WisDOT contract 20260310012 bid tabulation

6085-02-76. Let by Wisconsin DOT on March 10, 2026, Dane. 6 bids received; low bid $2,488,456 by Parisi Construction, LLC.

Owner
Wisconsin DOT
Letting
10 MAR 2026
Pay items
166
Data through
10 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Parisi Construction, LLC$2,488,456Low
2Rock Road Companies, Inc.$2,674,359+7.0%
3James Peterson Sons, Inc.$2,708,946+9.0%
4Integrity Grading and Excavating, Inc.$2,917,308+17%
5Lalonde Contractors Incorporated$2,953,283+19%
6Zignego Company, Inc.$2,977,611+20%
WisDOT contract 20260310012: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Parisi Construction, LLC2. Rock Road Companies, Inc.3. James Peterson Sons, Inc.4. Integrity Grading and Excavating, Inc.5. Lalonde Contractors Incorporated6. Zignego Company, Inc.
1Grubbing (201.0205)STA1$1,200.00$2,500.00$1,600.00$1,200.00$1,200.00$1,200.00
2Removing small pipe culverts (203.0100)EACH2$690.00$317.34$3,500.00$1,688.00$1,688.00$500.00
3Removing concrete pavement (204.0100)SY4,816$1.20$6.04$7.70$1.87$1.87$7.39
4Removing curb & gutter (204.0150)LF1,036$6.20$7.14$3.06$9.10$9.10$13.00
5Removing manholes (204.0210)EACH1$690.00$378.61$665.00$946.00$946.00$1,000.00
6Removing inlets (204.0220)EACH2$690.00$378.61$520.00$844.00$844.00$1,000.00
7Removing storm sewer (size) 01. 15-inch (204.0245)LF64$31.25$9.82$36.53$32.85$32.85$35.00
8Removing storm sewer (size) 02. 24-inch (204.0245)LF52$25.75$11.33$51.37$33.60$33.60$35.00
9Excavation common (205.0100)CY13,014$21.00$20.96$16.23$24.00$20.75$20.08
10Borrow (208.0100)CY55$25.00$30.00$40.40$33.90$33.90$100.00
11Temporary lane shift during culvert work (208.1500.S)EACH2$5,500.00$5,244.87$5,000.00$0.01$5,960.00$10,000
12Finishing roadway (project) 01. 6085-02-76 (213.0100)EACH1$500.00$5,113.78$6,100.00$1,000.00$1,102.00$1,000.00
13Base aggregate dense 3/4-inch (305.0110)TON899$23.75$34.94$35.86$31.85$31.85$40.00
14Base aggregate dense 1 1/4-inch (305.0120)TON9,959$15.50$19.71$20.86$19.00$21.50$18.00
15Breaker run (311.0110)TON1,818$15.25$17.57$17.52$17.50$18.00$19.55
16Select crushed material (312.0110)TON9,614$17.25$18.64$17.85$17.50$18.00$19.55
17Coloring concrete wisdot red (405.0100)CY185$127.00$127.00$127.00$127.00$154.43$150.00
18Concrete pavement 9-inch (415.0090)SY6,878$85.00$85.00$85.00$85.00$77.71$81.54
19Concrete truck apron 12-inch (415.2010)SY552$100.00$100.00$100.00$100.00$110.90$162.00
20Drilled dowel bars (416.0620)EACH40$28.00$28.00$28.00$28.00$29.90$30.00
21Tack coat (455.0605)GAL350$0.10$3.38$0.10$0.10$0.10$0.10
22Incentive density HMA pavement (460.2000)DOL170$1.00$1.00$1.00$1.00$1.00$1.00
23HMA pavement 4 LT 58-28 S (460.5224)TON254$97.00$87.65$95.00$95.00$95.00$95.00
24Asphaltic surface (465.0105)TON1,503$79.00$83.44$77.45$77.45$77.45$77.45
25Asphaltic surface driveways and field entrances (465.0120)TON2$170.00$228.06$170.00$170.00$170.00$170.00
26Asphaltic curb (465.0310)LF51$2.00$12.54$2.00$2.00$2.00$2.00
27Asphaltic flumes (465.0315)SY19$46.00$52.78$45.00$45.00$45.00$45.00
28Culvert pipe temporary 18-inch (520.2018)LF28$76.00$143.72$127.40$120.00$120.00$70.00
29Culvert pipe reinforced concrete class IV 36-inch (522.0436)LF77$350.00$252.96$286.16$418.50$418.50$259.00
30Culvert pipe reinforced concrete class IV 42-inch (522.0442)LF108$340.00$295.72$354.26$446.00$446.00$298.00
31Apron endwalls for culvert pipe reinforced concrete 18-inch (522.1018)EACH2$1,900.00$1,079.21$1,210.00$1,484.00$1,484.00$2,650.00
32Apron endwalls for culvert pipe reinforced concrete 36-inch (522.1036)EACH2$2,900.00$2,129.46$2,142.00$3,000.00$3,000.00$5,000.00
33Apron endwalls for culvert pipe reinforced concrete 42-inch (522.1042)EACH2$3,900.00$3,098.49$2,500.00$3,322.00$3,322.00$6,000.00
34Concrete curb & gutter 18-inch type A (601.0405)LF221$42.00$42.00$42.00$42.00$50.24$50.00
35Concrete curb & gutter 30-inch type A (601.0409)LF1,557$27.00$27.00$27.00$27.00$38.67$40.00
36Concrete curb & gutter 30-inch type D (601.0411)LF440$39.00$39.00$39.00$39.00$33.21$50.00
37Concrete curb & gutter 4-inch sloped 36-inch type A (601.0551)LF1,074$32.00$32.00$32.00$32.00$43.96$40.00
38Concrete curb & gutter 4-inch sloped 30-inch type R (601.0581)LF322$35.00$35.00$35.00$35.00$42.69$50.00
39Concrete curb pedestrian (601.0600)LF120$51.00$51.00$51.00$51.00$53.17$50.00
40Concrete sidewalk 4-inch (602.0405)SF11,196$6.45$6.45$6.45$6.45$7.25$7.74
41Curb ramp detectable warning field yellow (602.0505)SF320$60.00$60.00$60.00$60.00$42.40$45.00
42Concrete driveway 7-inch (602.0815)SY68$75.00$75.00$75.00$75.00$85.37$70.00
43Riprap light (606.0100)CY6$120.00$96.99$290.00$162.00$162.00$300.00
44Riprap medium (606.0200)CY19$100.00$96.99$119.52$119.00$119.00$300.00
45Storm sewer pipe reinforced concrete class IV 12-inch (608.0412)LF127$110.00$91.36$114.21$100.00$100.00$170.00
46Storm sewer pipe reinforced concrete class IV 15-inch (608.0415)LF144$100.00$97.44$118.02$102.00$102.00$200.00
47Storm sewer pipe reinforced concrete class IV 18-inch (608.0418)LF130$120.00$105.99$124.59$125.00$125.00$200.00
48Inlet covers type H (611.0624)EACH1$1,200.00$1,146.16$1,000.00$998.00$998.00$1,150.00
49Inlet covers type HM-S (611.0636)EACH1$1,300.00$1,146.16$1,000.00$998.00$998.00$1,150.00
50Inlet covers type H-S (611.0639)EACH7$1,200.00$1,146.16$1,000.00$998.00$998.00$1,050.00
51Inlet covers type S (611.0651)EACH1$1,200.00$1,138.84$990.00$998.00$998.00$1,150.00
52Inlet covers type T (611.0652)EACH2$1,500.00$1,429.56$1,400.00$1,257.00$1,257.00$1,550.00
53Inlets 4-FT diameter (611.3004)EACH8$2,500.00$2,396.46$2,843.33$3,963.00$3,963.00$3,500.00
54Inlets 2X2.5-FT (611.3225)EACH1$2,100.00$1,969.40$1,940.00$3,482.00$3,482.00$2,800.00
55Inlets 2X3-FT (611.3230)EACH2$2,100.00$2,042.51$2,210.00$3,588.00$3,588.00$2,800.00
56Cover plates temporary (611.8120.S)EACH3$520.00$823.84$250.00$150.00$150.00$600.00
57Pipe underdrain 6-inch (612.0106)LF522$16.50$24.56$16.09$16.50$16.50$20.00
58Insulation board polystyrene (inch) 01. 2-inch (612.0902.S)SY32$55.00$28.77$27.00$11.72$11.72$50.00
59Maintenance and repair of haul roads (project) 01. 6085-02-76 (618.0100)EACH1$140.00$0.01$1,000.00$500.00$1.00$1.00
60Mobilization (619.1000)EACH1$80,000$175,000$239,750$302,700$345,446$196,000
61Concrete median sloped nose (620.0300)SF157$12.75$12.75$12.75$12.75$26.64$20.00
62Water (624.0100)MGAL202$15.00$0.01$51.00$25.00$25.00$150.00
63Salvaged topsoil (625.0500)SY14,044$3.21$3.31$2.47$6.00$6.00$6.00
64Mulching (627.0200)SY4,086$0.75$0.75$0.75$0.75$0.30$0.30
65Silt fence (628.1504)LF1,374$2.30$2.25$2.25$2.25$2.05$2.05
66Silt fence maintenance (628.1520)LF1,374$0.01$0.01$0.01$0.01$0.01$0.01
67Mobilizations erosion control (628.1905)EACH7$100.00$100.00$100.00$100.00$150.00$150.00
68Mobilizations emergency erosion control (628.1910)EACH4$100.00$100.00$100.00$100.00$150.00$150.00
69Erosion mat urban class I type B (628.2008)SY10,834$1.90$1.90$1.90$1.90$1.80$1.80
70Inlet protection type B (628.7010)EACH11$61.00$60.00$60.00$60.00$50.00$50.00
71Inlet protection type D (628.7020)EACH1$140.00$135.00$135.00$135.00$95.00$95.00
72Temporary ditch checks (628.7504)LF46$10.25$10.00$10.00$10.00$6.95$6.95
73Culvert pipe checks (628.7555)EACH13$20.50$20.00$20.00$20.00$18.00$18.00
74Fertilizer type B (629.0210)CWT8.30$97.00$95.00$95.00$95.00$85.00$85.00
75Seeding mixture no. 10 (630.0110)LB152$9.20$9.00$9.00$9.00$10.00$10.00
76Seeding mixture no. 40 (630.0140)LB280$14.25$14.00$14.00$14.00$10.50$10.50
77Seeding mixture no. 60 (630.0160)LB14$20.50$20.00$20.00$20.00$20.00$20.00
78Seeding temporary (630.0200)LB113$4.10$4.00$4.00$4.00$4.00$4.00
79Seed water (630.0500)MGAL196$10.25$10.00$10.00$10.00$10.00$10.00
80Markers culvert end (633.5200)EACH4$66.00$65.00$65.00$65.00$65.00$65.00
81Posts wood 4X6-inch X 14-FT (634.0614)EACH14$87.00$85.00$85.00$85.00$100.00$100.00
82Posts wood 4X6-inch X 16-FT (634.0616)EACH25$92.00$90.00$90.00$90.00$105.00$105.00
83Posts wood 4X6-inch X 18-FT (634.0618)EACH1$100.00$100.00$100.00$100.00$115.00$115.00
84Posts wood 4X6-inch X 20-FT (634.0620)EACH4$120.00$115.00$115.00$115.00$125.00$125.00
85Signs type II reflective H (637.2210)SF291.04$22.50$22.00$22.00$22.00$21.00$21.00
86Signs type II reflective F (637.2230)SF120.50$22.50$22.00$22.00$22.00$23.00$23.00
87Removing signs type II (638.2602)EACH11$35.75$35.00$35.00$35.00$25.00$25.00
88Removing small sign supports (638.3000)EACH9$35.75$35.00$35.00$35.00$25.00$25.00
89Field office type B (642.5001)EACH1$6,500.00$10,500$10,500$15,000$12,080$20,000
90Traffic control drums (643.0300)DAY11,813$0.15$0.15$0.15$0.15$0.50$0.15
91Traffic control barricades type III (643.0420)DAY2,444$0.40$0.40$0.40$0.40$1.00$0.40
92Traffic control flexible tubular marker posts (643.0500)EACH50$35.75$35.00$35.00$35.00$30.00$35.00
93Traffic control flexible tubular marker bases (643.0600)EACH50$12.25$12.00$12.00$12.00$6.00$12.00
94Traffic control warning lights type A (643.0705)DAY4,888$0.15$0.15$0.15$0.15$0.10$0.15
95Traffic control warning lights type C (643.0715)DAY2,702$0.25$0.25$0.25$0.25$0.10$0.25
96Traffic control signs (643.0900)DAY8,223$0.15$0.15$0.15$0.15$1.00$0.15
97Traffic control covering signs type II (643.0920)EACH4$110.00$110.00$110.00$110.00$25.00$110.00
98Traffic control signs PCMS (643.1050)DAY35$30.50$30.00$30.00$30.00$50.00$30.00
99Temporary marking line paint 6- inch (643.3165)LF7,285$0.30$0.30$0.30$0.30$0.30$0.30
100Temporary marking line removable tape 6-inch (643.3180)LF11,871$2.20$2.20$2.20$2.20$1.50$2.20
101Traffic control (643.5000)EACH1$31,900$31,250$31,250$31,250$15,426$31,250
102Temporary pedestrian surface asphalt (644.1410)SF543$7.90$9.09$8.00$5.50$10.35$10.00
103Temporary pedestrian detectable warning field (644.1605)SF10$13.25$13.00$13.00$13.00$10.00$13.00
104Temporary pedestrian barricade (644.1810)LF1,758$6.10$6.00$6.00$6.00$4.25$6.00
105Geotextile type HR (645.0120)SY55$6.50$1.75$16.50$7.10$7.10$20.00
106Geotextile type R (645.0130)SY23$6.50$1.17$23.00$12.95$12.95$20.00
107Marking line epoxy 4-inch (646.1020)LF3,508$0.40$0.40$0.40$0.40$1.25$0.40
108Marking line grooved wet ref epoxy 6-inch (646.2040)LF7,797$1.60$1.53$1.53$1.53$2.40$1.53
109Marking line epoxy 10-inch (646.4020)LF267$1.20$1.20$1.20$1.20$2.50$1.20
110Marking dotted extension epoxy 18-inch (646.6320)LF56$17.50$17.15$17.15$17.15$30.00$17.15
111Marking diagonal epoxy 12-inch (646.7120)LF178$17.00$16.70$16.70$16.70$13.00$16.70
112Marking crosswalk epoxy transverse line 6-inch (646.7420)LF251$16.50$16.25$16.25$16.25$16.00$16.25
113Marking curb epoxy (646.8120)LF38$8.40$8.20$8.20$8.20$19.00$8.20
114Marking island nose epoxy (646.8220)EACH4$320.00$309.05$309.05$309.05$330.00$309.05
115Marking removal line 4-inch (646.9000)LF3,893$0.60$0.60$0.60$0.60$0.50$0.60
116Locating no-passing zones (648.0100)MI0.20$570.00$557.75$557.75$557.75$9,800.00$557.75
117Construction staking storm sewer (650.4000)EACH11$50.00$20.00$200.00$200.00$200.00$200.00
118Construction staking subgrade (650.4500)LF1,021$0.01$0.01$0.01$0.01$0.01$0.01
119Construction staking base (650.5000)LF217$1.00$0.01$1.50$1.50$1.50$1.50
120Construction staking pipe culverts (650.6000)EACH2$50.00$100.00$300.00$300.00$300.00$300.00
121Construction staking concrete pavement (650.7000)LF804$1.00$1.00$5.00$5.00$5.00$5.00
122Construction staking sidewalk (project) 01. 6085-02-76 (650.9500)EACH1$500.00$3,500.00$4,000.00$4,000.00$4,000.00$4,000.00
123Construction staking supplemental control (project) 01. 6085-02-76 (650.9911)EACH1$500.00$5,500.00$1,000.00$1,000.00$1,000.00$1,000.00
124Construction staking slope stakes (650.9920)LF1,805$0.25$0.02$1.50$1.50$1.50$1.50
125Conduit rigid nonmetallic schedule 40 2-inch (652.0225)LF1,387$10.25$10.00$10.00$10.00$10.00$10.00
126Conduit rigid nonmetallic schedule 40 3-inch (652.0235)LF26$16.25$16.00$16.00$16.00$16.00$16.00
127Conduit rigid nonmetallic schedule 80 2-inch (652.0325)LF185$12.25$12.00$12.00$12.00$12.00$12.00
128Pull boxes non-conductive 24X42- inch (653.0164)EACH9$2,100.00$2,100.00$2,100.00$2,100.00$2,100.00$2,100.00
129Concrete bases type 1 (654.0101)EACH4$1,100.00$1,100.00$1,100.00$1,100.00$1,100.00$1,100.00
130Concrete bases type 5 (654.0105)EACH12$1,200.00$1,200.00$1,200.00$1,200.00$1,200.00$1,200.00
131Concrete control cabinet bases type L24 (654.0224)EACH1$2,000.00$2,000.00$2,000.00$2,000.00$2,000.00$2,000.00
132Electrical wire lighting 10 AWG (655.0615)LF6,201$1.50$1.50$1.50$1.50$1.50$1.50
133Pedestal bases (657.0100)EACH4$310.00$300.00$300.00$300.00$300.00$300.00
134Poles type 5-aluminum (657.0322)EACH12$2,500.00$2,450.00$2,450.00$2,450.00$2,450.00$2,450.00
135Traffic signal standards aluminum 13-FT (657.0420)EACH4$820.00$800.00$800.00$800.00$800.00$800.00
136Luminaire arms truss type 4 1/2- inch clamp 15-FT (657.0715)EACH12$870.00$855.00$855.00$855.00$855.00$855.00
137Pedestrian push buttons (658.0500)EACH4$360.00$350.00$350.00$350.00$350.00$350.00
138Luminaires utility LED B (659.1120)EACH12$260.00$250.00$250.00$250.00$250.00$250.00
139Lighting control cabinets 120/240 24-inch (659.2124)EACH1$7,700.00$7,500.00$7,500.00$7,500.00$7,500.00$7,500.00
140Sawing asphalt (690.0150)LF253$1.40$1.39$1.18$1.39$1.18$1.39
141Sawing concrete (690.0250)LF1,707$2.00$1.95$2.24$1.95$2.24$1.95
142Incentive compressive strength concrete pavement (715.0720)DOL2,230$1.00$1.00$1.00$1.00$1.00$1.00
143Special 01. trench backfill - water main (SPV.0035)CY365$15.00$24.23$36.38$0.01$0.01$28.00
144Special 01. temporary lighting system (SPV.0060)EACH1$7,700.00$7,500.00$2,000.00$7,500.00$7,500.00$7,500.00
145Special 02. construction staking roundabout (SPV.0060)EACH1$3,500.00$6,000.00$20,000$20,000$20,000$20,000
146Special 03. research and locate existing land parcel monuments (SPV.0060)EACH11$75.00$200.00$100.00$100.00$100.00$100.00
147Special 04. verify and replace existing land parcel monuments (SPV.0060)EACH11$75.00$200.00$100.00$100.00$100.00$100.00
148Special 05. rectangular rapid flashing beacon (RRFB) system (SPV.0060)EACH1$10,100$9,930.00$9,930.00$9,930.00$9,930.00$9,930.00
149Special 06. abandon existing water main (slurry fill) (SPV.0060)EACH1$1,200.00$5,938.86$4,507.00$14,444$14,444$4,000.00
150Special 07. remove existing hydrant (SPV.0060)EACH1$1,300.00$1,083.80$750.00$2,500.00$2,500.00$1,500.00
151Special 08. abandon existing valve & box (SPV.0060)EACH3$180.00$1,130.55$750.00$742.00$742.00$2,500.00
152Special 09. valve and road box 6- inch (SPV.0060)EACH1$4,200.00$2,921.43$2,578.92$2,193.00$2,193.00$3,700.00
153Special 10. valve and road box 12- inch (SPV.0060)EACH4$8,200.00$6,185.64$6,456.80$5,972.00$5,972.00$4,200.00
154Special 11. fire hydrant (SPV.0060)EACH2$7,700.00$7,856.43$7,701.40$8,133.00$8,133.00$11,000
155Special 12. tee 12-inch X 6-inch (SPV.0060)EACH1$1,600.00$2,143.10$728.90$1,727.00$1,727.00$2,500.00
156Special 13. tee 12-inch X 12-inch (SPV.0060)EACH1$2,300.00$2,800.20$1,748.25$2,339.00$2,339.00$2,500.00
157Special 14. 22.5 degree bend 12- inch (SPV.0060)EACH2$1,500.00$1,507.56$988.40$1,640.00$1,640.00$3,000.00
158Special 15. 45 degree bend 12-inch (SPV.0060)EACH2$1,600.00$1,615.69$1,094.80$1,740.00$1,740.00$3,000.00
159Special 16. reducer 12-inch X 6- inch (SPV.0060)EACH1$1,400.00$1,802.73$729.40$1,410.00$1,410.00$2,100.00
160Special 17. connect to existing water main (SPV.0060)EACH4$3,600.00$2,736.41$2,579.14$6,586.00$6,586.00$5,000.00
161Special 18. utility line opening (ulo) (SPV.0060)EACH1$1,100.00$658.29$1,000.00$1,850.00$1,850.00$3,000.00
162Special 19. dewatering (SPV.0060)EACH1$1,400.00$5,951.67$4,500.00$100.00$100.00$5,000.00
163Special 20. fire hydrant extension 6-inch (SPV.0060)EACH1$1,500.00$2,168.19$1,335.11$2,500.00$2,500.00$2,500.00
164Special 01. remove existing water main (SPV.0090)LF48$17.75$20.23$50.00$73.00$73.00$100.00
165Special 02. ductile iron water main 6-inch (SPV.0090)LF16$130.00$114.46$172.99$118.00$118.00$300.00
166Special 03. ductile iron water main 12-inch (SPV.0090)LF282$190.00$161.65$161.63$208.00$208.00$265.00
WisDOT contract 20260310012: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.

Every contract let that day: WisDOT letting of March 10, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy