1090-09-75. Let by Wisconsin DOT on August 11, 2026, Walworth. 6 bids received; low bid $68,189,886 by Musson Bros., Inc..

Owner
Wisconsin DOT
Letting
11 AUG 2026
Pay items
421
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Musson Bros., Inc.$68,189,886Low
2Zignego Company, Inc.$69,047,370+1.0%
3Hoffman Construction Company$73,733,421+8.0%
4James Peterson Sons, Inc.$74,864,633+10%
5Rock Road Companies, Inc.$76,754,317+13%
6William Charles Construction, LLC$93,526,878+37%
WisDOT contract 20260811009: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Musson Bros., Inc.2. Zignego Company, Inc.3. Hoffman Construction Company4. James Peterson Sons, Inc.5. Rock Road Companies, Inc.6. William Charles Construction, LLC
1Clearing (201.0105)STA29$995.00$995.00$995.00$995.00$995.00$999.08
2Grubbing (201.0205)STA29$345.00$345.00$345.00$345.00$345.00$346.41
3Removing small pipe culverts (203.0100)EACH36$631.00$601.41$1,100.00$750.00$544.63$1,687.67
4Abatement of asbestos containing material (structure) 001. B-64-0092 (203.0211.S)EACH1$8,500.00$5,760.00$5,760.00$8,500.00$8,500.00$5,845.68
5Abatement of asbestos containing material (structure) 002. B-64-0093 (203.0211.S)EACH1$8,500.00$4,515.00$4,515.00$8,500.00$8,500.00$4,582.16
6Abatement of asbestos containing material (structure) 003. B-64-0094 (203.0211.S)EACH1$15,000$14,465$14,465$15,000$15,000$14,680
7Removing structure (structure) 001. B-64-89 (203.0220)EACH1$1,100,000$612,000$612,000$550,000$550,000$734,074
8Removing structure (structure) 002. B-67-129 (203.0220)EACH1$15,000$20,000$20,000$15,000$15,000$23,989
9Removing structure (structure) 003. B-64-0094 (203.0220)EACH1$1,100,000$400,000$400,000$550,000$550,000$479,787
10Removing concrete pavement (204.0100)SY1,642$11.00$5.17$20.00$10.55$15.87$29.34
11Removing asphaltic surface (204.0110)SY3,502$5.60$3.17$5.00$7.85$6.41$6.22
12Removing asphaltic surface butt joints (204.0115)SY10$100.00$0.10$0.10$0.10$25.39$0.10
13Removing asphaltic surface milling (204.0120)SY36,039$0.85$0.85$0.85$0.85$5.21$0.85
14Removing curb & gutter (204.0150)LF3,790$5.90$5.81$5.00$3.35$10.39$10.95
15Removing concrete sidewalk (204.0155)SY260$22.50$5.05$20.00$10.00$15.87$18.37
16Removing guardrail (204.0165)LF8,079$3.00$3.00$3.00$3.00$3.00$2.20
17Removing fence (204.0170)LF448$6.00$6.00$6.00$6.00$6.00$2.20
18Removing delineators and markers (204.0180)EACH525$20.00$20.00$20.00$20.00$20.00$27.49
19Removing surface drains (204.0190)EACH9$201.00$466.55$300.00$500.00$420.75$1,284.56
20Removing manholes (204.0210)EACH1$906.00$454.96$300.00$1,000.00$480.56$1,338.29
21Removing catch basins (204.0215)EACH9$438.00$461.40$300.00$600.00$480.56$1,284.56
22Removing inlets (204.0220)EACH31$447.00$326.62$300.00$400.00$480.56$1,272.77
23Removing storm sewer (size) 801. 12-inch (204.0245)LF1,722$12.50$3.95$15.00$33.00$17.24$71.25
24Removing storm sewer (size) 802. 18-inch (204.0245)LF4,029$12.50$6.07$15.00$35.00$17.24$71.54
25Removing storm sewer (size) 804. 30-inch (204.0245)LF243$12.50$13.16$22.00$12.00$17.24$74.50
26Removing storm sewer (size) 805. 36-inch (204.0245)LF503$18.50$13.16$22.00$13.00$19.70$75.11
27Sealing pipes (204.0280)EACH2$1,050.00$4,724.90$1,200.00$1,859.00$975.58$1,042.17
28Removing (item description) 001. pavement terminal anchors (204.9060.S)EACH16$2,080.00$551.52$1,000.00$1,450.00$2,151.71$7,349.08
29Removing (item description) 002. crash cushions temporary left in place (204.9060.S)EACH2$2,525.00$2,500.00$500.00$500.00$2,500.00$2,510.25
30Removing (item description) 301. traffic signals (STH 83 at IH 43 NB ramps) (204.9060.S)EACH1$2,931.55$2,181.78$2,931.55$2,931.55$2,181.78$2,190.73
31Removing (item description) 302. traffic signals (STH 83 at IH 43 SB ramps) (204.9060.S)EACH1$2,931.55$2,181.78$2,931.55$2,931.55$2,181.78$2,190.73
32Removing (item description) 303. traffic signals (STH 83 at bay view road) (204.9060.S)EACH1$2,931.55$2,181.78$2,931.55$2,931.55$2,181.78$2,190.73
33Removing (item description) 304. loop detector wire & lead-in cable (STH 83 at IH 43 NB ramps) (204.9060.S)EACH1$1,475.89$2,909.04$1,475.89$1,475.89$2,909.04$2,920.97
34Removing (item description) 305. loop detector wire & lead-in cable (STH 83 at IH 43 SB ramps) (204.9060.S)EACH1$1,475.89$2,909.04$1,475.89$1,475.89$2,909.04$2,920.97
35Removing (item description) 306. loop detector wire & lead-in cable (STH 83 at bay view road) (204.9060.S)EACH1$1,475.89$2,909.04$1,475.89$1,475.89$2,909.04$2,920.97
36Removing (item description) 801. apron endwalls for underdrain reinforced concrete (204.9060.S)EACH434$43.00$1.96$0.01$15.00$80.43$89.61
37Removing (item description) 802. apron endwalls (204.9060.S)EACH68$157.00$115.91$300.00$300.00$1,441.67$368.10
38Removing (item description) 001. concrete barrier temporary precast left in place (204.9090.S)LF812$8.00$5.00$5.00$5.00$5.00$5.93
39Removing (item description) 801. underdrain (204.9090.S)LF140,356$0.38$1.49$0.01$1.30$1.86$1.07
40Excavation common (205.0100)CY514,702$20.50$7.70$20.00$16.11$22.10$21.53
41Temporary emergency pullouts (205.3000.S)EACH16$4,100.00$2,031.76$5,705.51$4,455.00$4,440.59$9,476.95
42Excavation for structures bridges (structure) 001. B-64-89 (206.1001)EACH1$2,570.00$4,200.00$2,000,000$2,500.00$2,500.00$5,037.77
43Borrow (208.0100)CY16,199$4.90$14.09$25.00$31.69$15.66$30.21
44Backfill granular grade 1 (209.1100)CY705$43.00$42.47$60.00$40.51$41.35$48.03
45Backfill structure type A (210.1500)TON85$41.50$37.10$60.00$38.00$38.00$105.96
46Prepare foundation for asphaltic paving (project) 001. 1090-09-75 (211.0101)EACH1$250,000$250,000$100.00$24,950$615,776$38,963
47Finishing roadway (project) 001. 1090-09-75 (213.0100)EACH1$2,500.00$1,000.00$100.00$3,500.00$5,702.64$950.00
48Finishing roadway (project) 002. 1090-09-77 (213.0100)EACH1$2,500.00$1,000.00$100.00$3,500.00$5,702.64$950.00
49Base aggregate dense 3/4-inch (305.0110)TON35,421$17.50$27.00$30.00$20.86$26.45$29.95
50Base aggregate dense 1 1/4-inch (305.0120)TON415,987$0.01$0.01$0.01$13.37$12.13$18.34
51Base aggregate open-graded (310.0110)TON284$28.50$35.38$40.00$28.68$27.31$47.26
52Breaker run (311.0110)TON467,896$0.01$7.17$0.01$21.18$18.48$24.26
53Concrete pavement 8 1/2-inch (415.0085)SY807$97.72$61.00$97.72$97.72$97.72$102.32
54Concrete pavement 9-inch (415.0090)SY1,893$102.74$62.00$102.74$102.74$102.74$96.48
55Concrete pavement approach slab (415.0410)SY499$253.19$200.00$253.19$253.19$253.19$563.70
56Rout and seal (415.6000.S)LF264,695$0.79$1.14$1.14$0.87$0.79$0.87
57Drilled tie bars (416.0610)EACH1,077$11.62$10.00$11.62$11.62$11.62$23.73
58Drilled dowel bars (416.0620)EACH1,275$15.74$15.00$15.74$15.74$15.74$29.67
59Concrete pavement repair (416.1710)SY59$267.33$200.00$267.33$267.33$267.33$189.88
60Concrete pavement replacement (416.1720)SY1,214$115.45$150.00$115.45$115.45$115.45$207.68
61Concrete pavement replacement shes (416.1725)SY398$199.24$300.00$199.24$199.24$199.24$267.02
62HMA cold weather paving (450.4000)TON7,300$1.00$1.00$1.00$1.00$2.50$1.01
63Tack coat (455.0605)GAL20,155$1.00$1.00$1.00$1.00$0.01$1.01
64Incentive density HMA pavement (460.2000)DOL43,440$1.00$1.00$1.00$1.00$1.00$1.00
65HMA pavement 3 LT 58-28 S (460.5223)TON27,924$73.50$73.50$73.50$73.50$72.60$74.03
66HMA pavement 4 LT 58-28 S (460.5224)TON31,892$78.80$78.80$78.80$78.80$74.93$79.37
67Asphaltic surface (465.0105)TON213$255.00$255.00$255.00$255.00$125.88$256.85
68Asphaltic surface patching (465.0110)TON1,412$93.00$93.00$93.00$93.00$116.81$93.67
69Asphaltic surface temporary (465.0125)TON14,007$76.10$76.10$76.10$76.10$87.18$76.65
70Asphaltic flumes (465.0315)SY36$103.00$103.00$103.00$103.00$67.50$103.75
71Asphaltic rumble strips, shoulder divided roadway (465.0510)LF118,794$0.17$0.17$0.17$0.17$0.17$0.17
72Cold patch (495.1000.S)TON100$250.00$1.00$100.00$300.00$100.00$690.58
73Concrete masonry bridges (502.0100)CY1,289$1,030.00$1,100.00$1,100.00$1,030.00$1,030.00$1,319.41
74Bridge deck crack sealing (502.0180.S)LF45$25.00$8.00$8.00$25.00$25.00$8.12
75Expansion device (502.3101)LF477$275.00$305.00$305.00$275.00$275.00$365.84
76Protective surface treatment (502.3200)SY7,008$5.00$4.00$4.00$5.00$5.00$4.80
77Pigmented surface sealer reseal (502.3205)SY1,998$16.00$20.00$20.00$16.00$16.00$23.99
78Pigmented surface sealer (502.3210)SY660$10.00$14.00$14.00$10.00$10.00$16.79
79Protective surface treatment reseal (502.3215)SY26$8.00$100.00$100.00$8.00$8.00$119.95
80Adhesive anchors 1-inch (502.4108)EACH52$35.00$115.00$115.00$35.00$35.00$116.71
81Adhesive anchors 1 1/2-inch (502.4112)EACH44$225.00$140.00$140.00$225.00$225.00$167.93
82Adhesive anchors no. 4 bar (502.4204)EACH142$19.00$30.00$30.00$19.00$19.00$30.45
83Adhesive anchors no. 5 bar (502.4205)EACH710$23.00$33.00$33.00$23.00$23.00$33.49
84Bar steel reinforcement HS coated structures (505.0600)LB299,150$1.60$1.69$1.69$1.60$1.60$1.72
85Bearing pads elastomeric laminated (506.2610)EACH34$1,000.00$1,500.00$1,500.00$1,000.00$1,000.00$1,799.20
86Bearing assemblies expansion (structure) 001. B-67-129 (506.6000)EACH22$4,000.00$3,700.00$3,700.00$4,000.00$4,000.00$4,438.03
87Removing bearings (structure) 001. B-67-129 (506.7050.S)EACH22$3,600.00$2,200.00$2,200.00$3,600.00$3,600.00$2,638.83
88Removing bearings (structure) 002. B-67-130 (506.7050.S)EACH8$3,600.00$2,200.00$2,200.00$3,600.00$3,600.00$2,638.83
89Removing bearings (structure) 003. B-64-0092 (506.7050.S)EACH14$3,600.00$2,200.00$2,200.00$3,600.00$3,600.00$2,638.83
90Removing bearings (structure) 004. B-64-0093 (506.7050.S)EACH12$3,600.00$2,200.00$2,200.00$3,600.00$3,600.00$2,638.83
91Preparation decks type 1 (509.0301)SY226$225.00$200.00$200.00$225.00$225.00$239.89
92Preparation decks type 2 (509.0302)SY92$235.00$260.00$260.00$235.00$235.00$311.86
93Sawing pavement deck preparation areas (509.0310.S)LF230$8.00$6.00$6.00$8.00$8.00$6.09
94Cleaning decks (509.0500)SY3,053$15.00$26.00$26.00$15.00$15.00$31.19
95Joint repair (509.1000)SY102$2,800.00$1,800.00$1,800.00$2,800.00$2,800.00$1,826.77
96Curb repair (509.1200)LF18$160.00$135.00$135.00$160.00$160.00$137.01
97Concrete surface repair (509.1500)SF1,383$215.00$190.00$190.00$215.00$215.00$192.83
98Full-depth deck repair (509.2000)SY2$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00$1,522.31
99Concrete masonry deck repair (509.2100.S)CY24$100.00$1,200.00$1,200.00$100.00$100.00$1,217.85
100Concrete masonry overlay decks (509.2500)CY312$1,300.00$1,100.00$1,100.00$1,300.00$1,300.00$1,116.36
101Polymer overlay (509.5100.S)SY1,014$47.00$52.06$52.06$46.26$52.06$52.27
102Removing asphaltic concrete deck overlay (structure) 001. B-64-86 (509.9010.S)SY1,596$7.07$6.57$6.57$7.07$7.07$6.67
103Removing asphaltic concrete deck overlay (structure) 002. B-64-87 (509.9010.S)SY1,389$7.31$6.81$6.81$7.31$7.31$6.91
104Temporary shoring (511.1100)SF100$185.00$180.00$180.00$185.00$200.00$215.90
105Railing steel type C2 (513.7011)LF571$180.00$217.00$217.00$180.00$180.00$220.23
106Removing and resetting tubular railing (structure) 001. B-64-88 (513.9006.S)EACH3$1,500.00$2,000.00$2,000.00$1,500.00$1,500.00$2,029.75
107Removing and resetting tubular railing (structure) 002. B-67-130 (513.9006.S)EACH3$1,500.00$2,000.00$2,000.00$1,500.00$1,500.00$2,029.75
108Rubberized membrane waterproofing (516.0500)SY14$40.00$50.00$50.00$40.00$40.00$50.74
109Preparation and coating of top flanges (structure) 001. B-64-86 (517.0901.S)EACH1$6,000.00$4,650.00$4,650.00$6,000.00$6,000.00$4,719.17
110Preparation and coating of top flanges (structure) 002. B-64-87 (517.0901.S)EACH1$6,000.00$4,650.00$4,650.00$6,000.00$6,000.00$4,719.17
111Preparation and coating of top flanges (structure) 003. B-64-89 (517.0901.S)EACH1$8,480.00$24,100$24,100$8,480.00$8,480.00$24,458
112Preparation and coating of top flanges (structure) 004. B-64-0094 (517.0901.S)EACH1$23,040$81,620$81,620$23,040$23,040$82,834
113Apron endwalls for culvert pipe 12- inch (520.1012)EACH2$330.00$710.36$550.00$328.00$568.63$776.03
114Apron endwalls for culvert pipe 15- inch (520.1015)EACH2$430.00$756.21$600.00$376.00$606.25$817.35
115Apron endwalls for culvert pipe 18- inch (520.1018)EACH20$476.00$831.95$650.00$441.00$657.15$876.19
116Apron endwalls for culvert pipe 24- inch (520.1024)EACH2$470.00$974.34$780.00$629.00$785.49$867.43
117Apron endwalls for culvert pipe 36- inch (520.1036)EACH2$1,260.00$1,591.27$1,500.00$1,376.00$1,385.16$1,940.75
118Apron endwalls for culvert pipe 72- inch (520.1072)EACH1$4,030.00$4,282.14$4,600.00$14,004$5,416.78$8,977.71
119Culvert pipe temporary 12-inch (520.2012)LF164$44.50$39.87$40.00$51.00$83.22$170.62
120Culvert pipe temporary 15-inch (520.2015)LF66$52.50$44.66$46.00$59.00$87.05$178.56
121Culvert pipe temporary 18-inch (520.2018)LF1,157$52.00$46.87$50.00$69.00$85.94$154.91
122Culvert pipe temporary 24-inch (520.2024)LF44$71.00$70.18$74.00$85.00$103.01$258.37
123Culvert pipe temporary 36-inch (520.2036)LF61$96.00$101.12$156.00$118.00$124.53$281.58
124Culvert pipe temporary 72-inch (520.2072)LF28$328.00$430.31$576.00$484.00$407.40$692.64
125Concrete collars for pipe (520.8000)EACH35$704.00$1,136.96$1,650.00$987.00$769.22$2,028.93
126Cleaning culvert pipes (520.8700)EACH54$750.00$1,775.00$1,775.00$2,027.00$1,350.00$1,949.33
127Apron endwalls for culvert pipe steel 24-inch (521.1024)EACH2$470.00$764.63$780.00$381.00$1,643.93$867.43
128Culvert pipe corrugated steel 24- inch (521.3124)LF44$105.00$91.26$96.00$166.00$158.42$177.53
129Culvert pipe reinforced concrete class III 24-inch (522.0124)LF283$93.00$72.50$94.00$99.00$164.51$148.61
130Culvert pipe reinforced concrete class III 30-inch (522.0130)LF80$118.00$121.86$138.00$145.00$211.59$127.07
131Culvert pipe reinforced concrete class III 36-inch (522.0136)LF32$139.00$143.62$158.00$170.00$272.66$245.63
132Culvert pipe reinforced concrete class III 42-inch (522.0142)LF222$180.00$163.79$214.00$250.00$240.07$302.94
133Culvert pipe reinforced concrete class III 48-inch (522.0148)LF16$215.00$204.51$360.00$292.00$378.73$468.83
134Culvert pipe reinforced concrete class III 60-inch (522.0160)LF48$425.00$301.36$450.00$388.00$407.02$563.70
135Culvert pipe reinforced concrete class III 66-inch (522.0166)LF32$586.00$337.31$494.00$434.00$448.70$551.83
136Culvert pipe reinforced concrete class III 72-inch (522.0172)LF32$633.00$429.73$644.00$528.00$572.86$630.08
137Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF640$109.00$84.04$104.00$99.00$164.96$151.59
138Culvert pipe reinforced concrete class IV 30-inch (522.0430)LF80$131.00$109.23$144.00$216.00$162.99$167.46
139Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH13$1,260.00$1,501.39$1,900.00$1,286.00$2,762.80$1,828.34
140Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH34$1,460.00$1,714.55$2,060.00$1,486.00$2,598.17$1,992.67
141Apron endwalls for culvert pipe reinforced concrete 30-inch (522.1030)EACH14$1,430.00$1,931.80$2,400.00$1,709.00$3,124.18$2,245.26
142Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH5$2,360.00$3,043.46$3,000.00$2,334.00$2,987.59$3,097.76
143Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042)EACH8$2,730.00$3,405.59$3,800.00$2,842.00$4,412.50$3,537.68
144Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048)EACH4$2,980.00$3,657.89$4,100.00$3,516.00$4,850.86$4,044.15
145Apron endwalls for culvert pipe reinforced concrete 60-inch (522.1060)EACH3$3,870.00$4,530.65$5,000.00$4,698.00$6,572.96$5,131.40
146Apron endwalls for culvert pipe reinforced concrete 66-inch (522.1066)EACH2$4,440.00$4,836.62$5,300.00$5,436.00$7,963.17$4,944.00
147Concrete masonry ancillary structures type NS (531.1100)CY52.20$900.00$900.00$900.00$900.00$900.00$989.60
148Steel reinforcement HS ancillary structures type NS (531.1140)LB7,225$4.00$4.00$4.00$4.00$4.00$4.34
149Drilling shaft 24-inch (531.2024)LF437$85.00$85.00$85.00$85.00$85.00$81.37
150Drilling shaft 36-inch (531.2036)LF30$192.07$150.00$192.07$192.07$150.00$150.62
151Foundation camera pole 50-FT (531.4050)EACH3$6,122.47$6,451.80$6,122.47$6,122.47$6,451.80$6,478.25
152Concrete curb & gutter 30-inch type A (601.0409)LF1,285$30.00$30.00$30.00$30.00$30.00$40.28
153Concrete curb & gutter 30-inch type D (601.0411)LF2,272$29.00$29.00$29.00$29.00$29.00$35.64
154Concrete curb & gutter 6-inch sloped 30-inch type G (601.0413)LF231$30.00$30.00$30.00$30.00$30.00$67.21
155Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF319$30.00$30.00$30.00$30.00$30.00$59.12
156Concrete curb & gutter 4-inch sloped 30-inch type J (601.0576)LF116$33.00$33.00$33.00$33.00$33.00$79.04
157Concrete curb & gutter 4-inch sloped 36-inch type TBT (601.0588)LF943$30.00$30.00$30.00$30.00$30.00$64.28
158Concrete curb & gutter 4-inch sloped 36-inch type TBTT (601.0590)LF229$33.00$33.00$33.00$33.00$33.00$64.08
159Concrete curb pedestrian (601.0600)LF23$50.00$50.00$50.00$50.00$50.00$236.01
160Concrete sidewalk 5-inch (602.0410)SF3,550$12.90$12.90$12.90$12.90$12.90$17.33
161Curb ramp detectable warning field yellow (602.0505)SF80$50.00$50.00$50.00$50.00$50.00$53.40
162Curb ramp detectable warning field radial yellow (602.0605)SF64$60.00$60.00$60.00$60.00$60.00$65.27
163Concrete safety islands (602.2400)SF1,690$28.00$28.00$28.00$28.00$28.00$35.60
164Concrete surface drains (602.3010)CY47$1,100.00$1,100.00$1,100.00$1,100.00$1,100.00$967.19
165Concrete rumble strips, shoulder divided roadway (602.3210)LF102,175$0.84$0.85$0.85$0.85$0.85$0.29
166Concrete barrier temporary precast delivered (603.8000)LF112,762$8.50$8.06$10.50$8.25$8.25$12.46
167Concrete barrier temporary precast installed (603.8125)LF113,100$3.50$5.50$5.00$3.25$3.25$5.93
168Anchoring concrete barrier temporary precast (603.8500)LF2,050$5.50$15.00$10.00$5.50$5.50$11.87
169Slope paving repair crushed aggregate (604.9010.S)CY218$140.00$140.00$140.00$140.00$140.00$131.95
170Reseal crushed aggregate slope paving (604.9015.S)SY5,095$17.00$17.00$17.00$17.00$15.17$20.89
171Riprap light (606.0100)CY2$1,390.00$315.61$400.00$600.00$277.87$816.04
172Riprap medium (606.0200)CY638$167.00$142.67$260.00$125.00$87.88$157.20
173Riprap heavy (606.0300)CY36$481.00$157.75$260.00$157.00$96.79$263.79
174Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF567$83.50$69.99$64.00$78.00$122.27$100.28
175Storm sewer pipe reinforced concrete class III 24-inch (608.0324)LF1,256$95.00$224.30$80.00$91.00$118.45$223.68
176Storm sewer pipe reinforced concrete class III 30-inch (608.0330)LF254$120.00$123.92$132.00$160.00$212.25$212.19
177Storm sewer pipe reinforced concrete class III 42-inch (608.0342)LF224$195.00$198.73$192.00$246.00$226.58$418.62
178Storm sewer pipe reinforced concrete class III 48-inch (608.0348)LF235$231.00$216.74$298.00$269.00$285.18$369.77
179Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF98$78.50$86.49$66.00$80.00$129.05$93.76
180Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF340$98.50$102.59$86.00$109.00$163.01$159.16
181Storm sewer pipe reinforced concrete class IV 30-inch (608.0430)LF16$135.00$158.18$140.00$241.00$286.76$239.94
182Storm sewer pipe reinforced concrete class IV 36-inch (608.0436)LF274$155.00$150.24$172.00$201.00$207.02$271.87
183Storm sewer pipe reinforced concrete class V 18-inch (608.0518)LF797$89.00$88.08$70.00$78.00$109.23$113.57
184Reconstructing inlets (611.0430)EACH3$538.00$549.31$1,800.00$2,128.00$2,184.87$2,839.16
185Manhole covers type J (611.0530)EACH3$1,020.00$444.77$428.00$1,228.00$1,399.24$947.10
186Inlet covers type C (611.0612)EACH4$916.00$748.93$786.00$1,377.00$1,423.61$947.10
187Inlet covers type MS (611.0642)EACH26$714.00$743.83$814.00$573.00$1,409.69$983.70
188Manholes 3-FT diameter (611.2003)EACH3$1,670.00$2,943.52$2,100.00$1,635.00$2,658.93$2,588.52
189Inlets 3-FT diameter (611.3003)EACH2$1,080.00$2,939.43$1,740.00$1,507.00$2,533.67$2,519.66
190Inlets median 2 grate (611.3902)EACH13$2,350.00$3,972.92$3,800.00$3,248.00$2,920.30$3,141.78
191Adjusting inlet covers (611.8115)EACH3$619.00$549.31$1,300.00$628.00$914.14$816.94
192Cover plates temporary (611.8120.S)EACH1$5,000.00$565.32$210.00$1,500.00$710.60$1,059.58
193Pipe underdrain 6-inch (612.0106)LF4,250$13.50$10.80$11.00$7.20$16.27$29.40
194Pipe underdrain unperforated 6- inch (612.0206)LF540$17.00$7.83$11.00$7.93$20.45$49.83
195Apron endwalls for underdrain reinforced concrete 6-inch (612.0806)EACH17$346.00$333.02$500.00$330.00$447.16$959.91
196Anchor assemblies for steel plate beam guard (614.0150)EACH14$150.00$450.00$450.00$150.00$150.00$456.69
197Steel thrie beam structure approach (614.0200)LF21$95.00$95.00$95.00$95.00$95.00$104.46
198Steel thrie beam bullnose terminal (614.0220)EACH6$15,500$15,500$15,500$15,500$15,500$16,273
199Steel thrie beam (614.0230)LF450$38.00$38.00$38.00$38.00$38.00$41.23
200Steel plate beam guard short radius (614.0345)LF25$40.00$40.00$40.00$40.00$40.00$38.48
201Steel plate beam guard short radius terminal (614.0390)EACH1$3,250.00$3,250.00$3,250.00$3,250.00$3,250.00$2,748.89
202Guardrail mow strip emulsified asphalt (614.0397)SY3,438$14.00$14.00$14.00$14.00$11.18$20.89
203Crash cushions temporary (614.0905)EACH3$6,060.00$6,000.00$6,025.00$6,025.00$6,000.00$6,024.60
204MGS guardrail temporary (614.1000)LF302$26.00$26.00$26.00$26.00$26.00$27.49
205MGS guardrail temporary thrie beam transition (614.1100)LF320$80.00$80.00$80.00$80.00$80.00$97.86
206MGS guardrail temporary terminal eat (614.1200)EACH8$4,900.00$4,900.00$4,900.00$4,900.00$4,900.00$3,683.51
207MGS guardrail 3 (614.2300)LF4,367$29.00$29.00$29.00$29.00$29.00$30.79
208MGS thrie beam transition (614.2500)LF1,080$91.00$91.00$91.00$91.00$91.00$101.16
209MGS guardrail terminal eat (614.2610)EACH27$4,900.00$4,900.00$4,900.00$4,900.00$4,900.00$4,398.22
210MGS guardrail terminal type 2 (614.2620)EACH2$3,800.00$3,800.00$3,800.00$3,800.00$3,800.00$3,023.77
211Fence woven wire (height) 001. 4- FT (616.0100)LF448$20.00$20.00$20.00$20.00$20.00$13.74
212Maintenance and repair of haul roads (project) 001. 1090-09-75 (618.0100)EACH1$1.00$1.00$100.00$100.00$0.01$2,500.00
213Maintenance and repair of haul roads (project) 002. 1090-09-77 (618.0100)EACH1$1.00$1.00$100.00$100.00$0.01$2,500.00
214Mobilization (619.1000)EACH1$4,135,230$12,709,000$9,896,996$3,840,833$3,900,000$5,293,765
215Concrete median sloped nose (620.0300)SF263$20.00$20.00$20.00$20.00$20.00$35.60
216Dust control surface treatment (623.0200)SY565,387$0.05$0.01$0.01$0.01$0.01$0.10
217Water (624.0100)MGAL10,713$5.00$50.00$80.00$10.00$0.01$48.93
218Salvaged topsoil (625.0500)SY504,012$1.10$1.13$1.50$1.08$0.01$1.75
219Mulching (627.0200)SY5,000$0.50$0.50$0.50$0.50$0.50$0.27
220Silt fence (628.1504)LF76,498$2.25$1.95$1.95$1.95$1.95$2.14
221Silt fence maintenance (628.1520)LF76,498$0.01$0.01$0.01$0.01$0.01$0.01
222Silt fence heavy duty (628.1530.S)LF3,500$7.00$7.00$7.00$7.00$7.00$13.19
223Silt fence heavy duty maintenance (628.1535.S)LF3,500$0.01$0.01$0.01$0.01$0.01$1.10
224Mobilizations erosion control (628.1905)EACH14$150.00$150.00$150.00$150.00$150.00$1.10
225Mobilizations emergency erosion control (628.1910)EACH20$150.00$150.00$150.00$150.00$150.00$1.10
226Erosion mat class I type B (628.2004)SY482,242$1.00$1.00$1.00$1.00$1.00$1.01
227Erosion mat urban class I type B (628.2008)SY21,315$1.85$1.85$1.85$1.85$1.85$1.76
228Erosion mat class II type C (628.2027)SY300$5.00$5.00$5.00$5.00$5.00$4.40
229Inlet protection type A (628.7005)EACH32$125.00$125.00$125.00$125.00$125.00$137.44
230Inlet protection type B (628.7010)EACH51$75.00$75.00$75.00$75.00$75.00$65.97
231Inlet protection type C (628.7015)EACH17$75.00$75.00$75.00$75.00$75.00$65.97
232Inlet protection type D (628.7020)EACH27$125.00$125.00$125.00$125.00$125.00$129.75
233Temporary ditch checks (628.7504)LF9,595$3.00$3.00$3.00$3.00$3.00$8.25
234Culvert pipe checks (628.7555)EACH128$20.00$20.00$20.00$20.00$20.00$21.99
235Tracking pads (628.7560)EACH84$150.00$1.00$100.00$100.00$1.00$100.00
236Rock bags (628.7570)EACH138$20.00$20.00$20.00$20.00$20.00$21.99
237Fertilizer type B (629.0210)CWT864.59$0.01$0.01$0.01$0.01$0.01$76.97
238Seeding mixture no. 10 (630.0110)LB145$7.00$7.00$7.00$7.00$7.00$8.25
239Seeding mixture no. 30 (630.0130)LB21,714$7.00$7.00$7.00$7.00$7.00$7.64
240Seeding mixture no. 60 (630.0160)LB283$25.00$25.00$25.00$25.00$25.00$8.25
241Seeding temporary (630.0200)LB13,665$1.90$1.90$1.90$1.90$1.90$3.57
242Seed water (630.0500)MGAL10,444$0.01$0.01$0.01$0.01$0.01$1.10
243Delineator posts steel (633.0100)EACH572$55.00$55.00$55.00$55.00$55.00$68.72
244Delineator reflectors (633.0500)EACH713$12.00$12.00$12.00$12.00$12.00$13.74
245Delineators temporary (633.1100)EACH532$30.30$30.00$23.95$23.95$30.00$32.99
246Markers culvert end (633.5200)EACH157$75.00$75.00$75.00$75.00$75.00$65.97
247Posts wood 4X6-inch X 18-FT (634.0618)EACH224$135.00$135.00$135.00$135.00$135.00$109.96
248Posts wood 4X6-inch X 22-FT (634.0622)EACH181$165.00$165.00$165.00$165.00$165.00$126.45
249Sign supports structural steel HS (635.0200)LB27,750$6.25$6.25$6.25$6.25$6.25$4.40
250Signs type I reflective SH (637.1220)SF3,496$32.00$32.00$32.00$32.00$32.00$30.24
251Signs type II reflective H (637.2210)SF3,359.99$23.00$23.00$23.00$23.00$23.00$21.99
252Signs type II reflective H folding (637.2215)SF147$40.00$40.00$40.00$40.00$40.00$29.69
253Signs type II reflective F (637.2230)SF555.25$25.00$25.00$25.00$25.00$25.00$21.99
254Moving signs type I (638.2101)EACH2$2,000.00$2,000.00$2,000.00$2,000.00$2,000.00$494.80
255Moving signs type II (638.2102)EACH6$200.00$200.00$200.00$200.00$200.00$109.96
256Removing signs type I (638.2601)EACH22$250.00$250.00$250.00$250.00$250.00$384.84
257Removing signs type II (638.2602)EACH256$35.00$35.00$35.00$35.00$35.00$27.49
258Removing small sign supports (638.3000)EACH305$35.00$35.00$35.00$35.00$35.00$32.99
259Removing structural steel sign supports (638.3100)EACH46$725.00$725.00$725.00$725.00$725.00$384.84
260Traffic control drums (643.0300)DAY766,032$0.02$0.02$0.10$0.10$0.02$0.02
261Digital speed reduction system (DSRS) (643.0370.S)DAY350$101.00$100.00$105.00$105.00$100.00$100.41
262Traffic control barricades type III (643.0420)DAY67,682$0.22$0.22$0.44$0.44$0.22$0.22
263Traffic control flexible tubular marker posts (643.0500)EACH196$35.35$35.00$38.75$38.75$35.00$35.14
264Traffic control flexible tubular marker bases (643.0600)EACH196$1.01$1.00$12.50$12.50$1.00$1.00
265Traffic control warning lights type A (643.0705)DAY96,220$0.05$0.05$0.12$0.12$0.05$0.05
266Traffic control warning lights type C (643.0715)DAY148,370$0.05$0.05$0.12$0.12$0.05$0.05
267Traffic control connected arrow boards (643.0810)DAY1,322$5.05$5.00$9.85$9.85$5.00$5.02
268Traffic control signs (643.0900)DAY174,653$0.25$0.25$0.18$0.18$0.25$0.25
269Traffic control covering signs type I (643.0910)EACH33$227.25$225.00$275.00$275.00$225.00$225.92
270Traffic control covering signs type II (643.0920)EACH123$30.30$30.00$105.00$105.00$30.00$30.12
271Traffic control signs fixed message (643.1000)SF1,333$25.25$25.00$26.00$26.00$25.00$25.10
272Traffic control signs PCMS (643.1050)DAY619$20.20$20.00$25.00$25.00$20.00$20.08
273Traffic control cones 42-inch (643.1070)DAY10,138$0.20$0.20$0.20$0.20$0.20$0.20
274Dynamic late merge system (643.1100.S)DAY50$174.53$172.80$225.00$225.00$172.80$173.51
275Portable automated real-time traffic queue warning system (643.1200.S)DAY50$111.50$110.40$175.00$175.00$110.40$110.85
276Basic traffic queue warning system (643.1205.S)DAY706$64.64$64.00$105.00$105.00$64.00$64.26
277Traffic control connected work zone start and end location markers (643.1220)DAY2,043$5.05$5.00$7.00$7.00$5.00$5.02
278Temporary marking line epoxy 6- inch (643.3170)LF826,603$0.59$0.58$0.60$0.60$0.58$0.60
279Temporary marking line removable tape 6-inch (643.3180)LF50,657$1.62$1.60$1.82$1.82$1.60$1.61
280Temporary marking line epoxy 10- inch (643.3270)LF10,956$1.01$1.00$1.54$1.54$1.00$0.99
281Temporary marking line removable tape 10-inch (643.3280)LF2,519$2.68$2.65$3.60$3.60$2.65$2.66
282Temporary marking raised pavement marker type I (643.3760)EACH924$6.06$6.00$6.25$6.25$6.00$6.02
283Temporary marking stop line epoxy 18-inch (643.3820)LF30$4.04$4.00$17.15$17.15$4.00$10.04
284Traffic control interim lane closure (643.4100)EACH21$2,525.00$2,000.00$1,500.00$1,500.00$4,700.00$2,510.25
285Traffic control (643.5000)EACH1$889,810$881,000$609,650$609,650$881,000$884,612
286Temporary pedestrian surface asphalt (644.1410)SF190$15.50$15.50$15.50$15.50$10.00$17.83
287Temporary pedestrian surface matting (644.1440)SF192$15.15$15.00$5.75$5.75$15.00$15.06
288Temporary pedestrian curb ramp (644.1601)DAY222$12.68$12.55$8.00$8.00$12.55$12.60
289Temporary pedestrian barricade (644.1810)LF2,239$8.08$8.00$7.55$7.55$8.00$8.03
290Geotextile type DF schedule A (645.0111)SY3,029$1.20$0.98$5.00$1.15$1.84$0.93
291Geotextile type HR (645.0120)SY1,335$3.70$2.92$6.00$3.00$2.58$7.62
292Geogrid type SR (645.0220)SY688,213$2.20$0.80$1.50$1.00$1.98$2.27
293Marking line epoxy 4-inch (646.1020)LF12,664$0.36$0.36$0.36$0.36$0.36$0.60
294Marking line epoxy 6-inch (646.2020)LF4,752$0.49$0.49$0.49$0.49$0.49$0.75
295Marking line grooved black epoxy 6-inch (646.2025)LF33,290$0.73$0.73$0.73$0.23$0.73$0.95
296Marking line grooved wet ref epoxy 6-inch (646.2040)LF319,045$1.16$1.16$1.16$1.16$1.16$1.36
297Marking line epoxy 8-inch (646.3020)LF1,039$0.97$0.97$0.97$0.97$0.97$1.31
298Marking line epoxy 10-inch (646.4020)LF2,006$1.11$1.11$1.11$1.11$1.11$1.76
299Marking line grooved wet ref epoxy 10-inch (646.4040)LF16,746$2.72$2.72$2.72$2.72$2.72$2.51
300Marking arrow epoxy (646.5020)EACH56$211.35$211.35$211.35$211.35$211.35$301.23
301Marking word epoxy (646.5120)EACH20$216.06$216.06$216.06$216.06$216.06$326.33
302Marking aerial enforcement bar epoxy (646.5420)EACH20$407.22$407.22$407.22$407.22$407.22$331.35
303Marking outfall epoxy (646.5520)EACH17$53.37$53.37$53.37$53.37$53.37$52.21
304Marking stop line epoxy 18-inch (646.6120)LF581$12.61$12.61$12.61$12.61$12.61$15.06
305Marking yield line epoxy 18-inch (646.6220)EACH46$41.06$41.06$41.06$41.06$41.06$48.20
306Marking diagonal epoxy 12-inch (646.7120)LF41$11.43$11.43$11.43$11.43$11.43$12.05
307Marking chevron epoxy 24-inch (646.7220)LF960$20.37$20.37$20.37$20.37$20.37$18.07
308Marking crosswalk epoxy transverse line 6-inch (646.7420)LF621$10.35$10.35$10.35$10.35$10.35$11.05
309Marking corrugated median epoxy (646.8020)SF278$9.62$9.62$9.62$9.62$9.62$9.04
310Marking curb epoxy (646.8120)LF75$8.22$8.22$8.22$8.22$8.22$10.04
311Marking island nose epoxy (646.8220)EACH7$307.15$307.15$307.15$307.15$307.15$326.33
312Marking removal line 4-inch (646.9000)LF37,047$0.45$0.45$0.30$0.30$0.45$0.45
313Marking removal line 6-inch (646.9002)LF3,621$0.56$0.55$0.32$0.32$0.55$0.55
314Marking removal line 8-inch (646.9100)LF1,444$0.81$0.80$1.00$1.00$0.80$0.80
315Marking removal line grooved permanent tape 8-inch (646.9150)LF329$1.26$1.25$5.00$5.00$1.25$1.26
316Conduit rigid metallic 2-inch (652.0125)LF50$68.40$160.18$68.40$68.40$160.18$160.84
317Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF4,188$8.94$7.48$8.94$8.94$7.48$7.51
318Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF1,679$11.94$9.71$11.94$11.94$9.71$9.75
319Conduit special 2-inch (652.0605)LF56$26.72$13.57$26.72$26.72$13.57$13.63
320Conduit special 3-inch (652.0615)LF2,573$27.90$21.64$27.90$27.90$21.64$21.73
321Install conduit into existing item (652.0700.S)EACH1$786.38$727.26$786.38$786.38$727.26$730.24
322Conduit loop detector (652.0800)LF5,372$12.47$7.64$12.47$12.47$7.64$7.67
323Pull boxes steel 24X36-inch (653.0135)EACH24$1,297.94$1,397.26$1,297.94$1,297.94$1,397.26$1,402.99
324Pull boxes steel 24X42-inch (653.0140)EACH43$1,449.46$1,512.60$1,449.46$1,449.46$1,512.60$1,518.80
325Removing pull boxes (653.0905)EACH59$114.69$166.39$114.69$114.69$166.39$167.07
326Concrete bases type 1 (654.0101)EACH1$1,280.44$1,198.38$1,280.44$1,280.44$1,198.38$1,203.29
327Concrete control cabinet bases type 9 special (654.0217)EACH2$2,920.86$3,394.32$2,920.86$2,920.86$3,394.32$3,408.24
328Cable traffic signal 5-14 AWG (655.0230)LF5,779$2.46$2.19$2.46$2.46$2.19$2.20
329Cable traffic signal 7-14 AWG (655.0240)LF1,881$2.89$2.74$2.89$2.89$2.74$2.75
330Cable traffic signal 12-14 AWG (655.0260)LF1,271$4.62$4.53$4.62$4.62$4.53$4.55
331Electrical wire traffic signals 10 AWG (655.0515)LF43,545$1.35$1.17$1.35$1.35$1.17$1.17
332Electrical wire traffic signals 6 AWG (655.0525)LF330$2.40$2.43$2.40$2.40$2.43$2.44
333Electrical wire lighting 10 AWG (655.0615)LF25,580$1.35$1.31$1.35$1.35$1.31$1.32
334Electrical wire lighting 6 AWG (655.0625)LF540$2.40$2.43$2.40$2.40$2.43$2.44
335Loop detector lead in cable (655.0700)LF22,037$1.81$1.83$1.81$1.81$1.83$1.84
336Loop detector wire (655.0800)LF19,378$1.13$1.45$1.13$1.13$1.45$1.46
337Traffic signal evp detector cable (655.0900)LF3,376$1.69$1.52$1.69$1.69$1.52$1.53
338Electrical service meter breaker pedestal (location) 201. MB-CCTV- 64-0249 (656.0201)EACH1$1,513.29$2,247.47$1,513.29$1,513.29$2,247.47$2,256.68
339Electrical service meter breaker pedestal (location) 202. MB-CCTV- 64-0252 (656.0201)EACH1$1,513.29$2,247.47$1,513.29$1,513.29$2,247.47$2,256.68
340Electrical service meter breaker pedestal (location) 203. MB-CCTV- 64-0253 (656.0201)EACH1$1,513.29$2,247.47$1,513.29$1,513.29$2,247.47$2,256.68
341Electrical service breaker disconnect box (location) 201. CCTV640249 (656.0501)EACH1$931.93$727.26$931.93$931.93$727.26$730.24
342Electrical service breaker disconnect box (location) 202. CCTV640252 (656.0501)EACH1$931.93$727.26$931.93$931.93$727.26$730.24
343Electrical service breaker disconnect box (location) 203. CCTV640253 (656.0501)EACH1$931.93$727.26$931.93$931.93$727.26$730.24
344Traffic signal face 3S 12-inch (658.0173)EACH1$1,243.35$940.25$1,243.35$1,243.35$940.25$944.11
345Pedestrian signal face 16-inch (658.0416)EACH1$1,086.96$622.43$1,086.96$1,086.96$622.43$624.98
346Signal mounting hardware (location) 301. STH 83 & IH 43 NB ramps (658.5070)EACH1$872.64$909.22$872.64$872.64$909.22$912.95
347Signal mounting hardware (location) 302. STH 83 & IH 43 SB ramps (658.5070)EACH1$872.64$909.22$872.64$872.64$909.22$912.95
348Temporary traffic signals for intersections (location) 301. STH 83 & IH 43 NB ramps (661.0201)EACH1$71,510$58,579$71,510$71,510$58,579$58,819
349Temporary traffic signals for intersections (location) 302. STH 83 & IH 43 SB ramps (661.0201)EACH1$62,508$60,013$62,508$62,508$60,013$60,259
350Temporary traffic signals for intersections (location) 303. STH 83 & bay view road (661.0201)EACH1$68,137$60,013$68,137$68,137$60,013$60,259
351Field system integrator (670.0101)EACH2$20,766$25,267$20,766$20,766$25,267$25,371
352ITS documentation (670.0201)EACH2$5,560.65$6,943.59$5,560.65$5,560.65$6,943.59$6,972.06
353Conduit HDPE 2-duct 2-inch (671.0122)LF715$10.52$10.46$10.52$10.52$10.46$10.50
354Conduit HDPE 3-duct 2-inch (671.0132)LF44,605$12.49$14.01$12.49$12.49$14.01$14.07
355Conduit HDPE directional bore 3- duct 2-inch (671.0232)LF7,895$25.54$21.97$25.54$25.54$21.97$22.06
356Fiber optic cable marker (671.0300)EACH70$124.26$171.42$124.26$124.26$171.42$172.12
357Communication vault type 1 (673.0105)EACH38$3,668.27$3,418.36$3,668.27$3,668.27$3,418.36$3,432.38
358Tracer wire marker posts (673.0200)EACH6$248.51$490.24$248.51$248.51$490.26$492.25
359Install pole mounted cabinet (673.1225.S)EACH3$2,539.84$5,854.79$2,539.84$2,539.00$5,854.79$5,878.79
360Install camera pole 50-FT (677.0150)EACH3$4,500.64$4,179.48$4,500.64$4,500.64$4,179.48$4,196.62
361Install camera assembly (677.0200)EACH3$2,945.30$2,098.04$2,945.30$2,945.30$2,098.04$2,106.64
362Install fiber optic cable outdoor plant 6-CT (678.0006)LF1,495$1.29$1.38$1.29$1.29$1.38$1.39
363Install fiber optic cable outdoor plant 72-CT (678.0072)LF55,440$1.29$1.01$1.29$1.29$1.01$1.01
364Fiber optic splice enclosure (678.0200)EACH5$1,216.39$1,533.99$1,216.39$1,216.39$1,533.99$1,540.28
365Fiber optic splice (678.0300)EACH368$57.92$83.42$57.92$57.92$83.42$83.76
366Fiber optic termination (678.0400)EACH12$347.54$432.45$347.54$347.54$432.45$434.22
367Communication system testing (678.0501)EACH2$5,560.65$7,245.97$5,560.65$5,560.65$7,245.97$7,275.68
368Install ethernet switches (678.0600)EACH3$1,042.62$1,392.67$1,042.62$1,042.62$1,392.67$1,398.38
369Sawing asphalt (690.0150)LF48,664$1.60$1.35$1.35$1.60$1.35$1.76
370Sawing concrete (690.0250)LF4,631$3.25$2.65$2.65$3.22$2.65$2.76
371Incentive strength concrete structures (715.0502)DOL7,858$1.00$1.00$1.00$1.00$1.00$1.00
372Incentive flexural strength concrete pavement (715.0715)DOL113,446$1.00$1.00$1.00$1.00$1.00$1.00
373Incentive iri ride (740.0440)DOL79,541$1.00$1.00$1.00$1.00$1.00$1.00
374Railroad flagging reimbursement (801.0117)DOL22,500$1.00$1.00$1.00$1.00$1.00$1.00
375On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS14,000$5.00$5.00$5.00$5.00$5.00$5.00
376On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS27,000$5.00$5.00$5.00$5.00$5.00$5.00
377Special 001. removing concrete pavement modified (SPV.0035)CY78,816$62.50$13.24$20.00$6.62$15.86$15.27
378Special 002. removing asphaltic surface modified (SPV.0035)CY117,152$17.00$3.10$20.00$9.52$5.29$8.65
379Special 001. baseline CPM progress schedule (SPV.0060)EACH1$25,000$1,000.00$1.00$15,000$0.01$100.00
380Special 002. monthly CPM progress schedule updates (SPV.0060)EACH41$550.00$100.00$1.00$500.00$0.01$10.00
381Special 003. survey project 1090- 09-75 (SPV.0060)EACH1$227,250$225,000$225,000$225,000$125,000$267,015
382Special 004. survey project 1090- 09-77 (SPV.0060)EACH1$166,650$165,000$165,000$165,000$125,000$195,811
383Special 005. exposing existing infrastructure paved area (SPV.0060)EACH16$1,000.00$2,000.00$4,250.00$4,000.00$1,000.00$8,706.76
384Special 006. exposing existing infrastructure unpaved area (SPV.0060)EACH16$700.00$1,000.00$3,000.00$1,250.00$1,500.00$3,174.17
385Special 007. drilled high performance dowel bars (SPV.0060)EACH325$21.03$30.00$21.03$21.03$21.03$19.55
386Special 008. mobilizations emergency pavement repair (SPV.0060)EACH10$1,480.00$7,000.00$4,730.00$2,830.00$4,700.00$1,490.72
387Special 009. traffic control close- open freeway ramp (SPV.0060)EACH14$1,212.00$1,200.00$600.00$600.00$1,200.00$1,204.92
388Special 010. traffic control full freeway closure (SPV.0060)EACH18$2,626.00$2,600.00$3,200.00$3,200.00$2,600.00$2,610.66
389Special 011. traffic control local road lane closure (SPV.0060)EACH20$808.00$800.00$1,600.00$1,600.00$800.00$803.28
390Special 012. emergency response to traffic incident involving concrete barrier temporary (SPV.0060)EACH12$6,868.00$1,500.00$2,325.00$4,325.00$5,200.00$610.32
391Special 013. emergency response to traffic incident involving temporary crash cushion (SPV.0060)EACH8$2,525.00$2,600.00$1,250.00$1,250.00$2,600.00$2,610.66
392Special 014. temporary concrete barrier gate, 24-FT (SPV.0060)EACH19$17,170$17,000$7,850.00$7,850.00$17,000$17,070
393Special 201. ground rod (SPV.0060)EACH3$227.56$374.67$227.56$227.56$374.67$376.21
394Special 202. enter existing splice enclosure (SPV.0060)EACH1$1,216.39$872.71$1,216.39$1,216.39$872.71$876.29
395Special 301. TRNSPT & install state furn traffic control cabinet STH 83 & IH 43 NB ramp (SPV.0060)EACH1$727.83$4,363.56$727.83$727.83$4,363.56$4,381.45
396Special 302. TRNSPT & install state furn traffic control cabinet STH 83 & IH 43 SB ramp (SPV.0060)EACH1$727.83$4,363.56$727.83$727.83$4,363.56$4,381.45
397Special 401. replace diaphragm bolt (SPV.0060)EACH2$3,000.00$500.00$500.00$3,000.00$3,000.00$599.73
398Special 402. parapet repair (SPV.0060)EACH6$3,500.00$10,000$10,000$3,500.00$3,500.00$11,995
399Special 403. strapping B-64-89 (SPV.0060)EACH2$4,000.00$2,500.00$2,500.00$4,000.00$4,000.00$2,998.67
400Special 404. strapping B-64-113 (SPV.0060)EACH3$4,000.00$2,500.00$2,500.00$4,000.00$4,000.00$2,998.67
401Special 405. cleaning and sealing concrete girder repair (SPV.0060)EACH11$500.00$500.00$500.00$500.00$500.00$599.73
402Special 801. connect to existing inlet (SPV.0060)EACH1$1,480.00$3,457.98$1,200.00$2,187.00$1,587.95$2,365.97
403Special 001. pavement cleanup project 1090-09-75 (SPV.0075)HRS300$200.00$0.01$150.00$175.00$200.00$175.72
404Special 002. pavement cleanup project 1090-09-77 (SPV.0075)HRS300$200.00$0.01$150.00$175.00$200.00$175.72
405Special 003. animal carcass and debris removal (SPV.0075)HRS124$229.00$0.01$150.00$325.00$150.00$415.54
406Special 001. sealing cracks and joints with hot-applied sealant (SPV.0085)LB247.25$38.00$81.25$81.25$5.00$19.70$5.02
407Special 001. marking epoxy 6-inch black non-grooved (SPV.0090)LF439$0.39$0.39$0.39$0.39$0.39$0.85
408Special 002. glare screens temporary (SPV.0090)LF112,762$0.25$0.25$5.50$5.50$0.25$0.25
409Special 003. RE-lap guardrail (SPV.0090)LF2,820$8.00$8.00$8.00$8.00$8.00$13.19
410Special 001. field facilities office space (SPV.0135)MON30$8,600.00$20,000$15,000$7,500.00$2,500.00$3,500.00
411Special 001. anchored median curb (SPV.0165)SF270$25.00$25.00$25.00$25.00$25.00$59.34
412Special 401. removing loose concrete (SPV.0165)SF214$155.00$50.00$50.00$155.00$155.00$59.97
413Special 402. fiber wrap reinforcing non-structural (SPV.0165)SF261$98.00$94.00$94.00$98.00$98.00$112.75
414Special 403. prestressed girder surface repair (SPV.0165)SF51$240.00$380.00$380.00$240.00$240.00$455.80
415Special 001. excavation of phragmites contaminated soil (SPV.0180)SY7,875$37.00$42.70$45.00$47.42$18.26$55.04
416Special 002. herbicide application (SPV.0180)SY7,875$1.50$1.50$1.50$1.50$1.50$2.75
417Special 003. HPC pavement 8 1/2- inch (SPV.0180)SY37,146$60.45$61.31$60.45$60.45$60.45$70.74
418Special 004. HPC pavement 10- inch (SPV.0180)SY338,373$46.22$51.00$46.22$46.22$46.22$59.74
419Special 401. methacrylate flood seal (SPV.0180)SY5,057$18.00$15.58$15.58$17.98$15.58$15.64
420Special 402. abutment seat cleaning and sealing (SPV.0180)SY34$140.00$150.00$150.00$140.00$140.00$179.92
421Special 001. HMA longitudinal joint repair (SPV.0195)TON367$113.00$113.00$113.00$113.00$184.74$290.62
WisDOT contract 20260811009: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of August 11, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy