WisDOT contract 20250812002 bid tabulation
C Sun Prairie, Intersection Imprvmt; Main/Walker;Main/Bird;Bird/Linnerud (LOC STR, Dane County C Sun Prairie, Intersection Imprvmt). Let by Wisconsin DOT on August 12, 2025, Dane. 4 bids received; low bid $1,374,607 by Parisi Construction, LLC.
- Owner
- Wisconsin DOT
- Letting
- 12 AUG 2025
- Pay items
- 157
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Parisi Construction, LLC | $1,374,607 | Low |
| 2 | Lalonde Contractors Incorporated | $1,393,694 | +1.0% |
| 3 | Rock Road Companies, Inc. | $1,439,585 | +5.0% |
| 4 | Zignego Company, Inc. | $1,484,560 | +8.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Parisi Construction, LLC | 2. Lalonde Contractors Incorporated | 3. Rock Road Companies, Inc. | 4. Zignego Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0120) | ID | 11 | $92.00 | $87.00 | $87.00 | $87.00 |
| 2 | Grubbing (201.0220) | ID | 11 | $92.00 | $87.00 | $87.00 | $87.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 350 | $23.00 | $15.20 | $22.05 | $30.00 |
| 4 | Removing asphaltic surface (204.0110) | SY | 55 | $19.00 | $18.98 | $9.24 | $30.00 |
| 5 | Removing curb & gutter (204.0150) | LF | 411 | $23.00 | $13.19 | $31.30 | $30.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 578 | $27.75 | $14.04 | $15.69 | $30.00 |
| 7 | Removing concrete bases (204.0195) | EACH | 16 | $370.00 | $376.67 | $442.70 | $1,000.00 |
| 8 | Removing inlets (204.0220) | EACH | 4 | $690.00 | $925.00 | $839.49 | $1,200.00 |
| 9 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 85 | $23.00 | $30.00 | $39.51 | $55.00 |
| 10 | Removing storm sewer (size) 02. 15-inch (204.0245) | LF | 40 | $32.75 | $32.50 | $39.51 | $55.00 |
| 11 | Excavation common (205.0100) | CY | 542 | $50.00 | $35.11 | $41.83 | $60.00 |
| 12 | Finishing roadway (project) 01. 3996-00-10 (213.0100) | EACH | 1 | $500.00 | $3,680.00 | $4,505.77 | $1,000.00 |
| 13 | Base aggregate dense 3/4-inch (305.0110) | TON | 161 | $47.00 | $42.77 | $36.87 | $50.00 |
| 14 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 472 | $33.50 | $34.63 | $27.41 | $50.00 |
| 15 | Coloring concrete wisdot red (405.0100) | CY | 9 | $140.00 | $159.60 | $1,192.33 | $300.00 |
| 16 | Stamping colored concrete (405.1000) | CY | 9 | $490.00 | $399.60 | $876.84 | $300.00 |
| 17 | Concrete pavement 9-inch (415.0090) | SY | 1,202 | $110.00 | $123.16 | $105.68 | $123.00 |
| 18 | Drilled tie bars (416.0610) | EACH | 70 | $15.50 | $25.28 | $10.22 | $30.00 |
| 19 | Drilled dowel bars (416.0620) | EACH | 32 | $28.25 | $29.88 | $15.22 | $30.00 |
| 20 | Tack coat (455.0605) | GAL | 9 | $4.20 | $4.00 | $4.05 | $4.00 |
| 21 | Asphaltic surface (465.0105) | TON | 37 | $250.00 | $240.00 | $424.75 | $240.00 |
| 22 | Concrete curb type A (601.0105) | LF | 160 | $44.25 | $53.21 | $82.09 | $60.00 |
| 23 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 346 | $47.50 | $61.02 | $86.98 | $60.00 |
| 24 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 31 | $75.00 | $60.40 | $84.77 | $100.00 |
| 25 | Concrete curb & gutter integral 30- inch type D (601.0452) | LF | 230 | $54.00 | $47.13 | $20.27 | $60.00 |
| 26 | Concrete curb pedestrian (601.0600) | LF | 95 | $44.00 | $53.07 | $75.38 | $100.00 |
| 27 | Concrete sidewalk 4-inch (602.0405) | SF | 5,752 | $11.75 | $12.74 | $7.50 | $13.50 |
| 28 | Curb ramp detectable warning field natural patina (602.0515) | SF | 260 | $49.75 | $44.27 | $47.99 | $75.00 |
| 29 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 51 | $59.00 | $63.88 | $69.14 | $100.00 |
| 30 | Concrete driveway 6-inch (602.0810) | SY | 8 | $120.00 | $166.40 | $83.72 | $200.00 |
| 31 | Concrete driveway hes 6-inch (602.0860) | SY | 8 | $120.00 | $167.88 | $87.04 | $200.00 |
| 32 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 99 | $150.00 | $175.00 | $203.84 | $168.00 |
| 33 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 48 | $160.00 | $195.00 | $210.67 | $173.00 |
| 34 | Inlet covers type H-S (611.0639) | EACH | 6 | $1,200.00 | $975.00 | $1,727.33 | $1,595.00 |
| 35 | Inlets 2X3-FT (611.3230) | EACH | 4 | $3,300.00 | $3,295.00 | $4,559.97 | $3,903.00 |
| 36 | Adjusting manhole covers (611.8110) | EACH | 2 | $710.00 | $635.00 | $1,736.44 | $2,590.00 |
| 37 | Mobilization (619.1000) | EACH | 1 | $15,000 | $74,125 | $120,619 | $62,000 |
| 38 | Water (624.0100) | MGAL | 10 | $35.00 | $55.60 | $0.01 | $100.00 |
| 39 | Topsoil (625.0100) | SY | 435 | $21.00 | $6.95 | $0.01 | $6.95 |
| 40 | Silt fence (628.1504) | LF | 95 | $4.50 | $10.00 | $4.25 | $10.00 |
| 41 | Silt fence maintenance (628.1520) | LF | 95 | $0.01 | $1.00 | $0.01 | $1.00 |
| 42 | Mobilizations erosion control (628.1905) | EACH | 4 | $110.00 | $250.00 | $100.00 | $250.00 |
| 43 | Mobilizations emergency erosion control (628.1910) | EACH | 4 | $110.00 | $250.00 | $100.00 | $250.00 |
| 44 | Erosion mat urban class I type A (628.2006) | SY | 435 | $3.70 | $2.50 | $3.50 | $2.50 |
| 45 | Inlet protection type C (628.7015) | EACH | 21 | $80.00 | $80.00 | $75.00 | $80.00 |
| 46 | Inlet protection type D (628.7020) | EACH | 11 | $130.00 | $105.00 | $125.00 | $105.00 |
| 47 | Fertilizer type B (629.0210) | CWT | 0.50 | $210.00 | $250.00 | $200.00 | $250.00 |
| 48 | Seeding mixture no. 40 (630.0140) | LB | 10 | $26.50 | $75.00 | $25.00 | $75.00 |
| 49 | Seed water (630.0500) | MGAL | 13 | $21.25 | $150.00 | $20.00 | $150.00 |
| 50 | Posts tubular steel 2X2-inch X 11- FT (634.0811) | EACH | 10 | $240.00 | $225.00 | $225.00 | $225.00 |
| 51 | Signs type II reflective H (637.2210) | SF | 21.25 | $31.75 | $35.00 | $30.00 | $35.00 |
| 52 | Moving signs type II (638.2102) | EACH | 23 | $210.00 | $125.00 | $200.00 | $125.00 |
| 53 | Removing signs type II (638.2602) | EACH | 2 | $47.75 | $50.00 | $45.00 | $50.00 |
| 54 | Removing small sign supports (638.3000) | EACH | 5 | $130.00 | $50.00 | $125.00 | $50.00 |
| 55 | Moving small sign supports (638.4000) | EACH | 1 | $270.00 | $125.00 | $250.00 | $125.00 |
| 56 | Field office type B (642.5001) | EACH | 1 | $7,000.00 | $12,260 | $8,000.00 | $10,000 |
| 57 | Traffic control drums (643.0300) | DAY | 6,638 | $0.20 | $0.20 | $0.20 | $0.20 |
| 58 | Traffic control barricades type III (643.0420) | DAY | 3,835 | $0.50 | $0.45 | $0.45 | $0.45 |
| 59 | Traffic control warning lights type A (643.0705) | DAY | 5,599 | $0.15 | $0.12 | $0.12 | $0.12 |
| 60 | Traffic control warning lights type C (643.0715) | DAY | 1,118 | $0.25 | $0.25 | $0.25 | $0.25 |
| 61 | Connected arrow board (643.0810.S) | DAY | 127 | $10.00 | $9.52 | $9.52 | $9.52 |
| 62 | Traffic control signs (643.0900) | DAY | 6,304 | $0.20 | $0.19 | $0.19 | $0.19 |
| 63 | Traffic control signs PCMS (643.1050) | DAY | 21 | $64.00 | $60.00 | $60.00 | $60.00 |
| 64 | Connected work zone start and end location markers (643.1220.S) | DAY | 254 | $5.10 | $4.76 | $4.76 | $4.76 |
| 65 | Temporary marking line removable tape 6-inch (643.3180) | LF | 2,304 | $2.50 | $2.33 | $2.33 | $2.33 |
| 66 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 23 | $13.75 | $12.98 | $12.98 | $12.98 |
| 67 | Traffic control (643.5000) | EACH | 1 | $20,900 | $19,670 | $19,670 | $19,670 |
| 68 | Temporary pedestrian surface asphalt (644.1410) | SF | 357 | $7.20 | $16.70 | $17.62 | $20.00 |
| 69 | Temporary pedestrian curb ramp (644.1601) | DAY | 225 | $6.30 | $5.98 | $5.98 | $5.98 |
| 70 | Temporary pedestrian detectable warning field (644.1605) | SF | 81 | $8.50 | $7.97 | $7.97 | $7.97 |
| 71 | Temporary pedestrian barricade (644.1810) | LF | 1,837 | $4.20 | $4.00 | $4.00 | $4.00 |
| 72 | Temporary audible message devices (644.1900.S) | DAY | 1,529 | $1.60 | $1.50 | $1.50 | $1.50 |
| 73 | Marking line epoxy 4-inch (646.1020) | LF | 3,421 | $1.70 | $2.75 | $1.55 | $1.55 |
| 74 | Marking line epoxy 8-inch (646.3020) | LF | 1,045 | $3.30 | $3.50 | $3.10 | $3.10 |
| 75 | Marking arrow epoxy (646.5020) | EACH | 26 | $370.00 | $325.00 | $345.00 | $345.00 |
| 76 | Marking word epoxy (646.5120) | EACH | 1 | $530.00 | $350.00 | $500.00 | $500.00 |
| 77 | Marking symbol epoxy (646.5220) | EACH | 3 | $270.00 | $275.00 | $250.00 | $250.00 |
| 78 | Marking stop line epoxy 18-inch (646.6120) | LF | 208 | $23.25 | $16.25 | $22.00 | $22.00 |
| 79 | Marking diagonal epoxy 12-inch (646.7120) | LF | 243 | $16.75 | $11.50 | $15.80 | $15.80 |
| 80 | Marking chevron epoxy 12-inch (646.7320) | LF | 45 | $16.75 | $11.50 | $15.80 | $15.80 |
| 81 | Marking crosswalk epoxy transverse line 6-inch (646.7420) | LF | 960 | $15.50 | $9.75 | $14.50 | $14.50 |
| 82 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 522 | $35.50 | $18.10 | $33.50 | $33.50 |
| 83 | Marking removal line 4-inch (646.9000) | LF | 2,230 | $0.35 | $0.42 | $0.35 | $0.35 |
| 84 | Marking removal line 8-inch (646.9100) | LF | 550 | $0.75 | $0.80 | $0.70 | $0.70 |
| 85 | Marking removal line wide (646.9200) | LF | 110 | $1.10 | $1.25 | $1.05 | $1.05 |
| 86 | Marking removal special marking (646.9300) | EACH | 20 | $100.00 | $105.00 | $95.00 | $95.00 |
| 87 | Construction staking storm sewer (650.4000) | EACH | 4 | $190.00 | $200.00 | $100.00 | $200.00 |
| 88 | Construction staking subgrade (650.4500) | LF | 512 | $0.01 | $0.01 | $0.01 | $0.01 |
| 89 | Construction staking base (650.5000) | LF | 512 | $0.01 | $1.00 | $0.01 | $1.00 |
| 90 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 802 | $1.60 | $1.00 | $5.00 | $1.00 |
| 91 | Construction staking electrical installations (project) 01. 3996-00- 10 (650.8501) | EACH | 1 | $2,700.00 | $5,000.00 | $1,100.00 | $5,000.00 |
| 92 | Construction staking curb ramps (650.9000) | EACH | 12 | $210.00 | $300.00 | $50.00 | $300.00 |
| 93 | Construction staking sidewalk (project) 01. 3996-00-10 (650.9500) | EACH | 1 | $2,700.00 | $2,000.00 | $1,000.00 | $2,000.00 |
| 94 | Construction staking supplemental control (project) 01. 3996-00-10 (650.9911) | EACH | 1 | $2,100.00 | $2,000.00 | $1,000.00 | $2,000.00 |
| 95 | Construction staking slope stakes (650.9920) | LF | 610 | $0.01 | $1.00 | $1.00 | $1.00 |
| 96 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 317 | $9.50 | $9.00 | $9.00 | $9.00 |
| 97 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 102 | $13.75 | $13.00 | $13.00 | $13.00 |
| 98 | Install conduit into existing item (652.0700.S) | EACH | 30 | $210.00 | $200.00 | $200.00 | $200.00 |
| 99 | Conduit loop detector (652.0800) | LF | 26 | $8.50 | $8.00 | $8.00 | $8.00 |
| 100 | Pull boxes steel 24X36-inch (653.0135) | EACH | 4 | $1,100.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 101 | Removing pull boxes (653.0905) | EACH | 4 | $160.00 | $150.00 | $150.00 | $150.00 |
| 102 | Concrete bases type 1 (654.0101) | EACH | 22 | $1,100.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 103 | Concrete bases type 2 (654.0102) | EACH | 2 | $1,300.00 | $1,250.00 | $1,250.00 | $1,250.00 |
| 104 | Concrete bases type 10-special (654.0120) | EACH | 6 | $9,000.00 | $8,500.00 | $8,500.00 | $8,500.00 |
| 105 | Cable traffic signal 5-14 AWG (655.0230) | LF | 2,000 | $2.10 | $2.00 | $2.00 | $2.00 |
| 106 | Cable traffic signal 12-14 AWG (655.0260) | LF | 6,122 | $4.20 | $4.00 | $4.00 | $4.00 |
| 107 | Cable type UF 2-12 AWG grounded (655.0305) | LF | 1,315 | $1.90 | $1.75 | $1.75 | $1.75 |
| 108 | Electrical wire traffic signals 10 AWG (655.0515) | LF | 3,475 | $1.60 | $1.50 | $1.50 | $1.50 |
| 109 | Electrical wire lighting 12 AWG (655.0610) | LF | 976 | $1.20 | $1.10 | $1.10 | $1.10 |
| 110 | Loop detector lead in cable (655.0700) | LF | 4,652 | $1.70 | $1.60 | $1.60 | $1.60 |
| 111 | Traffic signal evp detector cable (655.0900) | LF | 2,140 | $1.60 | $1.50 | $1.50 | $1.50 |
| 112 | Electrical service meter breaker pedestal (location) 01. bus 151 (W main ST) & walker way (656.0201) | EACH | 1 | $2,100.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 113 | Electrical service meter breaker pedestal (location) 02. bus 151 (W main ST) & bird street (656.0201) | EACH | 1 | $2,100.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 114 | Pedestal bases (657.0100) | EACH | 22 | $340.00 | $325.00 | $325.00 | $325.00 |
| 115 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 2 | $690.00 | $650.00 | $650.00 | $650.00 |
| 116 | Poles type 3 (657.0310) | EACH | 2 | $4,500.00 | $4,250.00 | $4,250.00 | $4,250.00 |
| 117 | Poles type 10-special (657.0352) | EACH | 6 | $14,700 | $13,900 | $13,900 | $13,900 |
| 118 | Traffic signal standards aluminum 13-FT (657.0420) | EACH | 2 | $950.00 | $900.00 | $900.00 | $900.00 |
| 119 | Traffic signal standards aluminum 15-FT (657.0425) | EACH | 6 | $1,100.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 120 | Traffic signal standards aluminum 10-FT (657.0430) | EACH | 14 | $920.00 | $867.00 | $867.00 | $867.00 |
| 121 | Monotube arms 35-FT-special (657.0536) | EACH | 5 | $7,100.00 | $6,722.00 | $6,722.00 | $6,722.00 |
| 122 | Monotube arms 45-FT-special (657.0546) | EACH | 1 | $7,400.00 | $6,968.00 | $6,968.00 | $6,968.00 |
| 123 | Trombone arms 15-FT (657.0585) | EACH | 2 | $2,500.00 | $2,375.00 | $2,375.00 | $2,375.00 |
| 124 | Luminaire arms single member 4- inch clamp 6-FT (657.0609) | EACH | 2 | $430.00 | $410.00 | $410.00 | $410.00 |
| 125 | Luminaire arms steel 6-FT (657.0806) | EACH | 6 | $1,300.00 | $1,200.00 | $1,200.00 | $1,200.00 |
| 126 | Traffic signal face 3S 12-inch (658.0173) | EACH | 24 | $900.00 | $850.00 | $850.00 | $850.00 |
| 127 | Traffic signal face 4S 12-inch (658.0174) | EACH | 12 | $1,200.00 | $1,150.00 | $1,150.00 | $1,150.00 |
| 128 | Pedestrian signal face 16-inch (658.0416) | EACH | 16 | $660.00 | $625.00 | $625.00 | $625.00 |
| 129 | Signal mounting hardware (location) 01. bus 151 (W main ST) & walker way (658.5070) | EACH | 1 | $8,500.00 | $8,000.00 | $8,000.00 | $8,000.00 |
| 130 | Signal mounting hardware (location) 02. bus 151 (W main ST) & bird street (658.5070) | EACH | 1 | $9,500.00 | $9,000.00 | $9,000.00 | $9,000.00 |
| 131 | Luminaires utility LED A (659.1115) | EACH | 8 | $370.00 | $350.00 | $350.00 | $350.00 |
| 132 | Temporary traffic signals for intersections (location) 01. bus 151 (W main ST) & walker way (661.0201) | EACH | 1 | $79,511 | $75,000 | $75,000 | $75,000 |
| 133 | Temporary traffic signals for intersections (location) 02. bus 151 (W main ST) & bird street (661.0201) | EACH | 1 | $79,511 | $75,000 | $75,000 | $75,000 |
| 134 | Sawing asphalt (690.0150) | LF | 192 | $1.90 | $1.10 | $1.75 | $1.75 |
| 135 | Sawing concrete (690.0250) | LF | 748 | $2.50 | $2.25 | $2.35 | $2.35 |
| 136 | Incentive compressive strength concrete pavement (715.0720) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 137 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 1,200 | $5.00 | $5.00 | $5.00 | $5.00 |
| 138 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 600 | $5.00 | $5.00 | $5.00 | $5.00 |
| 139 | Special 01. utility line opening (ulo) (SPV.0060) | EACH | 5 | $620.00 | $1,275.00 | $740.00 | $1,000.00 |
| 140 | Special 02. pipe connection to existing structure (SPV.0060) | EACH | 2 | $1,500.00 | $1,525.00 | $2,282.21 | $4,560.00 |
| 141 | Special 10. furnish and install evp system (bus 151 (W main ST) & walker way) (SPV.0060) | EACH | 1 | $11,600 | $10,963 | $10,963 | $10,963 |
| 142 | Special 11. furnish and install evp system (bus 151 (W main ST) & bird street) (SPV.0060) | EACH | 1 | $11,600 | $10,963 | $10,963 | $10,963 |
| 143 | Special 12. furnish and install APS system (bus 151 (W main ST) & walker way) (SPV.0060) | EACH | 1 | $10,300 | $9,700.00 | $9,700.00 | $9,700.00 |
| 144 | Special 13. furnish and install APS system (bus 151 (W main ST) & bird street) (SPV.0060) | EACH | 1 | $10,300 | $9,700.00 | $9,700.00 | $9,700.00 |
| 145 | Special 14. retroreflective backplates 3S (SPV.0060) | EACH | 60 | $140.00 | $130.00 | $130.00 | $130.00 |
| 146 | Special 15. retroreflective backplates 4S (SPV.0060) | EACH | 7 | $170.00 | $160.00 | $160.00 | $160.00 |
| 147 | Special 16. retroreflective backplates 5S (SPV.0060) | EACH | 4 | $210.00 | $195.00 | $195.00 | $195.00 |
| 148 | Special 17. non-intrusive detection system (bus 151 (W main ST) & walker way) (SPV.0060) | EACH | 1 | $34,600 | $32,633 | $32,633 | $32,633 |
| 149 | Special 18. non-intrusive detection system (bus 151 (W main ST) & bird street) (SPV.0060) | EACH | 1 | $34,600 | $32,633 | $32,633 | $32,633 |
| 150 | Special 19. salvage traffic signals (bus 151 (W main ST) & walker way) (SPV.0060) | EACH | 1 | $3,700.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 151 | Special 20. salvage traffic signals (bus 151 (W main ST) & bird street) (SPV.0060) | EACH | 1 | $4,200.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 152 | Special 21. traffic signal cabinet and controller black (W main ST & walker way) (SPV.0060) | EACH | 1 | $27,200 | $25,698 | $25,698 | $25,698 |
| 153 | Special 22. traffic signal cabinet and controller black (W main ST & bird street) (SPV.0060) | EACH | 1 | $27,300 | $25,798 | $25,798 | $25,798 |
| 154 | Special 23. concrete bases type 1 spread footing (SPV.0060) | EACH | 2 | $2,700.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 155 | Special 01. sawing curb head (SPV.0090) | LF | 38 | $31.75 | $30.00 | $30.00 | $30.00 |
| 156 | Special 02. concrete curb & gutter 30-inch type X (SPV.0090) | LF | 35 | $68.00 | $60.56 | $93.39 | $100.00 |
| 157 | Special 01. high friction colored surface, green (SPV.0165) | SF | 60 | $31.75 | $54.95 | $30.00 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of August 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way