WisDOT contract 20251014003 bid tabulation
Shullsburg - Monroe; STH 23 Intersection (STH 011, Lafayette County Shullsburg - Monroe). Let by Wisconsin DOT on October 14, 2025, Lafayette. 4 bids received; low bid $3,484,865 by Zignego Company, Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 OCT 2025
- Pay items
- 155
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Zignego Company, Inc. | $3,484,865 | Low |
| 2 | Michels Road & Stone, Inc. | $3,522,819 | +1.0% |
| 3 | Parisi Construction, LLC | $3,607,402 | +4.0% |
| 4 | Integrity Grading and Excavating, Inc. | $3,801,527 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Zignego Company, Inc. | 2. Michels Road & Stone, Inc. | 3. Parisi Construction, LLC | 4. Integrity Grading and Excavating, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing small pipe culverts (203.0100) | EACH | 9 | $425.00 | $425.00 | $660.00 | $250.00 |
| 2 | Removing structure (structure) 01. 72" CPRC (203.0220) | EACH | 1 | $950.00 | $950.00 | $3,900.00 | $5,165.00 |
| 3 | Removing structure (structure) 02. C-33-0386 (203.0220) | EACH | 1 | $2,500.00 | $2,500.00 | $16,100 | $24,000 |
| 4 | Removing structure (structure) 03. C-33-0387 (203.0220) | EACH | 1 | $2,500.00 | $2,500.00 | $12,900 | $24,000 |
| 5 | Removing concrete pavement (204.0100) | SY | 1,240 | $1.00 | $1.00 | $11.50 | $7.60 |
| 6 | Removing asphaltic surface (204.0110) | SY | 44 | $10.00 | $10.00 | $20.00 | $13.25 |
| 7 | Removing curb (204.0130) | LF | 168 | $5.00 | $5.00 | $10.50 | $8.15 |
| 8 | Removing curb & gutter (204.0150) | LF | 240 | $5.00 | $5.00 | $9.20 | $7.70 |
| 9 | Removing guardrail (204.0165) | LF | 282 | $5.00 | $5.00 | $5.30 | $5.00 |
| 10 | Removing fence (204.0170) | LF | 26 | $5.00 | $15.00 | $5.30 | $5.00 |
| 11 | Removing inlets (204.0220) | EACH | 1 | $450.00 | $450.00 | $660.00 | $1,277.00 |
| 12 | Removing storm sewer (size) 01. 18-inch (204.0245) | LF | 13 | $15.00 | $15.00 | $24.75 | $46.70 |
| 13 | Removing (item description) 01. wood retaining wall (204.9060.S) | EACH | 1 | $500.00 | $500.00 | $4,100.00 | $2,800.00 |
| 14 | Removing (item description) 02. rock retaining wall (204.9060.S) | EACH | 1 | $250.00 | $250.00 | $2,300.00 | $2,000.00 |
| 15 | Removing (item description) 03. masonry retaining wall (204.9060.S) | EACH | 1 | $250.00 | $250.00 | $2,300.00 | $2,000.00 |
| 16 | Excavation common (205.0100) | CY | 28,640 | $9.45 | $9.45 | $16.75 | $16.00 |
| 17 | Excavation, hauling, and disposal of creosote contaminated soil (205.0506.S) | TON | 22 | $100.00 | $100.00 | $150.00 | $64.35 |
| 18 | Temporary lane shift during culvert work (208.1500.S) | EACH | 6 | $1.00 | $1.00 | $2,700.00 | $100.00 |
| 19 | Finishing roadway (project) 01. 1706-03-72 (213.0100) | EACH | 1 | $1,000.00 | $500.00 | $1,000.00 | $500.00 |
| 20 | Base aggregate dense 3/4-inch (305.0110) | TON | 443 | $21.00 | $21.00 | $26.00 | $60.00 |
| 21 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 9,160 | $16.50 | $16.50 | $16.75 | $22.00 |
| 22 | Base aggregate open-graded (310.0110) | TON | 151 | $43.00 | $43.00 | $45.00 | $16.00 |
| 23 | Select crushed material (312.0110) | TON | 12,927 | $17.30 | $17.30 | $15.25 | $20.00 |
| 24 | Coloring concrete wisdot red (405.0100) | CY | 276 | $100.00 | $105.00 | $110.00 | $100.00 |
| 25 | Concrete pavement 8 1/2-inch (415.0085) | SY | 9,460 | $98.00 | $90.00 | $99.25 | $90.00 |
| 26 | Concrete truck apron 12-inch (415.2010) | SY | 830 | $113.00 | $150.00 | $120.00 | $100.00 |
| 27 | Concrete pavement joint filling (415.4100) | SY | 12,020 | $2.00 | $3.30 | $4.10 | $2.50 |
| 28 | Rout and seal (415.6000.S) | LF | 1,650 | $7.97 | $4.25 | $8.40 | $7.97 |
| 29 | Tack coat (455.0605) | GAL | 66 | $5.40 | $5.40 | $5.70 | $5.40 |
| 30 | Incentive density HMA pavement (460.2000) | DOL | 950 | $1.00 | $1.00 | $1.00 | $1.00 |
| 31 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 155 | $131.50 | $131.50 | $140.00 | $131.50 |
| 32 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 1,459 | $117.25 | $117.25 | $120.00 | $117.25 |
| 33 | Asphaltic surface driveways and field entrances (465.0120) | TON | 79 | $137.00 | $137.00 | $150.00 | $137.00 |
| 34 | Asphaltic flumes (465.0315) | SY | 42 | $48.00 | $48.00 | $51.00 | $48.00 |
| 35 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 10 | $375.00 | $375.00 | $850.00 | $750.00 |
| 36 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 4 | $525.00 | $525.00 | $960.00 | $900.00 |
| 37 | Culvert pipe temporary 18-inch (520.2018) | LF | 112 | $45.00 | $45.00 | $65.00 | $55.00 |
| 38 | Culvert pipe temporary 24-inch (520.2024) | LF | 9 | $50.00 | $50.00 | $110.00 | $90.00 |
| 39 | Culvert pipe class III-A 18-inch (520.3318) | LF | 198 | $74.00 | $74.00 | $70.00 | $74.00 |
| 40 | Culvert pipe class III-A 24-inch (520.3324) | LF | 84 | $80.00 | $80.00 | $170.00 | $170.00 |
| 41 | Culvert pipe reinforced concrete class IV 72-inch (522.0472) | LF | 228 | $565.00 | $565.00 | $620.00 | $650.00 |
| 42 | Apron endwalls for culvert pipe reinforced concrete 72-inch (522.1072) | EACH | 2 | $5,400.00 | $5,400.00 | $6,500.00 | $5,500.00 |
| 43 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 227 | $25.00 | $50.00 | $40.00 | $25.00 |
| 44 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 1,050 | $24.00 | $52.00 | $33.00 | $20.00 |
| 45 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 427 | $25.00 | $52.00 | $33.00 | $21.00 |
| 46 | Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555) | LF | 3,191 | $25.50 | $37.00 | $29.00 | $21.00 |
| 47 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 368 | $30.00 | $56.00 | $34.00 | $21.00 |
| 48 | Concrete sidewalk 4-inch (602.0405) | SF | 8,170 | $6.00 | $8.10 | $6.30 | $5.50 |
| 49 | Riprap light (606.0100) | CY | 20 | $65.00 | $65.00 | $69.00 | $127.00 |
| 50 | Riprap medium (606.0200) | CY | 61 | $65.00 | $65.00 | $69.00 | $127.00 |
| 51 | Riprap heavy (606.0300) | CY | 76 | $65.00 | $65.00 | $71.00 | $127.00 |
| 52 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 62 | $71.50 | $71.50 | $84.00 | $99.00 |
| 53 | Storm sewer pipe class III-A 12- inch (608.3012) | LF | 534 | $63.00 | $63.00 | $70.00 | $65.00 |
| 54 | Storm sewer pipe class III-A 18- inch (608.3018) | LF | 1,148 | $74.00 | $74.00 | $64.00 | $70.00 |
| 55 | Storm sewer pipe class III-A 24- inch (608.3024) | LF | 219 | $80.00 | $80.00 | $78.00 | $80.00 |
| 56 | Reconstructing manholes (611.0420) | EACH | 1 | $1.00 | $1.00 | $2,500.00 | $940.00 |
| 57 | Inlet covers type H (611.0624) | EACH | 5 | $1,100.00 | $1,100.00 | $1,100.00 | $935.00 |
| 58 | Inlet covers type HM (611.0627) | EACH | 14 | $1,100.00 | $1,100.00 | $1,100.00 | $935.00 |
| 59 | Inlet covers type HM-S (611.0636) | EACH | 3 | $1,000.00 | $1,000.00 | $1,100.00 | $935.00 |
| 60 | Inlet covers type MS (611.0642) | EACH | 7 | $830.00 | $830.00 | $890.00 | $722.00 |
| 61 | Inlet covers type T (611.0652) | EACH | 4 | $1,400.00 | $1,400.00 | $1,400.00 | $1,187.00 |
| 62 | Manholes 5-FT diameter (611.2005) | EACH | 2 | $4,300.00 | $4,300.00 | $4,400.00 | $5,300.00 |
| 63 | Manholes 6-FT diameter (611.2006) | EACH | 1 | $6,750.00 | $6,750.00 | $5,800.00 | $6,500.00 |
| 64 | Inlets 4-FT diameter (611.3004) | EACH | 9 | $2,700.00 | $2,700.00 | $2,900.00 | $3,850.00 |
| 65 | Inlets 2X2.5-FT (611.3225) | EACH | 3 | $1,700.00 | $1,700.00 | $2,200.00 | $3,000.00 |
| 66 | Inlets 2X3-FT (611.3230) | EACH | 11 | $1,940.00 | $1,940.00 | $2,400.00 | $3,200.00 |
| 67 | Inlets median 1 grate (611.3901) | EACH | 1 | $3,300.00 | $3,300.00 | $3,600.00 | $4,470.00 |
| 68 | Inlets median 2 grate (611.3902) | EACH | 3 | $3,650.00 | $3,650.00 | $3,700.00 | $4,515.00 |
| 69 | Cover plates temporary (611.8120.S) | EACH | 3 | $75.00 | $75.00 | $890.00 | $345.00 |
| 70 | Pipe underdrain 6-inch (612.0106) | LF | 2,664 | $9.05 | $9.05 | $12.50 | $14.00 |
| 71 | Maintenance and repair of haul roads (project) 01. 1706-03-72 (618.0100) | EACH | 1 | $1.00 | $1.00 | $550.00 | $500.00 |
| 72 | Mobilization (619.1000) | EACH | 1 | $246,075 | $294,948 | $97,500 | $279,000 |
| 73 | Concrete median sloped nose (620.0300) | SF | 429 | $15.00 | $18.40 | $11.00 | $12.00 |
| 74 | Water (624.0100) | MGAL | 147 | $0.01 | $0.01 | $55.00 | $50.00 |
| 75 | Salvaged topsoil (625.0500) | SY | 36,010 | $1.75 | $1.75 | $1.40 | $3.60 |
| 76 | Mulching (627.0200) | SY | 8,190 | $0.35 | $0.35 | $0.35 | $0.35 |
| 77 | Silt fence (628.1504) | LF | 2,290 | $2.20 | $2.20 | $2.30 | $2.20 |
| 78 | Silt fence maintenance (628.1520) | LF | 2,290 | $0.01 | $0.01 | $0.01 | $0.01 |
| 79 | Mobilizations erosion control (628.1905) | EACH | 6 | $100.00 | $100.00 | $110.00 | $100.00 |
| 80 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $100.00 | $100.00 | $110.00 | $100.00 |
| 81 | Erosion mat class I type A (628.2002) | SY | 9,840 | $1.10 | $1.10 | $1.20 | $1.10 |
| 82 | Erosion mat urban class I type A (628.2006) | SY | 17,380 | $1.65 | $1.65 | $1.80 | $1.65 |
| 83 | Inlet protection type A (628.7005) | EACH | 37 | $75.00 | $75.00 | $79.00 | $75.00 |
| 84 | Inlet protection type C (628.7015) | EACH | 33 | $70.00 | $70.00 | $74.00 | $70.00 |
| 85 | Temporary ditch checks (628.7504) | LF | 107 | $8.95 | $8.95 | $9.50 | $8.95 |
| 86 | Culvert pipe checks (628.7555) | EACH | 62 | $18.00 | $18.00 | $19.00 | $18.00 |
| 87 | Fertilizer type B (629.0210) | CWT | 25 | $85.00 | $85.00 | $90.00 | $85.00 |
| 88 | Seeding mixture no. 30 (630.0130) | LB | 424 | $9.25 | $9.25 | $9.80 | $9.25 |
| 89 | Seeding mixture no. 40 (630.0140) | LB | 800 | $12.00 | $12.00 | $12.75 | $12.00 |
| 90 | Seeding temporary (630.0200) | LB | 943 | $3.65 | $3.65 | $3.90 | $3.65 |
| 91 | Seeding nurse crop (630.0400) | LB | 5 | $20.00 | $20.00 | $21.25 | $20.00 |
| 92 | Seed water (630.0500) | MGAL | 797.40 | $10.00 | $10.00 | $10.50 | $10.00 |
| 93 | Markers culvert end (633.5200) | EACH | 4 | $70.00 | $70.00 | $74.00 | $70.00 |
| 94 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 10 | $85.00 | $85.00 | $90.00 | $85.00 |
| 95 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 27 | $90.00 | $90.00 | $95.00 | $90.00 |
| 96 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 8 | $98.00 | $98.00 | $100.00 | $98.00 |
| 97 | Posts tubular steel 2X2-inch X 14- FT (634.0814) | EACH | 16 | $190.00 | $190.00 | $200.00 | $190.00 |
| 98 | Signs type II reflective H (637.2210) | SF | 634.06 | $20.00 | $20.00 | $21.25 | $20.00 |
| 99 | Signs type II reflective F (637.2230) | SF | 66.94 | $21.00 | $21.00 | $22.25 | $21.00 |
| 100 | Removing signs type II (638.2602) | EACH | 47 | $35.00 | $35.00 | $37.00 | $35.00 |
| 101 | Removing small sign supports (638.3000) | EACH | 47 | $35.00 | $35.00 | $37.00 | $35.00 |
| 102 | Field office type C (642.5201) | EACH | 1 | $30,000 | $10,000 | $6,700.00 | $15,000 |
| 103 | Traffic control drums (643.0300) | DAY | 6,262 | $0.20 | $0.20 | $0.20 | $0.20 |
| 104 | Traffic control barricades type III (643.0420) | DAY | 2,198 | $0.45 | $0.65 | $0.50 | $0.45 |
| 105 | Traffic control warning lights type A (643.0705) | DAY | 2,788 | $0.10 | $0.15 | $0.10 | $0.10 |
| 106 | Traffic control warning lights type C (643.0715) | DAY | 1,830 | $0.10 | $0.15 | $0.10 | $0.10 |
| 107 | Traffic control signs (643.0900) | DAY | 29,303 | $0.30 | $0.40 | $0.30 | $0.30 |
| 108 | Traffic control covering signs type II (643.0920) | EACH | 6 | $50.00 | $50.00 | $53.00 | $50.00 |
| 109 | Traffic control signs PCMS (643.1050) | DAY | 42 | $75.00 | $35.00 | $79.00 | $75.00 |
| 110 | Temporary marking line paint 6- inch (643.3165) | LF | 13,387 | $0.55 | $0.35 | $0.60 | $0.55 |
| 111 | Temporary marking line removable tape 6-inch (643.3180) | LF | 9,236 | $1.45 | $1.80 | $1.50 | $1.45 |
| 112 | Traffic control (643.5000) | EACH | 1 | $10,035 | $32,000 | $10,600 | $10,035 |
| 113 | Geotextile type C (645.0105) | SY | 260 | $3.25 | $3.25 | $2.70 | $1.68 |
| 114 | Geotextile type DF schedule A (645.0111) | SY | 1,184 | $3.50 | $3.50 | $0.90 | $0.78 |
| 115 | Geotextile type HR (645.0120) | SY | 343 | $5.00 | $5.00 | $3.20 | $1.92 |
| 116 | Geotextile type R (645.0130) | SY | 88 | $5.00 | $5.00 | $2.60 | $2.49 |
| 117 | Marking line epoxy 6-inch (646.2020) | LF | 93 | $3.00 | $3.00 | $3.20 | $4.00 |
| 118 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 14,088 | $1.60 | $1.60 | $1.70 | $1.55 |
| 119 | Marking line epoxy 10-inch (646.4020) | LF | 260 | $5.00 | $5.00 | $5.30 | $4.00 |
| 120 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 72 | $15.00 | $15.00 | $16.00 | $17.00 |
| 121 | Marking diagonal epoxy 12-inch (646.7120) | LF | 280 | $12.00 | $12.00 | $12.75 | $13.00 |
| 122 | Marking curb epoxy (646.8120) | LF | 60 | $8.00 | $8.00 | $8.50 | $7.50 |
| 123 | Marking island nose epoxy (646.8220) | EACH | 6 | $275.00 | $275.00 | $290.00 | $350.00 |
| 124 | Marking removal line 4-inch (646.9000) | LF | 3,230 | $1.00 | $0.50 | $1.10 | $1.00 |
| 125 | Marking removal line 8-inch (646.9100) | LF | 100 | $3.00 | $5.00 | $3.20 | $3.00 |
| 126 | Construction staking storm sewer (650.4000) | EACH | 34 | $200.00 | $140.00 | $160.00 | $250.00 |
| 127 | Construction staking subgrade (650.4500) | LF | 5,231 | $0.01 | $0.01 | $1.10 | $1.00 |
| 128 | Construction staking base (650.5000) | LF | 4,366 | $3.00 | $3.00 | $1.10 | $1.00 |
| 129 | Construction staking pipe culverts (650.6000) | EACH | 8 | $500.00 | $180.00 | $210.00 | $400.00 |
| 130 | Construction staking concrete pavement (650.7000) | LF | 4,677 | $8.00 | $2.50 | $1.60 | $2.00 |
| 131 | Construction staking electrical installations (project) 01. 1706-03- 72 (650.8501) | EACH | 1 | $6,000.00 | $2,520.00 | $530.00 | $1,550.00 |
| 132 | Construction staking supplemental control (project) 01. 1706-03-72 (650.9911) | EACH | 1 | $50,000 | $3,000.00 | $530.00 | $2,000.00 |
| 133 | Construction staking slope stakes (650.9920) | LF | 10,115 | $2.00 | $1.00 | $0.55 | $0.70 |
| 134 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 2,165 | $10.00 | $10.00 | $10.50 | $10.00 |
| 135 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 99 | $18.00 | $18.00 | $19.00 | $18.00 |
| 136 | Conduit special 2-inch (652.0605) | LF | 132 | $50.00 | $50.00 | $53.00 | $50.00 |
| 137 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 10 | $2,000.00 | $2,000.00 | $2,100.00 | $2,000.00 |
| 138 | Concrete bases type 5 (654.0105) | EACH | 16 | $1,500.00 | $1,500.00 | $1,600.00 | $1,500.00 |
| 139 | Concrete control cabinet bases type L24 (654.0224) | EACH | 1 | $2,000.00 | $2,000.00 | $2,100.00 | $2,000.00 |
| 140 | Electrical wire lighting 12 AWG (655.0610) | LF | 2,496 | $1.05 | $1.05 | $1.10 | $1.05 |
| 141 | Electrical wire lighting 8 AWG (655.0620) | LF | 8,723 | $1.65 | $1.65 | $1.80 | $1.65 |
| 142 | Electrical service meter breaker pedestal (location) 01. sta 26+71'NB' (656.0201) | EACH | 1 | $2,000.00 | $2,000.00 | $2,100.00 | $2,000.00 |
| 143 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 16 | $600.00 | $600.00 | $640.00 | $600.00 |
| 144 | Poles type 5-aluminum (657.0322) | EACH | 16 | $2,100.00 | $2,100.00 | $2,200.00 | $2,100.00 |
| 145 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 16 | $680.00 | $680.00 | $720.00 | $680.00 |
| 146 | Luminaires utility LED A (659.1115) | EACH | 16 | $275.00 | $275.00 | $290.00 | $275.00 |
| 147 | Lighting control cabinets 120/240 24-inch (659.2124) | EACH | 1 | $8,200.00 | $8,200.00 | $8,700.00 | $8,200.00 |
| 148 | Sawing asphalt (690.0150) | LF | 2,908 | $1.43 | $1.20 | $1.80 | $1.69 |
| 149 | Incentive compressive strength concrete pavement (715.0720) | DOL | 3,081 | $1.00 | $1.00 | $1.00 | $1.00 |
| 150 | Installing and maintaining bird deterrent system (station) 01. sta 72+43'EB' (999.2000.S) | EACH | 1 | $1.00 | $1.00 | $230.00 | $1,350.00 |
| 151 | Installing and maintaining bird deterrent system (station) 02. sta 28+59'NB' (999.2000.S) | EACH | 1 | $1.00 | $1.00 | $230.00 | $1,350.00 |
| 152 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 | $5.00 | $5.00 | $5.00 |
| 153 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 | $5.00 | $5.00 | $5.00 |
| 154 | Special 01. landmark reference monuments (SPV.0060) | EACH | 1 | $2,000.00 | $2,500.00 | $790.00 | $500.00 |
| 155 | Special 01. seeding no mow fescue (SPV.0085) | LB | 25 | $50.00 | $50.00 | $53.00 | $50.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.