WisDOT contract 20260210003 bid tabulation
5627-00-71. Let by Wisconsin DOT on February 10, 2026, Dane. 6 bids received; low bid $2,717,944 by James Peterson Sons, Inc..
- Owner
- Wisconsin DOT
- Letting
- 10 FEB 2026
- Pay items
- 93
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | James Peterson Sons, Inc. | $2,717,944 | Low |
| 2 | Integrity Grading and Excavating, Inc. | $3,125,672 | +15% |
| 3 | Rock Road Companies, Inc. | $3,253,988 | +20% |
| 4 | Fischer Excavating, Inc. | $3,461,526 | +27% |
| 5 | Parisi Construction, LLC | $3,999,038 | +47% |
| 6 | Speedway Sand & Gravel, Inc. | $4,018,135 | +48% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. James Peterson Sons, Inc. | 2. Integrity Grading and Excavating, Inc. | 3. Rock Road Companies, Inc. | 4. Fischer Excavating, Inc. | 5. Parisi Construction, LLC | 6. Speedway Sand & Gravel, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Clearing (201.0120) | ID | 24 | $65.00 | $65.00 | $65.00 | $65.00 | $68.00 | $65.00 |
| 2 | Grubbing (201.0220) | ID | 24 | $65.00 | $65.00 | $65.00 | $65.00 | $68.00 | $65.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 596 | $3.50 | $3.55 | $11.76 | $7.00 | $8.30 | $4.50 |
| 4 | Removing asphaltic surface (204.0110) | SY | 19,960 | $0.01 | $2.00 | $0.01 | $1.55 | $0.01 | $0.01 |
| 5 | Removing curb & gutter (204.0150) | LF | 5,310 | $2.00 | $5.30 | $5.72 | $3.50 | $7.70 | $4.00 |
| 6 | Removing concrete sidewalk (204.0155) | SY | 2,656 | $3.50 | $2.25 | $10.90 | $18.00 | $23.50 | $9.20 |
| 7 | Removing catch basins (204.0215) | EACH | 4 | $300.00 | $620.00 | $378.68 | $500.00 | $740.00 | $440.00 |
| 8 | Removing storm sewer (size) 01. 12-inch through 18-inch (204.0245) | LF | 120 | $31.55 | $26.00 | $24.53 | $20.00 | $32.00 | $13.80 |
| 9 | Excavation common (205.0100) | CY | 6,000 | $11.23 | $22.25 | $23.19 | $25.00 | $27.00 | $22.94 |
| 10 | Finishing roadway (project) 01. 5627-00-71 (213.0100) | EACH | 1 | $5,000.00 | $1,000.00 | $5,149.47 | $15,000 | $420.00 | $678.00 |
| 11 | Base aggregate dense 3/4-inch (305.0110) | TON | 740 | $25.98 | $35.75 | $25.71 | $20.00 | $24.00 | $28.20 |
| 12 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,210 | $20.86 | $31.75 | $16.53 | $20.00 | $15.25 | $20.00 |
| 13 | Base aggregate dense 3-inch (305.0130) | TON | 4,650 | $13.14 | $19.00 | $15.88 | $20.00 | $14.50 | $15.05 |
| 14 | Breaker run (311.0115) | CY | 1,603 | $12.42 | $40.00 | $29.76 | $35.00 | $26.00 | $30.50 |
| 15 | Drilled tie bars (416.0610) | EACH | 24 | $15.00 | $15.00 | $14.00 | $14.00 | $11.25 | $13.00 |
| 16 | Tack coat (455.0605) | GAL | 497 | $0.10 | $0.10 | $3.50 | $0.10 | $0.10 | $0.10 |
| 17 | Incentive density HMA pavement (460.2000) | DOL | 1,390 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 18 | HMA pavement 3 LT 58-28 S (460.5223) | TON | 1,216 | $68.50 | $68.50 | $68.82 | $68.50 | $72.00 | $68.50 |
| 19 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 945 | $69.50 | $69.50 | $73.58 | $69.50 | $73.00 | $69.50 |
| 20 | Asphaltic surface driveways and field entrances (465.0120) | TON | 40 | $120.00 | $120.00 | $237.32 | $120.00 | $130.00 | $120.00 |
| 21 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 5,310 | $19.50 | $19.50 | $19.70 | $20.00 | $20.00 | $29.52 |
| 22 | Concrete sidewalk 5-inch (602.0410) | SF | 22,840 | $5.60 | $5.60 | $5.10 | $8.00 | $5.55 | $7.20 |
| 23 | Concrete sidewalk 7-inch (602.0420) | SF | 4,221 | $6.60 | $6.60 | $8.00 | $10.00 | $8.00 | $9.70 |
| 24 | Curb ramp detectable warning field natural patina (602.0515) | SF | 180 | $50.00 | $50.00 | $45.00 | $45.00 | $45.00 | $60.00 |
| 25 | Concrete driveway 7-inch (602.0815) | SY | 886 | $60.00 | $60.00 | $72.00 | $94.00 | $70.00 | $83.00 |
| 26 | Storm sewer pipe reinforced concrete class V 15-inch (608.0515) | LF | 1,943 | $69.07 | $83.00 | $91.78 | $73.00 | $85.00 | $110.30 |
| 27 | Storm sewer pipe reinforced concrete class V 18-inch (608.0518) | LF | 48 | $92.96 | $93.50 | $117.93 | $82.00 | $104.00 | $117.45 |
| 28 | Manhole covers type J (611.0530) | EACH | 8 | $1,127.79 | $675.00 | $986.88 | $485.00 | $440.00 | $1,065.00 |
| 29 | Inlet covers type H (611.0624) | EACH | 18 | $1,563.32 | $925.00 | $1,228.44 | $745.00 | $680.00 | $1,156.00 |
| 30 | Catch basins 2X3-FT (611.1230) | EACH | 18 | $2,387.83 | $3,325.00 | $3,238.59 | $2,500.00 | $3,000.00 | $2,905.00 |
| 31 | Manholes 6X6-FT (611.2066) | EACH | 1 | $7,158.72 | $8,800.00 | $7,412.13 | $12,000 | $10,000 | $11,437 |
| 32 | Adjusting catch basin covers (611.8105) | EACH | 27 | $774.32 | $1,100.00 | $1,342.13 | $725.00 | $870.00 | $100.00 |
| 33 | Adjusting manhole covers (611.8110) | EACH | 6 | $660.79 | $1,100.00 | $1,342.13 | $725.00 | $680.00 | $550.00 |
| 34 | Pipe underdrain unperforated 8- inch (612.0208) | LF | 4,416 | $42.93 | $15.50 | $24.01 | $30.00 | $20.75 | $34.54 |
| 35 | Mobilization (619.1000) | EACH | 1 | $37,039 | $447,692 | $270,909 | $200,000 | $504,000 | $511,632 |
| 36 | Water (624.0100) | MGAL | 137.10 | $50.00 | $45.00 | $0.01 | $5.00 | $41.75 | $1.00 |
| 37 | Topsoil (625.0100) | SY | 4,790 | $8.17 | $14.00 | $0.01 | $5.00 | $12.75 | $4.95 |
| 38 | Mulching (627.0200) | SY | 4,790 | $0.50 | $0.50 | $0.50 | $0.35 | $2.10 | $0.45 |
| 39 | Mobilizations erosion control (628.1905) | EACH | 1 | $250.00 | $250.00 | $250.00 | $200.00 | $1,500.00 | $200.00 |
| 40 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $250.00 | $250.00 | $250.00 | $250.00 | $160.00 | $200.00 |
| 41 | Inlet protection type D (628.7020) | EACH | 31 | $130.00 | $130.00 | $130.00 | $65.00 | $130.00 | $90.00 |
| 42 | Tracking pads (628.7560) | EACH | 3 | $3,700.00 | $2,475.00 | $750.00 | $1,800.00 | $900.00 | $980.00 |
| 43 | Fertilizer type A (629.0205) | CWT | 3 | $70.00 | $70.00 | $70.00 | $80.00 | $160.00 | $90.00 |
| 44 | Seeding mixture no. 40 (630.0140) | LB | 161 | $11.00 | $11.00 | $11.00 | $10.00 | $21.00 | $12.95 |
| 45 | Seed water (630.0500) | MGAL | 100 | $1.00 | $1.00 | $1.00 | $2.00 | $0.01 | $12.00 |
| 46 | Moving signs type II (638.2102) | EACH | 27 | $200.00 | $200.00 | $200.00 | $40.00 | $260.00 | $110.00 |
| 47 | Traffic control drums (643.0300) | DAY | 6,260 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 |
| 48 | Traffic control barricades type III (643.0420) | DAY | 3,690 | $0.50 | $0.50 | $0.50 | $0.50 | $0.55 | $0.50 |
| 49 | Traffic control warning lights type A (643.0705) | DAY | 732 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 |
| 50 | Traffic control signs (643.0900) | DAY | 8,792 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 | $0.25 |
| 51 | Traffic control signs fixed message (643.1000) | SF | 8 | $18.00 | $18.00 | $18.00 | $18.00 | $19.00 | $18.00 |
| 52 | Traffic control signs PCMS (643.1050) | DAY | 20 | $69.99 | $69.99 | $69.99 | $70.00 | $73.00 | $69.99 |
| 53 | Traffic control (643.5000) | EACH | 1 | $4,500.00 | $4,500.00 | $4,500.00 | $4,500.00 | $5,000.00 | $4,500.00 |
| 54 | Temporary audible message devices (644.1900.S) | DAY | 3,618 | $2.00 | $2.00 | $2.00 | $2.00 | $2.10 | $2.00 |
| 55 | Marking stop line paint 18-inch (646.6105) | LF | 198 | $12.25 | $5.95 | $9.90 | $5.95 | $10.50 | $5.95 |
| 56 | Marking crosswalk paint transverse line 6-inch (646.7405) | LF | 790 | $5.75 | $1.95 | $9.70 | $1.95 | $10.25 | $1.95 |
| 57 | Marking crosswalk paint block style 24-inch (646.7505) | LF | 930 | $18.50 | $7.95 | $16.45 | $7.95 | $17.25 | $7.95 |
| 58 | Construction staking storm sewer (650.4000) | EACH | 19 | $150.00 | $150.00 | $150.00 | $200.00 | $0.01 | $150.00 |
| 59 | Construction staking subgrade (650.4500) | LF | 2,796 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 60 | Construction staking base (650.5000) | LF | 2,796 | $1.50 | $1.50 | $1.50 | $1.00 | $0.01 | $1.50 |
| 61 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 5,310 | $1.50 | $1.50 | $1.50 | $1.00 | $0.01 | $1.50 |
| 62 | Construction staking curb ramps (650.9000) | EACH | 20 | $300.00 | $300.00 | $300.00 | $250.00 | $0.01 | $300.00 |
| 63 | Construction staking sidewalk (project) 01. 5627-00-71 (650.9500) | EACH | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $5,000.00 | $0.01 | $4,000.00 |
| 64 | Construction staking supplemental control (project) 01. 5627-00-71 (650.9911) | EACH | 1 | $1,500.00 | $1,500.00 | $1,500.00 | $2,000.00 | $0.01 | $1,500.00 |
| 65 | Construction staking supplemental control (project) 02. 5627-00-72 (650.9911) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $2,000.00 | $0.01 | $1,000.00 |
| 66 | Sawing asphalt (690.0150) | LF | 493 | $2.00 | $2.00 | $2.00 | $2.00 | $1.60 | $2.50 |
| 67 | Sawing concrete (690.0250) | LF | 459 | $2.00 | $2.00 | $2.00 | $2.00 | $2.90 | $0.50 |
| 68 | Incentive iri ride (740.0440) | DOL | 1,000 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 69 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 70 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 71 | Special 01. hydrant assembly (SPV.0060) | EACH | 7 | $10,899 | $8,700.00 | $10,154 | $10,000 | $13,000 | $10,631 |
| 72 | Special 02. water valve 8-inch (SPV.0060) | EACH | 11 | $3,956.40 | $2,750.00 | $3,747.30 | $3,500.00 | $5,100.00 | $4,100.00 |
| 73 | Special 03. 1-inch curb stop and box (SPV.0060) | EACH | 12 | $347.20 | $310.00 | $1,224.25 | $550.00 | $630.00 | $918.00 |
| 74 | Special 04. 1-inch tap and corporation valve (SPV.0060) | EACH | 52 | $287.20 | $75.00 | $764.63 | $300.00 | $3,600.00 | $1,538.00 |
| 75 | Special 05. adjust sanitary manhole (SPV.0060) | EACH | 9 | $611.45 | $1,075.00 | $888.22 | $1,000.00 | $680.00 | $485.00 |
| 76 | Special 07. adjust water valve box (SPV.0060) | EACH | 24 | $150.00 | $635.00 | $500.14 | $1,000.00 | $580.00 | $250.00 |
| 77 | Special 08. water main vertical offset (SPV.0060) | EACH | 2 | $5,015.16 | $5,470.00 | $4,969.86 | $2,800.00 | $7,400.00 | $5,607.00 |
| 78 | Special 09. storm main crossing (SPV.0060) | EACH | 11 | $2,600.00 | $1,135.00 | $1,159.34 | $1,400.00 | $1,500.00 | $900.00 |
| 79 | Special 10. external sanitary manhole seal (SPV.0060) | EACH | 7 | $474.60 | $800.00 | $735.57 | $415.00 | $600.00 | $623.00 |
| 80 | Special 11. manhole sanitary 4FT (SPV.0060) | EACH | 7 | $6,022.58 | $4,545.00 | $5,311.01 | $7,400.00 | $6,000.00 | $6,141.00 |
| 81 | Special 12. connect to existing water main (SPV.0060) | EACH | 7 | $2,153.41 | $5,010.00 | $3,842.44 | $3,200.00 | $3,200.00 | $2,570.00 |
| 82 | Special 13. connect to existing sanitary sewer (SPV.0060) | EACH | 6 | $1,873.75 | $7,500.00 | $3,217.27 | $1,800.00 | $4,600.00 | $1,205.00 |
| 83 | Special 14. construction staking sanitary sewer system (SPV.0060) | EACH | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $5,000.00 | $0.01 | $4,000.00 |
| 84 | Special 15. construction staking water main system (SPV.0060) | EACH | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $5,000.00 | $0.01 | $4,000.00 |
| 85 | Special 16. remove sanitary manholes (SPV.0060) | EACH | 10 | $500.00 | $1,225.00 | $544.15 | $700.00 | $750.00 | $750.00 |
| 86 | Special 01. 8-inch ductile iron water main (SPV.0090) | LF | 2,706 | $144.48 | $119.00 | $149.73 | $100.00 | $146.00 | $168.15 |
| 87 | Special 02. 6-inch ductile iron hydrant lead (SPV.0090) | LF | 110 | $160.85 | $165.00 | $118.05 | $90.00 | $151.00 | $135.00 |
| 88 | Special 03. 1-inch water service pipe (SPV.0090) | LF | 1,242 | $93.76 | $87.00 | $136.28 | $100.00 | $36.00 | $97.50 |
| 89 | Special 04. sanitary sewer lateral (SPV.0090) | LF | 1,540 | $82.90 | $90.00 | $120.39 | $110.00 | $190.00 | $183.13 |
| 90 | Special 05. sanitary sewer PVC, 8- inch (SPV.0090) | LF | 368 | $116.74 | $100.00 | $126.19 | $145.00 | $192.00 | $216.40 |
| 91 | Special 06. sanitary sewer PVC, 10-inch (SPV.0090) | LF | 980 | $136.02 | $100.00 | $162.42 | $330.00 | $207.00 | $261.75 |
| 92 | Special 07. sanitary sewer PVC, 12-inch (SPV.0090) | LF | 1,293 | $190.53 | $100.00 | $198.80 | $365.00 | $320.00 | $308.53 |
| 93 | Special 08. remove existing sanitary sewer main (SPV.0090) | LF | 2,655 | $2.00 | $24.00 | $3.58 | $0.01 | $33.25 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of February 10, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.