| 1 | Removing small pipe culverts (203.0100) | EACH | 10 | $400.00 | $400.00 |
| 2 | Removing asphaltic surface (204.0110) | SY | 870 | $12.50 | $12.50 |
| 3 | Removing asphaltic surface butt joints (204.0115) | SY | 948 | $3.86 | $5.00 |
| 4 | Removing asphaltic surface milling (204.0120) | SY | 126,250 | $0.54 | $1.05 |
| 5 | Removing curb & gutter (204.0150) | LF | 410 | $14.90 | $14.90 |
| 6 | Removing guardrail (204.0165) | LF | 855 | $2.00 | $2.00 |
| 7 | Removing inlets (204.0220) | EACH | 2 | $750.00 | $750.00 |
| 8 | Excavation common (205.0100) | CY | 199 | $20.75 | $20.75 |
| 9 | Borrow (208.0100) | CY | 42 | $28.75 | $28.75 |
| 10 | Prepare foundation for asphaltic paving (project) 01. 6260-02-74 (211.0101) | EACH | 1 | $15,000 | $4,825.00 |
| 11 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 471 | $56.84 | $126.50 |
| 12 | Finishing roadway (project) 01. 6260-02-74 (213.0100) | EACH | 1 | $1,360.00 | $2,925.00 |
| 13 | Base aggregate dense 3/4-inch (305.0110) | TON | 5,211 | $26.46 | $30.05 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 165 | $26.75 | $26.75 |
| 15 | Tack coat (455.0605) | GAL | 10,233 | $3.74 | $3.00 |
| 16 | HMA percent within limits (PWL) test strip volumetrics (460.0105.S) | EACH | 1 | $3,750.00 | $2,250.00 |
| 17 | HMA percent within limits (PWL) test strip density (460.0110.S) | EACH | 1 | $3,750.00 | $3,275.00 |
| 18 | Incentive density HMA pavement (460.2000) | DOL | 350 | $1.00 | $1.00 |
| 19 | Incentive density PWL HMA pavement (460.2005) | DOL | 12,000 | $1.00 | $1.00 |
| 20 | Incentive density HMA pavement longitudinal joints (460.2007) | DOL | 8,040 | $1.00 | $1.00 |
| 21 | Incentive air voids HMA pavement (460.2010) | DOL | 12,000 | $1.00 | $1.00 |
| 22 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 16,710 | $67.26 | $67.75 |
| 23 | Asphaltic surface (465.0105) | TON | 1,629 | $74.10 | $85.75 |
| 24 | Asphaltic surface patching (465.0110) | TON | 14 | $148.50 | $329.25 |
| 25 | Asphaltic surface driveways and field entrances (465.0120) | TON | 55 | $148.50 | $169.95 |
| 26 | Asphaltic flumes (465.0315) | SY | 52 | $77.00 | $43.90 |
| 27 | Asphaltic rumble strips, centerline (465.0560) | LF | 36,310 | $0.45 | $0.26 |
| 28 | Concrete collars for pipe (520.8000) | EACH | 13 | $1,200.00 | $1,200.00 |
| 29 | Cleaning culvert pipes (520.8700) | EACH | 8 | $750.00 | $750.00 |
| 30 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 14 | $115.00 | $115.00 |
| 31 | Culvert pipe reinforced concrete class III 30-inch (522.0130) | LF | 8 | $225.00 | $225.00 |
| 32 | Culvert pipe reinforced concrete class III 48-inch (522.0148) | LF | 12 | $545.00 | $545.00 |
| 33 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 4 | $1,650.00 | $1,650.00 |
| 34 | Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030) | EACH | 4 | $2,200.00 | $2,200.00 |
| 35 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 3 | $3,500.00 | $3,500.00 |
| 36 | Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048) | EACH | 2 | $4,800.00 | $4,800.00 |
| 37 | Culvert pipe salvaged 24-inch (524.0124) | LF | 30 | $72.00 | $72.00 |
| 38 | Culvert pipe salvaged 30-inch (524.0130) | LF | 28 | $115.00 | $115.00 |
| 39 | Culvert pipe salvaged 36-inch (524.0136) | LF | 32 | $135.00 | $135.00 |
| 40 | Culvert pipe salvaged 48-inch (524.0148) | LF | 8 | $275.00 | $275.00 |
| 41 | Culvert pipe corrugated aluminum 24-inch (525.0124) | LF | 12 | $85.00 | $85.00 |
| 42 | Apron endwalls for culvert pipe aluminum 12-inch (525.0312) | EACH | 2 | $600.00 | $600.00 |
| 43 | Apron endwalls for culvert pipe aluminum 24-inch (525.0324) | EACH | 2 | $1,500.00 | $1,500.00 |
| 44 | Culvert pipe corrugated polyethylene 12-inch (530.0112) | LF | 24 | $28.50 | $28.50 |
| 45 | Concrete curb & gutter 6-inch sloped 36-inch type D (601.0557) | LF | 429 | $49.69 | $49.69 |
| 46 | Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588) | LF | 206 | $49.69 | $49.69 |
| 47 | Riprap medium (606.0200) | CY | 4 | $155.00 | $155.00 |
| 48 | Reconstructing inlets (611.0430) | EACH | 2 | $1,500.00 | $1,500.00 |
| 49 | Inlet covers type V (611.0654) | EACH | 2 | $1,050.00 | $1,050.00 |
| 50 | Inlets 2X2-FT (611.3220) | EACH | 2 | $2,250.00 | $2,250.00 |
| 51 | Adjusting inlet covers (611.8115) | EACH | 4 | $750.00 | $750.00 |
| 52 | Guardrail mow strip emulsified asphalt (614.0397) | SY | 181 | $30.00 | $30.00 |
| 53 | MGS guardrail 3 (614.2300) | LF | 425 | $28.55 | $28.55 |
| 54 | MGS guardrail short radius (614.2350) | LF | 72 | $30.00 | $30.00 |
| 55 | MGS thrie beam transition (614.2500) | LF | 160 | $94.00 | $94.00 |
| 56 | MGS guardrail terminal eat (614.2610) | EACH | 3 | $3,333.00 | $3,333.00 |
| 57 | MGS guardrail short radius terminal (614.2630) | EACH | 1 | $2,513.00 | $2,513.00 |
| 58 | Maintenance and repair of haul roads (project) 01. 6260-02-74 (618.0100) | EACH | 1 | $50.00 | $1.00 |
| 59 | Mobilization (619.1000) | EACH | 1 | $19,925 | $118,200 |
| 60 | Water (624.0100) | MGAL | 57 | $50.00 | $50.00 |
| 61 | Topsoil (625.0100) | SY | 1,727 | $5.95 | $5.95 |
| 62 | Silt fence (628.1504) | LF | 3,603 | $1.80 | $1.80 |
| 63 | Silt fence maintenance (628.1520) | LF | 3,603 | $0.03 | $0.03 |
| 64 | Mobilizations erosion control (628.1905) | EACH | 3 | $203.00 | $203.00 |
| 65 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $303.00 | $303.00 |
| 66 | Erosion mat urban class I type B (628.2008) | SY | 1,727 | $2.50 | $2.50 |
| 67 | Inlet protection type A (628.7005) | EACH | 8 | $125.00 | $125.00 |
| 68 | Inlet protection type C (628.7015) | EACH | 8 | $75.00 | $75.00 |
| 69 | Culvert pipe checks (628.7555) | EACH | 23 | $25.00 | $25.00 |
| 70 | Rock bags (628.7570) | EACH | 20 | $10.00 | $10.00 |
| 71 | Fertilizer type B (629.0210) | CWT | 5 | $100.00 | $100.00 |
| 72 | Seeding mixture no. 30 (630.0130) | LB | 150 | $12.00 | $12.00 |
| 73 | Seeding temporary (630.0200) | LB | 62 | $7.00 | $7.00 |
| 74 | Seed water (630.0500) | MGAL | 110 | $5.00 | $5.00 |
| 75 | Markers culvert end (633.5200) | EACH | 18 | $75.00 | $75.00 |
| 76 | Moving signs type II (638.2102) | EACH | 24 | $125.00 | $125.00 |
| 77 | Moving small sign supports (638.4000) | EACH | 24 | $125.00 | $125.00 |
| 78 | Field office type C (642.5201) | EACH | 1 | $6,390.00 | $9,150.00 |
| 79 | Traffic control drums (643.0300) | DAY | 1,200 | $2.00 | $2.00 |
| 80 | Traffic control warning lights type C (643.0715) | DAY | 360 | $1.00 | $1.00 |
| 81 | Traffic control signs (643.0900) | DAY | 5,140 | $0.85 | $0.85 |
| 82 | Traffic control signs fixed message (643.1000) | SF | 36 | $25.00 | $25.00 |
| 83 | Temporary marking line paint 6- inch (643.3165) | LF | 44,856 | $0.52 | $0.23 |
| 84 | Traffic control (643.5000) | EACH | 1 | $5,000.00 | $4,500.00 |
| 85 | Geotextile type HR (645.0120) | SY | 91 | $6.25 | $6.25 |
| 86 | Marking line epoxy 6-inch (646.2020) | LF | 290 | $0.76 | $1.15 |
| 87 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 120,380 | $1.15 | $1.20 |
| 88 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,080 | $2.00 | $2.62 |
| 89 | Marking stop line epoxy 18-inch (646.6120) | LF | 246 | $19.00 | $13.98 |
| 90 | Cold weather marking epoxy 6-inch (646.6466) | LF | 120,670 | $0.32 | $0.34 |
| 91 | Locating no-passing zones (648.0100) | MI | 8 | $430.00 | $530.81 |
| 92 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 650 | $1.00 | $1.00 |
| 93 | Construction staking pipe culverts (650.6000) | EACH | 2 | $125.93 | $125.93 |
| 94 | Construction staking resurfacing reference (650.8000) | LF | 40,190 | $0.12 | $0.12 |
| 95 | Construction staking supplemental control (project) 01. 6260-02-74 (650.9911) | EACH | 1 | $760.39 | $760.39 |
| 96 | Construction staking slope stakes (650.9920) | LF | 590 | $0.97 | $0.97 |
| 97 | Public land survey monument verify and reset (680.0100) | EACH | 11 | $856.18 | $856.18 |
| 98 | Sawing asphalt (690.0150) | LF | 1,917 | $2.66 | $1.74 |
| 99 | Sawing concrete (690.0250) | LF | 84 | $12.48 | $3.95 |
| 100 | Incentive iri ride (740.0440) | DOL | 30,440 | $1.00 | $1.00 |
| 101 | Special 01. rounded river rock (SPV.0035) | CY | 4 | $175.00 | $175.00 |
| 102 | Special 01. concrete curb & gutter 4-inch sloped 72-inch type TBT (SPV.0090) | LF | 6 | $163.85 | $163.85 |
| 103 | Special 01. removing distressed asphaltic surface milling (SPV.0180) | SY | 480 | $20.00 | $7.70 |
| 104 | Special 02. remove, salvage, and reinstall riprap heavy (SPV.0180) | SY | 55 | $50.00 | $50.00 |