WisDOT contract 20260414001 bid tabulation
Madison - Portage; STH 60 to CTH Cs (IH 039, Columbia County Madison - Portage). Let by Wisconsin DOT on April 14, 2026, Columbia. 4 bids received; low bid $2,990,362 by Chippewa Concrete Services, Inc..
- Owner
- Wisconsin DOT
- Letting
- 14 APR 2026
- Pay items
- 75
- Data through
- 10 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Chippewa Concrete Services, Inc. | $2,990,362 | Low |
| 2 | Zignego Company, Inc. | $2,991,853 | 0.0% |
| 3 | Parisi Construction, LLC | $3,286,163 | +10% |
| 4 | Michels Road & Stone, Inc. | $4,687,035 | +57% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Chippewa Concrete Services, Inc. | 2. Zignego Company, Inc. | 3. Parisi Construction, LLC | 4. Michels Road & Stone, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing structure (structure) 01. B-11-45 (203.0220) | EACH | 1 | $2,424.18 | $2,372.00 | $2,395.96 | $2,372.00 |
| 2 | Removing asphaltic surface milling (204.0120) | SY | 11,761 | $3.27 | $2.45 | $2.47 | $2.45 |
| 3 | Removing guardrail (204.0165) | LF | 9,529 | $2.56 | $2.50 | $2.50 | $2.50 |
| 4 | Excavation for structures culverts (structure) 01. B-11-45 (206.2001) | EACH | 1 | $9,120.33 | $8,924.00 | $9,014.14 | $8,924.00 |
| 5 | Cofferdams (structure) 01. B-11-45 (206.5001) | EACH | 1 | $5,549.46 | $5,430.00 | $5,484.85 | $5,430.00 |
| 6 | Backfill structure type B (210.2500) | TON | 118 | $26.57 | $26.50 | $26.77 | $26.50 |
| 7 | Prepare foundation for asphaltic paving (project) 01. 1012-01-62 (211.0101) | EACH | 1 | $5,110.00 | $1.00 | $0.01 | $5,000.00 |
| 8 | Finishing roadway (project) 01. 1012-01-62 (213.0100) | EACH | 1 | $5,110.00 | $1,000.00 | $9,914.68 | $5,000.00 |
| 9 | Base aggregate dense 3/4-inch (305.0110) | TON | 1,438 | $38.47 | $60.00 | $16.92 | $48.29 |
| 10 | Shaping shoulders (305.0500) | STA | 7 | $511.00 | $200.00 | $2,525.25 | $322.82 |
| 11 | Breaker run (311.0115) | CY | 29 | $27.59 | $27.00 | $27.27 | $27.00 |
| 12 | Rout and seal (415.6000.S) | LF | 2,677 | $5.19 | $5.08 | $5.08 | $5.08 |
| 13 | Drilled tie bars (416.0610) | EACH | 938 | $8.18 | $15.00 | $16.67 | $20.06 |
| 14 | Drilled dowel bars (416.0620) | EACH | 8,880 | $18.40 | $12.00 | $27.86 | $24.93 |
| 15 | Concrete pavement repair (416.1710) | SY | 2,735 | $129.79 | $152.00 | $192.82 | $271.05 |
| 16 | Concrete pavement repair shes (416.1715) | SY | 2,437 | $221.77 | $231.00 | $244.33 | $291.56 |
| 17 | Concrete pavement replacement (416.1720) | SY | 1,233 | $129.79 | $152.00 | $203.56 | $271.05 |
| 18 | Concrete pavement replacement shes (416.1725) | SY | 366 | $221.77 | $231.00 | $252.18 | $291.56 |
| 19 | Continuous diamond grinding concrete pavement (420.1000) | SY | 9,721 | $12.24 | $14.00 | $13.57 | $13.37 |
| 20 | HMA cold weather paving (450.4000) | TON | 330 | $5.11 | $4.00 | $4.04 | $4.00 |
| 21 | Tack coat (455.0605) | GAL | 82 | $52.63 | $3.00 | $60.00 | $3.00 |
| 22 | Incentive density HMA pavement (460.2000) | DOL | 850 | $1.00 | $1.00 | $1.00 | $1.00 |
| 23 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 1,318 | $112.42 | $83.10 | $86.97 | $83.10 |
| 24 | Cleaning and sealing cracks and joints with hot-applied sealant (492.2020.S) | MI | 0.09 | $86,529 | $84,666 | $84,666 | $84,666 |
| 25 | Concrete masonry culverts (504.0100) | CY | 20 | $1,514.60 | $1,482.00 | $1,496.97 | $1,482.00 |
| 26 | Bar steel reinforcement HS coated structures (505.0600) | LB | 2,620 | $1.77 | $1.73 | $1.75 | $1.73 |
| 27 | Temporary shoring (structure) 01. B-11-45 (511.1200) | SF | 320 | $53.14 | $52.00 | $52.53 | $52.00 |
| 28 | Rubberized membrane waterproofing (516.0500) | SY | 7 | $56.21 | $55.00 | $55.56 | $55.00 |
| 29 | Cleaning culvert pipes (520.8700) | EACH | 8 | $2,044.00 | $2,000.00 | $2,000.00 | $503.77 |
| 30 | Concrete barrier temporary precast delivered (603.8000) | LF | 400 | $14.82 | $14.50 | $14.65 | $14.50 |
| 31 | Concrete barrier temporary precast installed (603.8125) | LF | 400 | $7.15 | $7.00 | $7.07 | $7.00 |
| 32 | Slope paving crushed aggregate (604.0500) | SY | 1,620 | $23.22 | $20.10 | $22.72 | $22.72 |
| 33 | Riprap heavy (606.0300) | CY | 8 | $112.42 | $110.00 | $111.11 | $110.00 |
| 34 | Crash cushions temporary (614.0905) | EACH | 1 | $4,854.50 | $3,350.00 | $4,612.63 | $3,350.00 |
| 35 | MGS guardrail 3 (614.2300) | LF | 6,068 | $28.11 | $27.50 | $27.50 | $27.50 |
| 36 | MGS guardrail 3 K (614.2330) | LF | 2,429 | $43.95 | $43.00 | $43.00 | $43.00 |
| 37 | MGS thrie beam transition (614.2500) | LF | 391 | $99.13 | $97.00 | $97.00 | $97.00 |
| 38 | MGS guardrail terminal eat (614.2610) | EACH | 15 | $3,577.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 39 | MGS guardrail terminal type 2 (614.2620) | EACH | 11 | $3,219.30 | $3,150.00 | $3,150.00 | $3,150.00 |
| 40 | Maintenance and repair of haul roads (project) 01. 1012-01-62 (618.0100) | EACH | 1 | $1,022.00 | $1.00 | $1.00 | $0.01 |
| 41 | Mobilization (619.1000) | EACH | 1 | $200,389 | $141,000 | $133,370 | $1,147,950 |
| 42 | Water (624.0100) | MGAL | 14 | $86.87 | $200.00 | $22.42 | $65.00 |
| 43 | Field office type D (642.5401) | EACH | 1 | $10,220 | $20,000 | $11,211 | $10,000 |
| 44 | Traffic control drums (643.0300) | DAY | 11,250 | $0.51 | $0.50 | $0.50 | $0.50 |
| 45 | Digital speed reduction system (DSRS) (643.0370.S) | DAY | 30 | $970.90 | $950.00 | $950.00 | $950.00 |
| 46 | Traffic control barricades type III (643.0420) | DAY | 135 | $2.56 | $2.50 | $2.50 | $2.50 |
| 47 | Traffic control warning lights type A (643.0705) | DAY | 270 | $1.53 | $1.50 | $1.50 | $1.50 |
| 48 | Traffic control warning lights type C (643.0715) | DAY | 1,543 | $0.51 | $0.50 | $0.50 | $0.50 |
| 49 | Traffic control connected arrow boards (643.0810) | DAY | 109 | $51.10 | $50.00 | $50.00 | $50.00 |
| 50 | Traffic control signs (643.0900) | DAY | 1,060 | $1.53 | $1.50 | $1.50 | $1.50 |
| 51 | Traffic control covering signs type II (643.0920) | EACH | 10 | $76.65 | $75.00 | $75.00 | $75.00 |
| 52 | Traffic control signs PCMS (643.1050) | DAY | 102 | $51.10 | $50.00 | $50.00 | $50.00 |
| 53 | Basic traffic queue warning system (643.1205.S) | DAY | 67 | $511.00 | $500.00 | $500.00 | $500.00 |
| 54 | Traffic control connected work zone start and end location markers (643.1220) | DAY | 79 | $20.44 | $20.00 | $20.00 | $20.00 |
| 55 | Traffic control (643.5000) | EACH | 1 | $169,780 | $166,125 | $166,125 | $166,125 |
| 56 | Geotextile type HR (645.0120) | SY | 23 | $5.11 | $5.00 | $5.05 | $5.00 |
| 57 | Geotextile type sas (645.0140) | SY | 43 | $5.11 | $5.00 | $5.05 | $5.00 |
| 58 | Marking line epoxy 4-inch (646.1020) | LF | 4,450 | $1.02 | $1.00 | $1.00 | $1.00 |
| 59 | Marking line epoxy 6-inch (646.2020) | LF | 3,600 | $1.53 | $1.50 | $1.50 | $1.50 |
| 60 | Marking line epoxy 8-inch (646.3020) | LF | 627 | $2.41 | $2.36 | $2.36 | $2.36 |
| 61 | Marking line epoxy 10-inch (646.4020) | LF | 100 | $2.76 | $2.70 | $2.70 | $2.70 |
| 62 | Marking line same day epoxy 4- inch (646.4520) | LF | 4,080 | $2.04 | $2.00 | $2.00 | $2.00 |
| 63 | Marking arrow epoxy (646.5020) | EACH | 3 | $986.23 | $965.00 | $965.00 | $965.00 |
| 64 | Marking word epoxy (646.5120) | EACH | 1 | $998.18 | $976.69 | $976.69 | $976.69 |
| 65 | Cold weather marking epoxy 6-inch (646.6466) | LF | 500 | $1.24 | $1.21 | $1.21 | $1.21 |
| 66 | Construction staking structure layout (structure) 01. B-11-45 (650.6501) | EACH | 1 | $408.80 | $400.00 | $404.04 | $400.00 |
| 67 | Construction staking resurfacing reference (650.8000) | LF | 4,071 | $0.82 | $0.80 | $0.81 | $0.80 |
| 68 | Construction staking supplemental control (project) 01. 1012-01-62 (650.9911) | EACH | 1 | $511.00 | $500.00 | $505.05 | $500.00 |
| 69 | Sawing asphalt (690.0150) | LF | 94 | $1.99 | $2.39 | $1.39 | $1.95 |
| 70 | Sawing concrete (690.0250) | LF | 21,826 | $2.81 | $3.95 | $2.95 | $2.75 |
| 71 | Incentive strength concrete structures (715.0502) | DOL | 500 | $1.00 | $1.00 | $1.00 | $1.00 |
| 72 | Incentive iri ride (740.0440) | DOL | 3,000 | $1.00 | $1.00 | $1.00 | $1.00 |
| 73 | Special .01 special cross stitching longitudinal joints and cracks (SPV.0060) | EACH | 150 | $38.46 | $76.00 | $72.14 | $71.31 |
| 74 | Special .02 temporary access for structure B-11-45 repair (SPV.0060) | EACH | 1 | $16,587 | $16,230 | $17,394 | $16,230 |
| 75 | Special .01 UV GRP cipp 48X60- inch (SPV.0090) | LF | 157 | $784.90 | $768.00 | $775.76 | $680.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from WisDOT's tabulation for this contract. WisDOT All Bids Received PDFs, one per letting (awarded contracts only), January 2022 to November 2026. WisDOT prints unit prices to two decimals but computes line amounts from the full price, so about one bid in fifteen misses its total and is left out.
Every contract let that day: WisDOT letting of April 14, 2026. Compiled by Mirage Metrics.