| 1 | Grubbing (201.0220) | ID | 90 | $33.00 |
| 2 | Removing small pipe culverts (203.0100) | EACH | 1 | $1,300.00 |
| 3 | Removing asphaltic surface (204.0110) | SY | 1,745 | $4.50 |
| 4 | Removing asphaltic surface butt joints (204.0115) | SY | 1,360 | $7.75 |
| 5 | Removing asphaltic surface milling (204.0120) | SY | 71,580 | $5.24 |
| 6 | Removing curb & gutter (204.0150) | LF | 7,700 | $6.25 |
| 7 | Removing concrete sidewalk (204.0155) | SY | 1,255 | $14.50 |
| 8 | Removing inlets (204.0220) | EACH | 1 | $1,300.00 |
| 9 | Removing storm sewer (size) 01. 12-inch (204.0245) | LF | 11 | $76.00 |
| 10 | Removing (item description) 01. endwalls (204.9060.S) | EACH | 1 | $750.00 |
| 11 | Removing (item description) 01. distressed pavement milling (204.9180.S) | SY | 710 | $6.26 |
| 12 | Excavation common (205.0100) | CY | 2,218 | $23.00 |
| 13 | Borrow (208.0100) | CY | 503 | $16.00 |
| 14 | Prepare foundation for asphaltic paving (project) 01. 1706-06-71 (211.0101) | EACH | 1 | $18,715 |
| 15 | Prepare foundation for asphaltic paving (project) 02. 5330-02-73 (211.0101) | EACH | 1 | $18,715 |
| 16 | Prepare foundation for asphaltic shoulders (211.0400) | STA | 160 | $145.00 |
| 17 | Finishing roadway (project) 01. 1706-06-71 (213.0100) | EACH | 1 | $2,055.00 |
| 18 | Finishing roadway (project) 02. 5330-02-73 (213.0100) | EACH | 1 | $2,055.00 |
| 19 | Base aggregate dense 3/4-inch (305.0110) | TON | 400 | $35.00 |
| 20 | Base aggregate dense 1 1/4-inch (305.0120) | TON | 2,175 | $24.50 |
| 21 | Breaker run (311.0110) | TON | 1,491 | $22.00 |
| 22 | Coloring concrete wisdot red (405.0100) | CY | 35 | $100.00 |
| 23 | Concrete truck apron 12-inch (415.2010) | SY | 105 | $100.00 |
| 24 | Tack coat (455.0605) | GAL | 9,360 | $2.45 |
| 25 | Incentive density HMA pavement (460.2000) | DOL | 12,850 | $1.00 |
| 26 | HMA pavement 3 MT 58-28 S (460.6223) | TON | 8,760 | $85.30 |
| 27 | HMA pavement 4 MT 58-28 S (460.6224) | TON | 5,620 | $84.20 |
| 28 | HMA pavement 4 MT 58-28 H (460.6424) | TON | 5,840 | $89.90 |
| 29 | Asphaltic surface (465.0105) | TON | 600 | $149.50 |
| 30 | Asphaltic surface driveways and field entrances (465.0120) | TON | 133 | $96.14 |
| 31 | Asphaltic flumes (465.0315) | SY | 19 | $29.47 |
| 32 | Asphaltic rumble strips, shoulder (465.0520) | LF | 10,699 | $0.45 |
| 33 | Asphaltic rumble strips, centerline (465.0560) | LF | 4,600 | $0.45 |
| 34 | Apron endwalls for culvert pipe 30- inch (520.1030) | EACH | 1 | $920.00 |
| 35 | Culvert pipe class III-A 30-inch (520.3330) | LF | 88 | $141.00 |
| 36 | Concrete collars for pipe (520.8000) | EACH | 2 | $750.00 |
| 37 | Apron endwalls for culvert pipe steel 36-inch (521.1036) | EACH | 1 | $1,120.00 |
| 38 | Apron endwalls for culvert pipe sloped side drains steel 30-inch 6 to 1 (521.1530) | EACH | 1 | $4,720.00 |
| 39 | Culvert pipe corrugated steel 12- inch (521.3112) | LF | 8 | $262.00 |
| 40 | Culvert pipe corrugated steel 36- inch (521.3136) | LF | 12 | $237.00 |
| 41 | Concrete curb & gutter 30-inch type D (601.0411) | LF | 6,397 | $24.52 |
| 42 | Concrete curb & gutter 4-inch sloped 36-inch type D (601.0553) | LF | 562 | $25.18 |
| 43 | Concrete curb & gutter 4-inch sloped 30-inch type J (601.0576) | LF | 358 | $24.11 |
| 44 | Concrete curb pedestrian (601.0600) | LF | 495 | $70.00 |
| 45 | Concrete sidewalk 4-inch (602.0405) | SF | 14,285 | $9.10 |
| 46 | Curb ramp detectable warning field natural patina (602.0515) | SF | 830 | $55.00 |
| 47 | Curb ramp detectable warning field radial natural patina (602.0615) | SF | 224.90 | $65.00 |
| 48 | Concrete driveway 6-inch (602.0810) | SY | 60 | $75.00 |
| 49 | Concrete steps (602.1500) | SF | 33 | $70.00 |
| 50 | Riprap medium (606.0200) | CY | 5 | $200.00 |
| 51 | Reconstructing inlets (611.0430) | EACH | 24 | $1,600.00 |
| 52 | Inlet covers type HM (611.0627) | EACH | 1 | $1,500.00 |
| 53 | Inlets 2X3-FT (611.3230) | EACH | 1 | $3,600.00 |
| 54 | Adjusting manhole covers (611.8110) | EACH | 7 | $3,110.14 |
| 55 | Cover plates temporary (611.8120.S) | EACH | 28 | $1,182.19 |
| 56 | Maintenance and repair of haul roads (project) 01. 1706-06-71 (618.0100) | EACH | 1 | $500.00 |
| 57 | Maintenance and repair of haul roads (project) 02. 5330-02-73 (618.0100) | EACH | 1 | $500.00 |
| 58 | Mobilization (619.1000) | EACH | 1 | $431,590 |
| 59 | Water (624.0100) | MGAL | 25.70 | $100.00 |
| 60 | Topsoil (625.0100) | SY | 7,754 | $7.50 |
| 61 | Silt fence (628.1504) | LF | 2,434 | $2.30 |
| 62 | Silt fence maintenance (628.1520) | LF | 2,434 | $0.07 |
| 63 | Mobilizations erosion control (628.1905) | EACH | 9 | $378.00 |
| 64 | Mobilizations emergency erosion control (628.1910) | EACH | 3 | $225.00 |
| 65 | Erosion mat class I type A (628.2002) | SY | 4,114 | $1.53 |
| 66 | Erosion mat urban class I type A (628.2006) | SY | 4,471 | $2.33 |
| 67 | Inlet protection type C (628.7015) | EACH | 74 | $68.40 |
| 68 | Temporary ditch checks (628.7504) | LF | 46 | $8.06 |
| 69 | Culvert pipe checks (628.7555) | EACH | 6 | $21.15 |
| 70 | Fertilizer type B (629.0210) | CWT | 6 | $86.40 |
| 71 | Seeding mixture no. 10 (630.0110) | LB | 113 | $6.30 |
| 72 | Seeding mixture no. 40 (630.0140) | LB | 165 | $12.42 |
| 73 | Seed water (630.0500) | MGAL | 182 | $0.90 |
| 74 | Markers culvert end (633.5200) | EACH | 3 | $63.90 |
| 75 | Posts wood 4X6-inch X 16-FT (634.0616) | EACH | 13 | $104.40 |
| 76 | Signs type II reflective H (637.2210) | SF | 56.50 | $25.65 |
| 77 | Moving signs type II (638.2102) | EACH | 59 | $109.80 |
| 78 | Removing signs type II (638.2602) | EACH | 5 | $28.80 |
| 79 | Removing small sign supports (638.3000) | EACH | 11 | $30.87 |
| 80 | Moving small sign supports (638.4000) | EACH | 47 | $64.80 |
| 81 | Field office type C (642.5201) | EACH | 1 | $10,650 |
| 82 | Traffic control drums (643.0300) | DAY | 29,890 | $0.16 |
| 83 | Traffic control barricades type III (643.0420) | DAY | 66 | $1.50 |
| 84 | Traffic control warning lights type A (643.0705) | DAY | 132 | $0.50 |
| 85 | Traffic control signs (643.0900) | DAY | 10,977 | $0.30 |
| 86 | Traffic control signs PCMS (643.1050) | DAY | 21 | $35.00 |
| 87 | Temporary marking line paint 6- inch (643.3165) | LF | 84,752 | $0.40 |
| 88 | Traffic control (643.5000) | EACH | 1 | $10,000 |
| 89 | Temporary pedestrian surface matting (644.1440) | SF | 6,207 | $1.09 |
| 90 | Temporary pedestrian curb ramp (644.1601) | DAY | 1,525 | $4.52 |
| 91 | Temporary pedestrian detectable warning field (644.1605) | SF | 854 | $15.04 |
| 92 | Temporary pedestrian barricade (644.1810) | LF | 4,124 | $4.00 |
| 93 | Geotextile type HR (645.0120) | SY | 17 | $25.00 |
| 94 | Marking line grooved wet ref epoxy 6-inch (646.2040) | LF | 52,313 | $1.45 |
| 95 | Marking line grooved wet ref epoxy 10-inch (646.4040) | LF | 150 | $2.50 |
| 96 | Marking arrow epoxy (646.5020) | EACH | 2 | $330.00 |
| 97 | Marking stop line epoxy 18-inch (646.6120) | LF | 37 | $19.00 |
| 98 | Marking diagonal epoxy 12-inch (646.7120) | LF | 339 | $14.00 |
| 99 | Marking crosswalk epoxy block style 24-inch (646.7520) | LF | 658 | $21.00 |
| 100 | Marking removal line 6-inch (646.9002) | LF | 9,010 | $0.65 |
| 101 | Locating no-passing zones (648.0100) | MI | 3.54 | $880.00 |
| 102 | Construction staking storm sewer (650.4000) | EACH | 1 | $200.00 |
| 103 | Construction staking subgrade (650.4500) | LF | 1,437 | $0.01 |
| 104 | Construction staking base (650.5000) | LF | 1,437 | $0.30 |
| 105 | Construction staking curb gutter and curb & gutter (650.5500) | LF | 7,628 | $0.50 |
| 106 | Construction staking pipe culverts (650.6000) | EACH | 2 | $400.00 |
| 107 | Construction staking resurfacing reference (650.8000) | LF | 18,170 | $0.20 |
| 108 | Construction staking electrical installations (project) 01. 1706-06- 71 (650.8501) | EACH | 1 | $300.00 |
| 109 | Construction staking curb ramps (650.9000) | EACH | 94 | $200.00 |
| 110 | Construction staking sidewalk (project) 01. 1706-06-71 (650.9500) | EACH | 1 | $1,000.00 |
| 111 | Construction staking sidewalk (project) 02. 5330-02-73 (650.9500) | EACH | 1 | $1,000.00 |
| 112 | Construction staking supplemental control (project) 01. 1706-06-71 (650.9911) | EACH | 1 | $200.00 |
| 113 | Construction staking supplemental control (project) 02. 5330-02-73 (650.9911) | EACH | 1 | $200.00 |
| 114 | Construction staking slope stakes (650.9920) | LF | 3,015 | $0.30 |
| 115 | Conduit rigid nonmetallic schedule 40 2-inch (652.0225) | LF | 65 | $12.00 |
| 116 | Conduit rigid nonmetallic schedule 40 3-inch (652.0235) | LF | 185 | $15.00 |
| 117 | Pull boxes non-conductive 24X42- inch (653.0164) | EACH | 3 | $1,800.00 |
| 118 | Concrete bases type 5 (654.0105) | EACH | 4 | $1,200.00 |
| 119 | Concrete control cabinet bases type L30 (654.0230) | EACH | 1 | $1,500.00 |
| 120 | Electrical wire lighting 12 AWG (655.0610) | LF | 660 | $1.00 |
| 121 | Electrical wire lighting 8 AWG (655.0620) | LF | 1,656 | $1.50 |
| 122 | Electrical service meter breaker pedestal (location) 01. cabinet A (656.0201) | EACH | 1 | $2,500.00 |
| 123 | Transformer bases breakaway 11 1/2-inch bolt circle (657.0255) | EACH | 4 | $625.00 |
| 124 | Poles type 5-aluminum (657.0322) | EACH | 4 | $2,300.00 |
| 125 | Luminaire arms single member 4 1/2-inch clamp 8-FT (657.0615) | EACH | 4 | $700.00 |
| 126 | Luminaires utility LED B (659.1120) | EACH | 4 | $250.00 |
| 127 | Lighting control cabinets 120/240 30-inch (659.2130) | EACH | 1 | $8,000.00 |
| 128 | Sawing asphalt (690.0150) | LF | 9,585 | $1.39 |
| 129 | Sawing concrete (690.0250) | LF | 919 | $2.45 |
| 130 | Incentive iri ride (740.0440) | DOL | 13,016 | $1.00 |
| 131 | On-the-job training apprentice at $5.00/HR (ASP.1T0A) | HRS | 2,000 | $5.00 |
| 132 | On-the-job training graduate at $5.00/HR (ASP.1T0G) | HRS | 1,320 | $5.00 |
| 133 | Special 01. adjusting water valve box (SPV.0060) | EACH | 47 | $1,600.00 |
| 134 | Special 02. adjusting water service curb box (SPV.0060) | EACH | 13 | $1,250.00 |
| 135 | Special 03. adjusting sanitary manholes (SPV.0060) | EACH | 28 | $3,200.00 |
| 136 | Special 04. research and locate existing land parcel monuments (SPV.0060) | EACH | 71 | $50.00 |
| 137 | Special 05. verify and replace existing land parcel monuments (SPV.0060) | EACH | 71 | $50.00 |