WisDOT contract 20260811015 bid tabulation

Plover - Waupaca; Maple Drive to I-39 (STH 054, Portage County Plover - Waupaca). Let by Wisconsin DOT on August 11, 2026, Portage. 7 bids received; low bid $2,095,063 by Hoffman Construction Company.

Owner
Wisconsin DOT
Letting
11 AUG 2026
Pay items
113
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Hoffman Construction Company$2,095,063Low
2James Peterson Sons, Inc.$2,197,435+5.0%
3Gerke Excavating Inc$2,198,184+5.0%
4Musson Bros., Inc.$2,405,647+15%
5Haas Sons, Inc.$2,497,285+19%
6Vinton Construction Company$2,519,116+20%
7A-1 Excavating LLC$2,742,666+31%
WisDOT contract 20260811015: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Hoffman Construction Company2. James Peterson Sons, Inc.3. Gerke Excavating Inc4. Musson Bros., Inc.5. Haas Sons, Inc.6. Vinton Construction Company
1Removing small pipe culverts (203.0100)EACH10$1,000.00$1,200.00$617.45$494.12$1,400.00$861.10
2Removing concrete pavement (204.0100)SY26,880$5.00$5.48$4.00$3.59$4.55$1.50
3Removing asphaltic surface (204.0110)SY420$10.00$4.85$4.56$5.44$4.00$10.00
4Removing curb & gutter (204.0150)LF28$25.00$25.30$11.49$65.88$7.00$12.91
5Removing concrete sidewalk (204.0155)SY8$100.00$50.00$36.31$82.36$100.00$27.29
6Removing guardrail (204.0165)LF460$2.50$2.50$2.63$2.50$2.50$2.50
7Excavation common (205.0100)CY14,148$10.00$4.50$5.20$7.50$14.00$16.74
8Backfill granular grade 1 (209.1500)TON30$30.00$16.22$42.15$27.11$29.00$55.68
9Prepare foundation for asphaltic paving (project) 01. 6414-01-74 (211.0101)EACH1$100.00$13,580$30,830$100.00$31,980$31,980
10Finishing roadway (project) 01. 6414-01-74 (213.0100)EACH1$100.00$2,000.00$4,286.54$100.00$1.00$5,000.00
11Base aggregate dense 3/4-inch (305.0110)TON3,060$0.01$16.45$25.07$24.27$23.00$22.50
12Base aggregate dense 1 1/4-inch (305.0120)TON10,570$0.01$10.95$9.87$20.99$16.00$17.70
13Drilled tie bars (416.0610)EACH206$12.13$12.13$12.74$12.13$12.13$10.00
14Drilled dowel bars (416.0620)EACH256$16.59$16.59$17.42$16.59$16.59$18.50
15Concrete pavement replacement (416.1720)SY505$135.10$135.10$141.86$135.10$135.10$135.00
16Tack coat (455.0605)GAL2,598$4.68$4.68$4.91$4.68$4.68$4.68
17Incentive density HMA pavement (460.2000)DOL6,090$1.00$1.00$1.00$1.00$1.00$1.00
18HMA pavement 3 MT 58-28 S (460.6223)TON6,520$88.38$88.38$92.80$88.38$88.38$88.38
19HMA pavement 4 MT 58-28 H (460.6424)TON2,990$102.74$102.74$107.88$102.74$102.74$102.74
20Asphaltic surface driveways and field entrances (465.0120)TON70$220.86$220.86$231.90$220.86$220.86$220.86
21Asphaltic surface safety islands (465.0305)TON1$550.00$550.00$577.50$550.00$550.00$550.00
22Asphaltic rumble strips, shoulder (465.0520)LF2,390$1.91$0.75$2.24$1.92$1.00$0.75
23Asphaltic rumble strips, centerline (465.0560)LF5,570$0.78$0.75$0.97$0.78$1.00$0.75
24Sheet membrane waterproofing for buried structures (516.0610.S)SY103$70.00$58.00$65.10$62.00$145.00$137.69
25Culvert pipe reinforced concrete class IV 18-inch (522.0418)LF64$75.00$92.94$98.55$105.34$90.00$133.84
26Culvert pipe reinforced concrete class IV 24-inch (522.0424)LF400$95.00$110.48$110.13$144.10$133.00$169.29
27Culvert pipe reinforced concrete class IV 48-inch (522.0448)LF128$215.00$219.98$236.53$406.41$450.00$419.24
28Culvert pipe reinforced concrete class IV 54-inch (522.0454)LF112$325.00$291.58$309.98$499.26$565.00$535.27
29Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH2$1,200.00$840.28$1,192.33$1,274.35$1,700.00$1,513.35
30Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024)EACH8$1,500.00$1,145.90$2,012.16$1,453.80$1,905.00$1,628.13
31Apron endwalls for culvert pipe reinforced concrete 48-inch (522.1048)EACH4$4,500.00$4,267.30$4,646.23$3,466.08$4,750.00$4,086.25
32Apron endwalls for culvert pipe reinforced concrete 54-inch (522.1054)EACH4$5,500.00$5,250.23$5,437.40$4,266.81$5,500.00$4,850.00
33Culvert pipe reinforced concrete horizontal elliptical class HE-IV 24X38-inch (522.2424)LF128$215.00$189.40$199.24$232.45$232.00$275.90
34Apron endwalls for culvert pipe reinforced concrete horizontal elliptical 24X38-inch (522.2624)EACH4$1,400.00$1,372.95$2,024.38$2,037.27$2,950.00$2,715.00
35Anchor assemblies poles on structures (531.8990)EACH1$1.00$1,500.00$1.00$1.00$1.00$2,500.00
36Concrete curb & gutter 18-inch type A (601.0405)LF7$113.76$113.76$119.45$113.76$113.76$85.00
37Concrete curb & gutter 30-inch type A (601.0409)LF20$116.16$116.16$121.97$116.16$116.16$85.00
38Concrete sidewalk 6-inch (602.0415)SF65$54.92$54.92$57.67$54.92$54.92$15.00
39Riprap light (606.0100)CY15$160.00$100.00$138.53$407.99$160.00$150.00
40Riprap medium (606.0200)CY150$130.00$125.00$109.62$186.93$98.00$150.00
41Insulation board polystyrene (inch) 01. 2-inch (612.0902.S)SY4$50.00$25.00$285.85$81.04$57.00$42.13
42Guardrail mow strip asphalt (614.0396)SY104$49.80$59.80$52.29$49.80$49.80$49.80
43MGS guardrail 3 (614.2300)LF214$29.85$29.85$31.34$29.85$29.85$29.85
44MGS guardrail 3 L (614.2340)LF226$35.00$35.00$36.75$35.00$35.00$35.00
45MGS guardrail terminal eat (614.2610)EACH4$3,425.00$3,425.00$3,596.25$3,425.00$3,425.00$3,425.00
46Maintenance and repair of haul roads (project) 01. 6414-01-74 (618.0100)EACH1$100.00$0.01$4.12$1.00$1.00$0.01
47Mobilization (619.1000)EACH1$257,319$218,163$207,334$207,050$218,000$269,000
48Water (624.0100)MGAL270$100.00$50.00$40.30$100.69$40.00$40.00
49Topsoil (625.0100)SY2,755$5.00$5.28$4.72$3.92$8.65$7.50
50Silt fence (628.1504)LF3,160$1.95$1.95$2.05$1.95$1.95$1.95
51Silt fence maintenance (628.1520)LF3,160$0.03$0.03$0.03$0.03$0.03$0.03
52Mobilizations erosion control (628.1905)EACH3$285.00$285.00$299.25$285.00$285.00$285.00
53Mobilizations emergency erosion control (628.1910)EACH3$295.00$295.00$309.75$295.00$295.00$295.00
54Erosion mat urban class I type A (628.2006)SY7$3.25$3.25$3.41$3.25$3.25$3.25
55Erosion mat urban class I type B (628.2008)SY2,748$2.50$2.50$2.63$2.50$2.50$2.50
56Temporary ditch checks (628.7504)LF26$15.00$15.00$15.75$15.00$15.00$15.00
57Culvert pipe checks (628.7555)EACH108$22.00$22.00$23.10$22.00$22.00$22.00
58Rock bags (628.7570)EACH64$8.00$8.00$8.40$8.00$8.00$8.00
59Fertilizer type B (629.0210)CWT5$125.00$125.00$131.25$125.00$125.00$125.00
60Seeding mixture no. 30 (630.0130)LB132$8.95$8.95$9.40$8.95$8.95$8.95
61Seeding mixture no. 40 (630.0140)LB2$100.00$100.00$105.00$100.00$100.00$100.00
62Seed water (630.0500)MGAL56$10.00$10.00$10.50$10.00$10.00$10.00
63Markers culvert end (633.5200)EACH22$85.00$85.00$89.25$85.00$85.00$85.00
64Posts wood 4X6-inch X 18-FT (634.0618)EACH23$105.00$105.00$110.25$105.00$105.00$105.00
65Signs type II reflective H (637.2210)SF12.50$60.00$60.00$63.00$60.00$60.00$60.00
66Moving signs type II (638.2102)EACH39$125.00$125.00$131.25$125.00$125.00$125.00
67Removing signs type II (638.2602)EACH2$35.00$35.00$36.75$35.00$35.00$35.00
68Removing small sign supports (638.3000)EACH2$35.00$35.00$36.75$35.00$35.00$35.00
69Field office type B (642.5001)EACH1$20,000$12,500$10,285$20,000$15,000$12,000
70Traffic control drums (643.0300)DAY915$0.50$0.50$0.32$0.50$0.50$0.30
71Traffic control barricades type III (643.0420)DAY1,316$0.60$0.60$0.53$0.60$0.60$0.50
72Traffic control warning lights type A (643.0705)DAY2,712$0.10$0.10$0.01$0.10$0.10$0.01
73Traffic control connected arrow boards (643.0810)DAY10$20.00$20.00$42.00$20.00$20.00$40.00
74Traffic control signs (643.0900)DAY8,165$0.72$0.72$0.37$0.72$0.72$0.35
75Traffic control covering signs type II (643.0920)EACH21$20.00$20.00$36.75$20.00$20.00$35.00
76Traffic control signs fixed message (643.1000)SF36$10.90$10.90$11.03$10.90$10.90$10.50
77Traffic control (643.5000)EACH1$4,350.00$4,350.00$9,817.50$4,350.00$4,350.00$9,350.00
78Geotextile type HR (645.0120)SY300$10.00$4.00$3.72$8.81$6.00$3.90
79Geotextile type R (645.0130)SY23$10.00$40.00$24.38$14.12$17.00$5.00
80Marking line epoxy 6-inch (646.2020)LF500$1.00$1.00$1.05$1.00$0.75$1.00
81Marking line grooved black epoxy 6-inch (646.2025)LF6$10.00$10.00$10.50$10.00$50.00$10.00
82Marking line grooved wet ref epoxy 6-inch (646.2040)LF20,952$1.24$1.24$1.30$1.24$1.38$1.24
83Marking line grooved wet ref epoxy 10-inch (646.4040)LF152$2.75$2.75$2.89$2.75$2.50$2.75
84Marking stop line epoxy 18-inch (646.6120)LF182$13.60$13.60$14.28$13.60$14.00$13.60
85Marking diagonal epoxy 12-inch (646.7120)LF134$13.20$13.20$13.86$13.20$12.00$13.20
86Marking crosswalk epoxy transverse line 6-inch (646.7420)LF92$11.00$11.00$11.55$11.00$11.00$11.00
87Locating no-passing zones (648.0100)MI1.51$555.70$555.70$583.49$555.70$500.00$555.70
88Construction staking subgrade (650.4500)LF348$0.01$0.01$0.01$0.01$0.01$0.75
89Construction staking base (650.5000)LF7,968$0.01$0.78$0.82$0.58$0.58$0.78
90Construction staking pipe culverts (650.6000)EACH11$175.00$175.00$183.75$300.00$300.00$175.00
91Construction staking resurfacing reference (650.8000)LF7,968$0.01$0.14$0.15$0.14$0.14$0.14
92Construction staking electrical installations (project) 01. 6414-01- 74 (650.8501)EACH1$550.00$550.00$577.50$300.00$300.00$550.00
93Construction staking supplemental control (project) 01. 6414-01-74 (650.9911)EACH1$850.00$850.00$892.50$1,560.61$1,560.61$850.00
94Construction staking slope stakes (650.9920)LF881$0.01$0.79$0.83$2.95$2.95$0.79
95Install conduit into existing item (652.0700.S)EACH8$420.00$125.00$441.00$420.00$420.00$125.00
96Conduit loop detector (652.0800)LF566$12.15$6.00$12.76$12.15$12.15$6.00
97Concrete bases type 13 (654.0113)EACH1$22,970$15,000$24,119$22,970$22,970$15,000
98Loop detector lead in cable (655.0700)LF1,352$2.27$3.00$2.38$2.27$2.27$3.00
99Loop detector wire (655.0800)LF1,990$1.43$1.25$1.50$1.43$1.43$1.25
100Poles type 12-over height (657.0356)EACH1$19,793$16,985$20,783$19,793$19,793$16,985
101Monotube arms 15-FT (657.0515)EACH1$3,925.00$3,095.00$4,121.25$3,925.00$3,925.00$3,095.00
102Sawing asphalt (690.0150)LF248$1.50$1.50$1.58$1.50$1.50$3.00
103Sawing concrete (690.0250)LF867$2.25$2.25$2.36$2.25$2.25$4.00
104Incentive iri ride (740.0440)DOL6,040$1.00$1.00$1.00$1.00$1.00$1.00
105Special 01. 27-inch sanitary plug installation (SPV.0060)EACH1$250.00$1,300.00$559.99$1,300.00$1,600.00$1,637.08
106Special 02. connect to existing sewer (SPV.0060)EACH3$1,600.00$4,133.00$3,813.74$4,133.00$5,100.00$4,252.68
107Special 03. construction staking sanitary sewer (SPV.0060)EACH1$180.00$180.00$189.00$375.00$375.00$180.00
108Special 01. 10-inch PVC sanitary sewer (SPV.0090)LF14$250.00$710.54$94.61$710.54$280.00$268.11
109Special 02. 15-inch PVC sanitary sewer (SPV.0090)LF14$260.00$726.54$110.20$726.54$300.00$294.91
110Special 03. 27-inch PVC sanitary sewer (SPV.0090)LF70$300.00$807.60$165.86$807.00$240.00$397.87
111Special 04. 30-inch PVC sanitary sewer (SPV.0090)LF14$330.00$801.91$187.09$801.91$380.00$422.80
112Special 05. sanitary sewer service 4-inch (SPV.0090)LF10$200.00$698.11$115.64$698.11$275.00$168.36
113Special 01. 60-inch I.D. sanitary sewer drop manhole (SPV.0200)VF18$1,300.00$1,064.22$1,028.98$1,064.22$2,710.00$2,790.17
WisDOT contract 20260811015: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of August 11, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way