WisDOT contract 20260113006 bid tabulation

3997-01-79. Let by Wisconsin DOT on January 13, 2026, Jefferson. 7 bids received; low bid $3,245,906 by Integrity Grading and Excavating, Inc..

Owner
Wisconsin DOT
Letting
13 JAN 2026
Pay items
123
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Integrity Grading and Excavating, Inc.$3,245,906Low
2Lalonde Contractors Incorporated$3,269,125+1.0%
3Forest Landscaping & Construction Inc.$3,299,169+2.0%
4Zignego Company, Inc.$3,369,504+4.0%
5Rock Road Companies, Inc.$3,536,222+9.0%
6James Peterson Sons, Inc.$3,969,739+22%
7Parisi Construction, LLC$4,536,022+40%
WisDOT contract 20260113006: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Integrity Grading and Excavating, Inc.2. Lalonde Contractors Incorporated3. Forest Landscaping & Construction Inc.4. Zignego Company, Inc.5. Rock Road Companies, Inc.6. James Peterson Sons, Inc.
1Clearing (201.0110)SY64$80.00$80.00$140.00$55.55$55.55$55.55
2Grubbing (201.0210)SY64$6.00$6.00$45.00$55.55$55.55$55.55
3Removing concrete pavement (204.0100)SY8,331$3.10$7.31$7.00$10.64$7.15$8.59
4Removing asphaltic surface (204.0110)SY516$0.01$6.38$5.00$10.64$6.78$2.63
5Removing curb & gutter (204.0150)LF10$6.10$8.28$35.00$50.00$8.78$100.00
6Removing concrete sidewalk (204.0155)SY1,937$8.30$10.68$6.00$8.00$15.40$4.82
7Removing manholes (204.0210)EACH13$1,138.90$500.00$800.00$800.00$369.33$750.00
8Removing inlets (204.0220)EACH15$1,138.90$300.00$600.00$600.00$369.33$750.00
9Removing storm sewer (size) 01. 10-inch (204.0245)LF116$22.78$16.00$15.00$15.00$10.62$38.22
10Removing storm sewer (size) 02. 12-inch (204.0245)LF1,523$22.78$12.00$15.00$18.00$10.62$24.97
11Removing storm sewer (size) 03. 15-inch (204.0245)LF1,404$22.78$12.00$18.00$18.00$10.62$25.32
12Removing storm sewer (size) 04. 18-inch (204.0245)LF735$22.78$12.00$18.00$20.00$10.62$27.33
13Removing storm sewer (size) 05. 24-inch (204.0245)LF141$22.78$12.00$24.00$24.00$10.62$30.10
14Excavation common (205.0100)CY5,173$30.00$20.41$20.00$19.00$19.14$18.10
15Finishing roadway (project) 01. 3997-01-79 (213.0100)EACH1$500.00$2,610.00$2,500.00$1,000.00$5,023.27$10,000
16Base aggregate dense 1 1/4-inch (305.0120)TON4,500$19.49$21.04$21.00$30.00$22.52$21.33
17Tack coat (455.0605)GAL40$4.00$2.50$4.00$4.00$4.00$4.00
18Incentive density HMA pavement (460.2000)DOL70$1.00$1.00$1.00$1.00$1.00$1.00
19HMA pavement 3 MT 58-28 S (460.6223)TON60$135.00$249.00$140.00$135.00$135.00$135.00
20HMA pavement 4 MT 58-28 S (460.6224)TON40$180.00$249.00$185.00$180.00$180.00$180.00
21Asphaltic surface driveways and field entrances (465.0120)TON30$195.00$315.00$200.00$195.00$195.00$195.00
22Concrete collars for pipe (520.8000)EACH4$735.17$500.00$1,200.00$1,500.00$847.27$641.25
23Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH1$2,949.47$3,000.00$3,500.00$3,000.00$2,596.27$2,131.15
24Concrete curb & gutter 18-inch type D (601.0407)LF10$71.49$53.82$75.00$50.00$71.49$71.49
25Concrete curb & gutter 30-inch type D (601.0411)LF14$72.22$49.17$75.00$50.00$72.22$72.22
26Concrete curb pedestrian (601.0600)LF66$65.14$53.77$66.00$50.00$65.14$65.14
27Concrete sidewalk 5-inch (602.0410)SF17,950$6.02$7.94$6.15$7.05$6.02$6.02
28Curb ramp detectable warning field natural patina (602.0515)SF290$47.73$42.20$48.00$40.00$47.73$47.73
29Concrete driveway hes 6-inch (602.0860)SY1,360$62.54$87.73$63.00$71.55$62.54$62.54
30Concrete steps (602.1500)SF200$84.89$84.73$85.00$80.00$84.89$84.89
31Riprap medium (606.0200)CY3$229.05$100.00$150.00$150.00$207.15$92.58
32Storm sewer pipe reinforced concrete class III 15-inch (608.0315)LF186$102.28$122.00$80.00$80.00$154.09$261.66
33Storm sewer pipe reinforced concrete class III 18-inch (608.0318)LF208$102.50$124.00$85.00$85.00$134.57$127.42
34Storm sewer pipe reinforced concrete class III 36-inch (608.0336)LF647$169.35$182.00$160.00$160.00$176.32$202.54
35Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF60$106.08$121.00$80.00$80.00$154.09$255.07
36Storm sewer pipe reinforced concrete class IV 24-inch (608.0424)LF780$112.18$140.00$105.00$105.00$126.75$148.42
37Storm sewer pipe reinforced concrete class IV 36-inch (608.0436)LF502$185.95$200.00$175.00$175.00$181.55$202.69
38Storm sewer pipe reinforced concrete horizontal elliptical class HE-IV 29X45-inch (608.2429)LF147$110.25$292.00$230.00$230.00$253.00$298.28
39Manhole covers type J-special (611.0535)EACH9$735.57$490.00$900.00$900.00$1,329.33$1,257.04
40Inlet covers type H (611.0624)EACH16$908.56$673.00$1,200.00$1,200.00$1,392.44$1,715.39
41Catch basins 4-FT diameter (611.1004)EACH2$4,222.03$673.00$3,400.00$3,400.00$3,658.08$3,066.46
42Catch basins 2X3-FT (611.1230)EACH14$3,837.24$2,850.00$2,800.00$2,800.00$3,136.91$2,656.54
43Manholes 4-FT diameter (611.2004)EACH4$3,708.52$3,000.00$3,300.00$3,400.00$3,398.31$2,130.14
44Manholes 5-FT diameter (611.2005)EACH3$5,158.13$4,400.00$4,000.00$4,000.00$4,849.22$3,931.08
45Manholes 6-FT diameter (611.2006)EACH1$7,770.51$7,000.00$5,000.00$5,000.00$6,433.33$6,565.93
46Manholes 7-FT diameter (611.2007)EACH1$9,568.47$8,400.00$6,000.00$6,300.00$6,653.33$7,172.34
47Adjusting manhole covers (611.8110)EACH2$817.57$600.00$1,500.00$1,500.00$1,545.65$712.44
48Fence chain link salvaged 4-FT (616.0404)LF10$100.00$90.00$50.00$90.00$100.00$100.00
49Maintenance and repair of haul roads (project) 01. 3997-01-80 (618.0100)EACH1$500.00$1.00$1,000.00$1.00$0.01$1.00
50Mobilization (619.1000)EACH1$286,000$123,937$135,000$167,000$272,000$331,295
51Water (624.0100)MGAL45$45.34$56.20$40.00$200.00$0.01$50.00
52Salvaged topsoil (625.0500)SY3,300$13.51$4.01$6.50$10.00$3.70$11.14
53Silt fence (628.1504)LF50$10.00$5.00$10.00$5.00$10.00$10.00
54Silt fence maintenance (628.1520)LF50$1.00$0.01$5.00$0.01$1.00$1.00
55Mobilizations erosion control (628.1905)EACH3$1.00$150.00$200.00$150.00$1.00$1.00
56Mobilizations emergency erosion control (628.1910)EACH3$1.00$150.00$250.00$150.00$1.00$1.00
57Erosion mat urban class I type A (628.2006)SY3,300$5.00$1.85$2.00$1.85$5.00$5.00
58Inlet protection type D (628.7020)EACH37$125.00$90.00$100.00$90.00$125.00$125.00
59Fertilizer type A (629.0205)CWT210$0.01$0.01$0.10$1.00$0.01$0.01
60Seeding mixture no. 40 (630.0140)LB60$25.00$12.95$15.00$12.95$25.00$25.00
61Seeding temporary (630.0200)LB90$2.00$5.00$6.00$5.00$2.00$2.00
62Seed water (630.0500)MGAL19$100.00$25.00$30.00$25.00$100.00$100.00
63Posts tubular steel 2X2-inch X 12- FT (634.0812)EACH17$300.00$220.00$225.00$220.00$300.00$300.00
64Signs type II reflective F (637.2230)SF66.26$32.00$25.00$30.00$25.00$32.00$32.00
65Removing signs type II (638.2602)EACH17$50.00$30.00$35.00$30.00$50.00$50.00
66Removing small sign supports (638.3000)EACH17$50.00$30.00$35.00$30.00$50.00$50.00
67Field office type B (642.5001)EACH1$15,750$11,108$10,000$10,000$12,150$16,000
68Traffic control drums (643.0300)DAY1,175$1.00$1.00$1.10$1.00$1.00$0.15
69Traffic control barricades type III (643.0420)DAY1,880$1.00$1.00$1.10$1.00$1.00$0.45
70Traffic control warning lights type A (643.0705)DAY5,085$0.10$0.10$0.20$0.10$0.10$0.10
71Traffic control signs (643.0900)DAY8,590$0.20$0.20$0.30$0.20$0.20$0.25
72Traffic control signs PCMS (643.1050)DAY14$80.00$80.00$100.00$80.00$80.00$45.00
73Traffic control (643.5000)EACH1$8,300.00$8,300.00$8,500.00$8,300.00$8,300.00$32,850
74Temporary pedestrian surface asphalt (644.1410)SF3,200$3.75$0.01$4.00$3.75$2.50$3.75
75Temporary pedestrian curb ramp (644.1601)DAY3,000$5.00$0.01$5.25$5.00$5.00$5.75
76Temporary pedestrian barricade (644.1810)LF396$5.00$5.00$6.00$5.00$5.00$8.00
77Geotextile type HR (645.0120)SY12$37.58$8.00$10.00$6.00$2.54$93.42
78Marking line epoxy 6-inch (646.2020)LF4,890$0.95$0.95$53.00$0.95$0.51$0.51
79Marking stop line epoxy 18-inch (646.6120)LF41$11.30$11.30$17.00$11.30$16.92$16.92
80Marking crosswalk epoxy block style 24-inch (646.7520)LF666$15.10$15.10$28.00$15.10$27.76$27.76
81Marking curb epoxy (646.8120)LF781$12.75$12.75$9.00$12.75$8.09$8.09
82Construction staking storm sewer (650.4000)EACH26$200.00$200.00$300.00$200.00$200.00$200.00
83Construction staking subgrade (650.4500)LF1,997$0.01$0.01$1.00$0.01$0.01$0.01
84Construction staking base (650.5000)LF1,997$2.00$2.50$2.10$2.00$2.00$2.00
85Construction staking curb gutter and curb & gutter (650.5500)LF4,274$2.00$2.50$2.10$2.00$2.00$2.00
86Construction staking concrete pavement (650.7000)LF1,997$3.00$2.50$3.10$3.00$3.00$3.00
87Construction staking curb ramps (650.9000)EACH18$300.00$150.00$315.00$300.00$300.00$300.00
88Construction staking sidewalk (project) 01. 3997-01-79 (650.9500)EACH1$4,000.00$5,000.00$4,100.00$4,000.00$4,000.00$4,000.00
89Construction staking supplemental control (project) 01. 3997-01-79 (650.9911)EACH1$5,000.00$4,000.00$5,100.00$5,000.00$5,000.00$5,000.00
90Sawing asphalt (690.0150)LF451$2.25$1.25$5.00$1.25$1.89$1.45
91Sawing concrete (690.0250)LF916$2.25$2.35$5.00$2.35$2.15$2.45
92On-the-job training apprentice at $5.00/HR (ASP.1T0A)HRS2,000$5.00$5.00$5.00$5.00$5.00$5.00
93On-the-job training graduate at $5.00/HR (ASP.1T0G)HRS1,320$5.00$5.00$5.00$5.00$5.00$5.00
94Special 01. 8-inch gate valve & box (SPV.0060)EACH18$2,597.89$3,000.00$3,200.00$3,000.00$3,260.03$3,324.22
95Special 02. 6-inch gate valve & box (SPV.0060)EACH6$1,829.92$2,200.00$3,000.00$3,000.00$2,226.37$2,445.80
96Special 03. fire hyrdrant (SPV.0060)EACH6$6,665.05$7,200.00$8,000.00$9,400.00$6,610.81$6,567.77
97Special 04. temporary water service, project (SPV.0060)EACH1$50,000$25,000$65,000$75,000$170,769$37,500
98Special 05. watermain offset (SPV.0060)EACH8$8,405.33$6,800.00$4,500.00$4,900.00$5,716.57$5,434.88
99Special 06. 6-inch watermain tie in, station 10+26 (SPV.0060)EACH1$6,523.52$5,000.00$4,000.00$4,000.00$4,673.03$3,489.60
100Special 07. 6-inch watermain tie in, station 100+98 (SPV.0060)EACH1$5,155.55$2,800.00$4,200.00$4,500.00$4,327.78$2,215.80
101Special 08. 6-inch watermain tie in, station 201+52 (SPV.0060)EACH1$5,787.55$3,400.00$4,200.00$4,200.00$4,327.78$2,215.80
102Special 09. 6-inch watermain tie in, station 202+67 (SPV.0060)EACH1$5,787.55$4,275.00$4,500.00$4,800.00$4,327.78$2,215.80
103Special 10. 6-inch watermain tie in, station 301+64 (SPV.0060)EACH1$5,977.54$4,400.00$4,100.00$4,100.00$4,327.78$2,215.80
104Special 11. 6-inch watermain tie in, station 400+94 (SPV.0060)EACH1$5,977.54$4,451.00$4,000.00$4,000.00$4,327.78$2,215.80
105Special 12. 6-inch watermain tie in, station 500+75 (SPV.0060)EACH1$5,191.57$2,900.00$4,300.00$4,300.00$4,327.78$2,215.80
106Special 13. 8-inch watermain tie in, station 501+48 (SPV.0060)EACH1$4,945.56$2,600.00$5,000.00$5,000.00$4,425.03$2,313.45
107Special 14. mini storm cleanout (SPV.0060)EACH44$372.98$925.00$550.00$650.00$932.48$670.58
108Special 15. remove, salvage, and reinstall sign (SPV.0060)EACH12$350.00$120.00$130.00$120.00$350.00$350.00
109Special 01. 6-inch watermain (SPV.0090)LF50$170.48$75.00$140.00$150.00$137.55$201.74
110Special 02. 8-inch watermain (SPV.0090)LF2,350$103.67$120.00$110.00$120.00$108.66$125.40
111Special 03. 6-inch watermain, hydrant lead (SPV.0090)LF42$143.41$100.00$140.00$150.00$65.10$137.13
112Special 04. copper water service 1- inch (SPV.0090)LF588$71.59$95.00$85.00$90.00$129.50$149.95
113Special 05. mini storm sewer 6-inch (SPV.0090)LF2,920$39.57$52.00$45.00$50.00$53.23$106.51
114Special 06. mini storm sewer lateral, 6-inch (SPV.0090)LF380$84.78$92.00$45.00$50.00$110.19$265.86
115Special 07. sanitary sewer 8-inch PVC (SPV.0090)LF971$93.86$140.00$105.00$110.00$118.69$157.99
116Special 08. sanitary sewer 10-inch PVC (SPV.0090)LF284$98.38$155.00$110.00$120.00$125.85$229.57
117Special 09. sanitary sewer 12-inch PVC (SPV.0090)LF684$103.17$165.00$120.00$130.00$155.70$226.32
118Special 10. sanitary sewer 6-inch lateral (SPV.0090)LF1,520$102.40$87.00$95.00$100.00$143.44$121.23
119Special 11. concrete curb & gutter hes 30-inch type A (SPV.0090)LF2,133$22.84$32.39$23.00$24.65$22.84$22.84
120Special 12. concrete curb & gutter integral hes 30-inch type D (SPV.0090)LF2,117$12.76$19.57$13.00$35.50$12.76$12.76
121Special 01. concrete pavement hes 7-inch (SPV.0180)SY6,860$56.13$62.08$57.00$65.50$56.13$56.13
122Special 01. sanitary manhole 48- inch (SPV.0200)VF54$661.07$450.00$450.00$500.00$630.58$624.98
123Special 02. sanitary manhole 48- inch outside drop (SPV.0200)VF11$740.51$730.00$825.00$850.00$890.68$1,015.15
WisDOT contract 20260113006: unit prices by line, the 6 lowest bidders (all in the CSV)

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of January 13, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy