WisDOT contract 20251111008 bid tabulation

5990-02-41. Let by Wisconsin DOT on November 11, 2025, Rock. 2 bids received; low bid $1,532,701 by Rock Road Companies, Inc..

Owner
Wisconsin DOT
Letting
11 NOV 2025
Pay items
113
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Rock Road Companies, Inc.$1,532,701Low
2Parisi Construction, LLC$1,599,143+4.0%
WisDOT contract 20251111008: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Rock Road Companies, Inc.2. Parisi Construction, LLC
1Clearing (201.0120)ID94$43.00$44.25
2Grubbing (201.0220)ID94$20.00$20.50
3Removing concrete pavement (204.0100)SY300$21.05$9.40
4Removing curb & gutter (204.0150)LF4,935$0.50$7.70
5Removing concrete sidewalk (204.0155)SY580$22.00$22.00
6Removing manholes (204.0210)EACH6$616.19$580.00
7Removing inlets (204.0220)EACH10$616.19$580.00
8Removing storm sewer (size) 01. 12-inch (204.0245)LF395$16.70$23.25
9Removing storm sewer (size) 02. 18-inch (204.0245)LF43$16.70$26.75
10Removing storm sewer (size) 03. 42-inch (204.0245)LF6$18.79$48.00
11Sealing pipes (204.0280)EACH2$982.82$200.00
12Excavation common (205.0100)CY8,500$22.55$20.00
13Finishing roadway (project) 01. 5990-02-41 (213.0100)EACH1$5,222.73$1,000.00
14Base aggregate dense 1 1/4-inch (305.0120)TON9,300$18.05$16.00
15Select crushed material (312.0115)CY1,050$45.50$30.25
16Tack coat (455.0605)GAL545$2.85$1.00
17Incentive density HMA pavement (460.2000)DOL1,950$1.00$1.00
18HMA pavement 3 LT 58-28 S (460.5223)TON1,825$63.00$72.00
19HMA pavement 5 LT 58-28 S (460.5225)TON1,220$65.00$74.00
20Concrete curb & gutter 30-inch type L (601.0419)LF4,825$21.70$24.00
21Concrete curb pedestrian (601.0600)LF19$45.00$60.00
22Concrete sidewalk 4-inch (602.0405)SF3,500$9.95$10.75
23Concrete sidewalk 6-inch (602.0415)SF2,550$10.50$12.75
24Curb ramp detectable warning field natural patina (602.0515)SF300$40.00$45.00
25Curb ramp detectable warning field radial natural patina (602.0615)SF29.60$65.00$55.00
26Concrete driveway 6-inch (602.0810)SY330$79.20$68.00
27Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF1,121$108.41$71.00
28Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF43$142.70$82.00
29Manholes 4-FT diameter (611.2004)EACH5$3,148.73$2,600.00
30Manholes 6-FT diameter (611.2006)EACH5$8,249.34$7,100.00
31Inlets 2X3-FT (611.3230)EACH13$2,428.01$2,100.00
32Adjusting manhole covers (611.8110)EACH7$964.57$690.00
33Adjusting inlet covers (611.8115)EACH4$1,080.95$800.00
34Insulation board polystyrene (inch) 01. 2-inch (612.0902.S)SY28.48$21.33$18.50
35Maintenance and repair of haul roads (project) 01. 5990-02-41 (618.0100)EACH1$0.01$500.00
36Mobilization (619.1000)EACH1$68,713$97,000
37Dust control surface treatment (623.0200)SY14,325$0.01$0.25
38Water (624.0100)MGAL135$26.60$50.00
39Topsoil (625.0100)SY3,500$1.00$13.50
40Mobilizations erosion control (628.1905)EACH12$1.00$1.00
41Mobilizations emergency erosion control (628.1910)EACH6$1.00$1.00
42Inlet protection type D (628.7020)EACH39$125.00$130.00
43Tracking pads (628.7560)EACH2$1,420.00$630.00
44Fertilizer type B (629.0210)CWT2.30$150.00$150.00
45Sod water (631.0300)MGAL200$0.01$0.01
46Sod lawn (631.1000)SY3,500$14.00$14.50
47Posts tubular steel 2X2-inch X 12- FT (634.0812)EACH50$300.00$310.00
48Signs type II reflective H (637.2210)SF189.62$25.00$25.75
49Signs type II reflective SH (637.2220)SF13.26$26.00$26.75
50Signs type II reflective F (637.2230)SF83.74$27.00$27.75
51Moving signs type II (638.2102)EACH3$150.00$150.00
52Removing signs type II (638.2602)EACH22$50.00$51.00
53Removing small sign supports (638.3000)EACH18$50.00$51.00
54Moving small sign supports (638.4000)EACH2$1.00$1.00
55Field office type C (642.5201)EACH1$5,000.00$6,500.00
56Traffic control drums (643.0300)DAY1,000$0.43$0.45
57Traffic control barricades type III (643.0420)DAY2,700$0.62$0.65
58Traffic control warning lights type A (643.0705)DAY5,400$0.16$0.15
59Traffic control warning lights type C (643.0715)DAY230$0.70$0.70
60Traffic control signs (643.0900)DAY11,700$0.33$0.35
61Traffic control covering signs type II (643.0920)EACH2$157.36$160.00
62Traffic control signs fixed message (643.1000)SF90$22.99$23.75
63Traffic control signs PCMS (643.1050)DAY20$60.00$62.00
64Temporary marking line removable tape 6-inch (643.3180)LF350$3.51$3.60
65Traffic control (643.5000)EACH1$7,640.58$7,900.00
66Temporary pedestrian surface asphalt (644.1410)SF1,000$5.16$5.90
67Temporary pedestrian surface plate (644.1430)SF1,000$1.14$1.20
68Temporary pedestrian surface matting (644.1440)SF1,500$1.30$1.30
69Temporary pedestrian curb ramp (644.1601)DAY1,150$4.72$4.90
70Temporary pedestrian detectable warning field (644.1605)SF120$7.44$7.70
71Temporary pedestrian barricade (644.1810)LF500$7.37$7.60
72Marking line epoxy 4-inch (646.1020)LF10,165$0.71$1.00
73Marking line epoxy 8-inch (646.3020)LF80$1.45$2.10
74Marking arrow epoxy (646.5020)EACH21$225.00$310.00
75Marking word epoxy (646.5120)EACH6$240.00$340.00
76Marking symbol epoxy (646.5220)EACH19$450.00$290.00
77Marking stop line epoxy 18-inch (646.6120)LF180$12.50$20.50
78Marking crosswalk epoxy transverse line 6-inch (646.7420)LF725$10.75$13.50
79Marking crosswalk epoxy block style 24-inch (646.7520)LF78$20.00$25.75
80Construction staking storm sewer (650.4000)EACH24$25.00$150.00
81Construction staking subgrade (650.4500)LF2,392$0.01$0.01
82Construction staking base (650.5000)LF2,392$0.01$1.00
83Construction staking curb gutter and curb & gutter (650.5500)LF4,954$0.40$1.00
84Construction staking curb ramps (650.9000)EACH32$100.00$210.00
85Construction staking sidewalk (project) 01. 5990-02-41 (650.9500)EACH1$3,000.00$2,100.00
86Construction staking supplemental control (project) 01. 5990-02-41 (650.9911)EACH1$3,000.00$6,200.00
87Construction staking slope stakes (650.9920)LF2,392$0.25$0.01
88Sawing asphalt (690.0150)LF320$1.20$1.80
89Sawing concrete (690.0250)LF930$3.25$2.80
90Incentive iri ride (740.0440)DOL1,808$1.00$1.00
91On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS1,200$5.00$5.00
92On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS600$5.00$5.00
93Special 01. watermain granular backfill special (SPV.0035)CY210$14.03$23.00
94Special 01. remove and salvage flashing stop sign assembly (SPV.0060)EACH1$500.00$510.00
95Special 02. install city supplied street name sign (SPV.0060)EACH10$350.00$360.00
96Special 03. V-loc post anchor VS2 (SPV.0060)EACH50$200.00$210.00
97Special 04. manhole cover type special logo (SPV.0060)EACH11$920.15$890.00
98Special 05. inlet cover type H special logo (SPV.0060)EACH8$1,187.24$1,300.00
99Special 06. inlet cover type H special logo LP (SPV.0060)EACH8$1,187.24$1,300.00
100Special 07. saddle inlet (SPV.0060)EACH1$3,678.48$3,200.00
101Special 08. 8-inch X 8-inch D.I. tee (SPV.0060)EACH4$1,016.83$2,000.00
102Special 09. 8-inch X 6-inch D.I. reducer (SPV.0060)EACH1$688.58$1,600.00
103Special 10. 8-inch D.I. 45 deg bend (SPV.0060)EACH4$745.14$1,600.00
104Special 11. gate valve with valve box, 8-inch (SPV.0060)EACH6$3,332.07$4,500.00
105Special 12. removing water valve manhole (SPV.0060)EACH1$770.24$580.00
106Special 13. construction staking watermain (SPV.0060)EACH1$3,000.00$7,200.00
107Special 14. manhole structure chimney repair (SPV.0060)EACH9$2,224.29$1,200.00
108Special 15. sanitary structure replacement (SPV.0060)EACH1$11,439$8,600.00
109Special 16. sanitary structure standard barrel section (SPV.0060)EACH1$4,363.70$3,300.00
110Special 17. manhole cover type special logo sanitary (SPV.0060)EACH8$1,245.55$890.00
111Special 01. ductile iron watermain 8-inch (SPV.0090)LF234$163.90$170.00
112Special 02. remove existing watermain (SPV.0090)LF240$46.05$36.50
113Special 03. concrete curb & gutter 30-inch type L special (4-inch curb head height) (SPV.0090)LF110$30.00$45.00
WisDOT contract 20251111008: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of November 11, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy