (614.2610) | EACH | 4 | $4,000.00 | $4,000.00 |
| 62 | Maintenance and repair of haul roads (project) 01. 4085-66-71 (618.0100) | EACH | 1 | $1.00 | $1.00 |
| 63 | Mobilization (619.1000) | EACH | 1 | $341,550 | $301,050 |
| 64 | Water (624.0100) | MGAL | 122 | $52.79 | $65.00 |
| 65 | Topsoil (625.0100) | SY | 9,937 | $3.52 | $3.52 |
| 66 | Silt fence (628.1504) | LF | 6,574 | $2.00 | $1.78 |
| 67 | Silt fence maintenance (628.1520) | LF | 6,574 | $0.01 | $0.10 |
| 68 | Mobilizations erosion control (628.1905) | EACH | 15 | $125.00 | $250.00 |
| 69 | Mobilizations emergency erosion control (628.1910) | EACH | 2 | $100.00 | $250.00 |
| 70 | Erosion mat class I type B (628.2004) | SY | 8,981 | $1.35 | $1.07 |
| 71 | Erosion mat urban class I type B (628.2008) | SY | 955 | $2.00 | $1.84 |
| 72 | Inlet protection type B (628.7010) | EACH | 10 | $68.00 | $50.00 |
| 73 | Inlet protection type C (628.7015) | EACH | 40 | $70.00 | $50.00 |
| 74 | Culvert pipe checks (628.7555) | EACH | 143 | $15.00 | $16.00 |
| 75 | Fertilizer type B (629.0210) | CWT | 68 | $0.01 | $87.00 |
| 76 | Seeding mixture no. 10 (630.0110) | LB | 9 | $15.00 | $25.00 |
| 77 | Seeding mixture no. 40 (630.0140) | LB | 468 | $7.25 | $10.60 |
| 78 | Seed water (630.0500) | MGAL | 219 | $1.00 | $7.50 |
| 79 | Markers culvert end (633.5200) | EACH | 37 | $68.00 | $58.00 |
| 80 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 2 | $90.00 | $115.00 |
| 81 | Signs type II reflective H (637.2210) | SF | 16.50 | $28.00 | $36.30 |
| 82 | Moving signs type II (638.2102) | EACH | 7 | $60.00 | $100.00 |
| 83 | Moving small sign supports (638.4000) | EACH | 7 | $60.00 | $80.00 |
| 84 | Field office type B (642.5001) | EACH | 1 | $18,750 | $13,388 |
| 85 | Traffic control drums (643.0300) | DAY | 2,640 | $0.20 | $0.25 |
| 86 | Traffic control barricades type III (643.0420) | DAY | 307 | $0.50 | $0.65 |
| 87 | Traffic control warning lights type A (643.0705) | DAY | 614 | $0.35 | $0.15 |
| 88 | Traffic control warning lights type C (643.0715) | DAY | 230 | $0.35 | $0.15 |
| 89 | Traffic control signs (643.0900) | DAY | 6,146 | $0.25 | $0.45 |
| 90 | Traffic control covering signs type II (643.0920) | EACH | 11 | $110.00 | $40.40 |
| 91 | Traffic control signs PCMS (643.1050) | DAY | 136 | $30.00 | $35.35 |
| 92 | Temporary marking line paint 6- inch (643.3165) | LF | 145,627 | $0.23 | $0.36 |
| 93 | Temporary marking crosswalk removable tape 6-inch (643.3350) | LF | 1,502 | $2.30 | $2.08 |
| 94 | Traffic control (643.5000) | EACH | 1 | $27,500 | $24,745 |
| 95 | Temporary pedestrian surface asphalt (644.1410) | SF | 6,750 | $5.50 | $4.45 |
| 96 | Temporary pedestrian surface plate (644.1430) | SF | 1,040 | $6.95 | $10.10 |
| 97 | Temporary pedestrian curb ramp (644.1601) | DAY | 178 | $30.00 | $9.09 |
| 98 | Temporary pedestrian detectable warning field (644.1605) | SF | 220 | $4.25 | $17.17 |
| 99 | Temporary pedestrian barricade (644.1810) | LF | 4,410 | $3.25 | $5.81 |
| 100 | Geotextile type sas (645.0140) | SY | 430 | $5.00 | $5.00 |
| 101 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 97,530 | $1.26 | $1.22 |
| 102 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 898 | $3.05 | $2.78 |
| 103 | Marking railroad crossing epoxy (646.5320) | EACH | 2 | $2,175.00 | $1,641.25 |
| 104 | Marking stop line epoxy 18-inch (646.6120) | LF | 50 | $18.50 | $12.12 |
| 105 | Cold weather marking epoxy 6-inch (646.6466) | LF | 9,753 | $0.55 | $1.01 |
| 106 | Cold weather marking epoxy 10- inch (646.6470) | LF | 90 | $1.25 | $1.62 |
| 107 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 380 | $14.75 | $11.11 |
| 108 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 60 | $30.40 | $19.19 |
| 109 | Marking removal line 6-inch (646.9002) | LF | 12,823 | $0.40 | $0.86 |
| 110 | Marking removal line 10-inch (646.9102) | LF | 17 | $0.60 | $1.52 |
| 111 | Marking removal special marking (646.9300) | EACH | 2 | $100.00 | $116.15 |
| 112 | Locating no-passing zones (648.0100) | MI | 7.45 | $590.00 | $404.00 |
| 113 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 1,085 | $0.71 | $0.71 |
| 114 | Construction staking pipe culverts (650.6000) | EACH | 4 | $116.49 | $116.49 |
| 115 | Construction staking resurfacing reference (650.8000) | LF | 39,352 | $0.10 | $0.10 |
| 116 | Construction staking curb ramps (650.9000) | EACH | 43 | $143.43 | $143.43 |
| 117 | Construction staking sidewalk (project) 01. 4085-66-71 (650.9500) | EACH | 1 | $940.04 | $940.04 |
| 118 | Construction staking supplemental control (project) 01. 4085-66-71 (650.9911) | EACH | 1 | $462.62 | $462.62 |
| 119 | Sawing asphalt (690.0150) | LF | 1,365 | $1.95 | $1.95 |
| 120 | Sawing concrete (690.0250) | LF | 1,406 | $2.55 | $2.55 |
| 121 | Incentive iri ride (740.0440) | DOL | 59,600 | $1.00 | $1.00 |
| 122 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 |
| 123 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,200 | $5.00 | $5.00 |
| 124 | Special 01. foundation backfill (SPV.0035) | CY | 3,060 | $0.01 | $0.01 |
| 125 | Special 01. adjusting water valve boxes (SPV.0060) | EACH | 13 | $400.00 | $400.00 |
| 126 | Special 02. salvage and reinstall RRFB system (SPV.0060) | EACH | 1 | $850.00 | $325.00 |
| 127 | Special 01. salvage and reset landscape rock (SPV.0165) | SF | 159 | $7.00 | $12.60 |