WisDOT contract 20251209048 bid tabulation
Stoughton - Madison; Tower Road to Exchange Street (USH 051, Dane County Stoughton - Madison). Let by Wisconsin DOT on December 9, 2025, Dane. 9 bids received; low bid $5,588,660 by Rock Road Companies, Inc..
- Owner
- Wisconsin DOT
- Letting
- 09 DEC 2025
- Pay items
- 198
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Rock Road Companies, Inc. | $5,588,660 | Low |
| 2 | Musson Bros., Inc. | $5,655,526 | +1.0% |
| 3 | Zignego Company, Inc. | $5,757,094 | +3.0% |
| 4 | Lalonde Contractors Incorporated | $5,881,360 | +5.0% |
| 5 | R.G. Huston Company, Inc. | $6,008,788 | +8.0% |
| 6 | James Peterson Sons, Inc. | $6,088,118 | +9.0% |
| 7 | Parisi Construction, LLC | $6,117,488 | +9.0% |
| 8 | Hoffman Construction Company | $6,157,089 | +10% |
| 9 | Integrity Grading and Excavating, Inc. | $6,544,641 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Rock Road Companies, Inc. | 2. Musson Bros., Inc. | 3. Zignego Company, Inc. | 4. Lalonde Contractors Incorporated | 5. R.G. Huston Company, Inc. | 6. James Peterson Sons, Inc. |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Grubbing (201.0205) | STA | 31 | $320.04 | $249.00 | $249.00 | $249.00 | $150.00 | $249.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 10 | $468.01 | $707.00 | $468.01 | $707.00 | $780.00 | $1,200.00 |
| 3 | Removing concrete pavement (204.0100) | SY | 18,010 | $4.75 | $6.50 | $4.75 | $6.50 | $5.00 | $1.00 |
| 4 | Removing curb & gutter (204.0150) | LF | 39 | $6.93 | $20.50 | $6.93 | $20.50 | $16.00 | $3.00 |
| 5 | Removing fence (204.0170) | LF | 231 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 | $3.00 |
| 6 | Excavation common (205.0100) | CY | 49,090 | $9.44 | $11.50 | $9.44 | $11.50 | $15.85 | $14.63 |
| 7 | Borrow (208.0100) | CY | 1,440 | $19.04 | $0.01 | $19.04 | $0.01 | $22.50 | $0.01 |
| 8 | Finishing roadway (project) 01. 5845-16-84 (213.0100) | EACH | 1 | $5,040.94 | $500.00 | $1,000.00 | $3,680.00 | $7,600.00 | $5,000.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 750 | $32.47 | $34.00 | $32.47 | $34.00 | $30.00 | $32.55 |
| 10 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 18,750 | $14.75 | $15.25 | $14.75 | $15.25 | $16.65 | $16.15 |
| 11 | Select crushed material (312.0110) | TON | 28,089 | $15.45 | $17.25 | $16.01 | $17.25 | $16.40 | $14.58 |
| 12 | Removing pavement for base patching (390.0100) | CY | 80 | $65.82 | $55.00 | $65.82 | $69.67 | $64.00 | $20.00 |
| 13 | Base patching asphaltic (390.0201) | TON | 160 | $129.88 | $110.00 | $110.00 | $110.00 | $111.11 | $110.00 |
| 14 | Coloring concrete wisdot red (405.0100) | CY | 294 | $150.00 | $150.00 | $100.00 | $150.16 | $125.00 | $150.00 |
| 15 | Concrete pavement 8-inch (415.0080) | SY | 18,340 | $74.37 | $74.37 | $80.00 | $73.34 | $74.37 | $74.37 |
| 16 | Concrete pavement gaps (415.0210) | EACH | 3 | $1,000.00 | $1,000.00 | $1,000.00 | $0.01 | $1,000.00 | $1,000.00 |
| 17 | Concrete truck apron 12-inch (415.2010) | SY | 880 | $89.00 | $89.00 | $147.00 | $101.05 | $116.00 | $89.00 |
| 18 | Concrete pavement joint filling (415.4100) | SY | 11,430 | $2.45 | $2.45 | $2.00 | $1.63 | $2.45 | $2.45 |
| 19 | Rout and seal (415.6000.S) | LF | 3,158 | $3.55 | $3.55 | $2.50 | $3.50 | $3.55 | $3.55 |
| 20 | Drilled tie bars (416.0610) | EACH | 692 | $12.14 | $12.14 | $20.00 | $12.10 | $12.14 | $12.14 |
| 21 | HMA cold weather paving (450.4000) | TON | 120 | $0.01 | $5.00 | $5.00 | $5.00 | $5.05 | $5.00 |
| 22 | Tack coat (455.0605) | GAL | 510 | $2.88 | $3.00 | $3.00 | $3.00 | $3.03 | $3.00 |
| 23 | Incentive density HMA pavement (460.2000) | DOL | 1,470 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 24 | HMA pavement 4 LT 58-28 S (460.5224) | TON | 412 | $96.26 | $88.50 | $88.50 | $88.50 | $89.39 | $88.50 |
| 25 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 1,888 | $86.09 | $84.25 | $84.25 | $84.25 | $85.10 | $84.25 |
| 26 | Asphaltic surface (465.0105) | TON | 86 | $160.12 | $102.00 | $102.00 | $102.00 | $103.03 | $102.00 |
| 27 | Asphaltic surface driveways and field entrances (465.0120) | TON | 30 | $197.01 | $138.00 | $138.50 | $138.50 | $139.90 | $138.50 |
| 28 | Asphaltic surface temporary (465.0125) | TON | 1,057 | $101.26 | $80.00 | $80.00 | $80.00 | $80.81 | $80.00 |
| 29 | Asphaltic flumes (465.0315) | SY | 14 | $70.29 | $28.50 | $28.50 | $28.50 | $28.79 | $28.50 |
| 30 | Cold patch (495.1000.S) | TON | 20 | $189.76 | $200.00 | $1.00 | $376.80 | $150.00 | $250.00 |
| 31 | Apron endwalls for culvert pipe 18- inch (520.1018) | EACH | 4 | $595.33 | $441.00 | $595.33 | $441.00 | $400.00 | $437.64 |
| 32 | Apron endwalls for culvert pipe 24- inch (520.1024) | EACH | 4 | $635.03 | $620.00 | $635.03 | $620.00 | $500.00 | $596.51 |
| 33 | Culvert pipe temporary 12-inch (520.2012) | LF | 66 | $83.43 | $55.50 | $83.43 | $55.50 | $69.00 | $68.01 |
| 34 | Culvert pipe temporary 24-inch (520.2024) | LF | 12 | $103.32 | $160.00 | $103.32 | $160.00 | $112.00 | $114.72 |
| 35 | Culvert pipe temporary 36-inch (520.2036) | LF | 10 | $219.88 | $208.00 | $219.88 | $208.00 | $186.00 | $135.51 |
| 36 | Culvert pipe class III-A non-metal 18-inch (520.3418) | LF | 72 | $78.99 | $82.50 | $78.99 | $82.50 | $82.00 | $159.69 |
| 37 | Culvert pipe class III-A non-metal 24-inch (520.3424) | LF | 70 | $90.00 | $138.00 | $90.00 | $138.00 | $97.00 | $145.80 |
| 38 | Culvert pipe reinforced concrete class III 24-inch (522.0124) | LF | 90 | $208.48 | $149.00 | $208.48 | $149.00 | $99.00 | $216.00 |
| 39 | Culvert pipe reinforced concrete class III 36-inch (522.0136) | LF | 142 | $238.13 | $169.00 | $238.13 | $169.00 | $148.00 | $332.68 |
| 40 | Culvert pipe reinforced concrete class IV 24-inch (522.0424) | LF | 36 | $121.40 | $103.00 | $121.40 | $103.00 | $113.03 | $157.71 |
| 41 | Apron endwalls for culvert pipe reinforced concrete 12-inch (522.1012) | EACH | 8 | $1,159.23 | $1,070.00 | $1,159.24 | $1,070.00 | $1,200.00 | $1,188.78 |
| 42 | Apron endwalls for culvert pipe reinforced concrete 15-inch (522.1015) | EACH | 1 | $1,208.86 | $1,100.00 | $1,208.86 | $1,100.00 | $1,250.00 | $1,237.12 |
| 43 | Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018) | EACH | 1 | $1,283.09 | $1,150.00 | $1,283.09 | $1,150.00 | $1,300.00 | $1,358.45 |
| 44 | Apron endwalls for culvert pipe reinforced concrete 24-inch (522.1024) | EACH | 5 | $1,422.02 | $1,420.00 | $1,422.02 | $1,420.00 | $1,500.00 | $1,548.81 |
| 45 | Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036) | EACH | 2 | $2,181.38 | $2,490.00 | $2,181.39 | $2,490.00 | $2,400.00 | $2,349.66 |
| 46 | Apron endwalls for culvert pipe salvaged 24-inch (524.0624) | EACH | 2 | $1,217.88 | $1,010.00 | $1,217.88 | $1,010.00 | $700.00 | $1,190.70 |
| 47 | Drilling shaft 42-inch (531.2042) | LF | 72 | $265.00 | $265.00 | $265.00 | $265.00 | $265.00 | $265.00 |
| 48 | Foundation single-shaft type MC-III (structure) 01. S-13-0605 (531.5130) | EACH | 1 | $9,680.00 | $9,680.00 | $9,680.00 | $9,680.00 | $9,680.00 | $9,680.00 |
| 49 | Foundation single-shaft type MC-III (structure) 02. S-13-0606 (531.5130) | EACH | 1 | $9,680.00 | $9,680.00 | $9,680.00 | $9,680.00 | $9,680.00 | $9,680.00 |
| 50 | Foundation single-shaft type MC-III (structure) 03. S-13-0607 (531.5130) | EACH | 1 | $9,680.00 | $9,680.00 | $9,680.00 | $9,680.00 | $9,680.00 | $9,680.00 |
| 51 | Foundation single-shaft type MC-III (structure) 04. S-13-0608 (531.5130) | EACH | 1 | $9,680.00 | $9,680.00 | $9,680.00 | $9,680.00 | $9,680.00 | $9,680.00 |
| 52 | Monotube cantilever type III (structure) 01. S-13-0605 (532.5130) | EACH | 1 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 |
| 53 | Monotube cantilever type III (structure) 02. S-13-0606 (532.5130) | EACH | 1 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 |
| 54 | Monotube cantilever type III (structure) 03. S-13-0607 (532.5130) | EACH | 1 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 |
| 55 | Monotube cantilever type III (structure) 04. S-13-0608 (532.5130) | EACH | 1 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 | $20,000 |
| 56 | Concrete curb & gutter 18-inch type A (601.0405) | LF | 566 | $27.25 | $27.25 | $26.15 | $48.87 | $26.15 | $27.25 |
| 57 | Concrete curb & gutter 30-inch type A (601.0409) | LF | 7,240 | $20.75 | $20.75 | $24.65 | $32.23 | $24.65 | $20.75 |
| 58 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 229 | $22.25 | $22.25 | $38.00 | $30.51 | $38.00 | $22.25 |
| 59 | Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551) | LF | 536 | $25.00 | $25.00 | $34.60 | $40.75 | $34.60 | $25.00 |
| 60 | Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581) | LF | 736 | $25.25 | $25.25 | $29.90 | $36.69 | $29.90 | $25.25 |
| 61 | Concrete sidewalk 5-inch (602.0410) | SF | 27,340 | $5.90 | $5.90 | $6.45 | $7.53 | $6.45 | $5.90 |
| 62 | Concrete driveway 6-inch (602.0810) | SY | 43 | $71.00 | $71.00 | $90.00 | $81.47 | $90.00 | $71.00 |
| 63 | Riprap medium (606.0200) | CY | 51 | $111.52 | $187.00 | $111.52 | $187.00 | $130.00 | $110.00 |
| 64 | Storm sewer pipe reinforced concrete class III 12-inch (608.0312) | LF | 263 | $94.35 | $101.00 | $94.35 | $101.00 | $76.00 | $132.59 |
| 65 | Storm sewer pipe reinforced concrete class III 15-inch (608.0315) | LF | 107 | $98.74 | $86.00 | $98.74 | $86.00 | $81.00 | $132.65 |
| 66 | Storm sewer pipe reinforced concrete class III 18-inch (608.0318) | LF | 17 | $101.35 | $168.00 | $101.70 | $168.00 | $91.00 | $145.36 |
| 67 | Storm sewer pipe reinforced concrete class III 24-inch (608.0324) | LF | 157 | $114.59 | $166.00 | $114.59 | $166.00 | $98.00 | $182.07 |
| 68 | Storm sewer pipe reinforced concrete class IV 12-inch (608.0412) | LF | 577 | $88.13 | $87.50 | $88.13 | $87.50 | $76.00 | $120.57 |
| 69 | Storm sewer pipe reinforced concrete class IV 15-inch (608.0415) | LF | 108 | $98.74 | $86.00 | $98.74 | $86.00 | $81.00 | $127.48 |
| 70 | Storm sewer pipe reinforced concrete class IV 18-inch (608.0418) | LF | 51 | $97.05 | $98.50 | $97.05 | $98.50 | $91.00 | $133.65 |
| 71 | Storm sewer pipe reinforced concrete class IV 24-inch (608.0424) | LF | 55 | $116.56 | $114.00 | $116.56 | $114.00 | $109.00 | $176.69 |
| 72 | Inlet covers type DW (611.0613) | EACH | 4 | $1,161.44 | $319.00 | $1,161.45 | $319.00 | $1,200.00 | $1,825.12 |
| 73 | Inlet covers type H (611.0624) | EACH | 16 | $1,152.37 | $1,000.00 | $1,152.38 | $1,000.00 | $1,200.00 | $1,711.77 |
| 74 | Inlet covers type HM (611.0627) | EACH | 4 | $1,152.37 | $1,000.00 | $1,152.38 | $1,000.00 | $1,200.00 | $1,742.52 |
| 75 | Inlet covers type H-S (611.0639) | EACH | 21 | $1,152.37 | $1,000.00 | $1,152.38 | $1,000.00 | $1,200.00 | $1,711.72 |
| 76 | Inlet covers type MS-A (611.0645) | EACH | 2 | $716.32 | $754.00 | $716.32 | $754.00 | $900.00 | $1,441.52 |
| 77 | Inlet covers type T (611.0652) | EACH | 4 | $1,437.04 | $1,260.00 | $1,437.04 | $1,260.00 | $1,400.00 | $2,063.12 |
| 78 | Inlets 4-FT diameter (611.3004) | EACH | 18 | $2,856.07 | $2,410.00 | $2,856.08 | $2,410.00 | $2,000.00 | $2,563.12 |
| 79 | Inlets 2X2.5-FT (611.3225) | EACH | 3 | $2,202.56 | $1,660.00 | $2,202.57 | $1,660.00 | $1,200.00 | $1,359.06 |
| 80 | Inlets 2X3-FT (611.3230) | EACH | 24 | $2,441.27 | $1,760.00 | $2,441.28 | $1,760.00 | $1,300.00 | $1,617.82 |
| 81 | Inlets median 2 grate (611.3902) | EACH | 1 | $3,757.23 | $4,360.00 | $3,757.24 | $4,360.00 | $3,400.00 | $3,142.81 |
| 82 | Cover plates temporary (611.8120.S) | EACH | 15 | $281.89 | $160.00 | $281.89 | $300.00 | $180.00 | $165.75 |
| 83 | Fence safety (616.0700.S) | LF | 1,339 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 | $4.00 |
| 84 | Maintenance and repair of haul roads (project) 01. 5845-16-84 (618.0100) | EACH | 1 | $0.01 | $1.00 | $1.00 | $1.00 | $100.00 | $1,000.00 |
| 85 | Mobilization (619.1000) | EACH | 1 | $583,000 | $488,753 | $539,000 | $493,773 | $599,300 | $672,868 |
| 86 | Concrete median sloped nose (620.0300) | SF | 776 | $9.80 | $9.80 | $12.50 | $19.15 | $12.50 | $9.80 |
| 87 | Water (624.0100) | MGAL | 999 | $0.01 | $1.00 | $0.01 | $26.10 | $0.01 | $60.00 |
| 88 | Topsoil (625.0100) | SY | 46,302 | $0.01 | $1.00 | $0.01 | $1.00 | $0.01 | $1.86 |
| 89 | Mulching (627.0200) | SY | 35,230 | $0.33 | $0.33 | $0.33 | $0.33 | $0.33 | $0.33 |
| 90 | Silt fence (628.1504) | LF | 6,350 | $1.80 | $1.80 | $1.80 | $1.80 | $1.80 | $1.80 |
| 91 | Silt fence maintenance (628.1520) | LF | 18,120 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 92 | Mobilizations erosion control (628.1905) | EACH | 21 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 93 | Mobilizations emergency erosion control (628.1910) | EACH | 10 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 94 | Erosion mat class I type B (628.2004) | SY | 28,630 | $1.10 | $1.10 | $1.10 | $1.10 | $1.10 | $1.10 |
| 95 | Erosion mat urban class I type A (628.2006) | SY | 6,750 | $1.60 | $1.60 | $1.60 | $1.60 | $1.60 | $1.60 |
| 96 | Erosion mat class III type C (628.2037) | SY | 1,342 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 97 | Inlet protection type A (628.7005) | EACH | 50 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 98 | Inlet protection type B (628.7010) | EACH | 1 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 99 | Inlet protection type C (628.7015) | EACH | 27 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 | $75.00 |
| 100 | Inlet protection type D (628.7020) | EACH | 22 | $120.00 | $120.00 | $120.00 | $120.00 | $120.00 | $120.00 |
| 101 | Temporary ditch checks (628.7504) | LF | 433 | $8.50 | $8.50 | $8.50 | $8.50 | $8.50 | $8.50 |
| 102 | Stone ditch checks (628.7515.S) | CY | 317 | $61.43 | $47.00 | $60.00 | $90.00 | $65.00 | $60.00 |
| 103 | Culvert pipe checks (628.7555) | EACH | 58 | $18.00 | $18.00 | $18.00 | $18.00 | $18.00 | $18.00 |
| 104 | Tracking pads (628.7560) | EACH | 7 | $955.12 | $100.00 | $955.13 | $100.00 | $2,800.00 | $3,000.00 |
| 105 | Rock bags (628.7570) | EACH | 226 | $18.00 | $18.00 | $18.00 | $18.00 | $18.00 | $18.00 |
| 106 | Fertilizer type B (629.0210) | CWT | 49 | $79.50 | $79.50 | $79.50 | $79.50 | $79.50 | $79.50 |
| 107 | Seeding mixture no. 30 (630.0130) | LB | 1,832 | $8.50 | $8.50 | $8.50 | $8.50 | $8.50 | $8.50 |
| 108 | Seeding temporary (630.0200) | LB | 226 | $3.75 | $3.75 | $3.75 | $3.75 | $3.75 | $3.75 |
| 109 | Seeding borrow pit (630.0300) | LB | 24 | $8.50 | $8.50 | $8.50 | $8.50 | $8.50 | $8.50 |
| 110 | Seed water (630.0500) | MGAL | 1,179 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 | $10.00 |
| 111 | Sod water (631.0300) | MGAL | 0.30 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 112 | Sod lawn (631.1000) | SY | 13 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 113 | Sod erosion control (631.1100) | SY | 13 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 | $25.00 |
| 114 | Landscape planting surveillance and care cycles (632.9101) | EACH | 22 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 | $750.00 |
| 115 | Markers culvert end (633.5200) | EACH | 25 | $68.00 | $68.00 | $68.00 | $68.00 | $68.00 | $68.00 |
| 116 | Posts wood 4X6-inch X 12-FT (634.0612) | EACH | 7 | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 | $80.00 |
| 117 | Posts wood 4X6-inch X 14-FT (634.0614) | EACH | 14 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 | $85.00 |
| 118 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 40 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 | $90.00 |
| 119 | Posts wood 4X6-inch X 18-FT (634.0618) | EACH | 6 | $110.00 | $110.00 | $110.00 | $110.00 | $110.00 | $110.00 |
| 120 | Posts wood 4X6-inch X 20-FT (634.0620) | EACH | 11 | $120.00 | $120.00 | $120.00 | $120.00 | $120.00 | $120.00 |
| 121 | Signs type II reflective H (637.2210) | SF | 691.51 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 122 | Signs type II reflective F (637.2230) | SF | 124.75 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 | $20.00 |
| 123 | Moving signs type II (638.2102) | EACH | 1 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 | $250.00 |
| 124 | Removing signs type II (638.2602) | EACH | 22 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 125 | Removing small sign supports (638.3000) | EACH | 25 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 | $35.00 |
| 126 | Field office type C (642.5201) | EACH | 1 | $9,600.00 | $18,000 | $20,000 | $19,864 | $19,000 | $17,000 |
| 127 | Traffic control drums (643.0300) | DAY | 41,857 | $0.14 | $0.14 | $0.14 | $0.31 | $0.14 | $0.14 |
| 128 | Traffic control barricades type III (643.0420) | DAY | 5,756 | $0.55 | $0.55 | $0.55 | $0.56 | $0.56 | $0.55 |
| 129 | Traffic control flexible tubular marker posts (643.0500) | EACH | 28 | $45.00 | $45.00 | $45.00 | $13.53 | $45.45 | $45.00 |
| 130 | Traffic control flexible tubular marker bases (643.0600) | EACH | 28 | $15.50 | $15.50 | $15.50 | $22.90 | $15.66 | $15.50 |
| 131 | Traffic control warning lights type A (643.0705) | DAY | 11,268 | $0.11 | $0.11 | $0.11 | $0.17 | $0.11 | $0.11 |
| 132 | Traffic control warning lights type C (643.0715) | DAY | 6,190 | $0.13 | $0.13 | $0.13 | $0.30 | $0.13 | $0.13 |
| 133 | Traffic control connected arrow boards (643.0810) | DAY | 426 | $12.25 | $12.25 | $12.25 | $17.07 | $12.37 | $12.25 |
| 134 | Traffic control signs (643.0900) | DAY | 17,646 | $0.20 | $0.20 | $0.20 | $0.28 | $0.20 | $0.20 |
| 135 | Traffic control signs PCMS (643.1050) | DAY | 170 | $19.75 | $19.75 | $19.75 | $69.57 | $19.95 | $19.75 |
| 136 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 404 | $7.25 | $7.25 | $7.25 | $10.20 | $7.32 | $7.25 |
| 137 | Temporary marking line epoxy 6- inch (643.3170) | LF | 19,020 | $0.45 | $0.45 | $0.45 | $0.90 | $0.45 | $0.45 |
| 138 | Temporary marking line removable tape 6-inch (643.3180) | LF | 17,426 | $1.80 | $1.80 | $1.80 | $2.87 | $1.82 | $1.80 |
| 139 | Temporary marking stop line epoxy 18-inch (643.3820) | LF | 22 | $15.75 | $15.75 | $15.75 | $16.00 | $15.91 | $15.75 |
| 140 | Temporary marking stop line removable tape 18-inch (643.3850) | LF | 111 | $6.00 | $6.00 | $6.00 | $18.62 | $6.06 | $6.00 |
| 141 | Traffic control (643.5000) | EACH | 1 | $55,550 | $55,550 | $55,550 | $24,331 | $56,111 | $55,550 |
| 142 | Geotextile type HR (645.0120) | SY | 166 | $1.63 | $3.00 | $1.63 | $3.00 | $4.50 | $2.50 |
| 143 | Geotextile type R (645.0130) | SY | 720 | $1.05 | $2.80 | $1.05 | $2.80 | $2.00 | $2.00 |
| 144 | Marking line epoxy 6-inch (646.2020) | LF | 10,322 | $0.50 | $0.50 | $0.50 | $0.68 | $0.51 | $0.50 |
| 145 | Marking line grooved black epoxy 6-inch (646.2025) | LF | 806 | $0.85 | $0.85 | $0.85 | $1.50 | $0.86 | $0.85 |
| 146 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 8,282 | $1.35 | $1.35 | $1.35 | $1.75 | $1.36 | $1.35 |
| 147 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 1,464 | $2.75 | $2.75 | $2.75 | $2.90 | $2.78 | $2.75 |
| 148 | Marking arrow epoxy (646.5020) | EACH | 22 | $373.00 | $373.00 | $373.00 | $300.00 | $376.77 | $373.00 |
| 149 | Marking dotted extension epoxy 18-inch (646.6320) | LF | 181 | $15.60 | $15.60 | $15.60 | $18.00 | $15.76 | $15.60 |
| 150 | Marking diagonal epoxy 12-inch (646.7120) | LF | 506 | $15.20 | $15.20 | $15.20 | $14.00 | $15.35 | $15.20 |
| 151 | Marking chevron epoxy 12-inch (646.7320) | LF | 85 | $24.80 | $24.80 | $24.80 | $15.00 | $25.05 | $24.80 |
| 152 | Marking curb epoxy (646.8120) | LF | 171 | $7.50 | $7.50 | $7.50 | $10.00 | $7.58 | $7.50 |
| 153 | Marking island nose epoxy (646.8220) | EACH | 4 | $285.00 | $285.00 | $285.00 | $400.00 | $287.88 | $285.00 |
| 154 | Marking removal line water blasting 4-inch (646.9010) | LF | 4,930 | $0.50 | $0.50 | $0.50 | $0.85 | $0.51 | $0.50 |
| 155 | Construction staking storm sewer (650.4000) | EACH | 57 | $100.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 156 | Construction staking subgrade (650.4500) | LF | 11,166 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 | $0.01 |
| 157 | Construction staking base (650.5000) | LF | 5,622 | $0.01 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 158 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 229 | $1.00 | $2.00 | $2.00 | $2.00 | $2.00 | $2.00 |
| 159 | Construction staking pipe culverts (650.6000) | EACH | 7 | $100.00 | $200.00 | $200.00 | $200.00 | $200.00 | $200.00 |
| 160 | Construction staking concrete pavement (650.7000) | LF | 5,544 | $0.01 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 161 | Construction staking electrical installations (project) 01. 5845-16- 84 (650.8501) | EACH | 1 | $10,000 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 162 | Construction staking sidewalk (project) 01. 5845-16-84 (650.9500) | EACH | 1 | $1,500.00 | $0.01 | $0.01 | $0.01 | $1,500.00 | $1,500.00 |
| 163 | Construction staking supplemental control (project) 01. 5845-16-84 (650.9911) | EACH | 1 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 | $10,000 |
| 164 | Construction staking slope stakes (650.9920) | LF | 12,527 | $0.09 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 165 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 2,356 | $7.75 | $7.75 | $7.75 | $7.75 | $7.83 | $7.75 |
| 166 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 1,285 | $8.97 | $8.97 | $8.97 | $8.97 | $9.06 | $8.97 |
| 167 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 23 | $1,125.00 | $1,125.00 | $1,125.00 | $1,125.00 | $1,136.36 | $1,125.00 |
| 168 | Concrete bases type 5 (654.0105) | EACH | 24 | $1,021.00 | $1,021.00 | $1,021.00 | $1,021.00 | $1,031.31 | $1,021.00 |
| 169 | Concrete control cabinet bases type L30 (654.0230) | EACH | 2 | $1,755.00 | $1,755.00 | $1,755.00 | $1,755.00 | $1,772.73 | $1,755.00 |
| 170 | Electrical wire lighting 12 AWG (655.0610) | LF | 3,510 | $0.85 | $0.85 | $0.85 | $0.85 | $0.86 | $0.85 |
| 171 | Electrical wire lighting 10 AWG (655.0615) | LF | 15,361 | $0.98 | $0.98 | $0.98 | $0.98 | $0.99 | $0.98 |
| 172 | Electrical service meter breaker pedestal (location) 01. ush 51 & tower road (656.0201) | EACH | 1 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,212.12 | $1,200.00 |
| 173 | Electrical service meter breaker pedestal (location) 02. ush 51 & exchange street (656.0201) | EACH | 1 | $1,200.00 | $1,200.00 | $1,200.00 | $1,200.00 | $1,212.12 | $1,200.00 |
| 174 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 24 | $685.00 | $685.00 | $685.00 | $685.00 | $691.92 | $685.00 |
| 175 | Poles type 5-aluminum (657.0322) | EACH | 24 | $1,750.00 | $1,750.00 | $1,750.00 | $1,750.00 | $1,767.68 | $1,750.00 |
| 176 | Luminaire arms truss type 4 1/2- inch clamp 12-FT (657.0710) | EACH | 26 | $750.00 | $750.00 | $750.00 | $750.00 | $757.58 | $750.00 |
| 177 | Luminaires utility LED B (659.1120) | EACH | 26 | $248.00 | $248.00 | $248.00 | $248.00 | $250.51 | $248.00 |
| 178 | Lighting control cabinets 120/240 30-inch (659.2130) | EACH | 2 | $9,200.00 | $9,200.00 | $9,200.00 | $9,200.00 | $9,292.93 | $9,200.00 |
| 179 | Public land reference monument verify and reset (680.0100) | EACH | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 180 | Sawing asphalt (690.0150) | LF | 2,966 | $1.30 | $1.39 | $1.30 | $1.39 | $1.39 | $1.39 |
| 181 | Sawing concrete (690.0250) | LF | 5,261 | $1.95 | $2.25 | $1.95 | $2.25 | $2.25 | $2.25 |
| 182 | Incentive compressive strength concrete pavement (715.0720) | DOL | 5,766 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 183 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,400 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 184 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 2,160 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 | $5.00 |
| 185 | Special 02. research and locate existing land parcel monuments (SPV.0060) | EACH | 4 | $250.00 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 186 | Special 03. verify and replace existing land parcel monuments (SPV.0060) | EACH | 4 | $250.00 | $150.00 | $150.00 | $150.00 | $150.00 | $150.00 |
| 187 | Special 04. utility line opening (ulo) (SPV.0060) | EACH | 10 | $707.12 | $527.00 | $707.12 | $527.00 | $740.00 | $950.00 |
| 188 | Special 05. temporary lighting system tower road roundabout (SPV.0060) | EACH | 1 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,848.48 | $4,800.00 |
| 189 | Special 06. temporary lighting system exchange street roundabout (SPV.0060) | EACH | 1 | $4,800.00 | $4,800.00 | $4,800.00 | $4,800.00 | $4,848.48 | $4,800.00 |
| 190 | Special 07. perennials, june grass, container, #SP2 (SPV.0060) | EACH | 2,560 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 191 | Special 08. perennials, little bluestem, container, #SP2 (SPV.0060) | EACH | 1,088 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 192 | Special 09. perennials, prairie dropseed, container, #SP2 (SPV.0060) | EACH | 896 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 193 | Special 10. perennials, purple love grass, container, #SP2 (SPV.0060) | EACH | 3,136 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 194 | Special 11. perennials, switch grass, container, #SP2 (SPV.0060) | EACH | 128 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 | $15.00 |
| 195 | Special 12. apron endwalls for culvert pipe temporary 12-inch (SPV.0060) | EACH | 3 | $495.53 | $688.00 | $495.53 | $688.00 | $300.00 | $484.35 |
| 196 | Special 13. apron endwalls for culvert pipe temporary 36-inch (SPV.0060) | EACH | 1 | $1,977.23 | $1,960.00 | $1,977.24 | $1,960.00 | $1,200.00 | $1,661.95 |
| 197 | Special 01. pipe underdrain (6-inch) with geotextile fabric and aggregate (SPV.0090) | LF | 880 | $19.48 | $9.10 | $19.48 | $9.10 | $16.00 | $11.86 |
| 198 | Special 01. shredded hardwood bark mulch, 3-inch depth (SPV.0180) | SY | 1,382 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 | $9.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of December 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.