WisDOT contract 20251014003 bid tabulation

Shullsburg - Monroe; STH 23 Intersection (STH 011, Lafayette County Shullsburg - Monroe). Let by Wisconsin DOT on October 14, 2025, Lafayette. 4 bids received; low bid $3,484,865 by Zignego Company, Inc..

Owner
Wisconsin DOT
Letting
14 OCT 2025
Pay items
155
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Zignego Company, Inc.$3,484,865Low
2Michels Road & Stone, Inc.$3,522,819+1.0%
3Parisi Construction, LLC$3,607,402+4.0%
4Integrity Grading and Excavating, Inc.$3,801,527+9.0%
WisDOT contract 20251014003: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Zignego Company, Inc.2. Michels Road & Stone, Inc.3. Parisi Construction, LLC4. Integrity Grading and Excavating, Inc.
1Removing small pipe culverts (203.0100)EACH9$425.00$425.00$660.00$250.00
2Removing structure (structure) 01. 72" CPRC (203.0220)EACH1$950.00$950.00$3,900.00$5,165.00
3Removing structure (structure) 02. C-33-0386 (203.0220)EACH1$2,500.00$2,500.00$16,100$24,000
4Removing structure (structure) 03. C-33-0387 (203.0220)EACH1$2,500.00$2,500.00$12,900$24,000
5Removing concrete pavement (204.0100)SY1,240$1.00$1.00$11.50$7.60
6Removing asphaltic surface (204.0110)SY44$10.00$10.00$20.00$13.25
7Removing curb (204.0130)LF168$5.00$5.00$10.50$8.15
8Removing curb & gutter (204.0150)LF240$5.00$5.00$9.20$7.70
9Removing guardrail (204.0165)LF282$5.00$5.00$5.30$5.00
10Removing fence (204.0170)LF26$5.00$15.00$5.30$5.00
11Removing inlets (204.0220)EACH1$450.00$450.00$660.00$1,277.00
12Removing storm sewer (size) 01. 18-inch (204.0245)LF13$15.00$15.00$24.75$46.70
13Removing (item description) 01. wood retaining wall (204.9060.S)EACH1$500.00$500.00$4,100.00$2,800.00
14Removing (item description) 02. rock retaining wall (204.9060.S)EACH1$250.00$250.00$2,300.00$2,000.00
15Removing (item description) 03. masonry retaining wall (204.9060.S)EACH1$250.00$250.00$2,300.00$2,000.00
16Excavation common (205.0100)CY28,640$9.45$9.45$16.75$16.00
17Excavation, hauling, and disposal of creosote contaminated soil (205.0506.S)TON22$100.00$100.00$150.00$64.35
18Temporary lane shift during culvert work (208.1500.S)EACH6$1.00$1.00$2,700.00$100.00
19Finishing roadway (project) 01. 1706-03-72 (213.0100)EACH1$1,000.00$500.00$1,000.00$500.00
20Base aggregate dense 3/4-inch (305.0110)TON443$21.00$21.00$26.00$60.00
21Base aggregate dense 1 1/4-inch (305.0120)TON9,160$16.50$16.50$16.75$22.00
22Base aggregate open-graded (310.0110)TON151$43.00$43.00$45.00$16.00
23Select crushed material (312.0110)TON12,927$17.30$17.30$15.25$20.00
24Coloring concrete wisdot red (405.0100)CY276$100.00$105.00$110.00$100.00
25Concrete pavement 8 1/2-inch (415.0085)SY9,460$98.00$90.00$99.25$90.00
26Concrete truck apron 12-inch (415.2010)SY830$113.00$150.00$120.00$100.00
27Concrete pavement joint filling (415.4100)SY12,020$2.00$3.30$4.10$2.50
28Rout and seal (415.6000.S)LF1,650$7.97$4.25$8.40$7.97
29Tack coat (455.0605)GAL66$5.40$5.40$5.70$5.40
30Incentive density HMA pavement (460.2000)DOL950$1.00$1.00$1.00$1.00
31HMA pavement 3 MT 58-28 S (460.6223)TON155$131.50$131.50$140.00$131.50
32HMA pavement 4 MT 58-28 S (460.6224)TON1,459$117.25$117.25$120.00$117.25
33Asphaltic surface driveways and field entrances (465.0120)TON79$137.00$137.00$150.00$137.00
34Asphaltic flumes (465.0315)SY42$48.00$48.00$51.00$48.00
35Apron endwalls for culvert pipe 18- inch (520.1018)EACH10$375.00$375.00$850.00$750.00
36Apron endwalls for culvert pipe 24- inch (520.1024)EACH4$525.00$525.00$960.00$900.00
37Culvert pipe temporary 18-inch (520.2018)LF112$45.00$45.00$65.00$55.00
38Culvert pipe temporary 24-inch (520.2024)LF9$50.00$50.00$110.00$90.00
39Culvert pipe class III-A 18-inch (520.3318)LF198$74.00$74.00$70.00$74.00
40Culvert pipe class III-A 24-inch (520.3324)LF84$80.00$80.00$170.00$170.00
41Culvert pipe reinforced concrete class IV 72-inch (522.0472)LF228$565.00$565.00$620.00$650.00
42Apron endwalls for culvert pipe reinforced concrete 72-inch (522.1072)EACH2$5,400.00$5,400.00$6,500.00$5,500.00
43Concrete curb & gutter 18-inch type A (601.0405)LF227$25.00$50.00$40.00$25.00
44Concrete curb & gutter 30-inch type A (601.0409)LF1,050$24.00$52.00$33.00$20.00
45Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF427$25.00$52.00$33.00$21.00
46Concrete curb & gutter 6-inch sloped 36-inch type A (601.0555)LF3,191$25.50$37.00$29.00$21.00
47Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF368$30.00$56.00$34.00$21.00
48Concrete sidewalk 4-inch (602.0405)SF8,170$6.00$8.10$6.30$5.50
49Riprap light (606.0100)CY20$65.00$65.00$69.00$127.00
50Riprap medium (606.0200)CY61$65.00$65.00$69.00$127.00
51Riprap heavy (606.0300)CY76$65.00$65.00$71.00$127.00
52Storm sewer pipe reinforced concrete class III 12-inch (608.0312)LF62$71.50$71.50$84.00$99.00
53Storm sewer pipe class III-A 12- inch (608.3012)LF534$63.00$63.00$70.00$65.00
54Storm sewer pipe class III-A 18- inch (608.3018)LF1,148$74.00$74.00$64.00$70.00
55Storm sewer pipe class III-A 24- inch (608.3024)LF219$80.00$80.00$78.00$80.00
56Reconstructing manholes (611.0420)EACH1$1.00$1.00$2,500.00$940.00
57Inlet covers type H (611.0624)EACH5$1,100.00$1,100.00$1,100.00$935.00
58Inlet covers type HM (611.0627)EACH14$1,100.00$1,100.00$1,100.00$935.00
59Inlet covers type HM-S (611.0636)EACH3$1,000.00$1,000.00$1,100.00$935.00
60Inlet covers type MS (611.0642)EACH7$830.00$830.00$890.00$722.00
61Inlet covers type T (611.0652)EACH4$1,400.00$1,400.00$1,400.00$1,187.00
62Manholes 5-FT diameter (611.2005)EACH2$4,300.00$4,300.00$4,400.00$5,300.00
63Manholes 6-FT diameter (611.2006)EACH1$6,750.00$6,750.00$5,800.00$6,500.00
64Inlets 4-FT diameter (611.3004)EACH9$2,700.00$2,700.00$2,900.00$3,850.00
65Inlets 2X2.5-FT (611.3225)EACH3$1,700.00$1,700.00$2,200.00$3,000.00
66Inlets 2X3-FT (611.3230)EACH11$1,940.00$1,940.00$2,400.00$3,200.00
67Inlets median 1 grate (611.3901)EACH1$3,300.00$3,300.00$3,600.00$4,470.00
68Inlets median 2 grate (611.3902)EACH3$3,650.00$3,650.00$3,700.00$4,515.00
69Cover plates temporary (611.8120.S)EACH3$75.00$75.00$890.00$345.00
70Pipe underdrain 6-inch (612.0106)LF2,664$9.05$9.05$12.50$14.00
71Maintenance and repair of haul roads (project) 01. 1706-03-72 (618.0100)EACH1$1.00$1.00$550.00$500.00
72Mobilization (619.1000)EACH1$246,075$294,948$97,500$279,000
73Concrete median sloped nose (620.0300)SF429$15.00$18.40$11.00$12.00
74Water (624.0100)MGAL147$0.01$0.01$55.00$50.00
75Salvaged topsoil (625.0500)SY36,010$1.75$1.75$1.40$3.60
76Mulching (627.0200)SY8,190$0.35$0.35$0.35$0.35
77Silt fence (628.1504)LF2,290$2.20$2.20$2.30$2.20
78Silt fence maintenance (628.1520)LF2,290$0.01$0.01$0.01$0.01
79Mobilizations erosion control (628.1905)EACH6$100.00$100.00$110.00$100.00
80Mobilizations emergency erosion control (628.1910)EACH3$100.00$100.00$110.00$100.00
81Erosion mat class I type A (628.2002)SY9,840$1.10$1.10$1.20$1.10
82Erosion mat urban class I type A (628.2006)SY17,380$1.65$1.65$1.80$1.65
83Inlet protection type A (628.7005)EACH37$75.00$75.00$79.00$75.00
84Inlet protection type C (628.7015)EACH33$70.00$70.00$74.00$70.00
85Temporary ditch checks (628.7504)LF107$8.95$8.95$9.50$8.95
86Culvert pipe checks (628.7555)EACH62$18.00$18.00$19.00$18.00
87Fertilizer type B (629.0210)CWT25$85.00$85.00$90.00$85.00
88Seeding mixture no. 30 (630.0130)LB424$9.25$9.25$9.80$9.25
89Seeding mixture no. 40 (630.0140)LB800$12.00$12.00$12.75$12.00
90Seeding temporary (630.0200)LB943$3.65$3.65$3.90$3.65
91Seeding nurse crop (630.0400)LB5$20.00$20.00$21.25$20.00
92Seed water (630.0500)MGAL797.40$10.00$10.00$10.50$10.00
93Markers culvert end (633.5200)EACH4$70.00$70.00$74.00$70.00
94Posts wood 4X6-inch X 14-FT (634.0614)EACH10$85.00$85.00$90.00$85.00
95Posts wood 4X6-inch X 16-FT (634.0616)EACH27$90.00$90.00$95.00$90.00
96Posts wood 4X6-inch X 18-FT (634.0618)EACH8$98.00$98.00$100.00$98.00
97Posts tubular steel 2X2-inch X 14- FT (634.0814)EACH16$190.00$190.00$200.00$190.00
98Signs type II reflective H (637.2210)SF634.06$20.00$20.00$21.25$20.00
99Signs type II reflective F (637.2230)SF66.94$21.00$21.00$22.25$21.00
100Removing signs type II (638.2602)EACH47$35.00$35.00$37.00$35.00
101Removing small sign supports (638.3000)EACH47$35.00$35.00$37.00$35.00
102Field office type C (642.5201)EACH1$30,000$10,000$6,700.00$15,000
103Traffic control drums (643.0300)DAY6,262$0.20$0.20$0.20$0.20
104Traffic control barricades type III (643.0420)DAY2,198$0.45$0.65$0.50$0.45
105Traffic control warning lights type A (643.0705)DAY2,788$0.10$0.15$0.10$0.10
106Traffic control warning lights type C (643.0715)DAY1,830$0.10$0.15$0.10$0.10
107Traffic control signs (643.0900)DAY29,303$0.30$0.40$0.30$0.30
108Traffic control covering signs type II (643.0920)EACH6$50.00$50.00$53.00$50.00
109Traffic control signs PCMS (643.1050)DAY42$75.00$35.00$79.00$75.00
110Temporary marking line paint 6- inch (643.3165)LF13,387$0.55$0.35$0.60$0.55
111Temporary marking line removable tape 6-inch (643.3180)LF9,236$1.45$1.80$1.50$1.45
112Traffic control (643.5000)EACH1$10,035$32,000$10,600$10,035
113Geotextile type C (645.0105)SY260$3.25$3.25$2.70$1.68
114Geotextile type DF schedule A (645.0111)SY1,184$3.50$3.50$0.90$0.78
115Geotextile type HR (645.0120)SY343$5.00$5.00$3.20$1.92
116Geotextile type R (645.0130)SY88$5.00$5.00$2.60$2.49
117Marking line epoxy 6-inch (646.2020)LF93$3.00$3.00$3.20$4.00
118Marking line grooved wet ref epoxy 6-inch (646.2040)LF14,088$1.60$1.60$1.70$1.55
119Marking line epoxy 10-inch (646.4020)LF260$5.00$5.00$5.30$4.00
120Marking dotted extension epoxy 18-inch (646.6320)LF72$15.00$15.00$16.00$17.00
121Marking diagonal epoxy 12-inch (646.7120)LF280$12.00$12.00$12.75$13.00
122Marking curb epoxy (646.8120)LF60$8.00$8.00$8.50$7.50
123Marking island nose epoxy (646.8220)EACH6$275.00$275.00$290.00$350.00
124Marking removal line 4-inch (646.9000)LF3,230$1.00$0.50$1.10$1.00
125Marking removal line 8-inch (646.9100)LF100$3.00$5.00$3.20$3.00
126Construction staking storm sewer (650.4000)EACH34$200.00$140.00$160.00$250.00
127Construction staking subgrade (650.4500)LF5,231$0.01$0.01$1.10$1.00
128Construction staking base (650.5000)LF4,366$3.00$3.00$1.10$1.00
129Construction staking pipe culverts (650.6000)EACH8$500.00$180.00$210.00$400.00
130Construction staking concrete pavement (650.7000)LF4,677$8.00$2.50$1.60$2.00
131Construction staking electrical installations (project) 01. 1706-03- 72 (650.8501)EACH1$6,000.00$2,520.00$530.00$1,550.00
132Construction staking supplemental control (project) 01. 1706-03-72 (650.9911)EACH1$50,000$3,000.00$530.00$2,000.00
133Construction staking slope stakes (650.9920)LF10,115$2.00$1.00$0.55$0.70
134Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF2,165$10.00$10.00$10.50$10.00
135Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF99$18.00$18.00$19.00$18.00
136Conduit special 2-inch (652.0605)LF132$50.00$50.00$53.00$50.00
137Pull boxes non-conductive 24X42- inch (653.0164)EACH10$2,000.00$2,000.00$2,100.00$2,000.00
138Concrete bases type 5 (654.0105)EACH16$1,500.00$1,500.00$1,600.00$1,500.00
139Concrete control cabinet bases type L24 (654.0224)EACH1$2,000.00$2,000.00$2,100.00$2,000.00
140Electrical wire lighting 12 AWG (655.0610)LF2,496$1.05$1.05$1.10$1.05
141Electrical wire lighting 8 AWG (655.0620)LF8,723$1.65$1.65$1.80$1.65
142Electrical service meter breaker pedestal (location) 01. sta 26+71'NB' (656.0201)EACH1$2,000.00$2,000.00$2,100.00$2,000.00
143Transformer bases breakaway 11 1/2-inch bolt circle (657.0255)EACH16$600.00$600.00$640.00$600.00
144Poles type 5-aluminum (657.0322)EACH16$2,100.00$2,100.00$2,200.00$2,100.00
145Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710)EACH16$680.00$680.00$720.00$680.00
146Luminaires utility LED A (659.1115)EACH16$275.00$275.00$290.00$275.00
147Lighting control cabinets 120/240 24-inch (659.2124)EACH1$8,200.00$8,200.00$8,700.00$8,200.00
148Sawing asphalt (690.0150)LF2,908$1.43$1.20$1.80$1.69
149Incentive compressive strength concrete pavement (715.0720)DOL3,081$1.00$1.00$1.00$1.00
150Installing and maintaining bird deterrent system (station) 01. sta 72+43'EB' (999.2000.S)EACH1$1.00$1.00$230.00$1,350.00
151Installing and maintaining bird deterrent system (station) 02. sta 28+59'NB' (999.2000.S)EACH1$1.00$1.00$230.00$1,350.00
152On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00$5.00$5.00$5.00
153On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,320$5.00$5.00$5.00$5.00
154Special 01. landmark reference monuments (SPV.0060)EACH1$2,000.00$2,500.00$790.00$500.00
155Special 01. seeding no mow fescue (SPV.0085)LB25$50.00$50.00$53.00$50.00
WisDOT contract 20251014003: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy